Letter Sequence RAI |
|---|
|
|
MONTHYEARW3F1-2010-0003, License Amendment Request for Approval of Leak-Before-Break of the Pressurizer Surge Line2010-02-22022 February 2010 License Amendment Request for Approval of Leak-Before-Break of the Pressurizer Surge Line Project stage: Request ML1008205662010-03-23023 March 2010 Acceptance Review Email, License Amendment Request to Revise Technical Specification Table 3.4-1 to Add Shutdown Cooling Suction Bypass Isolation Valves Project stage: Acceptance Review ML1010406512010-04-14014 April 2010 E-mail, Request for Additional Information, License Amendment Request to Revise Technical Specification Table 3.4-1 to Add Shutdown Cooling Suction Bypass Isolation Valves Project stage: RAI W3F1-2010-0065, Response to Request for Additional Information Associated with Technical Specification Table 3.4-1 Isolation Valve Addition2010-08-12012 August 2010 Response to Request for Additional Information Associated with Technical Specification Table 3.4-1 Isolation Valve Addition Project stage: Response to RAI W3F1-2010-0064, Response to NRC Requests for Additional Information Regarding License Amendment Request for Leak-Before-Break of the Pressurizer Surge Line2010-08-12012 August 2010 Response to NRC Requests for Additional Information Regarding License Amendment Request for Leak-Before-Break of the Pressurizer Surge Line Project stage: Response to RAI ML1030101802010-10-28028 October 2010 E-mail Request for Additional Information, Round 2, License Amendment Request to Revise Technical Specification Table 3.4-1 to Add Shutdown Cooling Suction Bypass Isolation Valves Project stage: RAI ML1101806542011-01-18018 January 2011 Request for Additional Information Email on the LAR to Revise TS 3.4-1, Isolation Valve Addition Project stage: RAI ML1102403742011-01-24024 January 2011 E-mail Request for Additional Information, Round 4, License Amendment Request to Revise Technical Specification Table 3.4-1 to Add Shutdown Cooling Suction Bypass Isolation Valves Project stage: RAI ML1104905192011-02-18018 February 2011 E-mail Request for Additional Information, Round 5, License Amendment Request to Revise Technical Specification Table 3.4-1 to Add Shutdown Cooling Suction Bypass Isolation Valves Project stage: RAI ML1106904472011-03-10010 March 2011 Email Forwarding 6/28/2010 NRC Request for Additional Information on License Amendment Request to Revise Technical Specification Table 3.4-1 to Add Shutdown Cooling Suction Bypass Isolation Valves Project stage: RAI W3F1-2011-0025, Transmittal of Proprietary Valcor Report2011-03-18018 March 2011 Transmittal of Proprietary Valcor Report Project stage: Request ML1106302592011-03-23023 March 2011 Issuance of Amendment No. 233, Revise Technical Specification Table 3.4-1 to Add Shutdown Cooling Suction Bypass Isolation Valves Project stage: Approval ML1108004372011-04-26026 April 2011 Request for Withholding Information from Public Disclosure, 3/16/11 Affidavit Executed by S. Gatcomb, Valcor Engineering Corporation Project stage: Withholding Request Acceptance ML1111505082011-04-27027 April 2011 Correction Notice, Biweekly Notice of Issuance of Amendment No. 233 Project stage: Approval ML1111106332011-04-27027 April 2011 Correction to Amendment No. 233 to Revise Technical Specification Table 3.4-1 to Add Shutdown Cooling Suction Bypass Isolation Valves Project stage: Other NRC-2011-0071, Correction Notice, Biweekly Notice of Issuance of Amendment No. 2332011-04-27027 April 2011 Correction Notice, Biweekly Notice of Issuance of Amendment No. 233 Project stage: Approval 2011-01-24
[Table View] |
Text
From:
Kalyanam, Kaly Sent:
Tuesday, January 18, 2011 4:33 PM To:
STEELMAN, WILLIAM J Cc:
Lent, Susan; Burkhardt, Janet
Subject:
Request for Additional Information on the LAR to Revise TS 3.4-1, Isolation Valve Addition Plant: Waterford Steam Electric Station, Unit 3 (Waterford 3)
Docket No.: 50-382
Subject:
Request for Additional Information on the LAR to Revise TS 3.4-1, Isolation Valve Addition TAC Nos.: ME3421 SUNSI Review Done: Yes. Publicly Available, Normal Release, Non-sensitive, From: N. Kalyanam Affiliation: NRC/NRR/DORL/LPL4 To: W. Steelman Affiliation: Entergy Operations, Inc.
- Billy, By letter dated February 22, 2010, Entergy Operations, Inc. (Entergy) made application to amend the Technical Specifications (TS) of the Waterford Steam Electric Station, Unit 3 (Waterford 3).
The proposed amendment adds valve SI-4052A (Reactor Coolant Loop 2, Shutdown Cooling Suction, Inside Containment Bypass Isolation) and valve SI-4052B ((Reactor Coolant Loop 1, Shutdown Cooling Suction, Inside Containment Bypass Isolation) to Technical Specification Table 3.4-1. The purpose of this line is to equalize the shutdown cooling system pressure down stream of valve SI-405A (Reactor Coolant Loop 2, Shutdown Cooling Suction Inside Containment Isolation) and valve SI-405B
((Reactor Coolant Loop 1, Shutdown Cooling Suction Inside Containment Isolation).
Based on the telephone call with the NRC staff on January 13, 2011, the staff has determined that it requires additional information, on the issue noted below, to complete our review.
In view of the urgency of the LAR need date, please provide the response to this RAI as soon as possible.
Thanks Kaly
REQUEST FOR ADDITIONAL INFORMATION ENTERGY OPERATIONS, INC.
WATERFORD STEAM ELECTRIC STATION UNIT 3 DOCKET NO. 50-382
- 1. Please provide additional information to demonstrate the environmental qualification of the associated components such as cables, splices, junction boxes, that are required as a result of the valve-assembly system (SI-4052A and SI-4052B) modification for WF3.