Category:Memoranda
MONTHYEARML23156A2822023-06-0505 June 2023 Summary of Meeting with Q & a Session to Discuss the 2022 Annual Assessment of Safety Performance at CGS ML22349A2002022-12-0101 December 2022 NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2022 Priority Pollutant Discharge Monitoring Report ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML22034A3932022-02-16016 February 2022 Calendar Year 2021 Security Baseline Completion Memo ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML20322A0362020-11-19019 November 2020 Summary of October 19, 2020, Presubmittal Teleconference with Energy Northwest Regarding Proposed COVID-19 Related Biennial Emergency Preparedness Exercise Exemption Request for Columbia Generating Station ML19053A2922019-02-20020 February 2019 Memorandum to File from P. Longmire Decommissioning Funding Plans for Columbia Generating Station ML15191A2892018-10-17017 October 2018 Response to Task Interface Agreement 2014-08 - Columbia Generating Station - Assessment of the Design and Licensing Bases for the Tower Makeup System (CAC No. MF4630; EPID L-2014-LRA-0002) ML18173A0082018-06-20020 June 2018 Cancelling Numerous Inspection Report Numbers ML16117A5552017-11-0303 November 2017 Response to Task Interface Agreement 2014-07, Columbia Generating Station Design and Licensing Basis for Containment Nitrogen Inerting System and Emergency Diesel Generator Fresh Air Intakes ML17037B8502017-02-0606 February 2017 08/21/1975 Notice of Meeting with Architect Engineers of Mark II Owners to Discuss Load Combinations and Analytical Techniques for Determining Stresses in Mechanical Components and Structures of Mark II Containments ML16230A2512016-08-0404 August 2016 Energy Northwest - Response to Volume 13- Emergency Preparedness Procedures ML16132A5122016-05-16016 May 2016 Notice Of Closed Meeting With USACE, NRC And Energy Northwest To Discuss Flood Analysis Associated With Columbia Generating Station ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML15173A2732015-06-30030 June 2015 Summary of June 4, 2015, Category 1 Public Meeting with Energy Northwest to Discussion Columbia Generating Station Seismic Hazard Reevaluation Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1, ML14149A1012014-06-0202 June 2014 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Columbia Generating Station ML14148A3392014-05-30030 May 2014 G20130776/LTR-13-0866 - Memorandum to File and Transcript of 4/30/2014 Petition Review Board Conference Call with Charles Johnson, Oregon & Washington Physicians for Social Responsibility; 2.206 Petition Seismic Hazards at Columbia ML14050A3502014-02-25025 February 2014 G20130776/LTR-13-0866 - Memorandum to File and Transcript of 2/4/2014 Petition Review Board Conference Call with Charles Johnson, Oregon & Washington Physicians for Social Responsibility; 2.206 Petition Seismic Hazards at Columbia ML14087A1642013-12-12012 December 2013 Cooling Water Intake Screen NMFS Consultation No. (I/NWR/2011/05286) ML14091A2182013-12-12012 December 2013 Cooling Water Intake Screen NMFS Consultation No. (I/NWR/2011/05286) ML13309A0802013-12-11011 December 2013 Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors ML13098A0642013-04-10010 April 2013 Memorandum to File, Verbal Authorization on 4/6/2013 of Relief Request ISI3-13, Temporary Non-Code Repair of Reactor Water Cleanup System Piping to Prevent Reactor Shutdown Until Start of Refueling Outage 21 ML13071A4702013-02-28028 February 2013 Response to NRC Order EA-12-051-Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation ML12278A1212012-10-0404 October 2012 Notice of Pre-licensing Meeting to Discuss Future License Amendment Request to Address Impacts of Remediation Activities Undertaken by Department of Energy in the Owner-Controlled Area at Columbia Generating Station ML12102A2382012-06-13013 June 2012 Memo Conclusion of Informal Section 7 Consultation with U.S. Fish and Wildlife Service for Columbia Generating Station and Section 7 Consultation Report ML12157A2722012-06-11011 June 2012 5/31/2012 Summary of Telephone Conference with Licensees Regarding Near Term Task Force Recommendation 2.1 Seismic Reevaluations - Diablo Canyon, 1 and 2, San Onofre, Units 2 and 3, Columbia Generating Station, and Palo Verde, Units 1, 2, a ML13255A1152012-05-18018 May 2012 E-mail from B. Balsam, NRR to S. Uttal, OGC FW: Section 7 Memo ML13255A1132012-05-18018 May 2012 Memo from J. Susco, NRR to B. Holian, NRR and M. Galloway, NRR on Section 7 Consultants That Extend Beyond the Nrc'S Issuance of Renewed Operating License and ESA Section 7(D) Findings ML13255A1122012-05-17017 May 2012 Email from B. Balsam, NRR to L. Subin, OGC Et Al., on Section 7 Memo ML12101A3952012-05-0404 May 2012 Conclusion of Efh Consultation for Columbia Generating Station and Efh Consultation Report ML12058A4962012-02-27027 February 2012 License Renewal Application ML11350A0562011-12-21021 December 2011 12/15/11, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Metal Fatigue and Operating Experience Open Items in the Columbia License Renewal Safety Evaluation Repo ML11348A0142011-12-16016 December 2011 Summary of Telephone Conference Call Held on 12/06/11, Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Metal Fatigue and Operating Experience Open Items in the Columbia License Renewal SER with Open Items ML11336A1502011-12-12012 December 2011 Summary of Telephone Conference Call Held on November 14, 2011, Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Metal Fatigue Open Item in the Columbia License Renewal Safety Evaluation Report with Open I ML11339A0872011-12-12012 December 2011 Summary of Telephone Conference Call Held on November 28, 2011, Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Upper Shelf Energy Open Item in the Columbia License Renewal Safety Evaluation Report with O ML11291A0792011-11-0101 November 2011 09/27/2011 Summary of Public Meetings Conducted to Discuss the Dseis Related to the Review of the Columbia Generating Station License Renewal Application (Tac No. ME3121) ML11273A0662011-10-0404 October 2011 Summary of the Telephone Conference Call Held on September 29, 2011, Concerning the Inspection Report Pertaining to the Columbia Generating Station, License Renewal Application ML11238A1582011-09-14014 September 2011 8/25/11 - Summary of Telephone Conference Call Between NRC and Energy Northwest Concerning Drais Pertaining to the SAMA Review of the Columbia Generating Station License Renewal Application ML11238A1202011-09-0707 September 2011 Notice of Forthcoming Meeting to Discuss the D-SEIS for the Lr of Columbia Generating Station ML11242A0942011-08-30030 August 2011 Advisory Committee on Reactor Safeguards Review of the Columbia Generating Station, License Renewal Application - Safety Evaluation Report with Open Items ML1117305512011-06-21021 June 2011 Notice of Forthcoming Pre-Licensing Meeting with Energy Northwest to Discuss Proposed Power Range Neutron Monitoring System/Arts/Mellla License Amendment Request for Columbia Generating Station ML1108714952011-04-0505 April 2011 Summary of Telephone Conference Call Held on March 23, 2011, Between NRC and Energy Northwest, Concerning the RAI Pertaining to the Columbia Generating Station, LRA (Tac No. ME3058) ML1106704962011-03-28028 March 2011 Summary of Telephone Conference Call Held on 2/28/11 Btw the USNRC and Energy Northwest Concerning Draft Requests for Additional Information Pertaining to the SAMA Review of the Columbia Generating Station License Renewal Application ML1102007102011-02-0303 February 2011 01/11/11 Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Energy Northwest Concerning the Request for Additional Information Pertaining to the Columbia Generating Station, License Renewal Applicat ML1101405882011-01-31031 January 2011 01/12/11 Summary of Telephone Conference Call Held Between NRC and Energy Northwest, Concerning the Responses to RAI Pertaining to the Columbia Generating Station. License Renewal Application ML1100604382011-01-13013 January 2011 Summary of Telephone Conference Call Held on 1/5/11, Between NRC and Energy Northwesy, Concerning the RAI Pertaining to the Columbia Generating Station License Renewal Application (Tac No. ME3058) ML1100500182011-01-0606 January 2011 Summary of Telephone Conference Call Held on January 3, 2011, Between the NRC and Energy Northwest, Concerning the Request for Additional Information Pertaining to the Columbia Generating Station, License Renewal Application (TAC Number ME3 ML1034003172010-12-14014 December 2010 Notice of Forthcoming Pre-application Meeting on 1/18/2011 with Energy Northwest to Discuss Proposed Power Range Neutron Monitoring System/Arts/Mellla License Amendment Request ML1100300742010-12-14014 December 2010 Correction to Forthcoming Pre-Licensing Meeting with Energy Northwest(Tac No. ME5129), to Discuss Proposed Installation of a Digital Power Range Neutron Monitoring System, Average Power Range Monitor/Rod Block Monitor/Technical Specificatio 2023-06-05
[Table view] Category:Meeting Summary
MONTHYEARML23297A2642023-11-0606 November 2023 October 5, 2023, Summary of Teleconference with Energy Northwest Regarding Proposed License Amendment Request to Revise the Emergency Plan for Columbia Generating Station ML23156A2822023-06-0505 June 2023 Summary of Meeting with Q & a Session to Discuss the 2022 Annual Assessment of Safety Performance at CGS ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML22067A1832022-03-10010 March 2022 Summary of Energy Northwest Regulatory Conference Columbia Generating Station, Airborne Radioactivity Event Resulting in Preliminary White Finding, March 1, 2022 ML21321A0422021-12-13013 December 2021 Summary of October 22, 2021, Teleconference Meeting with Energy Northwest Regarding Proposed License Amendment Requests to Adopt Technical Specifications Task Force (TSTF)-505, and 10 CFR 50.69 Categorization Program ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML21112A3512021-05-0303 May 2021 Summary of March 31, 2021, Pre-Application Teleconference with Energy Northwest to Discuss a Planned LAR