MONTHYEARML1001906882010-01-12012 January 2010 G20100027/EDATS: OEDO-2010-0022 - Mike Mulligan E-mail, 2.206 - Vermont Yankee Tritium Leak Project stage: Request ML1003306032010-01-25025 January 2010 2.206 Petition of Michael Mulligan Transcript Vermont Yankee Teleconference 1-25-2010, Pages 1-33 Project stage: Request ML1004704302010-02-0808 February 2010 G20100074/EDATS: OEDO-2010-0087 - Raymond Shadis Ltr. 2.206 - Conditions Trending to a Degradation of Public Safety Margin at Vermont Yankee Power Station Project stage: Request ML1006213742010-02-20020 February 2010 G20100098/LTR-10-0069/EDATS: OEDO-2010-0145 - Thomas Saporito Ltr. Petition Under 10 CFR Section 2.206 Seeking Enforcement Action Be Taken by NRC Against Licensee Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Plant Project stage: Request ML1006802992010-03-0303 March 2010 Transcript of 2.206 Petition Vermont Yankee and Raymond Shadis Teleconference Dated March 3, 2010. Pages 1-30 Project stage: Request ML1007704082010-03-0808 March 2010 10 CFR 2.206 Petition Review Board Re Vermont Yankee and Thomas Saporito, March 8, 2010, Pages 1 - 48 Project stage: Request ML1009900312010-04-13013 April 2010 Entergy Nuclear Operations (Entergy): Meeting Presentation 2009 Nuclear Safety Culture Assessment Meeting Project stage: Request ML1013201212010-05-0505 May 2010 Transcript for 2.206 Petition of Raymond Shadis and Thomas Saporito Vermont Yankee Teleconference 5/5/2010 Project stage: Request ML1014500042010-06-25025 June 2010 G20100027/EDATS: OEDO-2010-0022/G20100074/EDATS: OEDO-2010-0087/G20100098/LTR-10-0069/EDATS: OEDO-2010-0145 - 2.206 Petitioners Letters Vermont Yankee Tritium Leaks Project stage: Other ML1014500072010-06-25025 June 2010 G20100027/EDATS: OEDO-2010-0022/G20100074/EDATS: OEDO-2010-0087/G20100098/LTR-10-0069/EDATS: OEDO-2010-0145 - Federal Register Notice Project stage: Other ML1033505532011-01-20020 January 2011 G20100027/EDATS: OEDO-2010-0022, G20100074/EDATS: OEDO-2010-0087, G20100098/LTR-10-0069/EDATS: OEDO-2010-0145: Ltr to Entergy Nuclear Operations in Response to Letters on Tritium Leaks at the Vermont Yankee Nuclear Power Station Project stage: Other ML1033503812011-01-20020 January 2011 G20100027/EDATS: OEDO-2010-0022, G20100074/EDATS: OEDO-2010-0087, G20100098/LTR-10-0069/EDATS: OEDO-2010-0145: Ltr/Mulligan, Shadis, Saporito in Response to Letters on Tritium Leaks at the Vermont Yankee Nuclear Power Station Project stage: Other ML1105405692011-03-11011 March 2011 G20100027/EDATS: OEDO-2010-0022/G20100074/EDATS: OEDO-2010-0087/G20100098/EDATS: OEDO-2010-0145 - Vermont Yankee Tritium DD Federal Register Notice Project stage: Other ML1105405582011-03-11011 March 2011 G20100027/EDATS: OEDO-2010-0022/G20100074/EDATS: OEDO-2010-0087/G20100098/EDATS: OEDO-2010-0145 - Final Director'S Decision Project stage: Other ML1105405512011-03-11011 March 2011 G20100027/EDATS: OEDO-2010-0022/G20100074/EDATS: OEDO-2010-0087/G20100098/EDATS: OEDO-2010-0145 - Vermont Yankee Tritium DD Cover Letter Project stage: Other NRC-2011-0060, G20100027/EDATS: OEDO-2010-0022/G20100074/EDATS: OEDO-2010-0087/G20100098/EDATS: OEDO-2010-0145 - Final Director'S Decision2011-03-11011 March 2011 G20100027/EDATS: OEDO-2010-0022/G20100074/EDATS: OEDO-2010-0087/G20100098/EDATS: OEDO-2010-0145 - Final Director'S Decision Project stage: Other 2010-03-08
[Table View] |
|
---|
Category:Federal Register Notice
MONTHYEARML21159A0522021-06-29029 June 2021 VY and CR Indirect License Transfer Order FRN ML21077A2772021-05-0404 May 2021 Final Ea/Fonsi for 20.2002 Alternate Disposal Request (License DPR-28, Docket No. 50-271) ML21064A1402021-03-29029 March 2021 (License DPR-28, Docket Nos. 50-271 and 72-59) - Notice of Consideration, Request for Indirect License Transfer ML18274A2492018-10-17017 October 2018 Exemption Issuance FRN ML18249A3622018-10-15015 October 2018 Federal Register Notice Announcing Approval of License Transfer Request (License DPR-28, Docket Nos. 50-271 and 72-59) NRC-2018-0216, Federal Register Notice Announcing