Acceptance of Clinton, Unit 1 - LAR Adoption of TSTF-501, Rev 1 - Relocation of Stored Fuel Oil and Lube Oil Volumes
ML103200322
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/15/2010
From: Nicholas Difrancesco
Plant Licensing Branch III
To: Mathews M
Exelon Corp
DiFrancesco N, NRR/DORL/LPL3-2, 415-1115
References
Download: ML103200322 (2)


Text

From:

DiFrancesco, Nicholas Sent:

Monday, November 15, 2010 5:15 PM To:

'Mitchel.Mathews@exeloncorp.com' Cc:

Lingam, Siva; Boyle, Patrick; Wohl, Marilyn; 'jeff.hansen@exeloncorp.com';

Norton, Charles

Subject:

Acceptance of Clinton Power Station, Unit 1 - LAR Re: Adoption of TSTF-501, Rev 1 - Relocation of Stored Fuel Oil and Lube Oil Volumes (TAC ME4850)

Mr. Mathews, By letter dated October 8, 2010, Exelon Generation Company, LLC (the licensee) submitted license amendment request (LAR) for Clinton Power Station (CPS), Unit 1 (ADAMS Accession No. ML102810654). The LAR proposes to revise the CPS Technical Specifications (TS) 3.8.3, Diesel Fuel Oil, Lube Oil, and Starting Air, by relocating the current stored diesel fuel oil and lube oil numerical volume requirements from the TS to the TS Bases. The TS are being modified so that the stored diesel fuel oil and lube oil inventory will require that a 7-day supply be available for each diesel generator. The purpose of this message is to provide the results of the Nuclear Regulatory Commission (NRC) staff's acceptance review of this LAR. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review was also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license must fully describe the changes requested and follow, as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and has concluded that it provides technical information in sufficient detail to enable the NRC staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendments in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the NRC staff to complete its technical review, you will be advised by separate correspondence.

In accordance with our process as described in LIC-109, "ACCEPTANCE REVIEW PROCEDURES," I am placing a copy of this email in ADAMS as a publicly-available, official agency record.

Sincerely, Nicholas DiFrancesco Project Manager Nuclear Regulatory Commission Division of Operating Reactor Licensing nicholas.difrancesco@nrc.gov

Tel: (301) 415-1115 Fax: (301) 415-1222 E-mail Properties Mail Envelope Properties (0046140293E11F408991442DB4FE25CA127DA7EDC5)

Subject:

Acceptance of Clinton Power Station, Unit 1 - LAR Re: Adoption of TSTF-501, Rev 1 - Relocation of Stored Fuel Oil and Lube Oil Volumes (TAC ME4850)

Sent Date: 11/15/2010 5:14:51 PM Received Date: 11/15/2010 5:14:51 PM From: DiFrancesco, Nicholas Created By: Nicholas.DiFrancesco@nrc.gov Recipients:

Mitchel.Mathews@exeloncorp.com ('Mitchel.Mathews@exeloncorp.com')

Tracking Status: None Siva.Lingam@nrc.gov (Lingam, Siva)

Tracking Status: None Patrick.Boyle@nrc.gov (Boyle, Patrick)

Tracking Status: None Marilyn.Wohl@nrc.gov (Wohl, Marilyn)

Tracking Status: None jeff.hansen@exeloncorp.com ('jeff.hansen@exeloncorp.com')

Tracking Status: None Charles.Norton@nrc.gov (Norton, Charles)

Tracking Status: None Post Office:

HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 21845 11/15/2010 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: