Notification Shearon Harris Nuclear Plant - Component Design Bases Inspection - NRC Inspection Report IR 05000400-11-008
ML103540440
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 12/20/2010
From: Binoy Desai
NRC/RGN-II/DRS/EB1
To: Burton C
Carolina Power & Light Co
References
IR-11-008
Download: ML103540440 (6)


See also: IR 05000400/2011008

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

December 20, 2010

Mr. Christopher L. Burton

Vice President

Carolina Power & Light Company

Shearon Harris Nuclear Plant

P.O. Box 165, Mail Zone 1

New Hill, NC 27562-0165

SUBJECT: NOTIFICATION SHEARON HARRIS NUCLEAR PLANT - COMPONENT

DESIGN BASES INSPECTION - NRC INSPECTION REPORT

05000400/2011008

Dear Mr. Burton:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a component design bases inspection at your Shearon Harris Nuclear

Power Plant reactor facility during the period of March 21 - April 22, 2011. The inspection team

will be led by Mr. Shakur Walker, a Senior Reactor Inspector from the NRC's Region II Office.

This inspection will be conducted in accordance with the baseline inspection procedure,

Procedure 71111.21, Component Design Bases Inspection, issued December 6, 2010.

The inspection will evaluate the capability of risk significant / low margin components to function

as designed and to support proper system operation. The inspection will also include a review

of selected operator actions, operating experience, and modifications.

During a discussion on December 2, 2010, Mr. Walker confirmed, with Mr. John Doorhy of your

staff, arrangements for an information gathering site visit and the three-week onsite inspection.

The schedule is as follows:

  • Information gathering visit: February 28 - March 4, 2011
  • Week 1 of onsite inspection: March 21 - March 25, 2011
  • Week 2 of onsite inspection: April 4 - April 8, 2011
  • Week 3 of onsite inspection: April 18 - April 22, 2011

The purpose of the information gathering visit is to meet with members of your staff to identify

risk-significant components and operator actions. Information and documentation needed to

support the inspection will also be identified and gathered or requested. Mr. George MacDonald

or Mr. Walt Rogers, both Region II Senior Reactor Analysts, may accompany Mr. Walker during

the information gathering visit to review probabilistic risk assessment data and identify risk

significant components which will be examined during the inspection.

CPL 2

The enclosure lists documents that will be needed prior to the information gathering visit. Please

contact Mr. Walker with any questions prior to preparing materials listed in the enclosure and

provide the referenced information to the Region II office by January 28, 2011, unless otherwise

noted. The inspectors will try to minimize your administrative burden by specifically identifying

only those documents required for the inspection preparation.

During the information gathering visit, the team leader will also discuss the following inspection

support administrative details: office space; site, plant and information system access; required

resources; and information exchange protocol.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document Room

or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011.

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for

information or an information collection requirement unless the requesting document displays a

currently valid Office of Management and Budget control number.

Thank you for your cooperation in this matter. If you have any questions regarding the

information requested or the inspection, please contact Mr. Walker at (404) 997-4639 or me at

(404) 997-4519.

Sincerely,

/RA/

Binoy B. Desai, Chief

Engineering Branch 1

Division of Reactor Safety

Docket Nos.: 50-400

License No.: NPF-63

Enclosure: Information Request for Shearon Harris Nuclear Power Plant Component Design

Bases Inspection

cc w/encl: (See page 3)

CPL 3

cc w/encl: W. Lee Cox, III

Brian C. McCabe Section Chief

Manager, Nuclear Regulatory Affairs Radiation Protection Section

Progress Energy Carolinas, Inc. N.C. Department of Environmental

Electronic Mail Distribution Commerce & Natural Resources

Electronic Mail Distribution

R. J. Duncan, II

Vice President Public Service Commission

Nuclear Operations State of South Carolina

Carolina Power & Light Company P.O. Box 11649

Electronic Mail Distribution Columbia, SC 29211

Greg Kilpatrick Chairman

Training Manager North Carolina Utilities Commission

Shearon Harris Nuclear Power Plant Electronic Mail Distribution

Progress Energy Carolinas, Inc.

Electronic Mail Distribution Robert P. Gruber

Executive Director

John C. Warner Public Staff - NCUC

Manager 4326 Mail Service Center

Support Services Raleigh, NC 27699-4326

Progress Energy Carolinas, Inc.

