UNITED S TATE S
N UCLE AR REGU LATORY COMMI SS ION
R E GI ON I V
6 1 2 E. LAMAR BLVD. , SU ITE 4 00
AR LIN GTON , TEXAS 7 6 01 1- 4005
January 4, 2011
Mr. Adam C. Heflin, Senior Vice
President and Chief Nuclear Officer
Union Electric Company
P.O. Box 620
Fulton, MO 65251
SUBJECT: CALLAWAY PLANT - INITIAL INFORMATION REQUEST FOR NRC
TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION NRC
INSPECTION REPORT 05000482/2011006
Dear Mr. Heflin:
On January 24, 2011, the NRC will begin a triennial baseline Component Design Bases
Inspection at your Callaway Plant. A six-person team will perform this inspection using NRC
Inspection Procedure 71111.21, "Component Design Bases Inspection."
The inspection focuses on components and operator actions that have high risk and low design
margins. The samples reviewed during this inspection will be identified during an information-
gathering visit and during the subsequent in-office preparation week. In addition, a number of
operating experience issues will also be selected for review.
The inspection will include an information gathering site visit by the team leader and a senior
reactor analyst, and 3-weeks of onsite inspection by the team. The inspection will consist of
four NRC inspectors and two contractors, of which three will focus on engineering and one on
operations. The current inspection schedule is as follows:
Onsite information gathering visit: Week of January 24, 2011
Preparation Week: February 7, 2011
Onsite weeks: February 14, 2011
February 28, 2011
March 14, 2011
The purpose of the information-gathering visit is to meet with members of your staff to identify
potential risk-significant components and operator actions. The lead inspector will also request
a tour of the plant with members of your operations staff and probabilistic safety assessment
staff. During the onsite weeks, several days of time will be needed on the plant-referenced
simulator in order to facilitate the development of operator action-based scenarios. Additional
information and documentation needed to support the inspection will be identified during the
inspection, including interviews with engineering managers, engineers, and probabilistic safety
assessment staff.
Union Electric Company -2-
Our experience with these inspections has shown that they are extremely resource intensive,
both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact
on the site and to ensure a productive inspection, we have enclosed a request for information
needed for the inspection. The request has been divided into three groups. The first group lists
information necessary for the information-gathering visit and for general preparation. This
information should be available to the regional office no later than January 18, 2011. Insofar as
possible, this information should be provided electronically to the lead inspector. Since the
inspection will be concentrated on high risk/low margin components, calculations associated
with your list of high-risk components should be available to review during the information
gathering visit to assist in our selection of components based on available design margin.
The second group of documents requested is those items that the team will need access to
during the preparation week in order to finalize the samples to be inspected. The third group
lists information necessary to aid the inspection team in tracking issues identified as a result of
the inspection. It is requested that this information be provided to the lead inspector as the
information is generated during the inspection. Additional requests by inspectors will be made
throughout all three onsite weeks for specific documents needed to complete the review of that
component/selection. It is important that all of these documents are up to date and complete in
order to minimize the number of additional documents requested during the preparation and/or
the onsite portions of the inspection. In order to facilitate the inspection, we request that a
contact individual be assigned to each inspector to ensure information requests, questions, and
concerns are addressed in a timely manner.
The lead inspector for this inspection is Wayne Sifre. We understand that our licensing
engineer contact for this inspection is Mr. Petzel. If there are any questions about the
inspection or the requested materials, please contact the lead inspector at (817) 860-8193 or via
e-mail at wayne.sifre@nrc.gov.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
made available electronically for public inspection in the NRC Public Document Room or from
the Publicly Available Records (PARS) component of NRCs document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the
Public Electronic Reading Room).
Sincerely,
/RA/
Thomas Farnholtz, Chief
Engineering Branch 1
Division of Reactor Safety
Docket: 50-483
License: NPF-30
Union Electric Company -3-
cc w/Enclosure:
Information Request for Callaway Plant Component Design Bases (CDBI) Inspection
Mr. Luke H. Graessle
Director, Operations Support
AmerenUE
P.O. Box 620
Fulton, MO 65251
Stephanie Banker
Manager, Protective Services
AmerenUE
P.O. Box 620
Fulton, MO 65251
Tom Voss
AmerenUE
1901 Choteau Avenue
St. Louis, MO 63103
Mr. Scott Sandbothe, Manager
Plant Support
AmerenUE
P.O. Box 620
Fulton, MO 65251
R. E. Farnam
Assistant Manager, Technical
Training
AmerenUE
P.O. Box 620
Fulton, MO 65251
J. S. Geyer
Radiation Protection Manager
AmerenUE
P.O. Box 620
Fulton, MO 65251
John ONeill, Esq.
