Sengupta, Abhijit From: Herrin, Dennis W. [Dennis.Herrin @pgnmail.com]

Sent: Wednesday, January 20, 2010 7:14 AM To: Lake, Louis Cc: Williams, Charles R.

Subject:

NRC Special Inspection Team - Database All Questions Attachments: rptAll Questions.pdf -K- ., ,I ... r" LeauudEni ne g&Rut Lead Engineer - Licensing & fRegulator-y Programs Progress Energy Florida, Inc.

crystal River Unit 3

"(b)6) 2 9 Cell)

'/oicenet 240-3299 i.sa-,llloIt., r' I III'4J IIII.IIII.AJIII bI~nvtoimni in this jcwi a a cgletod lil SOlamwfth the Freedoim 03 WWntoni"Of Aat I

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:19 AM Request Number: !1 Individual Contacted: ;Sid Powell Date Contacted: 10/15/2009 Requestor/Inspector: .Anthony Masters Category: Question Request: There is an area on the containment dome on the south, approximately half way between the walking platform and the peak of the dome that is depressed. There appears to be a grout covering that is seriously deteriorated. Is this evidence of repeat delamination damage?

References:

Response Assigned to: Craig Miller Date Due to Inspector: 10/16/2009 Z........ ..... . .. .. ...... L. ....

Response

I was up on the dome earlier this evening to examine the entire dome structure since I also have a Pri 3 investigation upcoming regarding the condition of the concrete on the dome (reference AR 357670). Although it

had been a number of years since my last visit up there, the overall condition of the dome is pretty much exactly
the same as it has been in my past trips as part of tendon surveillance. I believe that when they made the re-

.pours of the dome due to the original delamination, the final surface did not end up being a smooth arcing icurvature and had several localized uneven areas. The one in question is exactly that.

Furthermore, as part of our ongoing Condition Monitoring of Structures effort (EGR-NGGC-0351), I will be

.returning to the dome this evening (10/16/2009) with Dayna Mendez to obtain digital photographs of the area to

insert into our data base on this subject so that we have a reference point for future inspections.

Misc Notes:

Response By: 'Joe Lese Reviewed By: Date Response Provided: 10/16/2009.

Status: Closed Date Closed:

tptAll Questions Page 1 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:19 AM Request Number: 2 Individual Contacted: id Powell . Date Contacted':' 101/2009.

Requestor/Inspector: !Anthony Masters Category: Information Request Request: The Inspector has requested a procedure that was used for tensioning the tendons originally.

References:

Response Assigned to: 1Sid Powell DateDue to Inspector: 10/16/2009

Response

APrescon Field Installation Manual.tif was placed in folder LcShared\2009 NRC SPECIAL INSPECTION TEAM Q-AXPOWELL Q-A\Requ~est 2, Original Tenidon Tensitoninig.PocedUre Misc Notes:

Response By: .. -

Reviewed By: Date Response Provided:

Status: Open Date Closed:

rp0AII Questions Page 2 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:19 AM Request Number: 3

.. .... .. . ...... D at Co n a c t d : i..............i0../...09...........

Individual Contacted: ýPaul Fagan Date Contacted: 10/16/2009 Requestor/Inspector: George Thomas Category: Information Request I Request: George Thomas of the NRC requested a copy of our EC 74801 on the core bores. I printed a.

copy and delivered to Mr. Thomas at 0900, Thisisia preliminary copy since the EC has not beeni

References:

Response Assigned to: Glenn Pugh Date Due to Inspector: 10/16/2009

Response

An approvedc (issued) copy of Revision 1 of the EC 74801 was printed and hand carried to George Thomas on 10/28/09.

Misc Notes: See question #19 for continued submittal of NDE and Core Bore Plan changes.

Response By: :Glenn Pugh -

Reviewed By: Charles Williams Date Response Provided: 10/28/2009' Status: Closed Date Closed:

-rit.*Jll QUestior,S Page 3 of 94

2009 NRC Special Inspection,,. RB.Concrete Sepa ration 20-Jan-10 7:05:19 AM Request Number: 4 Individual Contacted: ýSid Powell Date Contacted: i 10/16/2009 Requestor/Inspector: George Thomas Category: Information Request Request: !Please provide the concrete mix design and associated material test data forconcrete use in original constructionof the.containment walL..Also provide original test data'6f production concrete used in the original construction of the containment wall.

References:

Calculation S00-0047

.~ ~~.....

~ ~...........

~ ~ .~. ........

~.n ..-111----

. ~ ...~~~H Response Assigned to: Sid Powell Date Due to Inspector: 10/17/2009

Response

'The RB exterior shell consisted of around 105 separate concrete pours. Attachment B of calculation S00-0047 ishows a listing of these pours by elevation and buttress zone. It also lists the mix design for each pour. For example, the SGR containment opening is between buttress 3 andA4 and between Elevations 180' and 220'.

Per thepour list in the calculation the corresponding pour numbers are 685RB, 695RB, 700RB, 712RB, and i722RB.,, The construction microfiche listing then gives a corresponding microfiche card number for each of thesel pours. For example the tecords for pour'nUmri er 685RBa4re *"icard-1 P08022. A typical microfiche card will contain several pages of information including the mix design, batch tickets (truck slips),;the date of the pour, curing data, and other relevant data. CR3 Document Services are attempting to scan these cards for use by the:

!NRC and Root Cause team. At this time, there are some examples of the pour cards at L:\Shared\Containment

ýRoot Cause Files\Requested by NRC. A copy of calculation S00-0047 is also includedrat this location.

Document Services is attempting to scan the pours between buttresses 3 and 4 (all elevations) first. If a different, location is required, please let-Glenn Pugh

'C.G. Pugh 10/17/09 Misc'Notes:

Response By: 'Glenn Pugh Reviewed By: Date Response Provided: 10/16/2009, Status: Closed Date Closed:

rpLtA1Otuesiions Page 4 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:19 AM Request Number: 5 Individual Contacted: Sid Powell Date Contacted: 10116/2009 Requestor/Inspector: Georgle Th...

o-.

.a.s-.... m ..... . . ... Category: Information Request Request: With regard to the SGR Construction Opening, please provide stress plots of the SGR Opening and surrounding areas for the Dead load + Prestress load combination for the following cases: (i) prior to tendon detensioning and removal (ii)after tendon removal; (iii) with SGR opening and (iv)!

After restoration of opening and tendon retensioning.

References:

Response Assigned to: Sid Powell Date Due to Inspector: 1 )10/1712009

Response

'George asked if we could provide stress plots for the analysis at-the SGR opening for the Dead Load + Pressurel

!Load combination at the 4 stages of the SGR project. Unfortunately we did not run computer stress analyses for!

,the various load combinations. Each load element (dead load, pressure, liner plate thermal, thermal gradient,

,etc.) were individually evaluated. Additionally each were run at unit values, as to support the various

,amplification factors applied to the design basis evaluations. The results of these analyses were then extracted 1from the structural analysis package and processed, as necessary, toaddress the load combinations for various building conditions throughout the outage. Unfortunately, the program used does not have the ability to develop

stress plots.

Misc Notes: .Response inadequate. By this question, the NRC is seeking information to- understand the

,structural behavior and response of the Containment Wall under real loads (i.e+,Dead +

.applicable Prestress Load) in and around the SGR'construction opening area for the configurations prior to, during and following creation of the SGR constructiod opening. Provide the pertinent information in an easily reviewable form. This information may be provided with pending response to Question 28.

Response By: 'Dan Jopling Reviewed By: Date Response Provided: 10/20/2009 Status: Open Date Closed:

rMtAll Questions Page 5 of 94

2009 NRC Special Inspectionm- RB Concrete Separation 20-Jan-10 7:05:19 AM Request Number: 6 Individual Contacted: Sid Powell Date Contacted: 10/16/2009 Requestor/Inspector: ,George Thomas- Category: Question Request: Were the vertical and hoop* tendons in the. SGR opening area subject to. lift-off measurements

.before detensioning and removal. If so provide lift off measurements... Were the removed tendons inspected/examined and if so what were the fi.ndings..

References:

Response Assigned to: Sid Powell Date Due to Inspector: 10/16/2009

Response

!No lift off measurements were made for the tendons that were removed from the opening.

IWL examinations were performed on the concrete and bearing plates for the removed tendons. tendon end

,examinations were performed on the two longest tendons that were non-destructively removed. One wire each was removed and examined for the two longest tendons. . .

Misc Notes: Does CR3 plan on performing tension testing (i.e., ultimate strength, yield strength and elongation) on a wire sample from oneor more of the removed hoop tendons that exhibited

ýhigher than anticipated loss of prestressing force (ie.., hoop tendons that did not meet the'95%

predicted value criteria in IWL)? This information may be provided with pending response to Question 22.

Response By: Sid Powell Reviewed By: Date Response Provided: 1 10/16/2009 Status: 'Open Date Closed: i rptAlI Quesions6 Page 6 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:19 AM Request Number: 7 Individual Contacted: Garry Miller Date Contacted: 10/22/2009 Requestor/Inspector: Dan Naus Category: Information Request Request: Provide de-tensioning sequence in R16 for the construction opening. Provide procedure? Did anyone hear anything?

'Follow up request: Documents related to the dome delamination seem to indicate that a loud

noise or boom was heard on December 4, 1974, however, no noticeable damage was observed I during a subsequent visual inspection. Did anyone hear a loud noise or boom during the detensioning procedure related to the SGR contruction opening? *  !

References:

Response Assigned to: charles Williams Date Due to Inspector: 10/26/2009

Response

-R16 Tendon Detensiong sequence.pdf: ( E-mail from the SGR Tendon Field Engineer on the detensioning

,sequence.}

'Containment Opening - Tendon Removal Timeline.xlsx: {Spreadsheet containing some interview questions and responses as well as some plant shutdown/mode times and tendon detensioning sequence information.}

.Z3R5 PSC Field and Quality Control Manuall.pdf: {PSC Procedures[ALL], F&Q 8.0, 8.1, and 10.0 specifically iaddress Tendon Detensioning/Removal, Plasma Tendon Detension, and Tendon Removal}

Follow up Response: Interviews were performed with craft and supervisory personnel associated with

detensioning and hydroblasting. None indicated any abnormal noises occurring during these evolutions. Some were asked specifically if any loud noises were heard and no one identified any abnormal loud noises.

Additionally, seismic monitoring data was obtained and reviewed for indication of movement. WO 1654188-01

shows no evidence of movement. Note: One direction was invalidated due to disturbance that occurred during data retrieval. The other two directions showed no movement. See Seismic Data - PT-379.pdf file at L:\Shared\2009 NRC SPECIAL INSPECTION TEAM Q-A\WILLIAMS Q-A\Request 7, Q1 Response Info -

Portmann Misc Notes:

Response By: Rick Portmann .. ... ...... . .....

I Charles

.. ..... ... . . .. . . .. .... . . Williams Reviewed By: Date Response Provided: .. 11/2/2009 Status: Open Date Closed:

I WtAlIQLuesions Page 7 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:19 AM Request Number: 8 Individual Contacted: .Garry Miller Date Contacted:, 10/22/2009 i Requestor/Inspector: Dan Naus Category: Information Request Request: Any information on significant repairs (concrete related) between buttress 3 and 4 from original construction to today.

r...e....

.... f.

. . ....... . .... ... ......... e.........

.... .. r.......e..n..................c..e.....

References:

Response Assigned to: Charles Williams Date Due to Inspector: 10/26/2009

Response

Performed a search of the document control system, both the SEEK system and historical QA records. Looked for any Work Orders, NCRs, Correspondence, or other documents using the keywords "concrete repair" and "concrete crack." There were several "hits" on these key words. The majority of these "hits" were screened away by reviewing the title of the document. Any "hits" where the title was not clear were reviewed individually.

,The results were several AR's and Work Orders to repair damaged or cracked concrete on the RB containment.

ýHowever, none of the items reviewed were in the area of concern. Document search summaries are here:

iL:\Shared\CR3 Containment\NRC SIT Team Questions & Info\Request 8, Q2 Response Info- Pugh In addition, conversations were held with several people in maintenance andengineering, including one person that was employed in the early 1970's. No one could rememlier making any repairs on the RB shell concrete in the area of interest. No modifications could be identified. , Conclude that the'concrete between buttress 3,and 4 i.s.origi al construction. . - . . . . .. . --.--

Misc Notes:

Response By: !,Glenn -ha I....

.......e Pugh,a s Reviewed By: :Chales Williams Date Response Provided: 10/28/20091 Status: Closed Date Closed:

rptAII Questions Page 8 of 94

2009 NRC-Special Inspection ,-RB Concrete Separation 20-Jan-10 7:05:19 AM Request Number: 9 Individual Contacted: Garry Miller Date Contacted: 10/22/2009 Requestor/Inspector: Dan Naus Category: Question Request: Was there any analysis of why re-tensioning was required in past tendon surveillance activities

,(done at that time of surveillance testing)?

Follow up request: Since lower than expected lift-off loads have been obtained'in the-recent 3 tendon surveillanceds for a significant number of horizontal tendons, describe you~rpian, ifany, to dtermine, evaluate and eliminate the cause(s) of the condition not meeting the IWL acceptance by examination criteria.

Follow up request: Is the cause of the larger than anticipated losses of prestressing force in several hoop tendons being addressed as part fo the root cause assessment?

References:

Response Assigned to: 'Chades Williams Date Due to Inspector: 10/26/2009

Response

There was no analysis performed during past surveillance testing years.in'.which tendons werere-tensioned.`

Additional information in response to the above question: See License Request No. 24 - NRC SIT Question#

'18 folder, under sub-folder: "IWL - Tendon Surveillance History" for information, discussions and actions taken

,related to tendon lift-off testing and re-tensioning.

Misc Notes:

Response By: Rick Portmann Reviewed By: Date Response Provided: 11/2/2009' Status: Open Date Closed:

rptAlt Questions Page 9 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:19 AM Request Number: 10 Individual Contacted: :Garry Miller Date Contacted: 10/22/2009 Requestor/Inspector: .Dan Naus Category: Question Request: When CTL is using IR and IE, can they determine relative concrete quality of locations tested as part of CTL NDE procedures?

