ML110280006

From kanterella
Jump to navigation Jump to search
IR 05000261-10-201, on 12/13/2010 - 12/16/2010, H. B. Robinson Steam Electric Plant, Unit 2, Target Set Inspection (Cover Letter)
ML110280006
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 01/28/2011
From: West G B
Division of Security Operations
To: McCartney E
Carolina Power & Light Co
Shared Package
ML110280005 List:
References
Download: ML110280006 (3)


See also: IR 05000261/2010201

Text

January 28, 2011

Mr. Eric McCartney Vice President Carolina Power and Light Company H.B. Robinson Steam Electric Plant, Unit 2 3581 West Entrance Road Hartsville, SC 29550

SUBJECT: H. B. ROBINSON STEAM ELECTRIC PLANT, UNIT 2 - NRC SECURITY INSPECTION REPORT 05000261/2010201

Dear Mr. McCartney:

On December 16, 2010, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at the H. B. Robinson Steam Electric Plant, Unit 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on December 16, 2010, with members of the site staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

The report documents one NRC-identified finding of very low safety significance (i.e., Green as determined by the Physical Protection Significance Determination Process). This finding was determined to involve a violation of NRC requirements. The deficiency was promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspectors left the site. The finding had no cross-cutting aspect. If you contest this non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington, DC 20555-0001; with copies to the Director, Office of Nuclear Security and Incident Response (NSIR); the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; and the Branch Chief, Security Training and Support Branch, NSIR. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's document system, Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.

In accordance with 10 CFR Paragraph 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,/RA/

Garmon West, Jr., Chief Security Training and Support Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket No.: 50-261 License No.: DPR-23

Enclosure:

As stated cc w/encl: C. Kamilaris, Carolina Power and Light Company J. Donahue, Carolina Power and Light Company B. McCabe, Progress Energy Carolinas, Inc.