Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001 February 10, 2011 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060*6711
SUBJECT:
CORRECTION TO AMENDMENT NOS. 261 AND 242 FOR NORTH ANNA POWER STATION, UNIT NOS. 1 AND 2, AND AMENDMENT NOS. 272 AND 271 FOR SURRY POWER STATION, UNIT NOS. 1 AND 2, ISSUANCE OF AMENDMENTS FOR CHANGES TO THE EMERGENCY PLAN (TAC NOS.
ME3383, ME3384, ME3385, AND ME3386)
Dear Mr. Heacock:
On January 26, 2011, the U.S. Nuclear Regulatory Commission (NRC) had issued Amendment Nos. 261 and 242 to Renewed Facility Operating License Nos. NPF*4 and NPF*7 for the North Anna Power Station, Unit Nos. 1 and 2, and Amendment Nos. 272 and 271 to Renewed Facility Operating License Nos. DPR*32 and DPR-37 for the Surry Power Station, Unit Nos. 1 and 2 (Surry), respectively. These amendments were in response to your application dated January 29, 2010, for the proposed changes to the Emergency Plan.
The amendments provided authorization to upgrade selected Emergency Action Levels based on Nuclear Energy Institute (NEI) 99*01, "Methodology for Development of Emergency Action Levels," Revision 5, dated February 2008 using the guidance of NRC Regulatory Issue Summary 2003-18, Supplement 2, "Use of Nuclear Energy Institute (NEI) 99-01, Methodology for Development of Emergency Action Levels."
The NRC staff corrected the maximum power level of both Surry licenses by correction letter dated October 21, 2010, from "2546 megawatts (thermal)" to "2587 megawatts (thermal)".
Amendment Nos. 272 and 271 issued on January 26,201.1, show the incorrect maximum power levels of 2546 megawatts (thermal). This correction letter is reissuing the license pages for Surry Units 1 and 2 to show the correct maximum power levels, which should be 2587 megawatts (thermal).
D. Heacock
- 2 The NRC regrets any inconvenience this may have caused. The revisions are identified by lines in the margin.
Sincerely,
..CJ...!],.\\
'\\
~
/.
/ {jIJJ}rv
-y;j//
/1
/
~
~~~n Cotton, Project Managfr Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-338, 50-339, 50-280, and 50-281
Enclosure:
License Page 3 -Surry Unit 1 License Page 3 -Surry Unit 2 cc w/encl: Distribution via Listserv
-3
- 3. This renewed license shall be cleemed to contain and is subject to the conditions specified in the following Commission regulations: 10 CFR Part 20, Section 30:34 of 10 CFR Part 30, Section 40.41 of 10 CFR Part 40, Secrons 50.54 and 50.59 of 10 CFR Part 50. and Section 70.32 of 1 D CFR Part 70: and is subject to all applicable provisions of the Act and the rules, regulations, and orders of the Commission row or hereafter in effect; and is subject to the additional conditions specified iJelow:
A. Maximum Power Level The licensee IS authorized to operate the faCility at steady state reactor core power levels not In excess of 2587 megawatts (thermal).
S. Technical Specifications The Technical SPRc.ifications contained In Appendix A, as revised through Amendment No. 272. are hereby incorporated in the renewed license. The licensee shall operate the facility In accordance with the Technical Specifications.
C. Reports the licensee shall make certain reports In accordance with the requirements of the Technical Specifications.
D. Records The licensee shall keep facility operating records in accordance with the requirements of 1he Technical Specifications.
E.Deleted by Amendment 65 F. Deleted by Amendment 71 G. Deleted by Amendment 227 H. Deleted by Ameooment 227 Fire Protection The licensee shall Implement and maintain in effect the provisions of the approved fire protection. program as Oescnbed In the Updated FInal Safety Analysis Reponand as approved In the SER oated September 19, 1979, (and Supplements dated May 29, 1980, October 9, 1980, December 1 S, 1980.
- ebruary, 3,1981, December 4,1981, April 27, 1982, NDvember 18,1982, January 17, 1984, February 25, 1988, and SURRY UNIT ~
Renewed License No. D~R*32 Amendment NO~
Corrected by letter dated February 10, 2011
-3 E. Pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.
- 3. This renewed license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations: 10 CFR Part 20, Section 30.34 of 10 CFR Part 30, Section 40.41 of 10 CFR Part 40, Sections 50.54 and 50:59 of 10 CFR Part 50, and Section 70.32 of 10 CFR Part 70; and is subject to all applicable provisions of the Act and the ru~es, 'regulations; and orders of the Commission now or hereafter In effect; and is subject to the additional conditions specified below:
A. Maximum Power Level The licensee is authorized to ooerate the facility at steady state reactor core Dower levels not in excess of 2587 megawatts (thermal).
B. Technical Specifications The Technical Spp~ifications contained in Appendix A, as revised through Amendment No. 271
, are hereby incorporated in this renewed license. The licensee shall operate the facility in accordance with the Technical Specifications.
C. Reports The licensee shall make certain reports in accordance with the reqUirements of the Technical Specifications.
O. Records The licensee shall k.eep facility operating records in accordance with the requirements of the Technical Specifications.
E. Deleted by Amendment 54 F. Deleted by Amendment 59 and Amendment 65 G. De~eted by Amendment 227 H. Deleted by Amendment 227 SURRY - UNIT 2 Renewed License No. OPR-37 Amendment No~
Corrected by letter dated February 10, 2011
-2 The NRC regrets any inconvenience this may have caused. The revisions are identified by lines in the margin.
Sincerely, IRA by VSreen;vas forI Karen Cotton, Project Manager Plant Licensing Branch 11-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-338, 50-339, 50-280, and 50-281
Enclosure:
License Page 3 -Surry Unit 1 License Page 3 -Surry Unit 2 cc w/encl: Distribution via Listserv DISTRIBUTION:
Public LPL2-1 R/F RidsNrrDirsltsb Resource DJohnson, NSIR RidsNrrDorlLpl2-1 Resource RidsOgcRpResource RidsAcrsAcnw_MailCTR Resource RidsNrrPMNorthAnnaResource(hard copy)
RidsRgn2MailCenter Resource RidsNrrDorlDprResource JAnderson, NSIR GWaig, NRR RidsNrrLAMOBrien Resource(hard copy)
RElliott, NRR RidsNrrPMSurry Resource (hard copy)
ADAMS Accession No M L 11 041 0066 IOFFICE 2-1/PM LPL2-1/LA LPL2-1/BC LPL2-1/PM INAME Cotton iNSreenivas for)
MO'Brien GKulesa KCotton (VSreenivas for)
IDATE 02/9/11 02/9/11 02110/11 02110/11 OFFICIAL RECORD COpy