Deletion of Certain License Conditions Relating to License Renewal Commitments for Columbia Generating Station ML20322A0362020-11-19019 November 2020 Summary of October 19, 2020, Presubmittal Teleconference with Energy Northwest Regarding Proposed COVID-19 Related Biennial Emergency Preparedness Exercise Exemption Request for Columbia Generating Station ML20314A0462020-11-0909 November 2020 Summary of November 4, 2020, NRC-NMFS Teleconference on Columbia Entrainment Study ML20189A2832020-07-0707 July 2020 Summary of Region IV Annual Assessment Public Meeting ML20101L5352020-04-14014 April 2020 Summary of April 6, 2020, Presubmittal Teleconference Meeting with Energy Northwest, to Discuss a Technical Specification Change License Amendment Request for the Columbia Generating Station ML19030A2152019-02-12012 February 2019 1/24/19, Summary of Presubmittal Teleconference Meeting with Energy Northwest, to Discuss a Shield Wall Deferral License Amendment Request for the Columbia Generating Station ML19030A3192019-02-12012 February 2019 1/17/2019, Summary of Presubmittal Meeting with Energy Northwest, to Discuss an Emergency Control Room Chiller License Amendment Request at Columbia Generating Station ML18354B0992019-01-0303 January 2019 Summary of Pre-Submittal Meeting with Energy Northwest, to Discuss an Emergency Control Room Chiller License Amendment Request for the Columbia Generating Station ML16266A3712016-09-29029 September 2016 Summary of Public Meeting with Energy Northwest to Discuss Upcoming License Amendment Request Regarding Change in Completion Time for Residual Heat Removal Pump a Repair for Columbia Generating Station ML16167A4602016-08-23023 August 2016 Summary of Closed Meeting with Representatives of the Us Army Corps of Engineers, Bureau of Reclamation, and Energy Northwest to Discuss the Flood Analysis Associated with Columbia Generating Station ML16193A0162016-07-14014 July 2016 Summary of 6/30/16 Prelicensing Meeting with Energy Northwest to Discuss License Amendment Request to Revise Emergency Action Levels Based on Nuclear Energy Institute (NEI) 99-01, Revision 6 at Columbia Generating Station ML16138A3762016-05-25025 May 2016 Summary of 5/3/2016 Prelicensing Meeting with Energy Northwest to Discuss License Amendment Request Regarding Emergency Control Room Chiller System at Columbia Generating Station ML16138A3292016-05-24024 May 2016 Summary of 5/2/2016 Prelicensing Meeting with Energy Northwest to Discuss Measurement Uncertainty Recapture Power Uprate License Amendment Request at Columbia Generating Station ML16126A4822016-05-17017 May 2016 Summary of Prelicensing Meeting with Energy Northwest to Discuss License Amendment Request Concerning Portional Reclassification of Reactor Water Cleanup System at Columbia Generating Station ML16138A1682016-05-0202 May 2016 Licensee Presentation Regarding Mur Power Uprate for Columbia Generating Station, Pending LAR ML15187A4442015-07-0606 July 2015 Summary of a Regulatory Conference to Discuss the Safety Significance of a Columbia Finding Emergency Plan Implementing Procedures Did Not Implement Some Protective Action Recommendations Required by the Emergency Plan ML15173A2732015-06-30030 June 2015 Summary of June 4, 2015, Category 1 Public Meeting with Energy Northwest to Discussion Columbia Generating Station Seismic Hazard Reevaluation Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1, ML15069A5162015-03-17017 March 2015 2/24/2014 Summary of Presubmittal Meeting with Energy Northwest to Discuss Relief Request for Radwaste Cleanup Piping for Columbia Generating Station ML14168A0452014-07-0808 July 2014 Summary of 6/10/14 Closed Meeting Between U.S. Army Corps of Engineers, U.S. Dept of Interior Bureau of Reclamation, and Energy Northwest to Discuss Flooding Analysis for Columbia Generating Station ML13339B1452013-12-0505 December 2013 Meeting Summary for Public Meeting with Energy Northwest Regarding Columbia Generating Station ML12306A3332012-11-16016 November 2012 Summary of 10/18/12 Pre-licensing Meeting to Discuss Future License Amendment Request to Address Impacts of Remediation Activities Undertaken by Department of Energy in the Owner-Controlled Area at Columbia Generating Station ML12293A0592012-10-18018 October 2012 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance Improvement Initiatives ML12157A2722012-06-11011 June 2012 5/31/2012 Summary of Telephone Conference with Licensees Regarding Near Term Task Force Recommendation 2.1 Seismic Reevaluations - Diablo Canyon, 1 and 2, San Onofre, Units 2 and 3, Columbia Generating Station, and Palo Verde, Units 1, 2, a ML1201201102012-01-12012 January 2012 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance Improvement Initiatives ML11350A0562011-12-21021 December 2011 12/15/11, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Metal Fatigue and Operating Experience Open Items in the Columbia License Renewal Safety Evaluation Repo ML11336A1502011-12-12012 December 2011 Summary of Telephone Conference Call Held on November 14, 2011, Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Metal Fatigue Open Item in the Columbia License Renewal Safety Evaluation Report with Open I ML11339A0872011-12-12012 December 2011 Summary of Telephone Conference Call Held on November 28, 2011, Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Upper Shelf Energy Open Item in the Columbia License Renewal Safety Evaluation Report with O ML11339A0852011-12-12012 December 2011 November 8, 2011, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Metal Fatigue Open Item in the Columbia License Renewal Safety Evaluation Report with Open Items ML11249A0132011-11-21021 November 2011 08/29/2011-Summary of Tele Conf Call Between the USNRC and Energy Northwest, Concerning the Response to the Request for Additional Information Pertaining to the Columbia Generating Station, License Renewal Application ML11311A2662011-11-10010 November 2011 Summary of Tele Conf Call Held on 11/2/11, Between the USNRC and Energy Northwest, Concerning the Core Plate Hold-Down Bolts Open Item in the Columbia License Renewal Safety Evaluation with Open Items ML11305A1762011-11-0303 November 2011 Summary of Tele Conf Call Held on 10/27/11, Between the USNRC and Energy Northwest, Concerning the Metal Fatigue Open Item in the Columbia License Renewal Safety Evaluation with Open Items ML11291A0792011-11-0101 November 2011 09/27/2011 Summary of Public Meetings Conducted to Discuss the Dseis Related to the Review of the Columbia Generating Station License Renewal Application (Tac No. ME3121) ML11273A0012011-10-0404 October 2011 Summary of Teleconf Call Held on Sept. 28, 2011, Between the USNRC and Energy Northwest, Concerning the Draft Request for Additional Information Pertaining to the Columbia Generating Station, License Renewal Application ML11273A0662011-10-0404 October 2011 Summary of the Telephone Conference Call Held on September 29, 2011, Concerning the Inspection Report Pertaining to the Columbia Generating Station, License Renewal Application ML11256A3002011-09-23023 September 2011 Summary of Telephone Conference Call Held on September 12, 2011, Concerning the Draft Request for Additional Information Pertaining to the Columbia Generating Station, License Renewal Application ML11238A1582011-09-14014 September 2011 8/25/11 - Summary of Telephone Conference Call Between NRC and Energy Northwest Concerning Drais Pertaining to the SAMA Review of the Columbia Generating Station License Renewal Application ML11250A0152011-09-0808 September 2011 Summary of Tele Conf Call Held on August 22, 2011, Btw the USNRC and Energy Northwest, Concerning Topics Pertaining to the Columbia Generating Station, License Renewal Application ML11223A3512011-08-23023 August 2011 Summary of Telephone Conference Call Held on August 11, 2011, Between the NRC and Energy Northwest, Concerning the Response to the Request for Additional Information Pertaining to the Columbia Generation Station, LRA ML11230B0892011-08-23023 August 2011 August 17, 2011, Summary of Conference Call Held, Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Response to the Request for Additional Information Pertaining to the Columbia Generating Station, LRA ML11216A2532011-08-11011 August 2011 August 3, 2011, Summary of Telephone Conference Call Held Between the NRC and Energy Northwest, Concerning the Response to the Request for Additional Information Pertaining to the Columbia Generating Station, LRA ML11217A0222011-08-11011 August 2011 8/3-4/11, Summary of Telephone Conference Call Held Between Nuclear Regulatory Commission and Energy Northwest, Concerning the Response to the Request for Additional Information Pertaining to the Columbia Generating Station, LRA ML11220A0102011-08-11011 August 2011 February 3, 2011, Summary of Telephone Conference Call Held Between NRC and Energy Northwest, Concerning the Responses to the RAI Pertaining to the Columbia Generating Station, LRA ML1119900742011-08-0404 August 2011 Summary of Pre-Licensing Meeting with Energy Northwest to Discuss Proposed Power Range Neutron Monitoring System/Arts/Mellla License Amendment Request for Columbia Generating Station ML11208B0492011-08-0202 August 2011 07/19/11 Summary of Telephone Conference Call Held Between the NRC and Energy Northwest, Concerning the Request for Additional Information Pertaining to the Columbia Generating Station, License Renewal Application (TAC No. Me3058) 2023-06-05
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information ML23110A2642023-04-20020 April 2023 Request for Information License Renewal Phase 2 Inspection ML22343A1802022-12-0808 December 2022 February 2023 Emergency Preparedness Program Inspection - Request for Information ML22301A1432022-10-28028 October 2022 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Adopt TSTF-505 - EPID L-2022-LLA-0023 ML22242A1082022-08-30030 August 2022 Information Request, Information Request, Security IR 2022404 ML22235A1052022-08-22022 August 2022 August 2022 Emergency Preparedness Exercise Inspection Request for Information ML22145A4462022-06-0606 June 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000397/2022401 ML22144A0342022-05-18018 May 2022 NRR E-mail Capture - Draft - Request for Additional Information - Columbia Generating Station - LAR to Change TS 3.4.11 - Reactor Coolant System Pressure and Temperature Limits - EPID L-2021-LLA-0191 ML22041A4572022-02-10010 February 2022 Notification of NRC Design Bases Assurance Inspection (Team) (05000397/2022010) and Request for Information ML21277A3572021-10-12012 October 2021 CGS Brq RFI Letter, Columbia Generating Station - Notification of Inspection (NRC Inspection Report 05000397/2021004) and Request for Information ML21216A0502021-08-0303 August 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia - License Amendment Request to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO EPID L-2021-LLA-0259 ML21209A9792021-07-28028 July 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Remove License Condition 2.C.(34) and Revise License Condition 2.C.(35) - EPID L-2021-LLA-0074 ML21120A1182021-04-30030 April 2021 NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - On-Site Cooling System Sediment Disposal Approval Request - EPID L-2020-LLL-0031 ML21068A2842021-03-0404 March 2021 2021002 Inservice Inspection (ISI) Request for Information (RFI) ML20336A1852020-11-30030 November 2020 NRR E-mail Capture - Final - RAI - Columbia - One -Time Exemption from 10 CFR 73, App B, Sect VI, Subsection C.3.(l)(1) Regarding Annual Force-On-Force Exercises Due to COVID-19 Pandemic - EPID L-2020-LLE-0172 ML20325A0402020-11-19019 November 2020 NRR E-mail Capture - Draft - RAI - Columbia - One -Time Exemption from 10 CFR 73, Appendix B, Section VI, Subsection C.3.(I)(1) Regarding Annual Force -On-Force Exercises Due to COVID-19 Pandemic - EPID L-2020-LLE-0172 ML20267A5162020-09-23023 September 2020 NRR E-mail Capture - Columbia Generating Station - Final - Request for Additional Information - Fourth Ten-Year Interval Inservice Inspection (ISI) Program Relief Request 4ISI-09 - EPID L-2020-LLR-0068 ML20245E2822020-08-31031 August 2020 NRR E-mail Capture - Columbia Additional Request for Additional Information: Exigent License Amendment Request to Extend Technical Specification 3.8.7, Distribution Systems - Operating, Completion Time ML20239A9702020-08-26026 August 2020 NRR E-mail Capture - Columbia Additional Request for Additional Information: Exigent License Amendment Request to Extend Technical Specification 3.8.7, Distribution Systems - Operating, Completion Time ML20149K4362020-05-26026 May 2020 NRR E-mail Capture - Formal RAIs for Columbia (COVID-19) QA Plan Change Surveillance, Request Response by Tuesday June 2, 2020 ML20112F4572020-04-21021 April 2020 NRR E-mail Capture - Official Release of NRC RAIs for Columbia Covid Exigent Due Friday April 24, 2020 ML20034E6082020-02-0303 February 2020 NRR E-mail Capture - RAI Formal Release Columbia TSTF 563 LAR, 30 Day Response Period Due March 3, 2020 ML20028E1512020-01-27027 January 2020 Notification of Evaluations of Changes, Tests, and Experiments Inspection (Inspection Report 05000397/2020002) and Request for Information ML19267A1842019-09-24024 September 2019 Request for Information for Upcoming Open Phase Condition Inspection at Columbia Generating Station ML19232A2282019-08-20020 August 2019 NRR E-mail Capture - Formal Release of RAIs Ref: Columbia Exigent Amendment - One Electrical RAI, ML19183A4752019-07-0202 July 2019 NRR E-mail Capture - Formal Release of RAIs Ref: Columbia HVAC LAR L-2019-LLA-0034 ML18088A0152018-03-29029 March 2018 Notification of NRC Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/ Staffing/Multi-Unit Dose Assessment Plans (05000397/2018010) and Request for ML17341B0272017-12-0707 December 2017 NRR E-mail Capture - RAI Associated with Columbia Amendment Request Revise Tech Spec 5.5.12 for Permanent Extension of Type a and Type C Containment Testing Frequencies for MF9469, EPID: L-2017-LLA-0197, ILRT, LLRT LAR - New RAI Response Da ML17292A0572017-10-18018 October 2017 NRR E-mail Capture - New RWCU RAI Due Date Now November 24, 2017 ML17249A6882017-09-0606 September 2017 NRR E-mail Capture - RAIs for Columbia Relief Request RAI (MF8925), 3ISI-19 ML17205A3152017-07-20020 July 2017 Notification of Evaluations of Changes, Tests, and Experiments Inspection (05000397/2017004) and Request for Information ML17193A2192017-07-12012 July 2017 NRR E-mail Capture - Columbia RWCU LAR MF8318, Formal Release of RAIs ML17144A1702017-05-24024 May 2017 NRR E-mail Capture - NRC RAIs for Columbia Relief Request MF8922, 3ISI-16 ML17047A7492017-02-16016 February 2017 Response to Request for Additional Information, Columbia Mur LAR Evib Rais ML17006A0922017-01-0404 January 2017 NRR E-mail Capture - Eicb RAIs for Columbia Mur ML17006A0902017-01-0404 January 2017 NRR E-mail Capture - Non Proprietary Request for Additional Information Regarding Columbia Mur Power Uprate ML16356A1382016-12-21021 December 2016 NRR E-mail Capture - Columbia Mur LAR Evib RAIs Non - Proprietary Version - Revise Operating License and Technical Specifications for