HNP-11-013, Completion of Regulatory Commitment Regarding Relief Request I3R-08

From kanterella
(Redirected from ML110340192)
Jump to navigation Jump to search

Completion of Regulatory Commitment Regarding Relief Request I3R-08
ML110340192
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/27/2011
From: Caves J
Progress Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
HNP-11-013
Download: ML110340192 (3)


Text

I

-)iwN gress Enegy

//M2 7 2011 U.S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 Serial: HNP-11-013 10 CFR 50.55a SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400/RENEWED LICENSE NO. NPF-63 COMPLETION OF REGULATORY COMMITMENT REGARDING RELIEF REQUEST 13R-08

Reference:

1. Letter from J. R. Caves to the Nuclear Regulatory Commission (SERIAL:

HNP-10-097), "Relief Request From ASME Boiler and Pressure Vessel Code,Section XI Requirements for the Service Water System," dated September 24, 2010 (ML102740038)

Ladies and Gentlemen:

By letter dated September 24, 2010, the Harris Nuclear Plant (HNP) submitted a request to the NRC (Reference 1) for relief from ASME Boiler and Pressure Vessel Code,Section XI Requirements for the Service Water System.

During a January 26, 2011, telephone discussion with NRC Staff, HNP agreed to provide the completion date for the Regulatory Commitment that required a code repair be completed during Refueling Outage 16.

The Attachment to this submittal contains the requested information.

This document contains no new Regulatory Commitment.

Please refer any questions regarding this submittal to me at (919) 362-3137.

Sincerely, TJ.R. Caves Supervisor - Licensing/Regulatory Programs Harris Nuclear Plant JRC/kab Progress Energy Carolinas, Inc.

Harris Nuclear Plant P. 0. Box 165 New Hill, NC 27562

/4CQJ4Th

HNP-1 1-013 Page 2

Attachment:

Completion Date of Regulatory Commitment for Relief Request 13R-08 cc:

Mr. J. D. Austin, NRC Sr. Resident Inspector, HNP Mrs. B. L. Mozafari, NRC Project Manager, HNP Mr. V. M. McCree, NRC Regional Administrator, Region II

Attachment to SERIAL: HNP-11-013 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. 1 DOCKET NO. 50-400/RENEWED LICENSE NO. NPF-63 10 CFR 50.55a RELIEF REQUEST: 13R-08 REGULATORY COMMITMENT COMPLETION The action identified in the table below was committed to by Harris Nuclear Plant (HNP) regarding 10 CFR 50.55a Request 13R-08, "Request for Relief for Temporary Non-Code Repair of Service Water Supply Piping Line in Accordance with 10 CFR 50.55a(g)(5)(iii). Please direct any questions regarding this document or any associated regulatory commitments to the Supervisor, Licensing/Regulatory Affairs.

Item Co tt Actual Completioni

-7,-

>Date Replace temporary non-code repair of defect in weld on line 3SWl-1 14SA-1 with a permanent repair. Temporary non-code repair consists of deferral of code repair until the next October 12, 2010 scheduled outage exceeding 30 days, RFO-16, provided the condition continues to meet the acceptance criteria of Generic Letter 90-05.

Page 1 of 1