ML102940065

From kanterella
Jump to navigation Jump to search

Acceptance Review Results; Request to Use Later Code Edition and Addenda
ML102940065
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 10/21/2010
From: Gratton C
Plant Licensing Branch II
To: Matthews T
Omaha Public Power District
Gratton C, NRR, DORL, 415-1055
References
TAC ME4672, TAC ME4673
Download: ML102940065 (1)


Text

From:

Gratton, Christopher Sent:

Thursday, October 21, 2010 9:20 AM To:

'Matthews, Thomas C IV'

Subject:

ACCEPTANCE REVIEW RESULTS FOR BROWNS FERRY NUCLEAR PLANT, UNITS 1 AND 3 (TAC ME4672-3)

Mr. T Mathews:

By letter dated July 1, 2010, the Tennessee Valley Authority submitted a request to use a subsequent edition of the American Society of Mechanical EngineersSection XI Code for repair and Replacement Activities, for use at Browns Ferry Nuclear Plant (BFN), Units 1 and 3. The proposed action would allow the requirements of the 2004 Edition of the ASME Section Xl Code, Subarticle IWA-4000, "Repair/Replacement Activities," in its entirety, and all related requirements for repair and replacement activities to be used at the BFN, Units 1 and 3.

The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff=s acceptance review of this request for approval. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review consistent with Section 50.55a(g)(4)(iv) of Title 10 of the Code of Federal Regulations (10 CFR),

and make an independent assessment regarding the acceptability of the proposed action in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

If you have any questions, please contact me at (301) 415-1055.

Christopher Gratton Senior Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation E-mail Properties Mail Envelope Properties ()

Subject:

ACCEPTANCE REVIEW RESULTS FOR BROWNS FERRY NUCLEAR PLANT, UNITS 1 AND 3 (TAC ME4672-3)

Sent Date: 10/21/2010 9:05:31 AM Received Date: 10/21/2010 9:19:00 AM From: Gratton, Christopher

Created By: Christopher.Gratton@nrc.gov Recipients:

tcmatthews@tva.gov ('Matthews, Thomas C IV')

Tracking Status: None Christopher.Gratton@nrc.gov (Gratton, Christopher)

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 12851 10/21/2010 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: