MONTHYEARML24310A0542024-10-31031 October 2024 NRR E-mail Capture - (External_Sender) PSEG Salem/Hope Creek Biological Opinion GAR-2020-02842 - Annual Ice Barrier Schedule Notification 20242025 ML24303A1752024-10-29029 October 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Atlantic Sturgeon 10/28/2024 ML24303A4242024-10-29029 October 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Atlantic Sturgeon 10/28/2024 ML24277A0812024-10-0303 October 2024 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Atlantic Sturgeon Collected on 10/02/2024 ML24269A0362024-09-24024 September 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemps Ridley Sea Turtle Collected on 9/24/2024 ML24248A0452024-09-0303 September 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemps Ridley Sea Turtle Collected on 9/3/2024 ML24229A0422024-08-16016 August 2024 NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Implement Optimized ZIRLO Fuel Rod Cladding ML24229A0432024-08-16016 August 2024 NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Exemption from 10 CFR 50.46 and 10 CFR 50 Appendix K to Allow the Use of Optimized ZIRLO Fuel Rod Cladding ML24227A5092024-08-14014 August 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemps Ridley Sea Turtle Collected on 8/13/2024 ML24228A1942024-08-14014 August 2024 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form for a Live - Atlantic Sturgeon 8/14/2024 ML24250A0562024-07-11011 July 2024 PSEG to NMFS, Regarding Processing of Fin Clips ML24219A2472024-07-0909 July 2024 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Shortnose Sturgeon 7/9/2024 ML24123A0522024-05-0101 May 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - One Deceased Sturgeon 4/30/2024 ML24106A0542024-04-12012 April 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form - One Alive Atlantic Sturgeon 4/12/2024 ML24101A2192024-04-0909 April 2024 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Atlantic Sturgeon 4/8/24 ML24093A1222024-04-0101 April 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form - One Atlantic Sturgeon 4/1/2024 ML24075A1862024-03-14014 March 2024 NRR E-mail Capture - (External_Sender) Biological Opinion Gar 2020-02842 - PSEG Salem and Hope Creek Generating Station Annual Incidental Take Report - 2023 ML24060A0492024-02-28028 February 2024 NRR E-mail Capture - Final Exhb RAI for Hope Creek, Salem 1 and 2 Amendment to Modify Exclusion Area Boundary ML24030A8432024-01-30030 January 2024 NRR E-mail Capture - (External_Sender) 2023 PSEG Sturgeon Pit Tag Data ML24016A1612024-01-10010 January 2024 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms - Two Atlantic Sturgeon 1/9/2024 ML24002A7222023-12-29029 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - 2023 Annual Report - Inspection of the Circulating Water Intake Structure (Cwis) Trash Rack Bars ML24002A7242023-12-28028 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form - Sturgeon 12/28/2023 ML23355A2732023-12-21021 December 2023 NRR E-mail Capture - (External_Sender) PSEG Response to Questions Associated with Supplement to Salem-Hope Creek Eab Reduction LAR ML24002A7252023-12-21021 December 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Shortnose Sturgeon 12/21/23 ML23346A0962023-12-0606 December 2023 NRR E-mail Capture - Reminder - Final Report - Completion of Required Additional Protocol (AP) Information in Accordance with the U.S. - IAEA Treaty Obligations ML23311A0792023-11-0101 November 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Atlantic Sturgeon Collected on 10/31/2023 ML23277A0482023-10-0404 October 2023 NRR E-mail Capture - 10/4/2023 Email: Acceptance Review - Hope Creek and Salem 1 and 2 - LAR to Modify Exclusion Area Boundary ML23277A0732023-09-29029 September 2023 NRR E-mail Capture - (External_Sender) 9/29/2023 Email from PSEG: Supplement to Proposed Amendment to PSEG Master Decommissioning Trust Amendment ML23226A0702023-08-11011 August 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form for Sturgeon Collected on 8/10/2023 ML23226A0732023-08-10010 August 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Submittal of Necropsy Reports Regarding Sea Turtles Collected on 06/12/2022 ML23201A0132023-07-20020 July 2023 NRR E-mail Capture - Acceptance Review - Salem 1 and 2 - Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML23172A0982023-06-21021 June 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemps Ridley Sea Turtle Collected on 06/20/2022 ML23164A2062023-06-13013 June 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report - Kemps Ridley Sea Turtle Collected on 06/12/2023 ML23163A0442023-06-0606 June 2023 NRR E-mail Capture - (External_Sender) Biological Opinion GAR-2020-02842; FIN Clip Analysis Facilities ML24250A0572023-06-0606 June 2023 PSEG to NMFS, Request for Sturgeon Fin Clip Analysis Facilities ML23153A1552023-06-0202 June 2023 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Atlantic Sturgeon 6/1/2023 ML23151A6582023-05-31031 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms Sturgeon 5/30/2023 ML23137A2632023-05-17017 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms Sturgeon 5/16/2023 ML23135A0102023-05-11011 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report Sturgeon 5/11/2023 ML23136B2832023-05-0404 May 2023 NRR E-mail Capture - (External_Sender) PSEG Bottom Trawl Sampling - Incidental Take Report and Data Collection Form - Atlantic Sturgeon 5/3/2023 ML23122A1672023-05-0202 May 2023 NRR E-mail Capture - Acceptance Review - Hope Creek and Salem 1 and 2 - Revise TS to Delete TS Section 5.5 - Meteorological Tower Location ML23122A1982023-05-0202 May 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Forms for Atlantic Sturgeon 5/1/2023 ML23117A2722023-04-17017 April 2023 NRR E-mail Capture - (External_Sender) Salem Generating STATION-INCIDENTAL Take of Atlantic Sturgeon Collected on 04/14/2023 ML23079A0032023-03-17017 March 2023 NRR E-mail Capture - Hope Creek, Salem 1 and 2 - Evacuation Time Estimate Review ML23065A0452023-02-23023 February 2023 NRR E-mail Capture - (External_Sender) Salem & Hope Creek Generating STATIONS-ANNUAL Incidental Take REPORT-STATION & REMP ML23033A0302023-02-0808 February 2023 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report Sturgeon 1/24/2023 ML23010A2882023-01-10010 January 2023 NRR E-mail Capture - (External_Sender) Salem Generating STATION-INCIDENTAL Take of Atlantic Sturgeon Collected on 01/09/2023 ML23003A2412023-01-0303 January 2023 NRR E-mail Capture - Final Nvib RAI - Salem Unit 2 Relief Request S2-I4R-211, Fourth Inservice Inspection (ISI) Interval Limited Examinations ML23003A2402022-12-21021 December 2022 NRR E-mail Capture - (External_Sender) Salem Generating Station - Incidental Take Report and Data Collection Form for Atlantic Sturgeon Collected on 12/20/2022 2024-09-03
[Table view] |
Text
From: DeFrancisco, Anne Sent: Wednesday, July 21, 2010 8:20:37 AM To: Ambrosini, Josephine; Kulp, Jeffrey Cc: RiENFORCEMENT RESOURCE; Barber, Scott
Subject:
Enforcement for OC Finding Auto forwarded by a Rule PRELIMINARY DRAFT INFORMATION - DO NOT RELEASE Jo, Jeff: Below is an excerpt from a marked up draft quarterly feeder for Salem dealing with a failure to meet 50.55a for a degraded piping issue. Question - I see in your OC writeup that the licensee did some calcs and acoustic testing for the core spray check valve -
what is the status of their overall operability assessment? -Anne Finding The inspector identified the following violation related to ASME,Section XI testing of buried Unit 1 and Unit 2 buried AFW piping, Introduction The inspector identified a GREEN non-cited violation (NCV) of 10 CFR 50.55a(g)(4) and the referenced American Society of Mechanical Engineers (ASME) Code, Section X1, paragraph IWA-5244 for PSEG's failure to perform required pressure tests of buried components. This piping is safety related, 4.0" ID, ASME Class 3, Seismic Class 1 piping, Description ýPortions of the Unit 1 and Unit'2 Auxiliary Feedwater (AFW) System piping is buried piping and has not been visually inspected since th e plant began 6peratio6 in 1977 for Unit 1 and since_1979for Salem Unit 2. InApri. 20f,_0 approximately.'680 ft. (340 ft.fof the #12 SG AFW supply and 340 ft. of the'#14 SG AFW supply) of piping betweeInthe purmp discharge manifodld and the connection tbthe Maini Feedwater piping to the.'affectedSGs was discoveredt o'be corroded to below~mlnimurn'wa'I1thickniess (0.278") for t'he195'0 ,si design pres r f~the AFW S sten*i' The lowest wall thickness measured in the affeced pipig was 6.077",. (b)(5)
(b)(5).. ( )5 10 CFR SO.S5(a)(g)(4)(ii) requires licensees to follow the in-service requirements of the ASME Code, Section X1.Paragraph IWA-5244 requires licensees to perform pressure tests on buried components to demonstrate structural integrity of the tested piping. The pressur by IWA-5244 is considered to be an inservice inspection and is part of Section XI.
(b)(5) k f mt* I n# Wr c ord I M*CI Oted i n 1="W~th the Fre--toM of l.nfoatMMn A0t FOLWA
PSEG sought relief, from the NRC, from the previous Code required pressure testing in 1988 for Unit 1 only. Relief was granted to PSEG, by the NRC, to perform an alternate flow test in 1991 for Unit 1. However, PSEG did not perform the proposed alternate tests during the 2 "dinservice I (b)(5) interval and during the 1" (5/19/01 t-'(b/5 r
X-*---*? ..
In~n~tinn Intprval for. Unit I
I I (b)(5)()5 hus, PSEG missed an opportunity to identify and correct this performance deficiency (b)5)hic afets Uni 11and Unit 2.
PSEG repiaced the affected buried Unit 1 piping during the refueling outage in April/May 2010.
The required completed after the replacement of the Unit 1 tests were successfullyIresure I (i5in).11(b)(5)
(buri)d l(b)(5)
(b)(5)
The inspector determined that a Cross Cutting Aspect did not exist because the issue was not Indicative of current performance because the condition existed since 1991, more than 3 years ago. Specifically.. .
Enforcement 10 CFR 50.55a(g)(4) states, in part: "Throughout the service life of a boiling or pressurized water-cooled nuclear power facility, components which are classified as ASME Code Class 1, Class 2 and Class 3 must meet the requirements,... , set forth in Section Xlof editions of the ASME Boiler and Pressure Vessel Code". ParagraphIWA-5244, Buried Components, of Section Xlsays, in part,
"(b) For buried components where a VT-2 visual examination cannot be performed, the examination requirement is satisfied by the following: (1) The system pressure test for buried components that are isolable by means of valves shall consist of a test that determines the rate of pressure loss. Alternatively, the test may determine the change in flow between the ends of the buried components..."
Contrary to these requirements, PSEG did not perform the required pressure tests of the buried AFW piping to the #12 SG and #14 SG at Salem Unit 1 during the 2 d In Service Inspection Interval (2/27/88 to 5/19/01) and during the 1" (5/19/01 to 6/3/04a "2Mi6/24/04 t q/0 t(b)(6) ,
I/
Because PSEG entered this condition into the corrective action process (Notification 20459686) and because it is of very low safety significance (Green), it is being treated as a non-cited violation consistent with Section VI.A.1 of the NRC Enforcement Policy. NCV 50-272/2010-??
and NCV 50-311/2010-??
PRE*CIMINAR-Y-DFAF-T-tN IrO-RMATION - T-%R.T"ASE
/'fice oflthe ReionIdminiis, tnr. ReJ.iwt /
6/10-33 7-5( 78 anne.defrancisco&-nrc.gov