Approval of License Transfer Request (License DPR-28, Docket Nos. 50-271 and 72-59)2018-10-15015 October 2018 Federal Register Notice Announcing Approval of License Transfer Request (License DPR-28, Docket Nos. 50-271 and 72-59) ML18248A0962018-10-11011 October 2018 Order Approving License Transfer Request (License DPR-28, Docket Nos. 50-271 and 72-59) NRC-2018-0226, FRN Ea/Fonsi for Exemption for Northstar to Use the Nuclear Decommissioning Trust for Spent Fuel Management Re Request for Direct and Indirect License Transfers from Entergy to Northstar2018-10-0303 October 2018 FRN Ea/Fonsi for Exemption for Northstar to Use the Nuclear Decommissioning Trust for Spent Fuel Management Re Request for Direct and Indirect License Transfers from Entergy to Northstar ML18257A2832018-10-0303 October 2018 FRN Ea/Fonsi for Exemption for Northstar to Use the Nuclear Decommissioning Trust for Spent Fuel Management Re Request for Direct and Indirect License Transfers from Entergy to Northstar NRC-2018-0140, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/20182018-07-0505 July 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/2018 ML18180A2182018-07-0505 July 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 7/17/2018 NRC-2018-0020, Federal Register Notice: Exemption: Issuance - Availability of Exemption for Entergy Operations, Inc., Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation2018-02-0808 February 2018 Federal Register Notice: Exemption: Issuance - Availability of Exemption for Entergy Operations, Inc., Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation ML17298A1582018-02-0808 February 2018 Federal Register Notice: Exemption: Issuance - Availability of Exemption for Entergy Operations, Inc., Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation ML18017B0492018-01-19019 January 2018 Correction Notice for EA and Fonsi NRC-2017-0134, Federal Register Notice: Notice of Availability of Environmental Assessment and Finding of No Significant Impact for Entergy Nuclear Operation, Inc., Vermont Yankee Nuclear Power Station ISFSI Exemption Request2018-01-16016 January 2018 Federal Register Notice: Notice of Availability of Environmental Assessment and Finding of No Significant Impact for Entergy Nuclear Operation, Inc., Vermont Yankee Nuclear Power Station ISFSI Exemption Request ML17249A2442018-01-16016 January 2018 Federal Register Notice: Notice of Availability of Environmental Assessment and Finding of No Significant Impact for Entergy Nuclear Operation, Inc., Vermont Yankee Nuclear Power Station ISFSI Exemption Request NRC-2017-0175, Biweekly Sholly Report - Federal Register Notice Fr Publication Date: August 15, 20172017-08-0404 August 2017 Biweekly Sholly Report - Federal Register Notice Fr Publication Date: August 15, 2017 ML17213A1842017-08-0404 August 2017 Biweekly Sholly Report - Federal Register Notice Fr Publication Date: August 15, 2017 ML17143A1562017-06-0606 June 2017 Enclosufederal Register Notice-Notice of Availability of Exemption for Entergy Energy Operations, Inc., Vermont Yankee Nuclear Power Station Independent Spent Fuel Storage Installation ML17045A5322017-05-25025 May 2017 Enclosufrn - Notice of Availability of Environmental Assessment and Finding of No Significant Impact for Entergy Nuclear Operations, Inc., Vermont Yankee Nuclear Power Station, Independent Spent Fuel Storage Installation Exemption Request ML17013A2572016-12-12012 December 2016 Draft Final EA ML16012A1572016-04-15015 April 2016 FRN: Exemption from the Requirements of 10 CFR Part 140, Section 140.11(a)(4) Concerning Primary and Secondary Liability Insurance NRC-2016-0017, FRN: Exemption from the Requirements of 10 CFR Part 50, Section 50.54(w)(1) Concerning Insurance for Post-Accident Site Decontamination2016-04-15015 April 2016 FRN: Exemption from the Requirements of 10 CFR Part 50, Section 50.54(w)(1) Concerning Insurance for Post-Accident Site Decontamination ML16012A1972016-04-15015 April 2016 FRN: Exemption from the Requirements of 10 CFR Part 50, Section 50.54(w)(1) Concerning Insurance for Post-Accident Site Decontamination NRC-2015-0200, OEDO-15-00251 - FRN for Final Director'S Decision 2.206 - Ultrasonic Inspection Test or Best Available Flaw Detection Technology for USA Reactor Plants Similar to the Thousands of Cracks Discovered in Belgium Nuclear Power Plants2016-03-29029 March 2016 OEDO-15-00251 - FRN for Final Director'S Decision 2.206 - Ultrasonic Inspection Test or Best Available Flaw Detection Technology for USA Reactor Plants Similar to the Thousands of Cracks Discovered in Belgium Nuclear Power Plants ML16054A6912016-03-29029 March 2016 OEDO-15-00251 - Letter to Petitioner for Final Director'S Decision 2.206 - Ultrasonic Inspection Test or Best Available Flaw Detection Technology for USA Reactor Plants Similar to the Thousands of Cracks Discovered in Belgium Nuclear Power ML16054A7312016-03-29029 March 2016 OEDO-15-00251 - Final Director'S Decision 2.206 - Ultrasonic Inspection Test or Best Available Flaw Detection Technology for USA Reactor Plants Similar to the Thousands of Cracks Discovered in Belgium Nuclear Power Plants ML16054A8032016-03-29029 March 2016 OEDO-15-00251 - FRN for Final Director'S Decision 2.206 - Ultrasonic Inspection Test or Best Available Flaw Detection Technology for USA Reactor Plants Similar to the Thousands of Cracks Discovered in Belgium Nuclear Power Plants ML15286A2722016-01-12012 January 2016 OEDO-15-00251: Proposed Director'S Decision 2.206 - Emergency Ultrasonic Inspection Test or Best Available Flaw Detection Technology for USA Reactor Plants Similar to the Thousands of Cracks Discovered in Belgium Nuclear Power Plants ML15356A5992015-12-29029 December 2015 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 5, 2016 ML15344A2432015-12-22022 December 2015 Letter, FRN for Partial Exemption from Recordkeeping Requirements ML15344A2572015-12-22022 December 2015 FRN for Partial Exemption from Recordkeeping Requirements ML15180A0542015-12-10010 December 2015 LTR, Exemptions from Certain Emergency Planning Requirements and Related Safety Evaluation ML15180A0472015-12-10010 December 2015 FRN - Exemptions from Certain Emergency Planning Requirements and Related Safety Evaluation ML15261A6662015-11-10010 November 2015 Withdrawal of an Amendment Request Regarding Deletion of Operating License Conditions Related to the Decommissioning Trust Provisions ML15261A6712015-11-10010 November 2015 FRN - Withdrawal of an Amendment Request Regarding Deletion of Operating License Conditions Related to the Decommissioning Trust Provisions ML15162A6902015-08-27027 August 2015 G20130211 - Transmittal Letter to Petitioner Judson Regarding Final Director'S Decision for James A. FitzPatrick Power Plant, Pilgrim Nuclear Power Station and Vermont Yankee Nuclear Power Station ML15181A1092015-08-20020 August 2015 OEDO-15-00251 - FRN Regarding 2.206 - Emergency Ultrasonic Inspection Test or Best Available Flaw Detection Technology for USA Reactor Plants Similar to the Thousands of Cracks Discovered in Belgium Nuclear Power Plants ML15180A0692015-07-31031 July 2015 Issuance of Environmental Assessment and Finding of No Significant Impact Related to Request for Exemptions from Certain Emergency Planning Requirements ML15128A1942015-06-17017 June 2015 Exemptions from the Requirements of 10 CFR Part 50, Sections 50.82(a)(8)(i)(A) and 50.75(h)(1)(iv) ML15103A4192015-04-24024 April 2015 Letter and Draft Environmental Assessment and Finding of No Significant Impact Related to Request for Exemptions from Certain Emergency Planning Requirements ML15103A4002015-04-24024 April 2015 Draft Environmental Assessment and Finding of No Significant Impact Related to Request for Exemptions from Certain Emergency Planning Requirements ML14266A3872015-02-12012 February 2015 Letter, Exemption from Requirements of 10 CFR Part 73 Related to Suspension of Security Measures in an Emergency or During Severe Weather ML14266A4172015-02-12012 February 2015 FRN, Exemption from Requirements of 10 CFR Part 73 Related to Suspension