Pillsbury Winthrop Shaw Pittman LLP
2300 N. Street, N.W.
Washington, DC 20037
Missouri Public Service Commission
P.O. Box 360
Jefferson City, MO 65102-0360
Union Electric Company -4-
Dru Buntin
Director of Government Affairs
Department of Natural Resources
P.O. Box 176
Jefferson City, MO 65102-0176
Matthew W. Sunseri, President and
Chief Executive officer
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, KS 66839
Kathleen Logan Smith, Executive Director and
Kay Drey, Representative, Board of Directors
Missouri Coalition for the Environment
6267 Delmar Boulevard, Suite 2E
St. Louis, MO 63130
Presiding Commissioner
Callaway County Court House
10 East Fifth Street
Fulton, MO 65251
Director, Missouri State Emergency
Management Agency
P.O. Box 116
Jefferson City, MO 65102-0116
Mr. Scott Clardy, Administrator
Section for Disease Control
Missouri Department of Health and
Senior Services
P.O. Box 570
Jefferson City, MO 65102-0570
Certrec Corporation
4200 South Hulen, Suite 422
Fort Worth, TX 76109
Mr. Keith G. Henke, Planner II
Division of Community and Public Health
Office of Emergency Coordination
Missouri Department of Health and
Senior Services
930 Wildwood Drive
P.O. Box 570
Jefferson City, MO 65102
Union Electric Company -5-
Chief, Technological Hazards Branch
FEMA Region VII
9221 Ward Parkway, Suite 300
Kansas City, MO 64114-3372
Union Electric Company -6-
Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art.Howell@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Vacant)
Senior Resident Inspector (David.Dumbacher@nrc.gov)
Resident Inspector (Jeremy.Groom@nrc.gov)
Acting Branch Chief, DRP/B (Don.Allen@nrc.gov)
Senior Project Engineer, DRP/B (Rick.Deese@nrc.gov)
Project Engineer, DRP/B (Greg.Tutak@nrc.gov)
Project Engineer, DRP/B (Nestor.Makris@nrc.gov)
CWY Administrative Assistant (Dawn.Yancey@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Mohan.Thadani@nrc.gov)
Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
OEMail Resource
R:_REACTORS\_CW\2011 ML 110050036
ADAMS: No 7Yes 7 SUNSI Review Complete Reviewer Initials: WS
7 Publicly Available 7 Non-Sensitive
Non-publicly Available Sensitive
DRS/EB1 C:DRS/EB1
WSifre TFarnholtz
/RA/ /RA/
1/4/2011 1/4/2011
OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
INFORMATION REQUEST FOR CALLAWAY PLANT COMPONENT DESIGN BASES (CDBI)
INSPECTION
Inspection Report: 05000483/2011006
Information Gathering Dates: January 24-27, 2011
On-site Inspection Dates: February 14-18, February 28 through March 4, and
March 14-18, 2011
Inspection Procedure: IP 71111.21, Component Design Bases Inspection
Lead Inspector/Team Leader: Wayne Sifre
817-860-8193
wayne.sifre@nrc.gov
I. Information Requested Prior to the information Gathering Visit (January 24, 2011)
The following information (Section I of this enclosure) should be sent to the Region IV
office in hard copy or electronic format (ims.certrec.com or compact disc, preferred), in
care of Wayne Sifre, by January 18, 2011 to facilitate the reduction in the items to be
selected for a final list during the preparation week February 7, 2011. The inspection
team will finalize the selected list during the prep week using the additional documents
requested in Section II of this enclosure. The specific items selected from the lists shall
be available and ready for review on the day indicated in this request. Please provide
requested documentation electronically in "pdf" files, Excel, or other searchable formats,
if possible. The information should contain descriptive names, and be indexed and
hyperlinked to facilitate ease of use. Information in "lists" should contain enough
information to be easily understood by someone who has knowledge of pressurized
water reactor technology. If requested documents are large and only hard copy formats
are available, please inform the lead inspector and provide subject documentation during
the first day of the onsite inspection.
1. An excel spreadsheet of equipment basic events (with definitions) including
importance measures sorted by risk achievement worth (RAW) and Fussell-
Vesely (FV) from your internal events probabilistic risk assessment (PRA). Include
basic events with RAW value of 1.3 or greater.
2. Provide a list of the top 500 cut-sets from your PRA.
3. Copies of PRA "system notebooks," and the latest PRA summary document.
4. An excel spreadsheet of PRA human action basic events or risk ranking of
operator actions from your site specific PSA sorted by RAW and FV. Provide
copies of your human reliability worksheets for these items.
5. If you have an external events or fire PSA model, provide the information
requested in items 1-4 for external events and fire.
-1- Enclosure
6. Any pre-existing evaluation or list of components and associated calculations with
low design margins, (i.e., pumps closest to the design limit for flow or pressure,
diesel generator close to design required output, heat exchangers close to rated
design heat removal, etc.).
7. List of high-risk maintenance rule systems/components and functions; based on
engineering or expert panel judgment.
8. A list of operating experience evaluations for the last two years.
9. A list of all time-critical operator actions in procedures.
10. A list of permanent and temporary modifications sorted by component identified in
Item 1.
11. List of current "operator work arounds/burdens."
12. A list of the design calculations, which provide the design margin information for
components included in Item 1. (Calculations should be available during the
information-gathering visit).
13. List of root cause evaluations associated with component failures or design issues
initiated/completed in the last five years.
14. Current management and engineering organizational charts.
15. Callaway Plant IPEEE, if available electronically.
16. Mechanical piping drawings for:
Engineered safety features
Emergency core cooling systems
17. Electrical one-line drawings for:
Offsite power/switchyard supplies
Normal AC power systems
Emergency AC/DC power systems including
120VAC power, and
125VDC/24VDC safety class systems
18. List of any common-cause failures of components in the last three years.
19. An electronic copy of the Design Bases Documents.
20. An electronic copy of the System Health notebooks.
-2- Enclosure
II. Information Requested to be Available on First Day of Preparation Week
(February 7, 2011)
1. List of condition reports (corrective action documents) associated with each of
the selected components for the last five years.
2. The corrective maintenance history associated with each of the selected
components for the last two years.
3. Copies of calculations associated with each of the selected components (if not
previously provided), excluding data files. Please review the calculations and
provide copies of reference material (such as drawings, engineering requests,
and vendor letters).
4. Copies of operability evaluations associated with each of the selected
components and plans for restoring operability, if applicable.
5. Copies of selected operator work-around evaluations associated with each of the
selected components and plans for resolution, if applicable.
6. Copies of any open temporary modifications associated with each of the selected
components, if applicable.
7. Trend data on the selected electrical/mechanical components performance for
last three years (for example, pumps performance including in-service testing,
other vibration monitoring, oil sample results, etc., as applicable).
8. A copy of any internal/external self-assessments and associated corrective
action documents generated in preparation for the inspection.
9. A copy of engineering/operations related audits completed in the last two years.
10. List of motor operated valves (MOVs) in the program, design margin and risk
ranking.
11. List of air operated valves (AOVs) in the valve program, design and risk ranking.
12. Structure, system and components in the Maintenance Rule (a)(1) category.
13. Site top 10 issues list.
14. Procedures used to accomplish operator actions associated with the basic
events in your PRA.
15. System Training Manuals.
16. List of licensee contacts for the inspection team with pager or phone numbers.
-3- Enclosure
III. Information Requested to be provided throughout the inspection.
1. Copies of any corrective action documents generated because of the teams
questions or queries during this inspection.
2. Copies of the list of questions submitted by the team members and the
status/resolution of the information requested (provide daily during the inspection
to each team member).
3. Reference materials (available electronically and as needed during all onsite
weeks):
General set of plant drawings
IPE/PRA report
Procurement documents for components selected
Plant procedures (normal, abnormal, emergency, surveillance, etc.)
Technical Specifications
Updated Final Safety Analysis Report
Vendor manuals
Inspector Contact Information:
Wayne C. Sifre
Senior Reactor Inspector
(817) 860-8193
wayne.sifre@nrc.gov
Mailing Address:
US NRC, Region IV
Attn: Wayne C. Sifre
612 East Lamar Blvd, Ste 400
Arlington, TX 76011
-4- Enclosure