ML103090713

From kanterella
Jump to navigation Jump to search
OL - FW: NRC Bucket List 10/14/10
ML103090713
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 10/13/2010
From:
Office of Nuclear Reactor Regulation
To:
Division of Operating Reactor Licensing
References
Download: ML103090713 (19)


Text

1 WBN2Public Resource From:

Poole, Justin Sent:

Wednesday, October 13, 2010 12:50 PM To:

Raghavan, Rags Cc:

WBN2HearingFile Resource

Subject:

FW: NRC Bucket List 10/14/10 Attachments:

NRC PM Open Items List Archive 10-14-10.docx; NRC PM Open Items List 10-14-10.docx From: Crouch, William D [1]

Sent: Wednesday, October 13, 2010 12:23 PM To: Poole, Justin; Wiebe, Joel; Milano, Patrick; Campbell, Stephen; ragahavan@nrc.gov Cc: Shea, Joseph W; Arent, Gordon; Riedl, Christopher John; Brandon, Michael Keyes

Subject:

NRC Bucket List 10/14/10 Attachedaretwoversionsofthebucketlist.Thefirstfileistheupdatedversionofthefilewehavebeenusingforthe lastseveralmonths.ThesecondfileisareducedversioninwhichIhavepurgedallofthecompletedactionsandadded inresponsibleorg/name.IfthisisokwiththeNRC,Iwouldliketomorrowtohavesomeverificationthattheupdatesto theoldlistareacceptableandthenarchivethatlist.Thenwewouldtransitiontothenewlistandtrackactionsjustlike wehavebeendoingbutwithanewstartinglist.

William D. (Bill) Crouch (423)3652004WBN (256)7777676Cell

Hearing Identifier:

Watts_Bar_2_Operating_LA_Public Email Number:

139 Mail Envelope Properties (19D990B45D535548840D1118C451C74D6FD362431C)

Subject:

FW: NRC Bucket List 10/14/10 Sent Date:

10/13/2010 12:49:42 PM Received Date:

10/13/2010 12:49:46 PM From:

Poole, Justin Created By:

Justin.Poole@nrc.gov Recipients:

"WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>

Tracking Status: None "Raghavan, Rags" <Rags.Raghavan@nrc.gov>

Tracking Status: None Post Office:

HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 945 10/13/2010 12:49:46 PM NRC PM Open Items List Archive 10-14-10.docx 51645 NRC PM Open Items List 10-14-10.docx 27579 Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received:

Page 1 of 13 NRC PM Open Items List 10/14/10 (423) 751-6338 ID 657601 No.

Description Status Additional Comments Respond to Refurbishment meeting questions C - 9/22 Respond to Replacement Items question C - 9/15 Letter on MSIP C - 11/04 List of I&C systems and affected FSAR section C - 9/17 List of open commitments C - 10/1 Resolve fifth DG licensing basis C-11/24 FSAR A95 NPG Issue Rod Krich EDCR Proc Appendix J C - 9/8 FSAR drawings C - 10/13 List of Project Milestones C - 9/24 Public Meeting Part 70 License C - 10/22 Application submitted 11/11 Decision on incorporating TSTF-493 (this will require you to develop a setpoint control program)

C - 11/18 Follow BFN path Other Unit 1 TSs that require revision for dual-unit operation (a list of any to start with)

C - 11/30 Provide info on your material purchases so that NRC can decide if vendor inspections are warranted.

C - 10/6 Test sequence schedule for Eagle-21 Factory Acceptance Testing C - 11/23 PRA/IPE/ submittal in Jan 2010 C - 2/9/10 Estimated schedule for cold and hot functional testing C - 9/24 On-site emergency preparedness drill C - 9/24 Current lists of items recommended in SECY 07-0096: e.g., betterments, adopt updated standards for Unit 2 where it would not significantly detract from design and operational consistency between Units 1 and 2, opportunities to resolve GSIs, exemptions/reliefs List Available Now Evacuation time estimates and State/local EP Plans C - 12/3 Support Contracts C - 12/14

Page 2 of 13 No.

Description Status Additional Comments Security Plan update (cyber security)

C - 11/23 FSAR Chapter 7 I&C C - 12/14 A-96 Commitment list for WRAG C - 2/18/10 List ready Big FSAR drawings for 9.2.1, 9.2.2 and 9.2.5 C-1/20 Refurbishment Electrical RAI C - 2/5/10 Draft I&C RAI 3/8/10 Complete RM-1000 Proprietary Documents and schedule for nonP 3/8/10 Ps will be in I&C RAI response Presevice Inspection/Refurbishment -

example implementing procedures for audit 12/31/09 Regional Request Complete.

Additional information related to GLs/

Bulletins / TMI items Region II request -

Bulletins sent Environmental RAIs 3/12/10 Step 1 Complete TS / TRM meeting ?

3/30/10 Meeting Set Preservice Inspection Additional Information 3/12/10 04/02/2010 04/19/2010 Drawings and preservice scope to be provided In-signoff

1.

PSI Commitments - Revised PSI procedure and ASME Inspection Plan and Schedule (Chinn)

Complete

2.

Security Plan update 05/28/10 05/14/10A RAI response submitted. Plan submitted.

3.

List of TVA QA and Bechtel self-assessments on implementation of licensing basis program, refurb program, etc. (Metzler)

Complete List of self assessments provided for NRC selection on 8/3/10.

See item 95 for NRC action.

4.

EAL procedure revisions (Walt Lee)

(Lyons) 04/10/2010 04/20/2010 04/29/10 10/12/10A RAIs received In Review/Signoff RAIs submitted 4/26 NRC questions: Are the EALs the same for U1 and U2?

Potential RAI on evacuation time estimate.

5.

Antitrust Info - Gap analysis 3/12/10 04/02/2010 04/23/2010 Complete -

Department of Justice Review

Page 3 of 13 No.

Description Status Additional Comments 04/29/10 5/13/10A started 9/1/10

6.

Step 1 - Submit Cyber Security Plan/Controls and Implementation Schedule. State will be ready for inspection by April 2011.

Step 2 - Conduct Cyber Security Self Assessment (Pointer)

Step 1 -

Complete Step 2 - TBD Update Cyber Security Plan IAW NEI 08-09 Rev 6 per NRC letter dated 5/24/10.

NRC Inspection early 2011 Need TVA letter to state ready for inspection in April 2011

7.

NUREG-0847 Appendix update (Pointer) A-12 and A-36 in particular 01/31/2010 04/30/2010 5/26/10 10/8/10 Letter to update the TVA appendices from NUREG-0847 including the USIs.

8.

IDVP Rationale for system selection 4/22/10 5/12/10A System selected CCS and RHR.

Scheduled for week of 9/28/10.

Wally Justice to lead. NRC Question: Who did the IDVP for U1?

9.

SBO assumptions W/ A98 FSAR A75 sent, needs additional clarification to ensure assumptions and coping strategy remain unchanged.-

Need to Docket result. Define where in FSAR the info is located. Info provided. See item

71.
10.

Environmental RAIs Step 2 due 4/30/10 05/12/10A Complete

11.

Regulatory Framework Update 3/18/10 4/9/10 4/30/2010 Complete 4/29

12.

IPEEE submittal 3/31/10 04/19/2010 04/30/10 In Review/Signoff Comment incorporation in progress Complete - Fed Exd out

Page 4 of 13 No.

Description Status Additional Comments

13.

FSAR RAIs (Elton)

Ongoing

14.

FSAR RAIs 11, 12, 14 Closed to Item 13

15.

FSAR RAIs 3.8-1 thru 3.8-5 Closed to Item 13

16.

FSAR RAIs 3.5.1 & 3.5.3, 3.10 Closed to Item 13

17.

FSAR RAIs 3.2.2 Closed to Item 13

18.

FSAR RAIs 2.3 Closed to Item 13

19.

FSAR RAIs 9.4.4 & 9.4.8 Closed to Item 13

20.

FSAR RAIs 9.3.2, 9.2.6 Closed to Item 13

21.

FSAR RAIs 11.3 & 11.4 Closed to Item 13

22.

Amendment 98 4/15/10 4/23/10 4/30/10 5/7/10A Complete

23.

Hydrology Section 2.4 w/A98 Complete

24.

Buried Piping/Cable White Paper (Lyons) 6/3/10A Complete

25.

ACRS Meeting Preparations SR Refurb (Valves, Pumps, Motors) -

totals, refurb, replace Fire Protection Program Buried Piping & Cables, other technical issues (Crouch)

Complete Develop Agenda

26.

Refurbishment Mtg - Overall Program:

Region/NRR/TVA (Crouch/Charlton)

Complete Purpose of meeting accomplished by NRR review of Refurb program document and Region inspection of program

27.

SAMA RAIs (Metzler)

Step 1 -

3/31/10 5/14/10 5/28/10 Step 1 Step 1 -

Complete Step 2-10/14/10 2-Step Approach Step 1 - Address Initial RAIs Step 2 - Provide comparison of Riskman vs CAFTA results Analysis is complete.

Preparing cost estimates of design alternatives.

28.

Indemnity Letter 04/02/2010 04/23/2010 04/29/10 Complete

29. 3/12/2010 submittal rejected by ADAMs due to duplicate and missing pages
  • duplicate documents for 5/11/10A Complete

Page 5 of 13 No.

Description Status Additional Comments Rosemount 3051 Vendor document dated March of 2008,

  • Duplicate documents dated November 2009 with missing pages 3-1 through 3-6
  • Duplicate CAM documents,
  • EDCR 523343-A missing pages 1, 11,12,13,14,15,16 & 17 of 17-need to resubmit with correct documentation
  • RM-100 Vendor test report missing page 6 of Appendix F Need to confirm duplicates are not required Provide missing sheets to Joel
30. 12/14/2009 Cultural resources submittal rejected by ADAMS
  • Missing pages 3, 5, & 7 and now is lost.
  • We need to resubmit with correct documentation again.

4/26/10 Complete 4/23/10 Complete

31. TVA - what is the schedule for the Fire Protection Plan submittal accounting for WBN 2 within the plan? What changes have occurred to the Unit 1 plan since last submitted to NRC?

(Knuettel/Woodfin)

Complete 7/16/10A Will provide another briefing on Fire Protection in an upcoming bi-weekly meeting

32.

Part 70 and 50 License Telecon regarding EP and Security with NMSS 05/05/2010A Telecon Held

33.

Pre-1995 Program Review Status for Generic Letters and TMI items 04/30/2010 Closed - Duplicate of Item 11

34.

Electrical RAIs (Includes Control Room Lighting?)

05/27/2010A Complete

35.

IPE/PRA RAIs on Peer Review (Metzler)

Complete Include information regarding the status of the F&Os Additional questions during 5/13/10 telecon

36.

Internal Setpoint Methodology 5/12/10A Complete

37.

Information for upcoming NRC visit to Westinghouse for Eagle 21 FAT 4/23/10 Complete

Page 6 of 13 No.

Description Status Additional Comments Updated GANT Chart - not required Points of Contact Testing to be Performed Location & Hotels

38.

Find & Forward: Radiation Records Data Collection and Analysis date January 4, 1994.

Closed Addressed by RAI on SNM License

39.

GL 2004-02 submittal of post Unit 1 RAIs (Pointer)

Step 1 9/10/10A Step 2 12/15/10 Step 1 Report w/o test data Step 2 Include test data

40.

Discrepancy between A95 and A97 for Rev bars in Section 5.5.2.1; A97 P 5.5-9 no Rev bars, A95 P5.5-14 no Rev bars With A98 Complete

41.

Section 5.5.2.4 last paragraph address Tech Spec requirement words W/ A98 Complete

42.

Provide categorization table for A92 thru A97 (Stockton)

Step 1 6/2/10A Step 2 - TBD Step 1 - Disks provided on 6/8/10 Step 2 - Need to add a column that identifies change by Amendment Number

43.

Issue PER and extent of condition for FSAR errors (Metzler/Stockton)

Complete PER 233219

44.

Plan for combining Unit 1 and Unit 2 FSARs post U2 Licensing Closed to Item 52

45.

Plan for NRC review of Fire Protection Report 5/11/10 mtg Duplicate of 31

46.

Issue letter to change TVA WBN Licensing personnel and distribution lists for NRR and Region (Crouch)

Complete I

47.

Add Station Blackout section to FSAR W/ A98 Closed - See Item 71

48.

Provide FMEA for 125 VDC system (Pointer)

Complete Presentation made in bi-weekly meeting

49.

NRC review of vendor procurement documents (Charlton)

Complete Audit Scheduled for July

50.

Schedule for Maintenance Rule Implementation Closed Addressed by Reg Framework Letter

51.

ACRS Meeting Preparations Unit 2 status, Buried Piping & Cables, Integrated Safeguards Test Closed Provide Slides for October 6 Meeting

52.

Discuss status of the U1/U2 Integration Discussed at When does U1

Page 7 of 13 No.

Description Status Additional Comments Team. Who is responsible for plant from now until U2 Licensing? (Pointer)

Sept 2010 WRAG PORC assume control of U2? Will discuss at August mtg at WBN

53.

Develop Plan for early Tech Spec verification (Elton/Stockton)

Need Schedule Describe how the Tech Spec template was developed

54.

Discuss dual unit operator licenses (Metzler)

Discussed at bi-weekly meetings -

Closed pending Region review of 8/27/10 submittal Mtg held on 7/20 between U1 and Region. Provide details of mtg to NRR.

55.

Provide plan for providing a single Emergency Plan for Unit 1 & 2 to NRC Closed - Discussed on 5/17. Will minimize Unit 1 revisions.

56.

March 2009 Emergency Plan response showed additional staffing in Rev 88 but not in Rev 89. Address why it changed.

Information provided to Joel Wiebe on 5/11/10.

Amendment 98 did not replace the template. This was explained in a letter dated 3/11/10.

57.

Provide Appendix R discussion of RCP

  1. 1 Seals need for cooling.

5/20/10A Unit 2 will have the same seals as Unit 1 therefore post fire cooling is required.

58.

For info in the FSAR that is as-designed/not confirmed yet such as stress, is the info Unit 2 as designed or Unit 1 as constructed? (Knuettel) 7/6/10A Provided discussion regarding how issue is tracked via UVAs.

NRC stated no need for submittal at this time.

59. Eagle 21 FAT Issues
1. Provide NRC with difference form from WBN Design change package EDCR 52319 Unit Diff Form provided
2. Provide NRC a statement of the new power supplies have been installed by TVA in WBN 1 -

that how the equipment was Closed by 7/30/10 letter Need Submittal

Page 8 of 13 No.

Description Status Additional Comments installed via equivalency evaluation from Westinghouse.

WO 08-813412-000

3. Provide NRC with Rack 5 issue cause determination and corrective actions needed for resolution
4. Was a PER written and an Extent of Condition performed?

Westinghouse PER initiated.

Cause analysis and extent of condition in process (Lyons)

60. Biweekly meeting on Shared Systems 5/25/10A Complete - See Item 68 for follow up meeting
61. Rx Systems RAI FSAR 15.2.14 Inadvertent SI @ Power

- RIS on subject not addressed FSAR 5.2.2 and 5.5.13 - Does not address Overpressure Protection relief capacity at power (Elton)

Closed to Item 13 Confirmed contained in the list for Item 13

62. A97 Sect 5.5.1.2 - Verify if TVA will do a periodic ISI inspection of the RCP flywheel versus taking credit for the vibration monitoring system (Pointer)

Closed Addressed in NRC EMCB RAI

63. Provide discussion of missing QA Records Was a PER written? What was the cause? What is the regulatory impact? What happened from 1985 to 1995 on Unit 1 pipe supports that makes Unit 1 different than Unit 2? Why was the same process not applied to Unit 2?

What went wrong? How did we lose the records? Address 10CFR50 Appendix B Control of Records. Does the CAP and/or Implementation Plan need to be changed? (Stephenson) 9/30/10A See item 125 Implementation plan to be revised due to inability to retrieve pipe/duct hanger records. will utilize records from the HAAUP and HVAC Duct programs as replacement records.

64. Confirm acceptability of shifting EP drill from May 2011 to July 2011 to Re-Opened No NRC objections.

Meeting with state on 7/16/10

Page 9 of 13 No.

Description Status Additional Comments support other state drills. (Crouch) determined state does not need a U2 drill and thus will not participate.

TVA/NRC to address issue with FEMA

65. Three issues identified regarding environmental items:
1. Three reports (Baxter)
2. Water samples different
3. Addressing three reactor events (locked rotor, RCP shaft break,

???)

Look at ML101370186 for NRC telecom minutes for 5/15/10.

(Lyons)

Closed 7/6/10A

66. Control Room Lighting RAI (Elton)

Closed to Item

13.
67. Instrumentation RAI List (Knuettel)

Ongoing

68. Shared Systems Meeting (Crouch) 8/17/10A
69. Emergency Preparedness RAI (Lyons)

Complete

70.

Part 70 and 50 License RAI regarding EP from NMSS (Lyons) 7/30/10A -

Complete Corporate provided response

71.

NRC reviewing the Station Blackout Design Criteria to determine if it provides the info they are requesting.

(Stockton)

Complete NRC stated that answering the FSAR RAI questions will provide the required info.

72. Questions on A98 rev bars-Sections 8.3.1.1, 9.4, 11.2.6, 11.3, 15.2 (Stockton)

Closed Discussed with NRC

73. Appendix R changes from Rev 0 to current (Boyd/Woodfin)

Closed to Item 31

74. Technical Specifications Change WBN-TS-10 Control Rod Assemblies (Lyon) 8/15/10A
75. Provide letter regarding Conformal Coatings on Eagle 21 boards.

Complete

76. Provide commitment letter on B.5.b assumptions and backup power to H2 igniters being the same as Unit 1 -

(i.e.,procedural guidance)

Closed 7/01/10A

Page 10 of 13 No.

Description Status Additional Comments

77. Answer RAI related to Spent Fuel Pool Heat Loads specific to Unit 2 only.

Closed to Item 13

78. X-750 Bolt Material Issue (Elton)

Closed Submittal issued 6/29/10A

79. Control Rod Tech Spec Change (Elton)

Closed Duplicate of item 74

80. Develop list of planned License Conditions
81. Submit Licensing Basis Preservation Review Results Complete
82. IPE RAI Questions (Metzler)

Complete 8/12/10A

83. Anti Trust RAI (Lyons)

Complete

84. Security Plan Update based on telecon (Corporate)

Complete

85. Hazardous Chemical RAI for Emergency Planning from e-mail 9/17/10A
86. August 3 Agenda Items FSAR RAIs IST SAMA RAI ACRS Agenda Complete
87. FSAR Amendment 100 with RAI incorporation and Setpoint Methodology writeup Closed 9/1/10A
88. Refurb Program followup items
89. Baseline list of OMAs 8/9/10A
90. Fire Protection Report Common Sections 8/9/10A Re-opened Unit 2 Deviations included in Part VII of FPR.

Specifically address questions from June 11, 2010 RAI Provide better justifications for why changes are required for Unit 2/dual unit operation and why change is technically acceptable.

91. MSO scenarios 8/20/10A Re-opened Add the 3 missing resolutions to the summary tables.

Remove reference to Unit 1 PERs that

Page 11 of 13 No.

Description Status Additional Comments do not apply to Unit

2. Add mods in work to table of required actions.

Explicitly identify OMAs that are being credited to resolve MSO scenarios and reference the Unit 1 approval.

92. Markup of Report Changes from Rev 5 to 40 8/30/10A Re-opened Provide additional detail regarding changes and justification. Ensure all changes are marked, justified and addressed in Revision Log. In Revision 7, what was the conclusion of the submittal to the NRC.
93. Final Fire Protection Report Submitted 12/17/10
94. Resolve Licensing Basis Preservation Self Assessment PERs
95. Self Assessments Review 10/15/10 NRR select assessments for onsite review
96. Resolve ASME Code Year approval for Section XI and OM Complete Based on NRC Report, code to be approved in May 2011
97. Chapter 11/12 RAIs Closed NRR to provide to TVA. Included in Item 13
98. Meteorology RAI Closed NRR to provide to TVA. Included in Item 13
99. Evacuation time estimate for transportation dependent people RAI Did the 2009 data confirm the 2000 data is unchanged? Rad Monitor reading factor of 10 issue.

8/13/10A 100. IPEEE Response NRC Review 10/26/10 Provide briefing to NRC reviewers 101. Integrated Safeguards Testing Issue 9/17/10A Initial discussion

Page 12 of 13 No.

Description Status Additional Comments held with NRR, Region and Residents. Provide justification submittal addressing impact on U1 loads and description of U1 testing. Justify why dual unit operation does not invalidate previous testing.

102. B.5.b Phase I issue 10/15/10 Address issues on 7/1/10 submittal regarding locations and shielding. Add commitments from 3/06/07 letter.

103. Diesel AOT duration 104. IDVP plan, date, personnel and resumes 9/28/10A Provide to Milano and Julian 105. Schedule/plan for GL89-10 testing 106. Schedule/plan for GL 96-01 testing 107. WCAP reference for NRC approval of new control rod material 108. Fuel Related RAI comments from 8/3 meeting SNPB 4.2.3-3, 4.3.2-1, SRP 5.2.2 ASME Code analysis, 15.2.14 Inadvertant ECCS, CVCS malfunction analysis, Fig 15.4-11 poor quality, Fig 15.4-11a vs 15.4-12a bounding reactivity issue 10/12/10 109. Schedule for submitting ISI/IST first 10 year plan. What triggers the submittal?

110. SAMA RAI response-item 5.e need more info regarding can we do something to fix the ones with low values of HCLPF?

111. Shared System GDC 5 - Provide explanation of why we are a hot shutdown vs cold shutdown plant. What events/scenarios are involved? How does this meet GDC 5? How did the NRC approve us as a hot shutdown plant? Do we have a procedure for heating up to hot standby on decay heat?

10/26/10 Provide flow rates/heat load/cool down analyses.

Address two unit Tech spec shutdown.

Page 13 of 13 No.

Description Status Additional Comments Is the ERCW path to the cooling tower/holding pond seismic? Is the holding pond structure seismic?

112. B.5.b/LOLA submittal - Address Unit 1 commitments for Hydrogen Igniter, skid mounted diesels and location of power supply Closed -

duplicate of item 102.

Confirm ignitors have backup power 113. Unit 2 Target Sets 11/15/10 Need concurrence from NSIR regarding inspection impact of new date 114. FSAR Chapter 7 50.59 RAI Complete 115. Generic Letter 2008-01 Gas Accumulation High Point Vents 10/29/10 Provide submittal of Engineering Products with commitment for final walkdown in 2011 116. Status on Aquatic Contention 10/21/10 117. Part 30 and 40 License 10/15/10 118. Status of Aux Instrument Room CO2 Issue Confirm this is a Unit 1 only issue.

119. Set up telecon/meeting for fuel thermal conductivity issue Closed Mtg held in Rockville. FSAR RAI addressing the issue.

120. Unit Difference submittal 10/19/10 121. Common Q Audit Trip 9/20-21/10A 122. Confirm status of NRC review of Developmental Tech Specs 10/20/10 Phone call with reviewer to discuss status of review.

123. Add MSIP Description and locations to FSAR 124. Status of GSI 199 125. Revise Implementation Plan for QA Records CAP relative to support records.

126. Address ACRS questions - Tritium concentration in plume from leak, WBN versus VC Summer weld flaw commonalities, baffle bolts status

Page 1 of 4 NRC PM Open Items List 10/14/10 (423) 751-6338 ID 657601 No.

Description Status Additional Comments Resp Org/Person

1.

Step 1 - Submit Cyber Security Plan/Controls and Implementation Schedule. State will be ready for inspection by April 2011.

Step 2 - Conduct Cyber Security Self Assessment (Pointer)

Step 1 -

Complete Step 2 - TBD Update Cyber Security Plan IAW NEI 08-09 Rev 6 per NRC letter dated 5/24/10. NRC Inspection early 2011 Need TVA letter to state ready for inspection in April 2011 Licensing/

Crouch

2.

NUREG-0847 Appendix update (Pointer) A-12 and A-36 in particular 01/31/2010 04/30/2010 5/26/10 10/8/10 Letter to update the TVA appendices from NUREG-0847 including the USIs.

Licensing/

Crouch

3.

FSAR RAIs (Elton)

Ongoing Licensing/Eng

4.

SAMA RAIs (Metzler)

Step 1 -

3/31/10 5/14/10 5/28/10 Step 1 Step 1 -

Complete Step 2-10/14/10 2-Step Approach Step 1 - Address Initial RAIs Step 2 - Provide comparison of Riskman vs CAFTA results Analysis is complete. Preparing cost estimates of design alternatives.

Eng/Koontz

5.

GL 2004-02 submittal of post Unit 1 RAIs (Pointer)

Step 1 9/10/10A Step 2 12/15/10 Step 1 Report w/o test data Step 2 Include test data Eng/Koontz

6.

Provide categorization table for A92 thru A97 (Stockton)

Step 1 6/2/10A Step 2 - TBD Step 1 - Disks provided on 6/8/10 Step 2 - Need to add a column that identifies change by Amendment Number Licensing/

Stockton

7.

Develop Plan for early Tech Spec verification (Elton/Stockton)

Need Schedule Describe how the Tech Spec template was developed Licensing/

Elton

8. Confirm acceptability of shifting EP Re-Opened No NRC objections. Meeting with state on 7/16/10 NRR

Page 2 of 4 No.

Description Status Additional Comments Resp Org/Person drill from May 2011 to July 2011 to support other state drills. (Crouch) determined state does not need a U2 drill and thus will not participate. NRC to address issue with FEMA

9. Instrumentation RAI List (Knuettel)

Ongoing Eng/Hilmes

10. Develop list of planned License Conditions Licensing/

Crouch

11. Refurb Program followup items Eng/Refurb Welch/Schlessel
12. Fire Protection Report Common Sections 8/9/10A Re-opened Unit 2 Deviations included in Part VII of FPR.

Specifically address questions from June 11, 2010 RAI Provide better justifications for why changes are required for Unit 2/dual unit operation and why change is technically acceptable.

Eng/Hilmes

13. MSO scenarios 8/20/10A Re-opened Add the 3 missing resolutions to the summary tables. Remove reference to Unit 1 PERs that do not apply to Unit 2. Add mods in work to table of required actions. Explicitly identify OMAs that are being credited to resolve MSO scenarios and reference the Unit 1 approval.

Eng/Hilmes

14. Markup of Report Changes from Rev 5 to 40 8/30/10A Re-opened Provide additional detail regarding changes and justification. Ensure all changes are marked, justified and addressed in Revision Log. In Revision 7, what was the conclusion of the submittal to the NRC.

Eng/Hilmes

15. Final Fire Protection Report Submitted 12/17/10 Eng/Hilmes
16. Resolve Licensing Basis Preservation Self Assessment PERs Eng/Freeman
17. Self Assessments Review 10/15/10 NRR select assessments for onsite review NRR
18. IPEEE Response NRC Review 10/26/10 Provide briefing to NRC reviewers NRR/TVA/Adair
19. B.5.b Phase I issue 10/15/10 Address issues on 7/1/10 submittal regarding locations and shielding. Add commitments from 3/06/07 letter.

Licensing/Lyons

20. Diesel AOT duration Eng/Hilmes
21. Schedule/plan for GL89-10 testing Construction
22. Schedule/plan for GL 96-01 testing Startup/Olson

Page 3 of 4 No.

Description Status Additional Comments Resp Org/Person

23. WCAP reference for NRC approval of new control rod material Eng/Koontz
24. Fuel Related RAI comments from 8/3 meeting SNPB 4.2.3-3, 4.3.2-1, SRP 5.2.2 ASME Code analysis, 15.2.14 Inadvertant ECCS, CVCS malfunction analysis, Fig 15.4-11 poor quality, Fig 15.4-11a vs 15.4-12a bounding reactivity issue 10/12/10 Eng/Koontz
25. Schedule for submitting ISI/IST first 10 year plan. What triggers the submittal?

ISI/Tinley

26. SAMA RAI response-item 5.e need more info regarding can we do something to fix the ones with low values of HCLPF?

Eng/Koontz

27. Shared System GDC 5 - Provide explanation of why we are a hot shutdown vs cold shutdown plant. What events/scenarios are involved? How does this meet GDC 5? How did the NRC approve us as a hot shutdown plant? Do we have a procedure for heating up to hot standby on decay heat?

Is the ERCW path to the cooling tower/holding pond seismic? Is the holding pond structure seismic?

10/26/10 Provide flow rates/heat load/cool down analyses.

Address two unit Tech spec shutdown.

Eng/Thompson

28. Unit 2 Target Sets 11/15/10 Need concurrence from NSIR regarding inspection impact of new date Corp Security/Glover
29. Generic Letter 2008-01 Gas Accumulation High Point Vents 10/29/10 Provide submittal of Engineering Products with commitment for final walkdown in 2011 Licensing
30. Status on Aquatic Contention 10/21/10 Arent
31. Part 30 and 40 License 10/15/10 Licensing/Lyons
32. Status of Aux Instrument Room CO2 Confirm this is a Unit 1 only issue.

Licensing/

Crouch

Page 4 of 4 No.

Description Status Additional Comments Resp Org/Person Issue

33. Unit Difference submittal 10/19/10 Licensing/

Stockton

34. Confirm status of NRC review of Developmental Tech Specs 10/20/10 Phone call with reviewer to discuss status of review.

Licensing/Elton

35. Add MSIP Description and locations to FSAR Eng/Thompson
36. Status of GSI 199 TVA/NRR
37. Revise Implementation Plan for QA Records CAP relative to support records.

Eng/Johnson

38. Address ACRS questions - Tritium concentration in plume from leak, WBN versus VC Summer weld flaw commonalities, baffle bolts status Eng/Freeman
39. Fuel Pool Hxr analysis in FSAR Need supplemental RAI response to address current Hxr, and makeup for evaporation losses Eng/Thompson
40.
41.

42.