References:

Response Assigned to: Paul Fagan Date Due to Inspector: 10/26/2009

Response

in general, the Impulse Response (IR) test results is influenced by concrete quality and existence of defects at

'the test point. The aspects in concrete influencing IR results include presence of delamination, cracking, Isignificant void or honeycomb and change in concrete properties. The most significant factor is the presence of delamination which effectively reduces the thickness of wall or slab responding to the impact. Considerable

'difference in quality of concrete is typically reflected in the test results. For example, a core removed from panel

'RBCN-0014-N (Core #13) where a higher, mobility value was obtained by NDT, had less coarse aggregate in

.the concrete, which changed density-and modulus in that localized area, no delamination was noted in these areas with subsequent boroscope examinations . .......

Misc Notes:

Response By: Paul Fagan Reviewed By: Date Response Provided: 11/12/2009, Status: 'Closed Date Closed:

rptAIt OLIestions Page 10 of 94

iL;ii**;*'*;

  • ,*,
      • *J*,!.*T'*'*"*!,I*;**'

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:19 AM Request Number: . .  ; ..... ....... .. .... ........

Individual Contacted: jGarry Miller Date Contacted: 10/22/2009 Requestor/Inspector: ............

!Louis .......

Lake ........

..... Category: Question Q u e stio n Request: Does the PGN Testing Procedure identify how CTL calibrates their equipment, qualification of personnel, and equipment set-up'(i.e., frequencies)? Provide Testing Procedure to NRC.

References:

Response Assigned to: 'Paul Fagan Date Due to Inspector: 10/26/2009

Response

'This question pertains to PGN procedure PT-407T, Reactor Building Concrete Examination and Testing,

Revision 2.

!The question is split into three areas with specific procedure steps stated to address each area.

lArea .1 - Calibration

,Step 3.2 Responsibilities

'Step 3.2.1 The Condition Assessment Consultant is responsible for:

'Provide equipment list and associated calibration documentation IStep 3.3 Limits & Precautions ZStep 3.3.2

!The equipment utilized to perform the NDT was calibrated in the field during trial use by CTLGroup. This method.

,of validating the test process and equipment for a specific application is standard practice 'for concrete condition

ýassessments utilizing NDT.

iStep 5.3 Reports

'Step 5.3.1

An equipment list with calibration documentation will be provided for the NDT used. The NDT process calibration/validation document will be included in the report.

Enclosure 7

For a critical structure of this scale, more correlation data is desired in order to finalize a more comprehensive

.calibration.

Enclosure 8

Individual equipment packages have been established to track specific calibrated equipment in order to link individual NDT locations with a calibrated equipment package. The Exterior Containment Inspection Log

.requires an Equipment Package Number to be recorded for each NDT location. The Equipment Package Number is traceable to a permanent plant record documenting the calibration records for the equipment.

'Area 2 - Qualification

ýStep 3.2 Responsibilities

'Step 3.2.1

  • The Condition Assessment Consultant, CTLGroup, shall be responsible for assuring that all individuals under his

,supervision are properly trained in the use of this procedure and associated equipment.

Step 3.2 1 The Condition Assessment Consultant is responsible for.

,Provide personnel qualification records for lead Engineer iStep 3.5.2 Initial Conditions

'ENSURE that all personnel are familiar with the operating manuals of the equipment to be used during the inspection.

rptAlI Questions Page 11 of 94

2009.NRC Special Inspection - RB Concrete: Separation, 20-Jan-10 7:05:19 AM Step 5.3 Reports Step 5.3.1 The report will include personnel qualification records of lead engineers who performed the NDT.

Area 3 - Equipment set-up

,Step 3.2 Responsibilities ZStep 3.2.1 The Condition Assessment Consultant is responsible for:.

Provide calibration/validation documentation to substantiate the NDT methods to be used and to support the'

'dedication Of the software (SMASH) being used t* evaluatetheNDT4 data lStep 3.3 Limits & Precautions

'Step 3.3.2 The equipment utilized to perform the NDT was calibrated in the field during trial use by CTLGroup. This method

!of validating the test process and equipment for a specific application is standard practice for concrete condition

ýassessments utilizing NDT.

'Enclosure 5, page 1 ITURN ON the computer to start setup process.

!Enclosure 6, page 1 TURN ON the computer to start setup process.

Misc Notes:

Response By: Paul Fagan Reviewed By: Date Response Provided: i 11112/2009!

Status: Closed Date Closed:

rplAjl Ouestions Page 12 of 94

2009 NRC Special -Inspection - RB Concrete Separation 20-Jan-10 7:05:19 AM Request Number: 12 Individual Contacted: Garry Miller Date Contacted: 10/22/2009' Requestor/Inspector: Dan Naus Category: Question...

Request: Once the construction opening is refilled with concrete, how and for how long will the concrete be allowed to cure, and what is decision process for start of post-tensioning the structure?

Follow up request: In light of the apparent much more extensive repair area affected by delamination, how will the concrete curing and decision process for start of post-tensioning be affected?

References:

........ ........ .............. ............ . ..... k . . ... . ..

Response Assigned to: Don Dyksterhouse Date Due to Inspector: 10/26/2009

Response

Response located in L:\Shared\2009 NRC SPECIAL INSPECTION TEAM Q-A\DYKSTERHOUSE Q-A

-Concrete will be cured for 7 days from the time of placement (Ref. 1).

0,-After forms are stripped a curing compound is applied (Ref. 1)

°0 Forms may be removed after 3 days, or sooner if the concrete has achieved a compressive strength of 3000 pi las demonstrated through strength testing (Ref. 1)

O.Tendon retensioning starts with the verticals at buttress #3 and #4 (23V1 thru 23V3, 45V22 thru 45V24) after

,the concrete reaches a compressive strength of 5000 psi, followed by the remaining verticals outside the

!opening (34V18 thru 34V24, 34V1 thru 34V7) in parallel with the hoop tendons above and below the opening

ý;(42H22 thru,42H26, 53H23 thru 53H26, 42H35 thru 42H39 and 53H36 thru 53H39). After the concrete reaches

'6000 psi the tendons within the opening are retensioned (34V8 thru 34V17 and 42H27 thru 42H34 and 53H27 thru 53H35). Tendon retensioning sequence is shown in detail on drawing 421-352 (Ref. 2).

The following is extracted from Ref. 3, page 86 and provides concrete mix strength information that may support!

!removing the formwork earlier:

The use of autogenous curing containers is not planned during the containment opening concrete placement.

Although autogenous containers would better represent the curing environment before formwork removal, their

use involves additional resources and storage space. Therefore, standard curing methods will be used during 1actual concrete placement at the opening. To better understand what the difference in compressive strengths

ýwould be between the two methods, S&ME was tasked with testing a batch of concrete (concrete proportions

'based on results of Phase II testing i.e. Option 1A) and determining the difference in compressive strength

'between the two curing methods at 1, 2, 3,5 and 28 days.

ýAttachment Z55R3 contains the S&ME test methodology and test results. Test results for compressive strength

are reproduced below:

Age, daysL]Autogenous ContainersLiAltemative Proposed Curing DAutogenous/Alt 11 15,620 psili4,760 psiO 18% increase

ý206,450cz5,9301L9% increase

ý3 i6 5 9 006,320[L4% increase S5T6,860E6,830Li0%

828D8 050.r_8,48075% decrease iThe results clearly indicate that the autogenous cured cylinders have higher early age strength which is as

expected. The heat of hydration is (to some extent, over and above the standard cylinders) trapped inside the
containers resulting in a harder concrete. These results would indicate that formwork could be removed as early
as one day after completion of concrete placement.

"Per Ref. 1:

rV~A1l QueStions Page 13 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:19 AM Specified Concrete Strength: 6000 psi at 5 days, 7000 psi at 28 days

Slump
6" to 9" iAir Entrainment: 0% to 3.5% maximum, Concrete Unit Wt: 145 pcf minimum

References:

1.LSpecification CR3-C-0003, Rev. 0, Specification for Concrete Work for Restoration of the SGR Opening in the

!Containment Shell.

j2.r-Drawing 421-352, Rev. 0, RB Temporary Access Opening for SGR - Restoration - Sheet 1 of 1 3.EEC 63016, Rev. 26, Containment Opening Misc Notes:

Response By:

Reviewed By: Date ResConse Provided: I Status: Open Date Closed:

rptANI Questions Page 14 of 94

2009 NRC Special Inspection ,- RBConcrete Separation 20-Jan-10 7:05:19 AM Request Number: 13 Individual Contacted: Garry Miller Date Contacted: 10/22/2009 Requestor/Inspector: 'George Thomas Category: Question Request: Before additional tendons are de-tensioned, will there be as-found lift off measurements taken for.

these tendons.

References:

Response Assigned to: cCharles Williams Date Due to Inspector: 10/26/2009

Response

,,Planning and scheduling are currently in progress to obtain lift-off measurements of some of the tendons which are going to be detensioned. The root cause team has requested lift-off data on vertical tendons 34V3 thru 34V71

& 34V18 thru 34V22 and horizontal tendons 42H22 thru 42H26 &42H35 thru 42H39.

See lift-off data provided in Request 6 response. ...

Misc Notes: ------

Mist Notes: ,:

Response By: Rick Portmann Reviewed By: Date Response Provided: 11/4/20091.

Status: Closed Date Closed:

iptAll Ouestions Page 15 of 94

2009 NRC Special Inspectionm- RB Concrete Separation 20-Jan-10 7:05:19 AM Request Number: 14 Individual Contacted: 'Garry Miller Date Contacted: 10/22/2009 Requestor/Inspector: ,Dan Naus Category:. Question Request:, :For the original structural integrity test, were there any strain gauges in the SGR opening area or near it?

References:

Response Assigned to: i(harles Williams Date Due to Inspector: 10/26/2009"-

Response

ýSection 5.3.2 of the Dome Repair report included with Letter 3F1276-10 outlines where the strain gauges were

attached.

In addition to the final report, Attachment 1 to Supplement number 2 (transmitted via letter 3F1076-05) containedi

a detailed listing of strain gages for the SIT. The construction opening is centered on azimuth 150o (between,,.

'buttresses 3 and 4) from Elevations 180' to 210'. The listing in Attachment 1, does not show any gages in this area. The closest would be at azimuths 90o and 200o at Elevation 204' (gages 13, and .15).. i iThe SIT report (GAI Report 1930, dated 12/7/76) contains radial displacements for these gages (See Appendix iB, PageB-5 of the GAI report),.

Documents for this response are located here: L:\Shared\CR3 Containment\NRC SIT Team Questions &

Ilnfo\Request 14, Q8 Response Info- Pugh Misc Notes:

Response..By

.Gle....g Response By: :Glen Pugh Reviewed By: Charles Williams Date Response, Provided: 10/28/2009i Status: Closed Date Closed:

rptAll Questions Page 16 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10. 7:05:19 AM Request Number: 15 Individual Contacted: ;Garry Miller Date Contacted: 10/22/2009 Requestor/Inspector: Louis Lake ............

....... .... .......... Category:

......... ........ Question Qu e t io Request: When the 1976 roof delamination issue occurred, was there any evaluation of the rest of containment, including a 'notch sensitivity" review? Refer to the FPC Final Report Page # 110.

a) was the concrete different in the containment versus..he dome?

References:

Response Assigned to: Charles . ... . .. .Williams

... .. .. . . . .. .. ..... . . . ... ..... .. .. ... . .. .. ......... Date Due ...to.... .......Inspector:

... .................. ... i . .... 10/26/2009 .......

Response

Misc Notes:

Response By:

Reviewed By: Date Response Provided:

Status: Open Date Closed:

iplAII Quiestions Page 17 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:19 AM Request Number: 16 Individual Contacted: ;GarryMiller - Date Contacted: i 10/2212009 Requestor/Inspector: Louis Lake Category: Information Request Request: Discuss the planned NDE method, its reliability, industry experience, and other pertinent

information.

B) Discuss supplementary verification plans to ensure results are reliable.-,

References:

Response Assigned to: Paul Fagan Date Due to Inspector: 10/26/2009

Response

A) Impulse Response (IR) test was chosen as the primary NDT technique to evaluate the extent of delamination. The IR method uses a low strain impact from a hammer equipped with aiload cell to send a stress' iwave through the element under test. Theresponse to the input stress is measured using a velocity transducer i(geophone). Both the hammer and the geophone are linked to a portable field computer for data acquisition and

ýstorage. Time records for both the hammer forceand the geophone velocity response are transformed into the

!frequency domain using the'Fast Fourier Transform (FF)algorithm. ,.*

Average Mobility is the key parameter that the dynamic IR test produces. ItWis defined as the structural surface 1velocityresponding to the impact divided by the force input [(m/s)/N]. The mean mobility ,aiue over the 0.1-1lkHzI Irange is directly related to the modulus, density and the effective thickness of the element In general, presence of significant voiding or an internally delaminated or un-bonded layer will result inant increased average mobility value. On the other hand, a sound concrete element without distress will produce a relatively low average

,mobility value. The test results can be analyzed and presented in the form of contour plots. The suspect areas can be identified through a scaled color scheme.

iComparing to another well-known NDT method Impact-Echo (IE) test, the IR test uses a compressive stress

'impact approximately 100 times that of the IE test. This greater stress input means that the plate responds to the4

,IR hammer impact in a bending mode over a very much lower frequency range (0-1 kHz for plate structures), as opposed to the reflective mode of the IE test which normally requires a frequency range of approximately 5 to 301

'kHz, The influence of reinforcement and tendons in the structure has generally less impact than it would for IE f test, while delamination at relatively shallow depth, if any, will dominate the signal responsie in IR testing. it I

,makesit ideal to evaluate the presence of delamination without having to layout locations of tendon and reinforcing bars prior to thetestiniigin, atime critical project. However, the IR test cannot detect with high certainty

'the absolutedepth of delamination; rather it's on a comparative basis. The width or size ofcrack cannot be

,determined in the IR testing..

'The IR test method has been used to evaluate concrete structure condition in the past 20 years. The test method!

is in the process of being standardized by ASTM. CTLGroup has extensive experiences in utilizing this method to characterize defects in concrete. IR test has been used in evaluating concrete structures in'both nuclear and

'fossil power plants. CTL Group experience for nuclear related structures has been compiled (see attached).

,B) According to the Progress Energy procedure PT-407T, Rev. 2, concrete core samples are removed in areas

ýwith high mobility values (greater than 1.0) to confirm the presence of delamination. Core samples are also removed in areas where mobility value is in the "Gray" (between 0.4 and 1.0) range to verify the condition, unless ithe slightly elevated values can be dispositioned through evaluation. Many cores have been removed based on

.the IR test results along the boundary of delamination in the section where steam generator opening is located.

At this time, the approximate 20 cores so far removed indicated the IR results have been accurate in, characterizing the extent of delamination in the steam generator opening area. Also accordingoto the test

.procedure, a population of coresamples is also removed from areas where'low mobility values (less thanh0.4) lare obtained to confirm the sound concrete condition. Based on the core samples removed, the IRresults have

been accurate to detect a delamination in the concrete.

-.._.1._._._. 1--_1_.i-- - --. . --. ý- ----. --ý. -. ---.-..l. ý"- ..-ý.-ý-ý. -ý, of 94-

- - 18__

Pa- ge.l -----

rptRlt Ouiestions Page 18 of 94

2009 NRC Special Inspedion - RB Concrete Separation 20-Jan-10 7:05:19 AM Misc Notes:

Response By: *'Paul Fagan Revyiw:ed :.......................................... .............. .......................

Reviewed By: Date Response Provided: 1-/12/2009 Status:  !,Closed ,,Date Closed:

rptAll OuesionPS Page 19 of 94

2009- NRC Special Inspection -,RB,. ConcreteSeparation 20-Jan-10 7:05:19 AM Request Number: 17 Individual Contacted: Garry Miller Date Contacted: 10122/2009 Requestor/Inspector: George Thomas Category: Question Request: For petrographic analysis, who are the labs and what are their credentials?

Follow up Request: Provide information on the qualification of the petrographers from CTL and, Photometrics who are, performing/supervising petrographic examination work for CR3.

References:

Response Assigned to: ýPaul Fagan Date Due to Inspector: 10/26/2009

Response

ýTwo labs have performed petrographic analyses in accordance with ASTM C 856: MACTEC Engineering

& Consulting and CTL Group. MACTEC performed petrographic analysis under their Appendix B

!program, while CTL performed an informational "comparison" analysis as an additional, independent

'data point. The resume and qualification package of the Mactec individual whoperformed.the analysis for CR3 is attached, as well as the CTL analyst's resume and petrography literature from the CTL website.

A third laboratory, PhotoMetrics, is-also performing material analysis, although not perlthe-ASTM standard. The material examinations being performed by Dr.Mostafa at the PhotoMetrics laboratory involve methods intended to'examine similar conditions and attributes evaluated underpetrographic examinations, but using tools and techniques more frequently used in material science,"e g., scanning electronimicroscope (SEM) and micro-hardness examinations that are more thorough. Information from the PhotoMetrics website is attached.

Misc Notes:

Response By: Craig Miller Reviewed By: Date Response Provided: 11/18/2009, Status: !Open Date Closed:..

rptAll Questions Page 20 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:19 AM Request Number: 18 Individual Contacted: 'Garry Miller Date Contacted: 10/22/2009" Requestor/Inspector: George Thomas Category: Question Request: How are core samples being processed and sent to the labs-for petrography?

A) How will you determine that the results are consistent between the labs?

Follow up Request: Please expand your response on the quesiton of determining consistency of results between the labs. This may be provided with response to new quesiton .. below.

References:

Response Assigned to: Paul Fagan Date Due to Inspector: 10/26/2009

Response

Each of the cores used for petrographic analysis was obtained with a 4",diamond core bore bit, sealed in aluminum foil and plastic, wrapped in bubble wrap, and packaged in wooden crates. The packages were shipped via Fedex for overnight delivery. Chain of Custody forms are used to track each core. Cores #5 and #7 were sent to MACTEC for analysis. MACTEC cut core #5 longitudinally and sent half to CTL. Core

  1. 6 was sent to PhotoMetrics using the same process.

The labs are each performing independent analyses. The primary goal of the analyses was to estimate the relative age of the cracked surface. Each lab was given this objective when the work was authorized.

,Final reports will be issued with results.

Misc Notes:

Response By: 'Craig Miller Reviewed By: Date;Response Provided: 11/18/2009.

Status: Open Date Closed:

[ýptfl,*l I Ues;ion$ Page 21 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:19 AM Request Number: 19 Individual Contacted: Garry Miller Date Contacted: 10/22/2009 Requestor/Inspector: George Thomas Category: Question Request: What is the sampling plan for NDE and core samples,

References:

Response Assigned to: Paul Fagan Date Due to Inspector: 10/26/2009

Response

IThe nondestructive testing (NDT) and core bores are being executed based on the requirements specified by I, e

'Root Cause Team in support of the root cause analysis, design basis evaluation and repair requirements. NDT is performed on the exposed surfaces of the,containment inl each of the'six bays, wher a bay is defined as the area between each of,the . six buttresses. NDT is also lannded to be performed on the dome surface and is in

-.progress on.the containment walils accessible from within adjoinig buildings such as the Auxiliary Building, L

'Intermediate Building,,and the FuelTransferBilding: .

ExposedSurfaces

,Exposed surfaces accessed via work platforms, scaffolding, ladders, and roofs of adjoining buildings are

'included in the condition assessment of structure. A sinal! percentage of the overall surface area of exposed tsurfaces has physical constraints that make access impractical.

'Adjoining Building Surfaces

,Surfaces within adjoining buildings are accessed via permanent platforms, scaffolding, and ladders included in the condition assessment of the structure. A large percentage of the accessible surfaces are included in the plan; however, physical constraints exist in each of the three adjoining buildings that limit access. Examples are

1) areas with wall attachments that limit access to the concrete surface,.2) locked high radiation areas, and 3).

!contaminated areas.

iCore Bores The location and number of core bores is defined by the on-going NDT results and input fromrthe Root Cause i Team..,Core boresare taken~to provide samples for concrete testing. Cores in both solid and delaminated areas icharacterized by NDT are used to confirm the test results. Core bores have been drilled aroundthe permeter of, ithe delamination in the bay between buttresses 3 and 4 to confirm the boundary of the delamination by NDT. .characterized Misc Notes:

Response By: iPaulFagan Reviewed By: Date Response Provided: 11/12/2009 Status: .Closed Date Closed:

rpLA11 Ouestions Page 22 of 94

2009 NRC. Special Inspection - RB Concrete Separation 20-Jan-10 7:05:19 AM Request Number: 20 Individual Contacted: Garry Miller. Date Contacted: 10/22/2009 Requestor/Inspector: George Thomas Category: Question Request: :What are your examination plans for below grade?

References:

Response Assigned to: iPaul Fagan Date Due to Inspector: 1-6/20 -09

Response

iThe containment exterior concrete surfaces not exposed to the elements are accessed from within the Auxiliary, Intermediate, and Fuel Transfer Buildings. The' containment wall rests on the foundation mat. The top surface

of thefoundation mat is at EL. 93'-0" (ref. drawing 421-004). No portion of the containment wall is inaccessible due to concrete being in contact with backfill (below grade). Surfaces within adjoining buildings are accessed viai permanent platforms, scaffolding, and ladders are included in the condition assessment of the structure. A large!

,percentage of the accessible surfaces are included in this assessment; however, physical constraints exist in

each of the three adjoining buildings that limit access. Examples are 1) areas with wall attachments that limit access to the concrete surface, 2) locked high radiation areas, and 3) contaminated areas.

Misc Notes:

Notesii:ii Iis i" Response By: Paul Fagan Reviewed By: Date Response Provided: i 11/12/2009i Status: Closed Date Closed:

rptAll Questions Page 23 of,94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 21

, --. ~

r "'" *:`* '; ....

Individual Contacted: GoarryMiller Date Contocted: 10/22/2009 Requestor/Inspector: GeorgeThomas . .. Category: Information Request Request: Provide interview observations from personnel involved with hydro-demolition and detensioning/cutting of tendons (when their comments note something of interest).

Provide information from additional interviews of personnel when they become available. Also, include interviews conducted by P11.

References:

i ~~ ~itllI~NI~ ~ ~ ... ... .. I Response Assigned to: Charles Williams Date Due to Inspector: 1 10/26/2009

Response

'Response located in L:\Shared\2009 NRC SPECIAL INSPECTION TEAM Q-A WILLIAMS Q-A\Request 21, Q15

'Response Info - Portmann Misc Notes:

i. .....

Response By: Charles Williams I*___L~~.. ........... ....._

Reviewed By: Date Response Provided:,

Status: Open Date Closed:

rptAll Ouestions Page 24 of 94

2009. NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 22 Individual Contacted: ;Garry Miller Date Contacted: 10/22/2009 Requestor/Inspector: .George Thomas Category: Question Request: Have removed tendons been inspected and were there any significant findings? .

Does CR3 plan on performing tension testing (i.e., ultimate strength, yield strength and

'elongation) on a wire sample from one or more of the removed hoop tendons that exhibited higher than anticipated loss of prestressing force (i.e., hoop tendons that did not meet the 95%

predicted value criteria in IWL)?

References:

Response Assigned to: 'Chades Williams DateDue to Inspector: /26/209......

Response

There was no requested/required inspections performed of the removed tendons. Various questions were askedý

of the SGR Tendon Field Engineer and PSC Lead Individual, responses documented in the enclosed.

i{Containment Opening - Tendon Removal Timeline.xlsx}

({10 28 interview Cliff Peters Gary Goetsch.pdf}

(Interview with Gary Goetsch.pdf.

Misc Notes:

Response By: Rick Portmann . .

Reviewed By: Date: RespIonse Provided: .......

/

Status: Closed Date Closed:

rotAll Questions Page 25 of 94

2009 NRC Special Inspection - RBConcrete Separation 20-Jan-10 7:05:20 AM Request Number: 23 Individual Contacted: ýGarry Miiler .. Date Contacted:,!- 10/22/2009 j Requestorinspector: GeorgeThomasry:

~ ~

.... ~~~ ~ ................... tgo.y " Question ue to Request: :When were observations of surface feature changes andwater leakage-noted below the construction opening?

At what location of the SGR opening area did hydro-demolition begin and what was the sequence of progression for the creation of the opening?

Provide a copy of NCR 358724 that identified voids in the RB concrete in the area of hydro-demolition.

References:

ii i.. ..........

D ctor:

Response Assigned to: Chades Williams

Response

IThe below is the timeline of events as noted in the Outage Autolog system (relevant Autolog ipages attached) 10/1/2009 4:28:59 AM Begin hydro-demolition 10/1/2009 1:15:08 PM Hydro-demolition to first layer of rebar is complete, begin cutting rebar 110/2/2009 3:55:53 AM Restart hydro-demolition 10/2/2009 5:15:30 AM Stream of water identified exiting RB wall from below/to the right of the

'transfer, opening. Hydro-demolition suspended.

10/2/2009 6:41:11 AM Voiding identified in RB wall 10/7/2009 12:52:15 PM 2 ft x 4 ft loose concrete below the containment opening.

Copy of NCR 358724 also provided in L:\Shared\2009 NRC SPECIAL INSPECTION TEAM Q-A\WILLIAMS Q-

A\Request 23, Q17 Response Info- Miller Misc Notes

Response By: Charles Williams Reviewed By: Date Response Provided: it 11/18/2009i Status: Open Date Closed:

tptAI* Ouestions Page 26 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-1 0 7:05:20 AM Request Number: 24 Individual Contacted: Garry Miller Date Contacted: 10/22/2009 1 Requestor/Inspector: George Thomas Category: Question Request: What were results of the last three IWE/IWL surveillance reports (provide actual complete reports)?

Provide inspection procedures and including qualification of personnel information?

References:

~~~~~~~ ,. ~ ~ - .......

Response Assigned to: tCharies Williams' Date Due to Inspector: 0/2'6/2604

Response

'Response located in L:\Shared\2009 NRC SPECIAL INSPECTION TEAM Q-A\WILLIAMS Q-A\Request 24, Q18:

,Response Info-Portmann Misc Notes:

Response By: !Chades Williams Reviewed By: Date Response Provided :

Status: Closed Date Closed: i fptAIt Questions Page 27 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 25 Individual Contacted: Garry Miller Date Contacted: 10122/2009 Requestor/Inspector: George Thomas Category: Information Request Request: Provide results of current visual inspections.

References:

Response Assigned to: PaulFagan. Date Due to Inspector: -10/26/2009'

Response

fi response to your E-Mail Clarification on,1 1/30109 for information regarding "all IWL examinations, being iperformed during this (R16) outage, "to let you know there were no scheduied :As-Found IWL examinations for Ithis outage as they are performed every 5 years and were performed last in outage R15,(2007) [that information

'has been provided to you under NRC Folder "WILLIAMS Q-A" file "Request 24, Q18 Response Info-Portmann"].

,The only IWL examinations scheduled are the As-Left Pre-Service IWL exams to be performed prior to, during,

!and following the ILRT on the repair/replacement area which is yet to be completed.

'However as a result of the containment crack we did an augmented IWL scope between buttresses 3-4 to compare to the R1 5 information as part of the root cause investigation. I have included these reports, reference file RO-16 IWL Exam Reports.pdf enclosed in the NRC folder "FAGAN Q-A" file,"Request 25; Q19 Response Info".

The SGR-QC also performed visual inspections of the tendon ends, bearing plates and surrounding concrete for

those tendons affected by the containment opening Engineering Change (EC). These inspections were not
required lAW IWL.

jRev. 1: The SGR-QC examination reports ( File: Tendon Bearing Plate and Concrete Inspections.pdf) has been 1provided in this NRC folder.

Misc Notes:

Response By: ýRick Portmann Reviewed By: Date Response Provided: 'I 11/30/2009 Status: :Open *Date Closed:,.

rptAII Questions Page 28 of.94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 26 Individual Contacted: Garry Miller Date Contacted: 1 10/22/2009 Requestorllnspector: Louis Lake Category: i Question Request: Will PGN be doing the overall IWL inspection this R16 outage concurrent with ILRT?

References:

Response Assigned to: Paul Fagan Date Due to'Inspector: 10/26/2009

Response

IThe IWL Inspections required by ASME Section Xl are required every 5 years. CR3 last performed this

'inspection in R15 (2007). During R16 the ASME Section XI Repair/ Replacement requirements require that a lPre-Service ISI VT examination be performed on the containment opening repair area prior to, during and following the ILRT. In support of the containment root cause it has been requested that an Augmented IWL

'Visual Examination be performed on the containment between Buttresses 3 and 4. This Augmented area includes the tendon gallery and the vertical face of containment Misc Notes:

Response By: *Rick Portmann Reviewed By: Date Response Provided: I 1 1/4/2009i

-Open Status: Date Closed: V rplAll Questions Page 29 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 27 Individual Contacted: !Garry Miller Date Contacted:. 10/22/2009 Requestorllnspector: George Thomas Category: *. Question Request: What was technical analysis for decision to detension only specific tendons? Provide the analysis?

References:

Response Assigned to: :Charles Williams Date Due to Inspector: 10/26/2009

Response

'Summary:

1.FJThe requirement to restore the concrete prestress within and around the steam generator opening-to lapproximately the levels that existed-pnor toconstnuction:so that the original-design margihs could be

maintained. This resulted in the need to de-tension 30 vertical tendons'and 35 horizontal tendons,

'2.OThe requirement to use the containment shell to move steam generators in andlout of containment. This analysis was based on de-tensioning only the 10 vertical tendons and the 17 horzontal tendons within the steam

generator opening. The remaining tendons adjacent to the opening were required to meet design loading iconditions. The controlling load case was loss of decay heat removal accident in combination with the applicable loads from the polar crane.

ýWhite paper The purpose ofthis white paper is to document the engineering processes and subsequent decisions made in identifying which tendons to detension in and aroundthe CR3 temporary access opening in support of.Steam Generators Removal (SGR) activities.

iSargent & Lundy (S&L) created Finite Element Models (FEMs) of the containmentshell that are summarizedlin

  • iRef. 1, Section 6.0. These FEMs were created using the GTSTRUDL program through the generation.Of a 3-D tmodel of the containment which includes the containment shell, dome, basemat, representative soil springs and ithe equipment hatch. Similar to the design basis analysis, the models utilize thin shell elements that take into laccount bending and membrane action in the shell. Linear soil springs were also modeled similar to the'design lbasis analysis to simulate the support provided by the rock foundation,

'A significant goal of the SGR project team was to restore the prestress within and around the access opening to

ýthe design basis level prior to SGR and thus maintain the original design margins. S&L performed preliminary

,studies utilizing these FEMs to determine the optimum number of vertical and hoop tendons to detension outsidei

the opening. These preliminary studies indicated that restoration of the prestress within the access opening was
not possible unless the axial stiffness of the concrete sections within the access opening are nearly the same as

ýor higher than the axial stiffness of the existing concrete sections around the opening. Ref. 2, Section 4.1 ievaluated the mechanical properties of the new concrete in the openingand the; existing concrete around the J

opening, including the effects of concrete creep (the time dependent increase in strain in the hardened concrete I 1when subjected to sustained load, i.e. prestress). This evaluation was based.on the requiremehts of ACI 209R-192, Prediction of Creep, Shrinkage, and Temperature Effects in Concrete Structures, and was partially i developed by Professor Domingo Carreira, Chairman of the sub-committee'that prepared ACI 209R-92.,This

!evaluation resulted in the requirement to add two layers of #11 at 11" centers to approximatelyequalize the

'stiffness of the concrete sections within the access opening with the axial.ssfiff ness'of the existing concrete

sections around the opening.

,As part of the design evolution process, several detensioning alternatives were considered. This was necessary

,to meet the design constraint of keeping the number of tendons that have to be detensioned during the SGR

!outage construction to a minimum to minimize the duration of construction yet at the same time ensure that

,when the tendons are retentioned after the SGR opening has been plugged, the prestress within and around the rptAfl Questionis Page 30 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM

access opening is restored to approximately the levels that existed prior to SGR construction thus maintaining

'the original design margins.

'Determination of Prestress Reduction Level

'The analysis: in Reference 2 to determine the number of hoop and vertical tendons to detension was performed I

'using the following FEM models:

FEM Model A:

. iOriginal design basis prestress. Tendon forces are based on original lock-off stress (0.7xFu) and losses atzend

.of outage and EOL.

,,7Access opening has not been created yet and is not in model.

  • -iJCreepadjusted E is based on age of concrete when initially loaded and load duration to end of outage and EO1 i.e. E = 2681.62 ksi (for both end of outage and EOL)
  • i.lElement forces and stresses analyzed at end of SGR outage and EOL

.FEM Model B:

  • i.hSame as Model #A except access opening is included in model.

-lTendon forces are based on original lock-off stress (0.7xFu) and losses at end of outage and EOL.

1.' Creep adjusted E is based'on age of concrete when initially loaded and load duration to end of outage and EOi i.e. E = 2681.62 ksi (for both end of outage and EOL)

  • '_JReduced prestress in containment shell from de-tensioning 30 vertical and 35 hoop tendons is derived from twi main load cases:
B1. All vertical and hoop tendons included in load case"(as in Model A).
B2. Only the 30 vertical and 35 hoop tendons included in second load case

,B3. Final reduced prestress = B1-B2 IFEM Model C:

'.]This model reflects re-tensioning of the tendons at the end of the SGR outage, Young's modulus is the same fc

'the new patch concrete and existing concrete, E= 3767.168 ksi (reflects the stiffening of the concrete section within the opening by adding rebar (#11 s at 11" c/c vertical and horizontal, both faces).

PFilnclude 30 vertical tendons and 35 hoop tendons. Tendon forces are based on re-tensioning to 0.7 Fu minus Itendon losses to end of life (EOL).

By adding the results from Models B and C (at end of SGR outage and EOL) and comparing to the design basis I

,results for vertical and hoop prestress from Model A, it can be determined if the prestress in and around the

!access and hatch area can be restored to pre-outage levels. The calculation (Ref. 2) determined that' the

.prestress levels in and around the opening after re-tensioning would be at levels similar to those before the SGR!

.outage.

.Note: After Ref. 2 was issued it was decided by S&L and Progress Energy that since the creep adjusted Young's, Modulus (E) of the new and old concrete have been equalized (by adding #11 rebar's to the access opening),

,that for all future analysis a reduced E value = 2500 ksi (Original design basis calculations were performed using!

ia reduced Young's Modulus E=2500 ksi) would be used for both short and long term loads (Refer to Ref. 1, ,

'Section 6.0, Task 2 and Ref. 2, Attachment 5, pages 7 and 8 for further discussion concerning the use of E=2500 ksi).

'Shell Analysis with Reduced Prestress for Activities Occurring During SGR

'Based on the results of Ref. 2, i.e. detension a total of 35 hoops (17 in the opening and 9 above and 9 below the!

access opening) and 30 vertical tendons (10 within the access opening and 10 on either side of the access' opening), S&L evaluated the containment shell (Ref.3) for activities occurring during the SGR-as follows
1. v Modes 5 and 6 with the access opening created and the exposed liner. plate in-place. The maximum,number'6

'tendons that'may be detensioned should be such that no overstressingof the concrete'shell or liner plate occursd for all accident load cases/combinations, including.a LODHR accident. ',

i2 iDefueled (No Mode) with the access opening created in tcncrete sheli and liner plate for all 'cbnstructioh

.loads resulting from rigging the steam generators (SGs) into and out of'containment and for moving the a'uxiliary

.crane on the hatch transfer system (HTS). The maximum number of tendons that may be detensioned should be!

!such that no overstressing of the concrete shell occurs. ' -

rptAll Questions Page 31 of 94

2009 NRC Special Inspection - RB rConcrete Separation 20-Jan-10 7:05:20 AM Preliminary studies performed by S&L in the development of this calculation (Ref. 3) initially considered all 30 vertical and 35 hoop tendons detensioned prior to creating the opening,,however, these preliminary studies

,revealed that the containment shell was grossly overstressed in this configuration when evaluated for loads resulting from moving the old SGs out and the new SGs into containment (these preliminary studies are not available). S&L determined that the maximum number of tendons that could be detensioned while lifting the SGs!

ion the HTS is 10 vertical and 17 hoop tendons within the access opening. The remaining 20 vertical and 18 hoop tendons, outside and adjacent to the access opening must remain fully tensioned until all lifting activities involvingi the SGs on the HTS are completed. The remaining 20 vertical and 18 hoop.tendons outside and adjacent to the

access opening may then be detensioned. This conclusion resulted in the containment shell having two stages ot prestress

U;LEIStage 1 Prestress - Reduced prestress based on de-tensioning. 17 hoop and 10 vertical tendons within the, opening. Applicable during Modes 5 and 6 descending and No Mode while the SGs are being moved on the HTSi FI..Stage 2 Prestress - Reduced prestress based on de-tensioning 17 hoop and 10 vertical tendons within the:

opening and de-tensioning an additional 9 hoops above and below the opening (total of 35 hoopsde-tensioned) land 10 additional vertical tendons on either side of the opening (total of 30 verticals de-tensioned). Applicable after all lifts involving the SGs on the HTS are completed thru Modes 6 and 5 ascending (Refueling).

The containment shell was evaluated in Ref. 3 for Stage 1 prestress, SGR opening with concrete removed but

'the liner plate intact and loads applicable during Modes 5 and 6 descending. Ref. 3 also evaluated the

,containment shell for Stage 1 prestress, SGR opening with concrete and liner plate removed, reactor defueled, land applicable loads for moving the-SGs in and out of the containment. Ref. 5 evaluated the containment shell, ifor Stage 2 prestress during Modes 6 and 5 ascending, prior to restoration of the opening, during which time a LODHR accident is.the controlling load case in combination with the applicable loads from the polar crane.-

These Ref. 3 and 5. evaluations show that containment'shell stresses for, Stage ilandStage,2 prestress and the applicable loadings during th6 SGR c*nstruction sequence:arewithin-code allowables.,The containment shell

.with all detensioned tendons-retentioned, SGR Opening plugged with conCrete; and the linerplate opening welded back was evaluated'for design basis loading (Rief.4) to show that the containment concreteand liner iplate stresses are within code allowable and the asrepaired containment has approximately the same design

!margins as the as-found containment prior to the SGR construction.

PrestressZMODEu2ConcreteEDLiner5FuelQHTS 0Polar, CrnEJDB LoadsDRef

!Stage 1[5 and 6r]CutG UncutuOldiNoOYes (*)DYes (**){23

'Stage 1r]No Mode DCut0LCut0 NoneOYesi]?Z]NoL3 IStage 205 and 60CutflRestoredoNew-NooYesoNoZ5 AAIICAII LPluggedO Restored ONewONo OYes[Yes]4

() Dead weight of polar crane only.'

I(**)

ncluded design basis load combinations but substituted accident pressure and temperature resulting from a

  • LODHR accident for LOCA pressure,and temperature. ,' . ' * . -',. ' ' '

Restored Condition Analysis . " ."-* '

,The evaluations in Ref. 4 were performed using the following:Finite Element Method (FEM) models: , .

'FEM Model A:

.i0Original design'basis prestress., Tendon forces are based on original lock-off stress (0.7xFu) and losses at end of outage and end of life (EOL).

,-0]Access opening has not been created yet and is not in the model.

.wE=2500 ksi for concrete (same as design basis calculations)

F°Element forces and stresses analyzed at end of SGR outage and EOL IFEM Model B:

.L'Same as Model A except access opening is included in the model.
  • °L-Tendon forces are based on original lock-off stress (0.7xFu) and losses at end of outage and EOL.

rptAll Ouestions Page 32,of.94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM

  • E=2500 ksi for concrete (same as design basis calculations)
  • Reduced prestress in containment shell from de-tensioning 30 vertical and 35 hoop tendons is derived from tw
main load cases

1B1.All vertical and hoop tendons included in load case (as in Model A).

!B2. Only the 30 vertical and 35 hoop tendons included in second load case 1B3. Final reduced prestress = B1-B2

".0Deadload of wet concrete within the opening is included FEM Model C:

  • ° This model reflects re-tensioning of the tendons at the end of the SGR outage. Young's modulus (E=2500 ksi)

'is the same for the new patch concrete and existing concrete (reflects the stiffening of the concrete section within,

'the opening by adding rebar (#1 ils at 11" c/c vertical and horizontal, both faces).

"[1 Include 30 vertical tendons and 35 hoop tendons. Tendon forces are based on re-tensioningdto 0.7 Fu minus tendon losses to end of life (EOL)

'By adding the results from Models B and C (at end of SGR outage and EOL) and comparing to the design basis results for vertical and hoop prestress from Model A, it can be determined if the prestress in and around the

access opening and hatch area can be restored to pre-outage levels. The calculation determined that the
prestress levels in and around the opening after re-tensioning would be at levels approximately the same as

!those before the SGR outage for a majority of the elements. Pre-outage prestress levels could not be restored to' certain elements in and around the access opening. For these elements detailed stress evaluations were

,performed that demonstrated they met all applicable design basis allowable stresses.

References:

1.L.Calculation S06-0002, Revision 1, Containment Shell Analysis for Steam Generator Replacement- Design

,Cnteria.

2. 0Calculation S06-0004, Revision 0, Containment Shell Analysis for Steam Generator Replacement . ý,Popertie;,

,of New Concrete for Access Opening and Number of Hoopand Vertical Tendons to be De-tensioned.

3. 0Calculation S06-0005, Revision 1,.Containment Shell Analysis for Steam Generator Replacement Shell -

Evaluation during Replacement Activities.

4.Calculation S06-0006, Revision 1, "Containment Shell Analysis for Steam Generator Replacement - Evaluaticý

of Restored Shell" 5.r-,Calculation S09-0025, Revision 0, Containment Shell Analysis for Steam Generator Replacement - Evaluatio for Refueling prior to Restoration of Access Opening.

Misc Notes:

Roensspe. ;D n .y ~ t r*. s ......................................................

Response By: Don Dyksterhouse Reviewed By: Date Response Provided:

Status: Open Date Closed:

rptAl, Questions Page 33 of 94

2009 NRC- SpecialInspection, - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 28 Individual Contacted: Garry Miller Date Contacted: 10/22/2009 Requestor/Inspector: George Thomas . Category: Question Request: What were forces acting on SGR opening area and adjacent areas:

A) Prior to tendon de-tensioning and concrete removal?

B) After de-tensioning and tendon removal?.

iC) After detention and concrete removal?

By this question -the NRC Jisseekinglinformation to understand the stictural behavior and

'response of the Containment Wall under, rea) lads (i.e., Dead + applicable Prestress Load) in and around the SGR c6nstruction opening area ,forthe configurations prior to, during.anld following creation of the SGR construction-opening. Provide the pertinent information in an easily, reviewable form.

References:

Response Assigned to: ýDon Dy[ksterhouse Date Due to Inspector: 10/26/2009

Response

Refer to Calculation S09-0048 stress plots. These plots are for dead load + vertical and hoop prestress as, irequested by George Thomas.

References:

1.FCalculation S09-0048; Revision' ,: Stress Plots, for SGR Containment Analysis Misc Notes: M ~s Noes .. ...................... ........ .. ... .. ...... . ... ........ .. ............... ............................................

Response By: Don Dyksterhouse Reviewed By: Date Response Provided:

Status: Open Date Closed:'

rptAII Questions Page 340of 94-

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 29 aInldiv cido u n tac te d : ~ ~~~~~~~~~~.........

Individual Contacted: Garry Miller Date Contacted: . 10/22/2009 Requestornspector:George Thomas Category: 1 Question Request: How were the forces acting on the buttress analyzed when the horizontal tendons were released and the forces became unbalanced?

References:

Response Assigned to: jDon Dyksterhouse Date-Due to Inspector: 10/2612009 1

Response

The unbalanced force(s) and moments from cletensioning hoop tendons were evaluated for Buttress numbers 2, 13, 4 and 5 (Ref. 1, Pages 90 thru 95) and these forcesand momentswere applied to the appropriate nodes along the centerline of each buttress. Note that the forces and moments shown on pages 90. thru 95 of Ref. 1 are.

'in the direction of the tensioned tendon. When these tendons are detensioned the signs reverse (Ref. 1,

!Attachment 2, load cases 6 and 10 and load combinations 102 and 104). The unbalanced forces are derived

'from the original lock-off stress - tendon losses at the time of the steam generator replacement outage (Ref. 2,

'Section 4.2.1.2).

References:

1. iCalculation S06-0005, Revision 1, Containment Shell Analysis for SGR - Shell Evaluation During Replaceme4 Activities.

2.0Calculation S06-0004, Revision 0, Containment Shell Analysis for SGR -Properties of new Concrete for Access Opening and Number of Hoop and Vertical Tendons to be Detensioned.

Misc Notes:

Response By: Don Dyksterhouse Reviewed By: Date Response Provided: .

Status: Open Date Closed:

rptAIlQuestions Page 35 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 30 Individual Contacted: :Garry Mi~llerl Date Contacted: 10/22/2009 Requestor/Inspector: 'George Thomas Category: i' 10/22/09 Request: Where is PH1 based, and provide a description of their credentials?

A) What is their root cause approach?

Provide P11's failure mode chart referred to in item (5) under the title, "Unique Qualification" of the

response.

Identify the root cause failure analysis report for the MOX facility referred to in Item (6) under the title "Unique Qualification" of the response, if submitted to the NRC, or provide a copy of the re port.............. . . . . . . . . . . . . .. . .

References:

. .i ..... .... .. ..............

.l l Response Assigned to: Charles Williams Date Due to-InspecItor: 10126/2009-

Response

'Pi location, background, qualification and methods were reviewed with George Thomas. A hard copy of the

,response.was provided and discussed on 10/28/09. Electronic copy of this file is in L:\Shared\2009 NRC OSPECIAL INSPECTION TEAM Q-A\WILLIAMS Q-A\Request 30, Q24 Response Info - Williams Misc Notes:

Response By: Charles Williams Reviewed By: Date Response Provided: 10/28/20091 Status: Open Date Closed:

rptAII Questions Page 36 of 94

2009, NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 31 Individual Contacted: Garry Miller Date Contacted: 10/22/2009 1 Requestor/Inspector: .George Thomas Category: Question Request: What are the various root causes and fault tree scenarios being considered?

Provide a list of root cause failure modes being considered under each of the 9 broad categories

'(i.e., break down each of the 9 categories into the approximately 79 failure modes being evaluated for CR3 containment).

References:

Response Assigned to: Charles Williams Date Due to Inspector: 10/26/2009

Response

'Alistingof potential causes categories and examples were reviewed with George Thomas. A hard copy response was provided and discussed with George Thomas on 10/28/09. Electronic copy of this file is in L:\Shared\2009 NRC SPECIAL INSPECTION TEAM Q-A\WILLIAMS Q-A\Request 31, Q25 Response Info -

!Williams Misc Notes:

Response By: Charles Williams Reviewed By: Date Response Provided: 10/28/2009!

Status: Open Date Closed:

rptAll Ouestions Page 37 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 32-Individual Contacted: ,Garry Miller Date Contacted: 10/22/2009

..Q.. est.ion.

Requestor/Inspector: 'George Thomas Category: Question Request: When and what will be the deliverable for the NRC to review, i.e., schedule for root cause, NDE,

,results of core bore samples, and design basis analysis?

Provide a response to part of the original question "What deliverables related to root cause

'analysis, extent of condition (NDE/core bores), design basis anal ysis and repair options would be, provided to the NRC for review?"

Provide weekly updates to the schedule.

References:

Response Assigned to: dChades Williams Date Due to Inspector: i 10/26/2009

Response

11asked George Thomas for a clarification of this request on 10/28/09. He said he would like a copy of the current schedule for activities for the Root Cause, Condition, Assessment, Design-Basis andRepair teams. A

!hard copy was provided on 10/29/09. Electronic copy of this file is in L:\Shared\2009 NRC SPECIAL INSPECTION TEAM Q-A\WILLIAMS Q-A\Request 32, Q26 Response Info - Williams Misc.Notes: i Response By: Charies Williams Reviewed By: Date Response Provided: 10/28/2009 Status: Open Date Closed:

rptAIl Questions Page'38o6f,94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 33 Individual Contacted: Garry Mlle.r Date Contacted: 10/22/2009 Requestor/Inspector:  ;George Thomas Category: Information Request Request: Provide copy of PGN's and P11's Root Cause Analysis procedure.

Include a statement on Pit's root cause analysis procedure or if they would be working to PE's procedure.R

References:

Response Assigned to: ýCharles Williams Date Due to Inspector: '""10/2"6/200-9

Response

.Ahard copy of the PGN root cause procedure CAP-NGGC-0205 was provided to George Thomas on 10/28/09.

PII does not have a written procedure. The PII Root Cause process was discussed with George Thomas as parti iof response to Request 30. Electronic copy of this file is in L
\Shared\2009 NRC SPECIAL INSPECTION TEAM Q-A\WILLIAMS Q-A\Request 33, Q27 Response Info - Williams Misc Notes: M iscN ......

ots...

Response By: Charles Williams Reviewed By: Date Response Provided: 10/28/2009; Status: Open Date Closed:

rptAll Questions Page 39 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 34 Individual Contacted: iGarry Miller Date Contacted: 10/22/2009 Requestor/Inspector: iGeorge Thomas Category: Question Request: Who is the contractor doing Design Basis Analysis? How does this relate to Root Cause analysis efforts?

References:

Response Assigned to: iDon Dyksterhouse Date Due to Inspector: 10/26/2009

Response

,The selected vendor to perform Design Basis Analysis is MPR Associates, Inc. Alexandria, Virginia. Computer Aided Engineering (CAE) Associates, Middlebury, Connecticut, is supporting MPR in the development of the 3-D:

ifinite element model.

The Root Cause Analysis teamh efforts are being supported by Performance Improvement International, PII,

!Oceanside, California and has independent technical capabilities to support the Root Cause Analysis team." The root cause(s) identified by the Root Cause Analysis team will be evaluated by the Design BasisAhaI*y*sisteam for

!impact on the design analysisiand on the design basis.

Misc Notes:

Response By: Don Dyksterhouse Reviewed By: Date Response Provided:

Status: Closed Date Closed:

rptAIl Questions Page 40 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Re quest Number: 35 Inc dividual Contacted: 'Garry Miller .. Da te Contacted: 1 10/22/2009 Re questor/Inspector: George Thomas Category: ......Question S.... ..A...... C........

............. e...........

Request: Are you changing the design or licensing basis? Will a License Amendmrent or 10CFR50.59 type; analyses be required?

A) Are you changing the AC! 318-63 code of record?

References:

Response Assigned to: iDon Dyksterhouse Date Due to Inspector: 1/261200.

Response

Misc Notes:

Response By:

Reviewed By: Date Response Provided:

Status: 'Open Date Closed: I mA;ll Questions Page 41 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 36 Individual Contacted: ;Garry Miller Date Contacted: 10/22/2009 Requestor/Inspector: lGeorge Thomas . Category:

Category: Question e.........

Re.uest:.Will.there.be.a.pas .

Request: Will there be a past-operability analysis completed?,

References:

Response Assigned to: ýDon Dyksterhouse . Date Due to Inspector: 10/26/2009

.Response:

Mi.sc No tes........:. ........ .............. ........ ......

M Nis te s . ..... .. . . ............... ................. ....... .. .......... .. ..... .. ..... ....... ..............

Response By:

Reviewed By: Date Response Provided:

Status: Open Date Closed:

rptAfl Questions Page 42 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 37 Individual Contacted: :Garry Miller Date Contacted: 10/22/2009 Requester/Inspector: George Thomas Category: Question Request: What type of analysis and codes (by names) is expected to be used in the design basis'analysis?

References:

Response Assigned to: IDon Dyksterhouse Date Due to Inspector: 10/26/2009

Response

'The analysis computer code that will be used for the design basis analyses is ANSYS Version 11.0 SP1.

Misc Notes:

Response By: Don Dyksterhouse Reviewed By: Date Response Provided:

Status: Closed Date Closed:

rptAII Questions Page 43 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 38 Individual Contacted: Gary MllrDate Contacted:, I 10 122.2009 Reqeuct sto /Insr: i nth ny aste s * ** '*- -:.................................................................

Requestr/Inspector: !Anthony Masters Category: Information'Request.

Request: Provide procedures and drawings for tendon..installation andstressingin original construction

.(containment walls and dome), and also after the 1976 dome repair.

References:

Response Assigned to: iDon Dyksterhouse Date Due to Inspector: 1 10/26/2009

Response

Design drawings for both original design and post-dome .. repair are included intheCR3.Document.Control ISystem. Generally the drawing series that start with 421-001 is theoriginal plant dIsign drawings. The series Ithat starts with 421-300 contains the dome repair drawings..Specifications for concrete and reinforcemnent are included in the shared drive. Drawing copies are included in thedrive where availabie. Several'of the 421300 iseries of drawings are available only on aperture cards. A drawing list is in the Excel file.

!L:\Shared\CR3 Containment\ROOT CAUSE ANALYSIS Files\(!) Concrete Design\Concrete Design Drawings Misc Notes:

Response By: 4Glenn Pugh Reviewed By: iChades Williams Date Response Provided: ----- 10/28/200] 8 Status: Open Date Closed: ..

rptAll Questions Page 44 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 39 Individual Contacted: Garry Miller Date Contacted: 10/22/2009 R'equestor/lnspector: :Louis Lake category: 1 Question Request: Were there any changes to the dome made in 1976 (additional new anchors and/or radial rebars)?

t . ... .. ..........

References:

Response Assigned to: :Don Dyksterhouse Date Due to Inspector: i01026/2009

Response

'The referenced report and drawings indicate radial #6 reinforcing bars were added and # 11 bars were used to

ýreplace damaged # 8 circumferential bars. There were approximately 1,850 radial #6 reinforcing bars added. If

.any #8 circumferential bars were damaged during concrete removal and the entire hoop was to be replaced, a

  1. 11 bar was used in place of the #8 bar. If any #8 circumferential bars were damaged during concrete removal
and only a portion of the bar was exposed, a new # 8 bar was cadwelded to the embed bar.

References:

Final Report - Reactor Building Dome Delamination Report, December 10,1976 SC-421-341, Reactor Building - Concrete, Dome Repair Dome Reinfbrcement North Half - Top Reinforcement SC-421-342, Reactor Building - Concrete Dome Repair Dome Reinforcement South Half -Top Reinforcement;,l SC-421-343, Reactor Building - Concrete Dome Repair Dome Reinforcement North Half- Bottom

!Reinforcement SC-421-344, Reactor Building - Concrete Dome Repair Dome Reinforcement South Half- Bottom

'Reinforcement

SC-421-345, Reactor Building - Concrete Dome Repair Dome Reinforcement Sections & Details Misc Notes:

Response RespnBy:

s y : ..Don Dyksterhouse ... ... .......................... ... ..................

Reviewed By: Date Response Provided: 11/1-3/2009i Status: Open Date Closed:

rnpLAl Questions Page 45 of 94

2009 NRC ,Special Inspection - RB ConcreteSeparation 20-Jan-10 7:05:20 AM Request Number: 40 Individual Contacted: :Garry Miller Date Contacted: 10/22/2009 Requestorlinspector: ,Anthony Masters Category: Question Request: What is the cause of the low spot on the dome?

A) Email from Lese said it was same as previous inspections since 1976. Can this be confirmed

'from the final documentation and photographs in 1976?

References:

Response Assigned to: iDon Dyksterhouse.. . . .... .. Date Due to Inspector: 10/26/2009

Response

'The construction microfiche database contains a listing of microfiche for the dome repair project. The cards range in number from 2C01024 to 2C02089.' A search of thedatabase titles showed several microfiche cards

(2C02064 and 2C02065) containing nonconformance's and corrective actionsfor the repair project. A review of

.these microfiche records did not reveal any information on a low spot. A check of the pour cards also did not mention a low spot or other problem.

,However, to help in answering this question a conversation was held with Mr. EarnestGallion about this repair.

Mr. Gallion was an employee at the, time of the dome, rep*ir.ý He reported thatthetconcrete;finishers used at the time of the repair where not as experienced as could be. There were several l6ow spots and other imperfections that existed from the initial concrete pours. These are not considered detrimental to the qualification of the

,dome. Would also consider that these existing since the repair project.

,This confirms statements by Mr. Joe Lese.

ýA copy of the Construction Microfiche log is included here: L:\Shared\CR3 Containment\ROOT CAUSE ANALYSIS Fles\(2) oncrete Constructibn\Construction MicroFiche Index.pdf Misc Notes: Related to question #1 Response By: Glenn Pugh Reviewed By: Charles Williams Date Response Provided: 0/28/,00.91 Status: Open Date Closed:

iptA1I Questions Page 46 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 41 Individual Contacted: iGarry Miller Date Contacted: 10/22/2009 .

Requestor/Inspector: , Anthony Masters

.............................. Category: "...t Questionn.. . ...

Request: iNCR 360269 mentions SGR expected flexible tendon sheaths? What was the basis for them expecting a thin wall sheath?

References:

... II]1] .. ....... ...... ...

Response Assigned to: iCharles Williams Date Due to Inspector: 10/26/2009

Response

Enclosed in this folder in response to the above question:

!FW NRC Question - D Jopling Response.pdf M isc Misc Notes:...

Notes: ... . . ... .. ...... ........ . ... . . ......

Response By: 'Rick Portmann Reviewed By: Date Response Provided: 11/2/2009ý Status: Closed Date Closed:

rotAll Questions Page 47 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 42 Individual Contacted: iGarry Miller . Date Contacted: -10/22/2009..

...n....... M a.s Requestor/Inspector:

Sn' 0nthonMast,ers Category: Question Request: Were radial*tension stresses due to the hoop tendons considered in the original design?

References:

Response Assigned to: Don Dyksterhouse Date Due to Inspector: 10/26/2009 -

Response

'Cannot readily determine from the old Gilbert Calculations what the direct answer is to the request. It appears that the tendon design is based on limiting the concrete tensile stress to 212 psi. This limit bounds the tensile stresses in meridional, and hoop directions. See Book 2, Section 1.01.7, pages 1,01.716 and 1.01.7/7 for a brief.

memorandum outlining the critical loading of the cylindrical RB wall. The tendon pre-stress is designed to limit the tensile stresses in the concrete for the load combinations. However, it does not appear that the calculations considered the tensile stresses in the concrete outside the tendon's influence.

1Copies of calculation pages are included at following drive location:

L:\Shared\2009 NRC SPECIAL INSPECTION TEAM Q-A\WILLIAMS Q-A\Request 42, Q36 Response info- Pugh Misc Notes: Consideration is on-going by George/Anthony Response By: Glenn Pugh i Reviewed By: Charles Williams Date Response Provided: 10/28/20091 Status: Closed Date Closed:

rptAll Questions Page 48 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 43 Individual Contacted: .Dennis Herrin Date Contacted: t 11/2/2009 Requestor/Inspector: Anthony Masters Category: Information Request' Request: Please provide Drawings: sc-400-007, 008, 009, and 015; and S-425-01i1 and S-425-012 Specifications: SP-5566, 5569, 5583, 5618, 5648, and 5909 Reports: VT-3C Report VT-07-106.and VT-3C Report VT-07-1 11 Calculations: S-07-0019 and S-07-0033

References:

Response Assigned to: ;Don Dyksterhouse Date Due to Inspector: i 11/212009

Response

Enclosed in this folder in response to the above question: All requested information provided ex~cept for SP-
5566, SP-5583. 11/3/09 Update. The last 2 spec's requested have been-included in the file.

Misc Notes:

Response By: Rick Portmann Reviewed By: Date Response Provided:

Status: Closed . Date Closed:

1r;tN, AIt estio~s Page 49 of 94

2009;NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 44 Individual Contacted: Dennis Herrin Date Contacted: 11/3/2009 Requestor/Inspector: Anthony Masters .Category:' lnformation-Request.

Request: In continuing evaluation of the IWL inspection and mainten6nce program:

,Ifpossible, I would like to speak with Mr. Bernard Komara and Mr. Marc LeBlanc as they were

.listed as the inspectors on two previous inspection reports that I,have reviewed,.

References:

Response Assigned to: Don Dyksterhouse Date Due to Inspector: f

Response

Mr. Marc LeBlanc (NIC Contractor Inspector) was.here in refuel 15(2007) and tomy-knowledge. isnot here for&.. ,

refuel 16. Mr. Bemard Komara (NIGContractor lnspector)has returned to CR3for refuel :16 and is'working'f6rd 1 the site QC Organization. The Supervisor for Mr. Komara is Jeff Bennett.. Please contactJeff (x-3323) for RBernie's availability.

Misc Notes: Evaluation of containment liner bulges still in progress.

Response By: Rick Portmann Reviewed By: Date Response Provided: 11/9/2009J Status: Closed Date Closed: 17.

rptAll Oueslions Page 50 of 94

2009 NRC Special Inspection - RBConcrete Separation 20-Jan-10 7:05:20 AM Request Number: 45 Individual Contacted: ,Dennis Herrin Date Contacted: 11/3/2009 Requestor/Inspector: iAnthony Masters Category: Information Request Request: In continuing evaluation of the IWL inspection and maintenance program:

SP-182, Rev. 16. (Dated 5/22/09) Reactor Building Structural Integrity Tendon Surveillance

'Program, indicates compliance with the 1992 addenda of the 1992 Edition of ASME Section XI, I Subsection IWL, while the document titled ASME Section XI/ASME OM Code Program, Interval 4: Containment Inspection Program (2nd ClSI) Revision:3 (Dated 5/6/09) indicates the 2001 Editiont1hrough.. the. 2003Addenda. Please clarify. ...... . .........................

References:

Response Assigned to: Don Dyksterhouse Date Due to Inspector: I

Response

!The last performance of the Tendon Surveillance under SP-182 was in 2007. The ASME Section Xl code of

record during that time was the 1992 addenda of the 1992 Edition of ASME Section Xl, Subsection IWL. In
accordance with 10CFR50.55a, licensees are required to update their ISI Programs to meet the requirements of iASME Section XI once every 10 years or inspection interval. The 3rd inspection interval was completed on August 13, 2008 and the new interval (4th) began on August 14, 2008. For the 4th interval , the 2001 Edition, ithrough the *2003 Addenda is the code of record. The SP-182 will be revised to reflect the new code edition prior!

'to its-next required 5 year tendo~n, su.veil.la nc.e..

Moist c N s: .............................

Misc Notes:

Response By: Rick Portmann Reviewed By: Date Response Provided: 11/9/20091 Status: Closed Date Closed:

rptAII Questions Page 51 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 46 J....

Individual Contacted: Dennis Hemn Date Contacted: 11/3/2009 Requestor/Inspector: Anthony Masters Category: Information Request Request: In continuing evaluation of the IWL inspection and maintenance program:

,SP-182, Rev. 16 (Dated 5/22/09) Reactor Building Structural Integrity Tendon Surveillance

  • iProgram, has. some concrete inspection activites associatediwith it as part of the tendon
survelliances. Arethe-documented and reported in separate documentation or are the VT-lC

.and VT-3C examinations credited..for this (iL'e. VT-07-1 11 and YT.07-289)? If not, I would like to review the additional documentation.  : - ,.  : .... ...-

References:

Response Assigned to: .Don Dyksterhouse Date Due to Inspector: I

Response

The visual examinations for the tendon surveillances are documented separately from the IWL concrete

.examinations. The last two tendon surveillances and the last two IWL examination reports have been supplied.

See the Request #24, NRC SIT Question #18 folder for these examination reports.

Misc Notes:

Response By: Rick Portmann Reviewed By: Date Response Provided: 11/9/2009 Status: Closed Date Closed:

rntAtl QUeslionsPg Page 52 of 94

2009 NRC Special Inspection - RB COncrete Separation 20-Jan-10 7:05:20 AM Request Number: 47

liv a lIC idou ta t d .le. n ,-....

. i H1-e. -rn!. . . ....- ........

a eC n a t d ' ...........

1/3 2 0 1 Incfividual Contacted: DVennis Herrin Date Contacted: 111/3/2009 Requestor/Inspector: Anthony Masters ......... ................ ....................

t g o ry........ ...... in.°.ai......e .Ca t Request: In continuing evaluation of the IWL inspection ahd maintenance program:

,SP-182, Rev. 16 (Dated 5/22/09) Reactor Buildin'gStru*turaI'Integrity Tendon.Surveillance

'Program,, Section 3.5.3.1 specifies requirements for calibration for all measuring devices. I

'would like to review a sample of those records also.

References:

Response Assigned to: Don Dyksterhouse Date Due to Inspector:

Response

The tendon surveillance reports have the'calibration records for the tendontesting equipment: The last two

!tendon surveillances reports have been supplied. See the Request #24, NRC SIT Question #18 folder for these:

,examination reports.

Misc Notes:

Response By: Rick Portmann Reviewed By: Date Response Provided: 11/9/2009 Status: Closed Date Closed:

TptAlI Questions Page 53 of 94

2009 NRC Special Inspection - RB.Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 48 Individual Contacted: :Dennis Herrin I Date Contacted:- 11/3/2009 Requestor/Inspector: Anthony Masters .Category: Question Request: In continuing evaluation of the IWL inspection and maintenance program:

SP-182, Rev. 16 (Dated 5/22109) Reactor Building Structural Integrity Tendon Surveillance Program, Section 3.6 specifies acceptance criteria. Section 3.6.2 states that "abnormal conditions determined as the result of a visual inspection of the exterior concrete surface of the containment shall be recorded and documented, and investigated by Engineering for possible

.degradation of the structure."

Also, "Cracks found in concrete adjacent to the tendons (within 2 feet of the bearing plate) having; widths greater than 0.010 inch shall be recorded and reported to Engineering.for evaluation and resolution. Any crack widths greater than 0.050 inch shall be cause for investigation by, Engineering to determine the cause and if there is any abnormal degradation'of the structural integrity of the containment."

Photographs VT-07-289-8 and VT-07-289-1 1, which are associated with VT- lC Report VT ý289, appear to show cracks within 2 feet of the, bearing plate., Have these been documented and.

evaluated?

References:

Response Assigned to: ýDon Dyksterhouse Date Due to Inspector:

Response

'The SP-182 criteria specified applies to the anchorage and bearing plate inspections performed for the tendon

ýsurveillances. The reports discussed are from the ASME Section Xl IWL examinatiofisperformed. The, recording and acceptance criteria may differ as the~performance requirements come from separate

,requirements. These particular indications described on R15 IWL Report T-07-289were included in NCR 256010 for evaluation. .

Misc Notes:

Response By: Rick Portmann Reviewed By: . .. .. . . . . ...... . .. . . .. ....

Date Response Provided: 11/9120091

. . . ... .. . . . .. . ..... . . . ... .. .J Status: Closed Date Closed:J rptAll Questions Page 54 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 49 Individual Contacted: 'Dennis Herrin Date Contacted: 11/3/2009 Requestor/Inspector: ,Anthony Masters Category: Question Request: In continuing evaluation of the IWL inspection and maintenance program:

SP-182, Rev. 16 (Dated 5/22/09) Reactor Building Structural Integrity Tendon Surveillance Program; Section 3.7.1 recommends equipment forimplementation of this inspection and

'3.7.1.12 lists "optical comparators with 0.005 inch accur acy for measuring crack widths in

,concrete." Is this being used? VT-07-1 11 and VT-07-;289 do not have itlisted in the inspection equipment area on the reports. These reports list a 6"scale and measuring tape. Is 0.005 inch accuracy (or the 0.010 inch as acceptance criteria section 3.6.2 states) possible with these?

References:

Response Assigned to: D-on Dyksterhouse- Date Due to Inspector:

Response

IThe inspection reports referenced were performed as part of the IWL Examinations. The controlling procedures

are NDEP-0620 and NAP-02. The SP-182 surveillance procedure referenced is used in conjunction with the

'Tendon examinations (not the IWL Examinations). The accuracy stated comesfrom the PSC Procedures and

,equipment utilized for the Tendon Examinations. An example of the certification record for one of the past Isurveillances can be found on pages 77-78 of the 6th surveillance report {WR 341602 6th-Surv.pdf}. Copies of I

,the certifications have been enclosed in this file. This report can be found:

IL:\Shared\2009 NRC SPECIAL INSPECTION TEAM Q-A\WILLIAMS Q-A\Request 24, 018 Response Info-

ýPortmann\IWL - Tendon Surveillance History Misc Notes:

Response By: Rick P. rtm .nn................ .. . . ............... ...

Reviewed By: Date Response Provided: 11/12/20091 Status: Closed Date Closed:

rptAII Ouestions Page 55 of 94

2009 NRC Special Inspection - RB ConcreteSeparation 20-Jan-10 7:05:20 AM Request Number: 1 50 Individual Contacted: Dennis Herrin Date Contacted: 11/3/2009 Requestor/Inspector: iAntfhny

ý 1 1 _11 Masters

............ ....... ..... . .. ... Category: Question Request; ln continuing evaluation of the IWL inspection and maintenance program:

SP-182, Rev. 16 (Dated 5/22/09) Reactor Building Structural Integrity Tendon Surveillance Program, Section 3.7.2.11 states as an prerequisite to, "verify that stressing jacks, pressure gauges, comparators, and all other measuring deviceshave been Calibrated per Step 3.5.3.1..."

Are the measuring devices used calibrated per Step. 3.5.3.1?

References:

== ....

Response Assigned to: ';Don Dyksterhouse Date Due to Inspector:

Response

ýMeasuring devices are calibrated per Step 3.5.3.1 of SP-182. An example of the certification records for one of Ithe past surveillances can be found on pages 58-82 in the 6th surveillance report {WR 341602 6th-Surv.pdf}.

'This report can be found:

L:\Shared\2009 NRC SPECIAL. INSPECTION TEAM Q-A\WILLIAMS Q-A\Request.24; Q18 Response Info-,

!Portmann\IWL- Tendon Surveillance Hi story ..  :,"" * ." .- ...

Misc Notes: ,  :, , 91 : , II 1 9 1 7 rý i Response By: Rick Portmann Reviewed By: Date Response Provided: 11/12/2009, Status: Closed Date Closed:

rptAlIQuestions Page 56 of 94

2009 NRC Special, Inspection - RBConcrete Separation 20-Jan-10 7:05:20 AM Request Number: 51 Individual Contacted: Dennis Herrin Date Contacted: 11/3/2009 Requestorilnspector: Anthony Masters Category: Question Request: In continuing evaluation of the IWL inspection and maintenance program:

'SP-182, Rev, 16 (Dated 5/22/09) Reactor Building Structural Integrity Tendon Surveillance Program, Enclosure 1 lists:tendons in the 5th and 7th.surveillance as 46H21, 46H28, etc...;

however, Enclosure 11 indicates that they are numbered as'64H21, 64H28, etc... I believe these are in fact the same tendons, but should the numbers not be consistent?'

References:

Response Assigned to: bDon Dyksterhouse Date Due to Inspector:

Response

,These are the same tendons. The first two digits of the horizontal tendcon identification refer to the tendon series on the containment buttresses it spans (ie. Between buttresses 4 and 6 [46Hxx] is the same as between

.buttresses6.ýand 4[64Hxx]). Over the years CR3 has notbeen consistent in the use of one versus the other. A spreadsheet has been provided showing the tendon identifications used over prior surveillances. [Note: the spreadsheet is not a controlled document, just an aid for review of previous surveillance documentation.]

,Enclosed in the Request# 51 folder:

.Spreadsheet: Tendon Identification History (#51).xls Misc Notes:

Response By: Rick Portmann Reviewed By: Date Response Provided: 11/9/2009 Status: Closed Date Closed:

rptAlU Questions Page 57,of 94

2009 NRC Special Inspection-RB Concrete Separation 20-Jan-i 0 7:05:20 AM

,Request Number: 52 Individual Contacted: 'Dennis Herrin Date Contacted:  :. 11/3/2009 Requestor/Inspector: lAnthony Masters Category: Question Request: In continuing evaluation of the IWL inspection and maintenance program:

SP-182, Rev. 16 (Dated 5/22/09) Reactor Building Structural Integrity Tendon Surveillance Program, Enclosure 5,is'titled "Reduced Force Dome Tendons" and lists 18 tendons. What is I

.meant by this term "reduced force"?,: When, how, and why did they become reduced? D 125 is

..... i shown on this listand is'also listed as tested in the 3rd Surveillance.n Please clar.fy.

References:

Response Assigned to: Don Dyksterhouse Date Due to Inspector:

Response

.Following the investigation and evaluation of the 1976 Dome delamination event the dome tendons were re-istressed to, predetermined values,, of which approximately every 8th tendon was stressed at a value much, much!

lower than the remaining tendons,(Approx. 646 KIPS vs.ý 1635 KIPS).- These tendonsare exempt from tendon Ilift-off, and wireremoval testing.

IDuring the random selection process if.one of these exempt tendons (or ingeneral a tendon that is inaccessible .

or due to inteiferences cannot be safelytested per theIWlUcocde) happe ns to be selected for testing then a

substitutetendon located as close as possible to the exempt tendon gets selected for examination and testing'. djn Although still classified as exempt, the original exempt tendon is still'subject to exaination tendon ethe

ýanchorage, free water and corrosion protection mediumexamination requirements if possible.

.A review of the 3rd Surveillance tendon lift-off data shows that tendon D123 was tested. No test data was found for 0125.

Misc Notes:

.. .... .. .. i. ...... - _ --

Response By: Rick.Po.r.tma.nn.

Reviewed By: Date Response Provided:

Status: Closed Date Closed:,

rptAII Questions Page 58 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 53 Individual Contacted: Dennis Herrin Date Contacted: 11/4/2009 Requestor/Inspector: AtoyMasters Category: Question Request: In continuing evaluation of the IWL inspection and maintenance program:

SP-182, Rev. 16 (Dated 5/22/09) Reactor Building Structural lntegrityjTendon*Surveillance Program, Enclosure 11 lists original lift-off values. Are the values for the dome in this listing before or after the repair? .............................. .......

References:

Response Assigned to: :Don Dyksterhouse Date Due to Inspector:

Response

iThe values listed in SP-1 82, Enclosure 11 are following the 1976 delamination event repair of the Dome.

Misc Notes:

Response By: Rick Portmann Reviewed By: Date Response Provided: 11/9/2009i Status: Closed Date Closed:

rptAIt Question1s Page 59 of 94

2009 NRC Special Inspection - RB ConcreteSeparation 20-Jan-10 7:05:20 AM Request Number: 54 Individual Contacted: ýDennis Herrin Date Contacted: 11/4/2009 Requestor/Inspector: Anthony Masters Category; Information Request Request: In continuing evaluation of the IWL inspection and maintenance-program:

I have reviewed some inspection reports forthe IWL inspections for the shell, but would like to review some reports and evaluationsfor inspections on the dome.

References:

Response Assigned to: !Don Dyksterhouse Date Due to Inspector:

Response

i.......--x.......

he. .... ...e.o.t. ... ...

iThe last two IWL examination reports for 2001 (R12 and 2007 (R15) have been supplied and include lexamination of the dome. See theRequest #24, NRC SIT Question #18 folder for these examination reports.

Misc Notes: I......

Response By:' iRick Portmann Reviewed By: Date Response Provided: 11/9/2009!

Status: Closed Date Closed:

rplAUl Questions Page 60 of 94

a~L 2009 NRC Special Inspection - RB Concrete Separation 20-Jan-1 0 7:05:20 AM Request Number: 55 Individual Contacted: :Dennis Herrin Date Contacted: 11/4/2009 Requestor/Inspector: Masters....

Anthony M.......... Category: Question

Request: In continuing evaluation of the IWL inspection and maintenance program:

VT-07-1 11 and VT-07-289 documents some cracks and spalls and measured depths. How were the depths obtained for the cracks and spalls?

References:

Response Assigned to: !Don Dyksterhouse Date Due to Inspector: f

Response

'Direct Visual Examination was conducted on RBCN-001 5'during' R15 using the suspended work platform, a man

,lift (around the equipment hatch), and a step ladder (lower elevations not accessible by suspended work plafforn

!or man lift).

iUsing the procedure and criteria provided in the Engineering letter as threshold for recording, the VT-3C was performed and any areas of distress identified were further evaluated during a VT-1C. The VT-3C also.

considered areas of distress not previously identified, as well as changes to previously identified areas of distress.

ýDuring the VT-lC, previously existing areas of distress were compared with previous data and further icharacterized to document changes to previous data recorded. Areas of distress not previously identified were characterized and recorded. In all cases, size and depth were dimensioned and recorded with a tape measure

-and 6" scale. A short length of 3/32" bare wire welding rod was used for tight spots where the 6" scale would not Ifit. Technique used with the bare wire was to insert into the opening, and measure maximum depth against the Misc Notes:;

Response By: Rick Portmann Reviewed By: Date Response Provided: 11/18/2009 Status: Closed Date Closed:

rptAll Questions Page 61 of 94

2009 NRC Special Inspection -,RBConcrete Separation 20-Jan-10 7:05:20 AM Request Number: 56 1 Individual Contacted: Dennis Herrin, Date Contacted:. 11/4/2009 RequestorlInspector: Anhony MastersQuestion Request: In continuing evaluation of the IWL inspection and maintenance program:

VT-07-1 11. and 289, Item #11 indicates that spalls were due to some embedded cables near boxes (shown in photographs VT-07-289-6 and VT-07-289-15). What were these cables?

References:

Response Assigned to: iDon Dyksterhouse . Date Due to Inspector:

Response

It is believed that these cables andboxes are abandoned remnants from the testing equipment utilized during th.

,original Structural Integrity Test in 1976. (stress &strain gages.etc.)."

Misc Notes:

Response By: 'Rick Portmann I.

Reviewed By: Date Response Provided: 1/1I9I20091 oio sedd......

~~~~~ ...........

~ ~~~~ ............

Status: Date Closed: J rrptA.i QuestiorPa6s Page 62 of 94

2009 NRC Special Inspection - RBConcrete Separation 20-Jan-10 7:05:20 AM Request Number: 57 Individual Contacted: Dennis Herrin Date Contacted: 11/4/2009 Requestor/Inspector: Anthony Masters Category: Question Request:~ ~ niiu ~ n~ ~ ~~..... .v.uton

... f. ......................................................................

Request: In continuing evaluation of the IWL inspection and maintenance program:

The names and dates on theVT-lC and VT-3C reportslare identical. Are both' inspections/reports done on the same day by the Same staff?*

References:

Response Assigned to: Do'n Dyksterhouse Date Due to Inspector:

Response

Yes, the VT examiners know that certain indications found during a VT-3 examination require an additional, icloser VT-1 examination and, may elect to perform both examinations in series since they are already at the area.i Misc Notes

Response By:

Reviewed By: Date ResponseProvided:

Status: Closed . ..... ...... .....

.. . . . . .~ ... ~~....

.. .. . .. ... . . .. ..... i".... .......... Date Closed:

.............. . .. . ... . . . . ..j rptAII Questions Page 63 of 94

2009 NRC Special Inspection- - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 58 Individual Contacted: Dennis Herrin Date Contacted: 11/4/2009 Requestor/Inspector: Anthony Masters Category: Question Request: In continuing evaluation of the IWL inspection and maintenance program:

FSAR, Section 5.2, Section2,52.5,2.1.1.h.5'states: 5. The surveillance was performed 1, 3, and 5 years after the initial containment structural integrity test and is performed every5 years thereafter. Areport of each inspection will be recorded and significant deterioration or abnormal.

behavior reported tothe Commission.

Are significant deterioration or abnormal behaviors being reported to the Commission?

References:

Response Assigned to: Don Dyksterhouse Date Due to Inspector:

Response

Yes - Significant deterioration or abnormal behaviors are being reported to the Commission. SP-182 (Para's 5.3.2 and 5.3.4) and the Improved Technical Specification's (5.7.2 Special Repo6ts) describethe reporting requirements.

M is....

...c .ot...

e.........

s . .. . .... ... .... . . .. . ... .............. ................i Misc Notes: RikPrmn Response By: Rick Portmann Reviewed By: Date Response Provided: 11/1212009!

Status: Open Date Closed:

rptAIl Questions Page 64 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 59 Individual Contacted: Dennis Herrin Date Contacted:  ! 11/4/2009 Requestor/Inspector: Anthony Masters Category: Information Request Request: In continuing evaluation of the IWL inspection and maintenance program:

I would like to review SP-180 and understand the basis surrounding the use and discontinuance for inspections of the dome repairs.

References:

Response Assigned to: 'Don Dyksterhouse Date Due to Inspector:

Response

'Acopy of.SP-180 for inspection of the dome was provided to George Thomas on November 18, 2009. Te document was obtained from microfiche and is not available electronically. Also note thatthe procedure was developed and implemented prior to the development of the IWL program.

Misc Notes:

Response By:

Reviewed By: Date Response Provided:

Status: Open Date Closed:

rptAil Questioos Page 65 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 60 Individual Contacted: Diennis Herrin Date Contacted:, 11/4/2009 Requestor/Inspector: L.ouis Lake, Category::' 1, Question Request: What are the repair options, being considered as a fix to the CR3 containment delamrination issue?

References:

Response Assigned to: Sammy Radford Date Due toInspector: I 11/6/2009

Response

There were two options that had being considered.

il.Remove the delaminated concrete that is between is between Buttress #3.and Buttress #4 and install ladditional rebar ties. The wall will be reformed and replaced with new concrete. This'wasýthe'method used to.

[repair the delaminated dome section during construction and the method we will be using.

ý2.E.The next option we considered was to install anchors into the solid concrete portion of the wall on a spacing tV

ýbe determined and anchor the delaminated section and solid section together. Then we will be pressuring

,grouting the delamination using a cementitious grout and epoxy grout to bond the two layer.We will be using

'some NDT to ensure we have filled all the voids between the two layers. This option was eliminated due to

ýproblems identified with the use of the grout with the potential of the debris blocking flow paths of the grout and

,size of some of the crack areas.

Misc Notes:...........

..... . ............ . ........... ............ ... ... ...... ... .. .... .... .... . . . .. .. .. ... . . ... . .o .. . ... .. ................ .................

Response By: Sammy Radford Reviewed By: Date Response Provided: t 11/18/20091 Status: Closed Date Closed: i rptAll Questions Page 66 of 94

2009 NRC Special Inspection - .RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 61 Individual Contacted: Dennis Herrin Date Contacted: 11/4/2009 Requestor/Inspector: Louis Lake Category: Question Request: What post modification testing of the CR3 containment is being planned to be performed following repair of the delaminated condition in order to demonstrate structural and leak-tight integrity?

References:

Response Assigned to: 'Sammy Radford Date Due to Inspector: 11/6/2009

Response

We are looking at the requirements for post mod testing. At the present time we plan to use the ILRT as the post

mod testing.

Misc Notes:

Response By: Sammy Radford Reviewed By: Date Response Provided: 1 11/18/2009 Status: Open Date Closed:

rpt*lI Oiuestions Page 67 of 94

2009 NRC Special Inspection - RB Concrete Separation..

20-Jan-10 7:05:20 AM Request Number: 62 Individual Contacted: 'Chares Williams Date Contacted: 11/18/2009 Requestor/Inspector: ':George Thomas Category: Information Request Request: Provide strain gage data and map.

References:

Response Assigned to: 'Paul Fagan Date Due to Inspector: 11/18/2009

Response

1Strain gaeaddisplacement. data provided on 11/18/09. Electronic copies available on L\NShared\2009 NRC SPECIAL INSPECTION TEAM Q-A\FAGAN Q-A\Request 62- Worthington - Williams Misc Notes:

Response By: Worthington Reviewed By: Charles Williams Date Response Provided: 11/18/2009 Status: Closed Date Closed:

rptAll Questions Page 68 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 63 Individual Contacted: 'Garry Miller Date Contacted: 12/2/2009 .