Measurement Uncertainty Recapture Power Uprate ML16342C4322016-12-0707 December 2016 NRR E-mail Capture - Columbia Measurement Uncertainty Recapture Power Uprate LAR Rais: Human Performance: MF8060, Formal Release for Response on Monday January 9, 2017 ML16327A1842016-11-22022 November 2016 NRR E-mail Capture - Non Proprietary Request for Additional Information Regarding Columbia Mur Power Uprate ML16323A1192016-11-16016 November 2016 NRR E-mail Capture - Eicb RAIs for Columbia Mur ML16218A3902016-08-0808 August 2016 Supplemental Information Needed for Acceptance of Requested Licensing Action, Request for Measurement Uncertainty Recapture (Mur) Power Uprate (from 3486 Mwt to 3544 Mwt) ML16194A3702016-07-11011 July 2016 Notification of NRC Triennial Heat Sink Performance Inspection 05000397/2016003 and Request for Information ML16069A3592016-03-0909 March 2016 NRR E-mail Capture - Second Round Rais: Columbia MF6042 LAR TSTF-425 ML16061A5542016-03-0101 March 2016 Notification of NRC Design Bases Inspection (05000397/2016007) and Initial Request for Information ML16061A5662016-03-0101 March 2016 Notification of Design Bases Inspection (Programs)(Inspection Report 05000397/2016008) and Initial Request for Information ML15254A2572015-09-16016 September 2015 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1 Seismic Reevaluations ML15215A0432015-08-18018 August 2015 Request for Additional Information Associated with Near-Term Task Force Recommendation 2.1, Seismic Reevaluations ML14262A3412014-09-24024 September 2014 Request for Additional Information, Round 2, License Amendment Request to Revise TS Table 3.3.1.1-1 Function 7, Scram Discharge Volume Water Level - High ML14192B0312014-08-13013 August 2014 Redacted, Request for Additional Information, Nrr/Dss/Scvb, Request to Modify Emergency Core Cooling Systems Surveillance Requirements for Low Pressure Core Spray and Low Pressure Coolant Injection Pump Flows ML14206A0112014-07-31031 July 2014 Request for Additional Information, License Amendment Request to Revise TS Table 3.3.1.1-1 Function 7, Scram Discharge Volume Water Level - High 2024-01-10
[Table view] |
Text
t.,,11 ReGUt UNITED STATES
..~.;,v'" "')-01>.<. NUCLEAR REGULATORY COMMISSION f!! (") WASHINGTON, D.C. 20555-0001
<{ 0
... 3:
fI> ~
~ i;' March 28,2011
~ ~
'1-" ~o
LICENSEE: Energy Northwest FACILITY: Columbia Generating Station
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON FEBRUARY 28, 2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENERGY NORTHWEST CONCERNING DRAFT REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE SEVERE ACCIDENT MITIGATION ALTERNATIVES REVIEW OF THE COLUMBIA GENERATING STATION LICENSE RENEWAL APPLICATION The U.S. Nuclear Regulatory Commission and representatives of Energy Northwest (the applicant) held a telephone conference call on February 28, 2011, to discuss draft requests for additional information concerning the Severe Accident Mitigation Alternatives review of the Columbia Generating Station license renewal application.
Enclosure 1 provides a list of the participants and Enclosure 2 contains a list of the draft requests for additional information including a brief description of the status of the items.
The applicant had an opportunity to comment on this summary.
Daniel I. Doyle, roject Manager Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No. 50-397
Enclosures:
- 1. List of Participants
- 2. List of Draft Requests for Additional Information cc w/encls: Distribution via Listserv
LIST OF PARTICIPANTS COLUMBIA GENERATING STATION LICENSE RENEWAL APPLICATION SEVERE ACCIDENT MITIGATION ALTERNATIVES REVIEW TELEPHONE CONFERENCE CALL FEBRUARY 28, 2011 PARTICIPANTS AFFILIATIONS Daniel Doyle U.S. Nuclear Regulatory Commission (NRC)
Ray Gallucci NRC Steve Short Pacific Northwest National Laboratory (PNNL)
Garill Coles PNNL Abbas A. Mostala Energy Northwest (EN)
Jim Tansy EN Lisa Williams EN Albert T. Chiang EN Jerral E. "Dusty" Rhoads EN Eric J. Jorgenson Maracor David Lee AREVA Jennifer Butler AREVA Darvin Kapitz AREVA James Metcalf AREVA Mark Rutherford AREVA ENCLOSURE 1
REQUESTS FOR ADDITIONAL INFORMATION COLUMBIA GENERATING STATION LICENSE RENEWAL APPLICATION SEVERE ACCIDENT MITIGATION ALTERNATIVES REVIEW FEBRUARY 28, 2011
Background:
The U.S. Nuclear Regulatory Commission (NRC or the staff) and representatives of the applicant, Energy Northwest (EN), held a telephone conference call on February 28, 2011, to discuss and clarify the following draft requests for additional information (RAls) concerning the Severe Accident Mitigation Alternatives (SAMA) review of the Columbia Generating Station (CGS) license renewal application. The draft RAls are follow-up questions based on the EN RAI response dated January 28,2011 (ADAMS Accession Number ML110330395).
Draft Requests for Additional Information:
Draft RAI1:
Table B-4 does not provide an analysis of SAMA CC-21 , which was screened as Criterion C. If modeled similar to SAMA CP-01, SAMA CC-21 (procedure change) would be cost-beneficial.
Clarify the disposition of this SAMA.
