Plant St. Lucie - Notification of Inpsection and Request for Information 5000335/2010 and 05000389/2010
ML103210596
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 11/15/2010
From: Brian Bonser
NRC/RGN-II/DRS/PSB1
To: Nazar M
Florida Power & Light Co
References
Download: ML103210596 (9)


See also: IR 05000335/2020010

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

November 15, 2010

Mr. Mano Nazar

Executive Vice President and Chief Nuclear Officer

Florida Power & Light Company

P.O. Box 14000

Juno Beach, FL 33408-0420

SUBJECT:

PLANT ST. LUCIE - NOTIFICATION OF INSPECTION AND REQUEST FOR

INFORMATION 05000335/2010 AND 05000389/2010

Dear Mr. Nazar:

During the periods of January 10 - 14, 2011 and February 7 - 11, 2011, the NRC will perform the

baseline Occupational and Public Radiation Safety Inspection at the St. Lucie Nuclear Power Station,

(NRC Inspection Procedures 71124.01, 71124.02, 71124.03, 71124.04, 71124.05, Radiation Safety

Sections of 71151, and TI 2515/179). Experience has shown that this inspection is resource intensive

for both the NRC inspectors and your staff. In order to minimize the impact to your on-site resources

and to ensure a productive inspection, we have enclosed a request for documents needed for this

inspection. It is important that all of these documents are up to date and complete, in order to minimize

the number of additional documents requested during the preparation and/or the onsite portions of the

inspection. We request that the documents on the enclosed list be provided in the form of computer

readable optical media such as a CD or available for review on a shared drive.

We have discussed the schedule for these inspection activities with your staff and understand that our

regulatory contact for this inspection will be Don Cecchett and Christopher Martin of your organization

with the material available for review by December 17, 2010. If there are any questions about this

inspection or the material requested, please contact the lead inspector, Wade T. Loo at (404) 997-

4727.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document Room or

from the Publicly Available Records (PARS) component of NRC's document system(ADAMS). ADAMS

is accessible from the NRC Web site at http://www.nrc.gov/ reading-rm/adams.html (the Public

Electronic Reading Room).

Sincerely,

/RA/

Brian R. Bonser, Chief

Plant Support Branch 1

Division of Reactor Safety

Dockets Nos.: 50-335, 50-389,

License Nos.: DPR-67 and NPF-16

Enclosure: Occupational Radiation Protection Inspection Document Request

cc w/encl.: See page 2

FPL

2

cc w/encl:

Richard L. Anderson

Site Vice President

St. Lucie Nuclear Plant

Electronic Mail Distribution

Robert J. Hughes

Plant General Manager

St. Lucie Nuclear Plant

Electronic Mail Distribution

Gene St. Pierre

Vice President, Fleet Support

Florida Power & Light Company

Electronic Mail Distribution

Ronnie Lingle

Operations Manager

St. Lucie Nuclear Plant

Electronic Mail Distribution

Eric Katzman

Licensing Manager

St. Lucie Nuclear Plant

Electronic Mail Distribution

Larry Nicholson

Director

Licensing

Florida Power & Light Company

Electronic Mail Distribution

Alison Brown

Nuclear Licensing

Florida Power & Light Company

Electronic Mail Distribution

Mitch S. Ross

Vice President and Associate General

Counsel

Florida Power & Light Company

Electronic Mail Distribution

Marjan Mashhadi

Senior Attorney

Florida Power & Light Company

Electronic Mail Distribution

William A. Passetti

Chief

Florida Bureau of Radiation Control

Department of Health

Electronic Mail Distribution

Ruben D. Almaguer

Director

Division of Emergency Preparedness

Department of Community Affairs

Electronic Mail Distribution

J. Kammel

Radiological Emergency Planning

Administrator

Department of Public Safety

Electronic Mail Distribution

Mano Nazar

Executive Vice President and Chief Nuclear

Officer

Florida Power & Light Company

P. O. Box 14000

Juno Beach, FL 33408

Senior Resident Inspector

St. Lucie Nuclear Plant

U.S. Nuclear Regulatory Commission

P.O. Box 6090

Jensen Beach, FL 34957-2010

Seth B. Duston

Training Manager

St. Lucie Nuclear Plant

Electronic Mail Distribution

Faye Outlaw

County Administrator

St. Lucie County

Electronic Mail Distribution

Jack Southard

Director

Public Safety Department

St. Lucie County

Electronic Mail Distribution

_________________________

X SUNSI REVIEW COMPLETE

OFFICE

RII: DRS

RII: DRS

SIGNATURE

RA

RA

NAME

W. LOO

B. BONSER

DATE

11/15/2010

11/15/2010

E-MAIL COPY?

YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO

Enclosure

Pre-Inspection Document Request

Occupational and Public Radiation Safety Cornerstone

Licensee:

St. Lucie Nuclear Plant

Docket Numbers:

50-335, 50-389

Inspection Dates:

January 10 - 14, 2011 and February 7 - 11, 2011

Inspection Procedures to be performed:

71124.01

Radiological Hazard Assessment and Exposure Controls

71124.02

Occupational ALARA Planning and Controls

71124.03

In-Plant Airborne Radioactivity Control and Mitigation

71124.04

Occupational Dose Assessment

71124.05

Radiation Monitoring Instrumentation

71151

Performance Indicator Verification

TI 2515/179

Verification of Licensee Responses to NRC Requirement for Inventories of

Materials Tracked in the National Source Tracking System Pursuant to Title 10,

Code of Federal Regulations, Part 20.2207 (10 CFR 20.2207)

Documentation is requested from May, 2009, to the present for all items.

We would prefer as much of the information as possible in electronic form. An index to the CD

or shared drive contents is also helpful. For those items requesting a list of documents/areas,

the inspectors will select documents/areas from the list for on-site review. If any of the

requested information is too burdensome to provide electronically or as hard copies, simply

indicate that the requested material is available for onsite review by the inspectors.

If you have any questions, please call Wade Loo at 404-997-4727. Thank you in advance for all

your effort in putting together this material.

Assistance Requested During On-Site Inspection

Identification of work activities during the inspection for inspector observations, including

notification of pre-job briefings, notification of diving activities, audio/visual surveillance for

remote job coverage.

Health physics assistance in plant walk-downs assessing access controls, e.g. verifying the

posting and locking of entrances to HDR-HRA and VHRA, and spent fuel pool controls.

Health physics assistance in plant walk-downs/job coverage of ongoing outage activities to

assess access controls and ALARA practices.

Discussions with appropriate individuals regarding access controls and ALARA planning.

General Information Request

Telephone numbers of contacts.

Plant and Radiation Protection organizational charts, including personnel involved in solid

radwaste processing and transportation of radwaste/radioactive materials.

Electronic copy of applicable chapters of UFSAR (e.g. radiation protection program, liquid

Enclosure

and solid radioactive waste program, etc.).

Outage schedule, including work activities to be conducted during the week(s) of the

inspection.

List of active radiation work permits, including those specific to outage activities, with their

administrative limits, electronic dosimeter dose rate limit, and dose limit.

List of radiation protection procedures.

Corrective Action Program procedures.

Procedure(s) for identifying, notification, tracking, and correcting PI occurrences.

List of all Performance Indicators (PIs) and copies of associated corrective action reports for

Occupational Exposure Control Effectiveness and RETS/ODCM Radiological Effluent

Occurrences.

Audits and self-assessments performed since the last inspection that encompass the areas

of (1) access controls, (2) the ALARA program and implementation, (3) liquid and solid

radwaste processing, and (4) transportation of radioactive material/radwaste.

Procedures associated with the ISFSI facility. Procedures should include:

o Radiological surveys, postings, and radiation control barricades

o Environmental monitoring (including TLDs)

o Loading of casks

o Routine activities

Radiation surveys of the ISFSI since the last inspection.

ALARA reviews and planning and associated RWPs for cask loading activities.

Environmental monitoring results (e.g. TLDs).

Radiological records for the loading of casks since the last inspection.

Records of contamination incidents since the last inspection.

List of corrective action reports related to the ISFSI with respect to radiation protection (i.e.

access controls, ALARA, contamination, radiation levels, etc.) since the last inspection.