Electronic Mail Distribution Herb Council

Chair

David H. Corlett Board of County Commissioners of Wake

Supervisor County

Licensing/Regulatory Programs P.O. Box 550

Progress Energy Raleigh, NC 27602

Electronic Mail Distribution

Sally Kost

David T. Conley Chair

Associate General Counsel Board of County Commissioners of

Legal Dept. Chatham County

Progress Energy Service Company, LLC P.O. Box 1809

Electronic Mail Distribution Pittsboro, NC 27312

Christos Kamilaris Kelvin Henderson

Director Plant General Manager

Fleet Support Services Carolina Power and Light Company

Carolina Power & Light Company Shearon Harris Nuclear Power Plant

Electronic Mail Distribution Electronic Mail Distribution

John H. O'Neill, Jr. Senior Resident Inspector

Shaw, Pittman, Potts & Trowbridge U.S. Nuclear Regulatory Commission

2300 N. Street, NW Shearon Harris Nuclear Power Plant

Washington, DC 20037-1128 U.S. NRC

5421 Shearon Harris Rd

Joseph W. Donahue New Hill, NC 27562-9998

Vice President

Nuclear Oversight

Carolina Power and Light Company

Electronic Mail Distribution

_________________________ X SUNSI REVIEW COMPLETE

OFFICE RII:DRS RII:DRS

SIGNATURE RA RA

NAME S. Walker B. Desai

DATE 12/20/2010 12/20/10

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

INFORMATION REQUEST FOR SHEARON HARRIS NUCLEAR POWER PLANT

COMPONENT DESIGN BASES INSPECTION

Please provide the information electronically in .pdf files, Excel, or other searchable format on

CD/DVD-ROM. The CD/DVD-ROM should be indexed and possibly hyperlinked to facilitate

ease of use. Information in lists should contain enough information to be easily understood to

someone who has knowledge of pressurized water reactor technology.

1. From your most recent probabilistic safety analysis (PSA) excluding external events and

fires, please provide:

a. Two risk rankings of components from your site-specific probabilistic safety

analysis (PSA) - one sorted by Risk Achievement Worth (RAW), and the other

sorted by Birnbaum Importance.

b. A list of the top 500 cutsets.

2. From your most recent probabilistic safety analysis (PSA) including external events and

fires, please provide:

a. Two risk rankings of components from your site-specific probabilistic safety

analysis (PSA) - one sorted by Risk Achievement Worth (RAW), and the other

sorted by Birnbaum Importance.

b. A list of the top 500 cutsets.

3. Risk ranking of operator actions from your site specific PSA sorted by RAW. Provide

copies of your human reliability worksheets for these items.

4. Any pre-existing evaluation or list of components and calculations with low design

margins (i.e., pumps closest to the design limit for flow or pressure, diesel generator close

to design required output, heat exchangers close to rated design heat removal, MOV risk-

margin rankings, etc.).

5. A list of station applicability evaluations/reviews performed and documented in the station

corrective action program in the past two years for industry events, critical equipment

failures, and safety related equipment vulnerabilities (as communicated by NRC generic

communications, industry communications, 10 CFR Part 21 notifications, etc.).

6. A list of operability evaluations completed within the last two years, sorted by associated

component or system.

7. A list of common-cause failures of components that have occurred at Shearon Harris

Nuclear Power Plant and have been identified within the last five years.

8. A list of equipment currently planned for upgrade/improvement by the site (e.g. ONE

List), including a description of the reason(s) why each component (i.e. not a

programmatic or system level concern) is on that list and summaries (if available) of your

plans to address those reasons.

9. A list of equipment currently in RIS 05-020 (formerly GL 91-18) status, or in MR (a)(1)

status.

10. Contact information for a person to discuss PRA information prior to the information

gathering trip: name, title, phone number, and e-mail address.

Enclosure

2

11. Provide two sets of PI&D drawings (11x17) for safety-related systems (for onsite week of

February 28 - March 3, 2011)

12. Provide six copies of FSAR (CD/DVD-ROM only) (for onsite week of February 28 - March

3, 2011)

13. Provide six copies of Technical Specifications and Bases (CD/DVD-ROM only) (for

onsite week of February 28 - March 3, 2011)

Enclosure