Discussion:
The Phase 1 screening criterion for SAMA candidate CC-21 was inadvertently listed as Criterion C - Considered for Further Evaluation in the Environmental Report (ER) Table E.10-1.
The correct screening criterion is Criterion A - Not Applicable to CGS. A piping connection between condensate and residual heal removal (RHR) existed in CGS's earlier history but was blank flanged off due to secondary containment bypass issues. This connection is no longer used and is not allowed during operation. ER Table E.1 0-1 will be updated with the corrected information and supporting justification including any relevant NRC correspondence.
Draft RAI2:
Tables A-10, A-12, and A-14 provide a large early release frequency (LERF) importance analysis for internal, fire, and seismic events, respectively, and associated SAMA assessment.
Tables A-6 through A-7 show that release category Mil is generally a much more significant contributor to population dose/economic impact than the LERF (H/E) release category, with release category HII also being a significant contributor. Clarify how release categories Mil and HII are considered in the LERF importance analysis.
ENCLOSURE 2
-2 Discussion:
The Mil and H/I release categories were not considered in the LERF importance analysis (Tables A-10, A-12 and A-14). Level 2 Probabilistic Safety Assessment (PSA) basic events importance lists will be generated for the Mil and H/I release categories, and any basic events not already considered in the Level 1 PSA and LERF basic event tables will be dispositioned. A risk reduction worth (RRW) benefit value associated with Mil and HII release categories will be developed for screening similar to that used in Tables A-10, A-12, and A-14.
Draft RAI 3:
The Level 1 and Level 2 seismic basic events importance lists (Tables A-13 and A-14) identify, in addition to the two initiating events, only a few basic events, and those identified appeared to be flag events, split fractions, or success terms. Neither seismically-induced failures nor random failures appear to be addressed in this importance analysis. Clarify how the seismic importance lists were developed. In the response, specifically discuss how the seismic PSA model treats both seismically-induced failures and random failures. If random failures are not included in the seismic analysis, explain how this model incompleteness impacts the SAMA evaluation.
Discussion:
Confirmation will be provided that random failures are included in the seismic PSA model but that these did not rise above the cutoff level (for RRW benefit) to be included in the tables.
Draft RAI4:
Table A-1 presents a total fire core damage frequency (CDF) of 3.6E-6/yr on the Rev. 6.2 Model column header, but the contributing fire sequences under that column header sum to 3.92E-6/yr. ER Table E.3-1, on the other hand, presents a total fire CDF of 7.4E-6/yr and Table E.4-5 presents release categories that appear to support (Le., frequencies when summed equals 7.4E-6/yr) that total. Clarify these discrepancies.
Discussion:
Table A-1 (Fire) is incorrect. The correct value for total fire CDF is 7.4E-6/yr. A corrected Table A-1 (Fire) will be provided.
Draft RAI 5:
The truncation limits for internal events, fire and seismic models used in the quantification of Revision 6.2 Level 1 and Level 2 CDFs range from 5xlO- 14 to 1x10-8 . In response to an NRC staff RAI (Sept. 17, 2010) EN explained that in general a four-order difference between the calculated total and truncation limit was maintained, except in a few cases where a lesser difference was appropriate. In a telephone clarification, EN further explained that the expression "appropriate" referred to cases in which the calculated CDF appeared to converge using a lower truncation limit. Clarify if the following statement is applicable for both the Revision 6.2 and 7.1 PSA models: "In general a four-order-of-magnitude difference between
- 3 the calculated total and truncation limit was maintained, except in a few cases where a lower truncation limit resulted in convergence between the calculated CDF and truncation limit."
Discussion:
Confirmation will be provided of the following: for Revision 6.2 of the PSA, a four-order-of magnitude difference between the calculated total and truncation limit was maintained, except in a few cases where a lower truncation limit resulted in convergence between the calculated CDF and truncation limit. For Revision 7.1 of the PSA, at least a four-order-of-magnitude difference between the calculated total and truncation limit was maintained.
Draft RAI6:
The fire events listed in Table A-1 are almost entirely different from the fire events listed in Table E.3-7 of the ER. It appears that the Table A-1 fire events are identified by initiating event category rather than fire compartment (although the Table A-1 column header uses the term "Fire Compartment"). Clarify the difference between the fire events listed in the ER and Table A-1 of the RAI response.
Discussion:
The applicant clarified that different compartment labels were employed in ER Table E.3-7 (based on PSA Rev. 6.2) versus Table A-1 (based on PSA Rev. 7.1), although the compartments themselves were the same. A footnote will be provided to cross-reference the labels.
Draft RAI7:
Additional Comment #2 discussed in the January 19, 2011 conference call (ADAMS Accession Number ML110400510) does not appear to have been addressed. The Phase I screening for SAMAs AC/DC-05, CB-02, CB-05, CC-13, and FR-02 needs to be re-evaluated based on the total risk reduction benefit and associated implementation cost.
Discussion:
The Phase 1 screening for the identified SAMA candidates will be re-evaluated based on the total risk reduction benefit and associated implementation cost.
Draft RAI 8:
Comment #2 discussed in the January 19, 2011 conference call (ADAMS Accession Number ML110400510) does not appear to have been entirely addressed. Explain the reason for the increase in fire population dose risk for SAMAs CW-02, CW-03, and CW-04 (Analysis Cases 18 and 19 in Table B-3) and the increase in internal events CDF and population dose-risk for SAMA AC/DC-30R (Analysis Case 45 in Table B-2).
-4 Discussion:
The requested information will be provided. Revised benefit results for the identified SAMA candidates will be provided as appropriate.
Draft RAI9:
The calculated total for the internal, fire, and seismic events listed for the release categories presented in Tables A-3, A-4, and A-5 (5.61 E-06/yr, 1.02E-05/yr, and 4.31 E-06/yr respectively) are not the same as the total CDFs given for internal, fire, and seismic events in Table A-1 (7.4E-6/yr, 1.4E-6/yr, and 4.9E-6/yr respectively). Explain these differences. Also, the percentage contributions presented in Tables A-3, A-4, and A-5 total to much less than 100%
for each table (e.g., totals to 75% in the case of the internal events release categories).
Discussion:
Revised Tables A-3, A-4, and A-5 will be provided.
Draft RAI 10:
Table A-1 (seismic) shows that the CDF for a couple of the seismic damage states (Le., S2P2, S20P2) was completely eliminated in PSA Rev. 7.1. Explain.
Discussion:
S2P2 and S20P2 are seismic station blackout (S80) event trees with reactor core isolation cooling {RCIC} successful. The RCIC system success criteria in PSA Rev. 7.1 require success of the condensate storage tank, which is failed by the modeled seismic events. Therefore, all of the S2P2 and S20P2 accident sequence cutsets transfer to the seismic S80 event trees with RCIC unavailable, S2P3 and S20P3. A footnote will be added to Table A-1 (seismic) to provide this clarification.
Draft RAI 11:
Section 2.2 provides a sensitivity analysis of the assumed 0.3 hot short probability (if CPTs were known to be present for the circuits; otherwise, 0.6) for three selected SAMAs that address fire events. The basis for selecting the three SAMAs is the RRW significance of the hot shorts they address and that they address numerous important functions. Clarify Energy Northwest's basis for believing that the sensitivity analysis results for these three SAMAs bound the effect for other fire SAMAs. In the response, specifically address the potential for multiple hot shorts in series and whether the factor of two impact determined for SAMA FR-07b is bounding for the fire SAMAs. Alternatively, specifically assess the impact of using a 0.6 hot short probability (or 0.3 if these circuits are known to be protected by CPTs) on the analysis results for fire-related SAMAs FR-08, FR-09R, FR-12R, and FR-11R.
-5 Also, the hot short probability assumption could result in an underestimate of the estimated risk reduction for SAMAs identified principally to address internal events if the SAMA addresses cutsets that contain hot shorts. Assess the impact of using a 0.6 hot short probability (or 0.3 if these circuits are known to be protected by CPTs) on the analysis results for non-fire-related SAMAs ACIDC-15, AC/DC-23, AC/DC-27, CC-02, CP-01, CW-02, CW-07, CC-24R, FW-05R, and OT-09R, which have significant fire risk reduction contribution to the total estimated benefit.
Discussion:
The above SAMA candidates will be included in the sensitivity evaluation and the results provided in the same format as Table 2-2 in the January 28, 2011, response. The applicant proposed to determine the delta-CDF factor increase resulting from a sensitivity analysis using the hot short probabilities consistent with NUREG/CR-6850, with a subsequent comparison against the 95 th percentile uncertainty factor to determine if there is any change in cost-benef, including increases in margins for candidates already deemed cost-beneficial. The NRC requested an e-mail with additional details on this proposed approach (ADAMS Accession No. ML110670526).
Draft RA112:
Table 2-3 notes that the "Late" time category (Le., greater than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) is not used in PSA model Rev. 7.1. Clarify that all Level 2 sequences are mapped into "early" or "intermediate" release categories. If not, assess the impact of this incompleteness on the results of the sensitivity study.
Discussion:
The footnote to Table 2-3 will be clarified to state that all Level 2 PSA sequences, including those whose release time is listed as "Late," are mapped into either the early or intermediate release categories.
'.. ML110670496 .
- concurred via email OFFICE PM:RPB1 :DLR LADLR* BC:RPB1:DLR PM:RPB1 :DLR I i
i NAME DDoyle YEdmonds BPham DDoyle DATE 03/17/2011 03/16/2011 03/1812011 03/28/2011
Memorandum to Energy Northwest from D. Doyle dated March 28, 2011
SUBJECT:
SUMMARY
OF TELEPHONE CONFERENCE CALL HELD ON FEBRUARY 28,2011, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND ENERGY NORTHWEST CONCERNING DRAFT REQUESTS FOR ADDITIONAL INFORMATION PERTAINING TO THE SEVERE ACCIDENT MITIGATION ALTERNATIVES REVIEW OF THE COLUMBIA GENERATING STATION LICENSE RENEWAL APPLICATION DISTRIBUTION:
HARD COPY:
DLR RF E-MAIL:
PUBLIC RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRapb Resource RidsNrrDlrRasb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource ACunanan DDoyle MThadani WWalker, RIV RCohen, RIV LSubin,OGC