UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 October 18, 2010 Mr. Jon A. Franke Vice President, Crystal River Nuclear Plant Crystal River Nuclear Plant (NA2C) 15760 W. Power Line Street Crystal River, FL 34428-6708
SUBJECT:
INSPECTION OF LICENSED OPERATOR REQUALIFICATION TRAINING PROGRAM DURING EXTENDED SHUTDOWN AT CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING STATION REPORT NO. 05000302/2010005
Dear Mr. Franke:
In a telephone conversation on October 14, 2010, Mr. Rick Baldwin, Senior Operations Inspector and Mr. Mark VanSicklen, Superintendent Operations Training made arrangements for the NRC to inspect the licensed operator requalification and Just-In-Time (JIT) training programs at the Crystal River Unit 3 Nuclear Generating Station. This inspection is planned for the week of October 25, 2010. This inspection is being initiated as a result of the extended shutdown which coincides with your scheduled JIT and requalification training programs.
In accordance with 10 CFR 55.59, the NRC has requested that you make ready upon arrival, the material as specified in your extended shutdown JIT and requalification training programs, in order to support the NRC's inspection program needs. Mr. VanSicklen has been advised of this request.
The inspection team will verify that your JIT training program is being implemented as described in NRC letter to Jon A. Franke from Malcolm T. Widmann dated March 8, 2010. Additionally, the inspection team will verify that the combination of JIT and requalification training programs ensure that the CR-3 operators are proficient before standing watch prior to reactor start up and power ascension. The team will observe JIT training during classroom, simulator scenarios and simulator Job Performance Measures (JPMs) and during in-plant JPMs.
NUREG-1220, Rev. 1, Training Review Criteria and Procedures, and NRC Staff Inspection Procedure 41500, Training and Qualification Effectiveness, provide guidance on the purpose and content of the inspection. These documents are available on the NRCs public web site.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018), which expires on February 28, 2013.
FPC 2
The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB approval number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. (The Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection please contact Mr. Rick Baldwin at (404) 997-4642, (Internet E-mail:
Richard.Baldwin@nrc.gov), or me at (404) 997-4550, (Internet E-mail:
Malcolm.Widmann@nrc.gov).
Sincerely,
/RA/
Malcolm T. Widmann, Chief Operations Branch Division of Reactor Safety Docket Nos.: 50-302 License Nos.: DPR-72 cc: (See Page 3)
G SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS SIGNATURE RSB /RA/
MTW /RA/
NAME RBaldwin MWidmann DATE 10/18/2010 10/18/2010 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO
FPC 3
cc w/encl:
R. J. Duncan, II Vice President Nuclear Operations Carolina Power & Light Company Electronic Mail Distribution Brian C. McCabe Manager, Nuclear Regulatory Affairs Progress Energy Carolinas, Inc.
Electronic Mail Distribution James W. Holt Plant General Manager Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution Stephen J. Cahill Engineering Manager Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution R. Alexander Glenn Associate General Counsel (MAC - BT15A)
Florida Power Corporation Electronic Mail Distribution Christos Kamilaris Director Fleet Support Services Carolina Power & Light Company Electronic Mail Distribution William A. Passetti Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution Daniel R. Westcott Supervisor Licensing & Regulatory Programs Crystal River Nuclear Plant (NA1B)
Electronic Mail Distribution Joseph W. Donahue Vice President Nuclear Oversight Carolina Power and Light Company Electronic Mail Distribution Jack E. Huegel Manager, Nuclear Oversight Crystal River Nuclear Plant Electronic Mail Distribution David T. Conley Associate General Counsel Legal Dept.
Progress Energy Service Company, LLC Electronic Mail Distribution Mark Rigsby Manager, Support Services - Nuclear Crystal River Nuclear Plant (NA2C)
Electronic Mail Distribution Attorney General Department of Legal Affairs The Capitol PL-01 Tallahassee, FL 32399-1050 Ruben D. Almaguer Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution Chairman Board of County Commissioners Citrus County 110 N. Apopka Avenue Inverness, FL 36250 Phyllis Dixon Training Manager Crystal River Nuclear Plant Electronic Mail Distribution
FPC 4
Letter to Jon A. Franke from Malcolm T. Widmann dated October 18, 2010
SUBJECT:
INSPECTION OF LICENSED OPERATOR REQUALIFICATION TRAINING PROGRAM DURING EXTENDED SHUTDOWN AT CRYSTAL RIVER UNIT 3 NUCLEAR GENERATING STATION REPORT NO. 05000302/2010005 Distribution w/encl:
C. Evans, RII L. Douglas, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMCrystal River Resource