71124.01: Radiological Hazard Assessment and Exposure Controls

Site and corporate procedures associated with the access control program. Procedures

should include:

o Radiological surveys, postings, and radiation control barricades

o Security and control of high radiation sources/objects stored in pools

o Radiation Work Permits

o Radiological Job-Coverage

o Controlling access to High Radiation Areas (HRAs), High Dose Rate High Radiation

Areas (HDR-HRAs), and Very High Radiation Areas (VHRAs)

o Key controls for all high radiation areas

o Radioactive material control, including contamination and hot particles

Enclosure

List of the 10 most exposure significant work areas within radiation areas, high radiation

areas (<1R/hr), or airborne radioactivity areas in the plant. This may include areas with low

dose rates but high collective dose. Identify any high radiation areas with significant dose

gradients (factor of five or more), including underwater diving activities.

List of LHRAs, HDR-HRAs (>25 rem in one hour @ 30 cm), and VHRAs. Include areas with

the potential to become a LHRA during routine operations or outages.

List of corrective action reports generated since the last inspection related to access

controls, including the following:

o Access controls, including high radiation area radiological incidents

o Radiological events caused by radiation worker errors

o Radiological events caused by radiation protection technician errors

Available for onsite review during inspection:

o Elevation maps with most recent operating and outage radiation survey levels.

o RWPs for the top five dose rate areas or tasks.

71124.02: ALARA Planning and Controls

Site and corporate procedures associated with maintaining site dose ALARA, including

those involving ALARA work activities. These procedures should include:

o ALARA program implementation, including ALARA committee activities and ALARA

planning, briefing, and reviews

o Radiation work permit preparation and worker compliance

o Processes used to estimate and track work activity specific exposures

o Making changes to dose estimates during task performance

o Work controls

o Engineering controls

o Exposure mitigation requirements

Most recent annual ALARA report and most recent refueling outage report.

Annual ALARA goals for 2010, and 2011, and the methodology utilized to make the

projections.

Historic trends and current status of plant source term.

List approximately 10-15 work activities planned during the inspection likely to result in the

highest personnel collective exposures and those which present the greatest radiological

risk to workers (e.g. work in HRAs, diving, potentially changing radiological conditions).

Include the dose projections and ALARA package numbers.

ALARA Committee activity summaries (e.g. meeting minutes) for three months or 3

meetings after the last refueling outage and the three months or 3 meetings prior to the

upcoming refueling outage.

Completed ALARA packages (including post-job reviews) for the five work activities that

were completed during the last outage which had the greatest collective dose and/or

Enclosure

presented significant radiological risk.

List of five activities (including ALARA package number) from the previous outage in which

the work scope changed or was extended and alternative ALARA measures were taken to

respond to the emergent conditions.

List of five activities from the previous outage in which the estimated work hours were

significantly different than the actual hours expended. List five activities in which the

estimated and actual hours expended were accurate.

Outline of the source term reduction strategy. Information should include:

o Historic trends and current status of plant source term

o Factors that affect the source term

o Activities employed to reduce the source term

o Specific sources identified for reduction actions

o Source term reduction evaluation

o Results achieved since last inspection

List of activities since that last inspection that were reviewed for ALARA problems and

actions taken to prevent recurrence. Include corrective action report number(s) if applicable.

List of corrective action reports generated since the last inspection related to the ALARA

program, including the following:

o ALARA planning

o Post-job review identified problems

o Radiation worker practices

o Occurrences where the collective exposure was greater than intended dose

determined to be ALARA for the individual work activities

Available for onsite review during the inspection:

o ALARA planning packages for jobs being performed during the outage

o Temporary shielding requests generated for the outage.

o Records of personnel monitored for radiation exposure that show the total TEDE to

date for each person. If possible, sort individuals by work group.

71124.03: In-Plant Airborne Radioactivity Control and Mitigation

Site and corporate procedures/manuals associated with airborne radiation monitoring

instrumentation and respiratory protection. Procedures/manuals should include:

o Operation, calibration, and maintenance of air sampling instrumentation, including

set-point determination (e.g., low-vols, high vols, goosenecks, AMS 4s, etc.)

o Calibration and maintenance of portable instruments

o Actions to be taken when air sampling instrumentation is found to be significantly out

of tolerance/calibration

o Issuance and use of respiratory protective equipment (emphasis on SCBA and air-

supplied equipment)

o Training, including fit-testing, for use of SCBA and supplied-air systems

Enclosure

o SCBA maintenance activities, including vital components (i.e. regulators)

o Determination/verification of Grade D air for SCBA

Two most recent calibrations for the following CAM equipment:

o Control Room Ventilation

o Spent Fuel Pool

o Radioactive Waste Processing

Records of certification of air quality for equipment used to provide breathing air for air-

supplied respirators and SCBA bottles since the last inspection.

List of corrective action reports generated since the last inspection involving radiation

monitoring and protective equipment deficiencies, including the following:

o Continuous air monitors

o Respiratory protection equipment and program implementation

Available for onsite review by inspector during inspection:

o Inventory, inspection, and maintenance records for SCBA equipment

o Training records, including fit-testing, for SCBA-qualified individuals

o Training records/certification for individuals qualified to perform maintenance on vital

components (e.g. regulators) on SCBA

71124.04: Occupational Dose Assessment

1.

Site and corporate procedures associated with dosimetry operations. Procedures should

include:

a. Issuance/use of external dosimetry (routine, multibadging, extremity, neutron, declared

pregnant workers, assigning dose of record, etc.)

b. For non-NVLAP accredited passive dosimeters, procedures for calibration, application

of calibration factors, zeroing, etc.

c. Calibration and use of electronic dosimeters, including, if applicable, use of a

correction factor to address response of ED with respect to TLD

d. Assessment of internal dose (operation of whole body counter, assignment of dose

based on DAC-hours, urinalysis, etc.)

e. Evaluation of, and dose assessment for, radiological incidents (e.g. distributed

contamination, hot particles, loss of dosimetry, etc.)

2.

Most recent NVLAP accreditation report.

3.

List of the types of dosimetry used, e.g. TLD, OSL, bubble dosimeter, electronic

dosimeter, by manufacturer and, if applicable, model number M.

4.

List of any internal dose assessments exceeding 10 mrem CEDE and any skin dose

assessments performed since May, 2009.

5.

List of CAP condition reports generated since May, 2009, related to internal and external

dosimetry, dose assessment, etc.

Enclosure

71124.05: Radiation Monitoring Instrumentation

Site and corporate procedures associated with radiation detection and monitoring

instrumentation. Procedures should include:

o Portable radiation survey instrument calibrations and source checks

o Electronic dosimeter calibration and use

o Whole body counter, personnel contamination monitor, portal monitor, and small

article monitor calibrations and source checks

o Area radiation monitor alarm setpoint values and setpoint bases, calibration, and

source checks

o Effluent monitor alarm setpoint bases and calculational methods

o Collecting and analyzing high-range, post-accident iodine effluent samples

o Maintenance and calibration/certification of calibration sources/ranges

List of in-service survey instrumentation including air samplers, small article monitors,

personnel contamination monitors, portal monitors, whole body counters, neutron monitoring

instrumentation, etc.

Technical Specifications related to post-accident monitoring instrumentation, effluent

monitoring, and emergency assessment.

Most recent channel calibration and functional test for the effluent/process monitors, post-

accident monitoring instruments, and area radiation monitors.

Whole body counter calibration reports since May, 2009, calibration/check source

information, and WBC analysis library.

List of CAP condition reports generated since May, 2009, related to radiation monitoring

instrumentation, including the following:

o Radiation survey instruments/calibrations

o Radiation Monitoring System, including effluent monitors, process monitors, and area

radiation monitors

o Chemistry count lab, including cross-check analysis and QC

o Whole body counter, PCMs, PMs, and SAMs

71151: Performance Indicator (PI) Verification

Monthly PI reports since September, 2010, and copies of associated condition reports for

any RETS/ODCM Radiological Effluent occurrences.

Liquid and gaseous effluent release permits which specify the monthly, quarterly, and

annual curies released by isotope and associated public dose assessments since

September, 2010.

List of all corrective action documents since September, 2010, using keywords such as:

HRA, LHRA, VHRA, unintended dose, unlocked door, etc.

List of all electronic dosimeter (ED) dose rate alarms > 1 R/hr and all ED dose alarms since

September, 2010.