of Security Measures in an Emergency or During Severe Weather NRC-2015-0034, FRN, Exemption from Requirements of 10 CFR Part 73 Related to Suspension of Security Measures in an Emergency or During Severe Weather2015-02-12012 February 2015 FRN, Exemption from Requirements of 10 CFR Part 73 Related to Suspension of Security Measures in an Emergency or During Severe Weather ML15008A1092015-01-22022 January 2015 FRN Reopening of Public Comment Period for Permanently Defueled Emergency Plan and Emergency Action Level Scheme Change Amendment Request ML15012A2012015-01-22022 January 2015 Correction and Reopening of Public Comment Period for Permanently Defueled Emergency Plan and Emergency Action Level Scheme Change Amendment Request ML14335A6302015-01-15015 January 2015 G20110262 - Final Response to Paul Gunter and Kevin Kamps Letter 2.206 - Immediately Suspend the Operating License of General Electric Boiling Water Reactors Mark I Units ML14335A6482015-01-15015 January 2015 G20110262 - FRN - Paul Gunter and Kevin Kamps Letter 2.206 - Immediately Suspend the Operating License of General Electric Boiling Water Reactors Mark I Units NRC-2015-0009, G20110262 - FRN - Paul Gunter and Kevin Kamps Letter 2.206 - Immediately Suspend the Operating License of General Electric Boiling Water Reactors Mark I Units2015-01-15015 January 2015 G20110262 - FRN - Paul Gunter and Kevin Kamps Letter 2.206 - Immediately Suspend the Operating License of General Electric Boiling Water Reactors Mark I Units 2021-06-29
[Table view] |
Text
[7590-01-P]
NUCLEAR REGULATORY COMMISSION ENTERGY NUCLEAR OPERATIONS, INC.
ENTERGY NUCLEAR VERMONT YANKEE, LLC VERMONT YANKEE NUCLEAR POWER STATION DOCKET NO. 50-271
[NRC-2011-0060]
LICENSE NO. DPR-28 RECEIPT OF REQUEST FOR ACTION Notice is hereby given that petitions dated January 12, 2010, from Mr. Michael Mulligan, February 8, 2010, from Mr. Raymond Shadis, and February 20, 2010, from Mr. Thomas Saporito, have requested that, under Title 10 of the Code of Federal Regulations (10 CFR) 2.206, Requests for Action under this Subpart, the U.S. Nuclear Regulatory Commission (NRC) take action with regard to the Vermont Yankee Nuclear Power Station (VY).
Mr. Mulligan requested in his petition that (1) the radioactive leak into the environment of VY be immediately stopped, VY be immediately shut down, and all leaking paths be isolated, and (2) VY disclose its preliminary root cause analysis and the NRC release its preliminary investigative report on this analysis before plant startup.
Mr. Shadis requested in his petition that the NRC (1) require VY to go into cold shutdown and depressurize all systems in order to slow or stop the leak, (2) act promptly to stop or mitigate the leak(s) and not wait until all issues raised by New England Coalition are resolved, (3) require VY to reestablish its licensing basis by physically tracing records and reporting physical details of all plant systems that would be within scope as buried pipes and tanks in NUREG-1801, Generic Aging Lessons Learned (GALL) Report, and under the requirements of 10 CFR 50.54, Conditions of Licenses, (4) investigate and determine why Entergy has been
allowed to operate VY since 2002 without a working knowledge of all plant systems, and why the NRCs Reactor Oversight Process (ROP) and review process for license renewal amendment did not detect this dereliction, (5) take notice of Entergy Nuclear Vermont Yankees many maintenance and management failures (from 2000 to 2010) and the ROPs failure to detect them early and undertake a full diagnostic evaluation team inspection or NRC Inspection Procedure 95003, Supplemental Inspection for Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple Yellow Inputs or One Red Input, and (6) require Entergy VY to apply for an amendment to its license renewal that would address both aging analysis and aging management of all buried piping carrying or with the potential to carry radionuclides and/or the potential to interact with any safety or safety-related system.
Mr. Saporito requested in his petition that the NRC (1) order a cold-shutdown mode of operation for VY because of leaking radioactive tritium and (2) issue a confirmatory order modifying the NRC-issued license for VY so that the licensee must bring the nuclear reactor to a cold-shutdown mode of operation until the licensee can provide definitive reasonable assurance to the NRC, under affirmation, that the reactor will be operated in full compliance with the regulations in 10 CFR Part 50, Domestic Licensing of Production and Utilization Facilities, and General Design Criteria 60, Control of Releases of Radioactive Materials to the Environment, and 64, Monitoring Radioactivity Releases, of Appendix A, General Design Criteria for Nuclear Power Plants, to 10 CFR Part 50, and with other NRC regulations and authority.
The requests are being treated under 10 CFR 2.206 of the Commissions regulations.
The requests have been referred to the Director of the Office of Nuclear Reactor Regulation (NRR). As provided by 10 CFR 2.206, the NRC will take appropriate action on this consolidated petition within a reasonable time.
Each petitioner stated that the tritium leak is just one example of many maintenance and management failures at VY. All three raised a concern about what they perceive as the NRCs
failure to examine the deficiencies at VY in an integrated manner. Although the individual petition was written to request enforcement action specifically because of the tritium leak, during each of the transcribed phone calls, each petitioner urged the NRC to take a broader view and assess operational and performance failures at VY collectively instead of individually. This concern has met the criteria for review in accordance with Management Directive 8.11, Review Process for 10 CFR 2.206 Petitions.
Subsequently, the Petition Review Board recommended that the NRC accept the consolidated petition for review for the following specific issues and concerns identified in the petitions and supplemented during the teleconferences:
- 1. Increasing concentrations of radiocontaminants in the soil and groundwater at VY, as well as an increasing area of contamination, are manifest on a daily basis. VY risks aggravating the contamination by continuing to run the reactor at full power while attempting over a period of a month to triangulate the location of a presumed leak by drilling a series of test wells in the affected area.
- 2. During the license renewal application proceeding, the licensee averred that it was unaware of the existence of some buried pipes, now uncovered, and it has yet to discover their path and purpose.
- 3. Entergy has, in 8 years of ownership, failed to learn and understand VYs design, layout, and construction. This failure to comprehend and understand the layout, function, and potentially the interaction of the plants own piping systems constitutes a loss of design basis.
- 4. The NRCs ROP has apparently failed to capture, anticipate, and prevent ongoing maintenance, engineering, quality assurance, and operation issues that have manifested themselves in a series of high-profile incidents since Entergy took over VY. The agency
has repeatedly failed to detect root cause trends until they have, as in this instance, become grossly self-revealing.
- 5. The NRC should ensure that Entergy has adequate decommissioning funds. The tritium leak will increase decommissioning costs because of the need for site radiological examination and soil remediation.
The NRC sent a copy of the proposed Directors Decision to the petitioners and the licensee for comment on January 20, 2011. The staff did not receive any comments on the proposed Directors Decision.
The NRR staff determined that the activities requested by the petitioners have been completed, with the exception of immediate cold shutdown of Vermont Yankee. Therefore, the Director of NRR concludes that the petition has been granted in part and denied in part. The reasons for this decision are explained in the Director's Decision (DD-11-03) pursuant to 10 CFR 2.206.
Copies of the petitions (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML100190688, ML100470430, and ML100621374) and the Directors Decision (ADAMS Accession No. ML110540558) are available for inspection at the Commissions Public Document Room (PDR) at One White Flint North, Room O1-F21, 11555 Rockville Pike (first floor), Rockville, Maryland 20852, and from the NRCs ADAMS Public Electronic Reading Room on the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
NRC Management Directive 8.11, Review Process for 10 CFR 2.206 Petitions (ADAMS Accession No. ML041770328), describes the petition review process. Persons who do not have access to ADAMS or who have problems in accessing the documents in ADAMS should contact the NRC PDR reference staff by telephone at 1-800-397-4209 or 301-415-4737, or by e-mail to pdr.resource@nrc.gov.
A copy of the Director's Decision will be filed with the Secretary of the Commission for the Commission's review in accordance with 10 CFR 2.206 of the Commission's regulations. As provided for by this regulation, the Director's Decision will constitute the final action of the Commission 25 days after the date of the decision, unless the Commission, on its own motion, institutes a review of the Director's Decision in that time.
Dated at Rockville, Maryland this 11th day of March, 2011.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Eric J. Leeds, Director Office of Nuclear Reactor Regulation