Requestor/Inspector: George Thomas Category:

Request: Provide survey data results for the dome [repeated survey surveilance test internal diameter of containment and survey data results for external buttresses.

References:

Response Assigned to: Paul Fagan Date Due to Inspector:

Response

Misc Notes:

Response By:

Reviewed By: Date Response Provided:

Status: Open Date Closed:

rptAII Questions Page 69 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 64 Individual Contacted: ýGarry Miller Date Contacted: 12/2/2009 Re questor:Inspector: LOUIS a Category:

Request: Provide evaluation of crack identified in AR 368389 [core number 54 below the equipment hatch].~

References:

Response Assigned to: Paul Fagan Date Due to Inspector:

Response

Misc Notes:

Response By:

Reviewed By: Date Response Provided:

Status: .Open Date Closed:

rpWA1t Questions Page 70 of 94

2009 NRC Special Inspection,- RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 65 Individual Contacted: Garry Miller Date Contacted: 12/2/2009 Requestor/Inspector: Louis Lake Category:

Request: Provide credentials of MPR Associates and CAE specifically with regard to concrete

  • containment structural analysis and design for nuclear plants.

References:

Response Assigned to: Don Dyksterhouse Date Due to Inspector:

Response

The following data are excerpts from the MPR Associates response to a request for proposal RFP J009-01 1.

The responses are listed if the experience involved reinforced concrete analysis at a nuclear power plant if either:

MPR Associates or CAE were involved in the projects listed.

1. iDevelopment of the 3-D model for Three Mile Island nuclear power plant.
2. DOriginal analysis of Crystal River containment dome delamination report.
3. 0 Structural analysis of the reinforced concrete Fuel Handling Building at Salem Nuclear Plant.
4. PiDevelopment of models for structural analysis of concrete containment buildings at Turkey Point and Oconeel nuclear power plant.
MPR Associates has supported the nuclear industry since 1964.

ýCAE has supported the nuclear industry since 1993.

Misc Notes:

Response By:

Reviewed By: Date Response Provided:

Status: Open Date Closed:

,ptAit Quiestions Page 71 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 66 Individual Contacted: lGarry Miller Date Contacted: i 12/2/2009 Requestor/Inspector: S u is ke .................................

Category:

Request: Please confirm that the condition assessment, design basis analysis, root cause analysis, and

repair option analysis efforts, currently ongoing for CR3, account for the following: SGR construction sequence (initial tendon detensioning, concrete removal, additional tendon detensioning, concrete placement, repair, tendon retensioning) loading and stiffness, based on the extent of condition of the affected areas, and is properly' considered to account for the stress redistribution in the containment wall within the opening and its adjacent areas.

References:

Response Assigned to: 'Don ..... . Dyksterhouse

... . .. Date Due to Inspector:

Response

  • . *;.; . .....-*T i~i ;2i;2*Z *2* 2:* /* *i~i2;* `*** / :*.*

2:*

  • i. ...........

.... .. 2 2*;*2 ?;2*:

.`...... -*2-* * --*-

M N ..... .. ..

Mist Notes: "..

Response By:

Reviewed By: Date Response Provided:

Status: Open Date Closed:

rptAIl Questions Page 72 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 67 Individual Contacted: ;Ganry Miller Date Contacted: - 12/2/2009 1 Requestor/Inspector: Louis Lake Category:

Request: Refer to Slide #59 of the 11/2.public meeting presentation. This is with regard to how the liner is modeled for the Design Basis Analysis. Based on your current design basis in the FSAR and Containment Design Basis document 1/1, the liner serves as a leak-tight membrane during operating and accident conditions, and not as a structural element resisting design basis loads.

However, in your current FEA model developed for the delamination issue, the liner seems to be included as a structural load-carrying member.

Explain and justify how the way the liner is modeled in the ANSYS model are consistent with your current design basis?

ýHow will the liner be evaluated against design basis acceptance criteria?.

How will you evaluate the effects on the liner during detensioning, repair, and retensioning?

References:

Response Assigned to: iDon Dyksterhouse Date Due to Inspector:

Response

Misc Notes:

Response By:

Reviewed By: Date Response Provided:

Status: Open Date Closed:

rntAIt Questions Page 73 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number:

Individual Contacted: P.arry Miller Date Contacted:, 12/2/2009 Requestor/Inspector: !Louis Lake. Category:'

Request: Refer to Slide #75 of the 11/20 public meeting presentation. Slide states: "Run comparison to original design building elastic design results."

Explain how you plan to evaluate your analysis results for design basis loads and load

!combinations against acceptance criteria in accordance with the code of record, i.e., ACI 318-63,.

.in the FSAR. How would you process your analysis results to perform code checks for stresses, strains, displacements or other applicable design basis acceptance criteria for concrete, rebar, liner and prestressing.tendons? How is reinforcement being accounted for in your design basis evaluation?

The slide only inidicatesevaluationfor controlling factored load combinations.; Are there not service or other load combinations in the design basis with a different set of acceptance criteria that needs to be documented? How would your calculation document the design basis of the modified containment following repair of the'delaminated condition?

How will stresses in the concrete and rebar be determined from the ANSYS analysis? Provide your approach to performing the finite element analysis and design checks in support of the Design Basis Analysis considering the various interim configurations associated with the creationi and restoration SGR construction opening, the delaminated condition and the associated repair?!

References:

Response Assigned to: iDon Dyksterhouse . . Date Due to Inspector-

Response

~~~ ~~ ~~....

Misc Notes:

Response By:

Reviewed By: Date Response Provided:

Status: Open ateClosed:

rptAtl Questions Page 74 of 94

2009 NRC Special Inspection - RB Concrete Separation, 20-Jan-10 7:05:20 AM Request Number: 69 Individual Contacted: Garry Miller Date Contacted: 12/2/2009 Requestor/Inspector: Louis Lake Category:

Request: Refer to Slide #74 - "Planned Analysis Steps" of the 11/20 public meeting presentation. Footnote' (1) against "Delamination states "Analysis will consider time of delamination and specific concrete properties."

Since the final root cause analysis results will not be known'until later, do you plan on running twc different cases with regard to timing of delamination at this time? Specifically, With regard to making a decision on the number of tendons that will be required to be detensioned prior to repair and retensioned following repair.

Regarding the bullet that states: "SAVE path dependent model for starting point to Run 5 controlling design cases." As you go through the planned analysis steps, explain how your analysis model or ANSYS software is capable of starting the next analysis step using the deformed configuration of the previous step as the initial conditions for the next analysis step?

Are you planning to use the same concrete mix design as for the SGR construction opening in implementing repair of the delaminated area? How are properties of the new concrete being inco rp o ra te d into you r a n alysis ? . . ............ .. . . ... .... .................. ....... .. .... ..... . ...

References:

Response Assigned to: 'Don Dyksterhouse Date Due to Inspector:

Response

Misc Notes:

Response By:

Reviewed By: Date Response Provided:

Status: Open Date Closed:

rptAII Questions Page 75 of 94

2009 NRC Special Inspection- RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 70 Individual Contacted: Garry Miller Date Contacted: 12/2/2009 Requestorlinspector: Louis Lake Category:

Request: With reference tol1/20 public meeting presentation, Slide 65-,shows approximation in Equipment Hatch modeling; and Slide 34 - shows that the delaminated conditions extends to above the EQ hatch area; slide 35 shows hoop tendons that wrap around EQ hatch. Further, there are also removed vertical tendons that wrap around EQ hatch. Ifyour detensioning/retensioning scheme involves tendon elements that influence forces in the EQ hatch area, how do youplan to address it in your design basis model? Describe any plans to refine your model around the EQ hatch area..

References:

Response Assigned to: Don Dyksterhouse Date Due to Inspector:

Response

M isc N otes:.............. ..... ............. .....

Ms Notes.

Response By:

Reviewed By: Date Response Provided:

Status: Open Date Closed:

ptAII Queslions Page 76 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 71 Individual Contacted: Garry Miller Date 7.., Contacted:

_7111.I.2"'..' 12/2/2009 Requestor/Inspector: Louis Lake Category:

Request; Refer to slide 58 of the 11/20 public meeting presentation - describes a 180 degree symmetric

model.

Please confirm whether, for your analysis, the explicitly developed 180 degree model is extruded to 360 degrees for your runs or not.

Please confirm if there are any unsymmetric containment features that may not be adequately represented in a symmetric model but may affect the response of the affected area.

References:

Roespn se..

A s ig e.. o i 0 n D s e io s ........................................ D te D u---Isp ct r:-...........................

Response Assigned to: Don Dyksterhouse ,~~ ............ Date Due to Inspector:

...... ... . i........

Response

Misc Notes:

Response By:

Reviewed By: Date Response Provided:

Status: Open Date Closed:

rptAtl Ouestion~s Page 77 of 94

2009 NRC Special Inspection - RB Concrete, Separation 20-Jan-10 7:05:20 AM Request Number: 72 Individual Contacted: :Garry Miller Date Contacted: 12/2/2009 Requestor/Inspector: Louis Lake Category:

Request: Refer to Slide 74 (and 76) of the 11/20 public meeting presentation.. The first three planned analysis steps are: (i) Dead Load + Tendons; (ii) RemoveHoop. + Vertical Tendons in SGR' opening; and (iii) Remove SGR opening. Provide stress and deformation plots for the area in and around the vicinity of the SGR opening ,(between Buttresses"3 &'4 from above the EQ hatch

.to below the ring girder) for each 0f the above configurations fo rthe Dead,+ Prestress load

.combination.

References:

Response Assigned to: Don Dyksterhouse Date Due to Inspector:

Response

Misc Notes:

Response By:.................................

Response By:

Reviewed By: Date Response Provided:

Status: Open Date Closed:

rpLAIl Oueslions Page 78 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 73

,.oi Individual Contacted: ~~ ~ Miller Garry ~ ~ o ... .......~

.. Date Contacted: og..

12/212009 Requestor/Inspector: Louis Lake Category:

Request: Refer to Slide 81 of the 11/20 public meeting presentation with regard to Post Repair Testing.

Provide the name and credentials/qualifications of the designated Responsible Engineer, in accordance with ASME Section Xl, Subsection IWL, for repair/replacement of the CR3

ýcontainment structure related to the SGR project and 'the Containment Delamination project.

Provide the date the individual was designated as the Responsible Engineer.

Second bullet on the slide states: "Concrete exterior will be visually examined prior to pressurization and following depressurization." Third bullet states: "Evaluating other additional instrumentation based on the final repair that is implemented, and as driven by: root cause

,analysis." For the major containment repair/replacement activity involved at CR3, describe how the post-repair system pressure testing would meet the requirements of IWL-5000, and

,specifically provide verification of the containment structural integrity under accident pressure

and corresponding structural behavior as predicted by the design basis analysis.

The response is incomplete/inadequate as indicated below. Provide a complete response to address these concerns. Also, confirm whether or not the design basis accident pressure and/or; the containment design pressurewas affected by the extended power uprate being implemented during/following the RF16 Outage.

1. The information provided with regard to qualifications and credentials of the designated IWL Responsible Engineer for the SGR Project, does not indicate nor provide evidence of basic qualifications required by IWL-2320 for an individual to be designated the Responsible Engineer.:

Provide evidence (such as PE registration) and information of required qualifications stated in the first paragraph of IWL-2320 (ASME Section IX, 2001 Edition with 2003 Addenda) for the designated Responsible Engineer. Also, include a resume with educational qualifications and experience of the individual.

2. There was no response provided with regard to the designated Responsible Engineer for the Containment Delamination Project, the person's qualifications and credentials and date of designation. Provide the requested information for the designated Responsible Engineer for the Containment Delamination Project.
3. For the major repair of the extensively delaminatecadcondition.of the CR-3 containment involving new design/construction features, the response provided with regard to examinations during the containment pressure test does not meet the requirements and intent of IWL-5250.

Just performing visual examination of the repaired concrete surfaces prior/during/after the test, without performing structural response measurements and additional examinations, will not demonstrate the qualityrand adequacy of the repair (i.e. the repaired containment has not delaminated again) nor will it provide a verification of structural response/behavior as expected 5 and predicted by the design basis analysis. Further, there will not be data available to compare to a previous benchmark test (such as original SIT) to fully demonstrate structural integrity of the repaired containment.

References:

rptAII Questions Page 79 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Response Assigned to: Charles Williams Date Due to Inspector:

Response

(1)Provide the name and credentials /qualifications of the designated Responsible Engineer, in accordance with ASME Section Xl, Subsection IWL, for repair/replacement of the CR3 containment structure related to the SGR project and the Containment Delamination project.

(2)Provide the date the individual was designated as the Responsible Engineer.

Second bullet on the slide states: "Concrete exterior will be'visually examined prior to pressurization and following depressurization." Third bullet states: "Evaluating other additional instrumentation based on the final repair that is implemented; and as'driven'by: root cause analysis." For the major containment repair/replacement activity involved at CR3, (3)describe how ithe post-repair system, pressure testing would meet the requirements of IWL-5000; and specifically provide verification ofthe containment structural integrity under accident pressure and corresponding structuralbehavior as predicted by the design basis analysis.

Enclosed in this folder in response to the above question:

(1) The designated Responsible Engineer for the SGR Opening Project is John Holiday.: EInclosed in this response folder is a copy of John's completed Progress Energy COMMON ESP TRAINING GUIDE

ý(ESG0090N) - CONTAINMENT INSPECTION RESPONSIBLE ENGINEER TRAINING GUIDE., [See enclosed pdf: ESG0076N-Holliday.pdf]

(2) The effective date of John's designation as the SGR RE was the'date on his training guide completion approval 7-14-09.

,(3) See the excerpt below from the "Containment IWL Repair Plan" contained in the SGR Opening EC 63016, attachment Z58R26 for the IWL-5000 Pressure Test information. It is anticipated that this information will be moved from EC 63016 (SG Replacement Opening Project) to EC 75221 (Containment Repair Project).

15.0 PRESSURE TESTING AND PRESERVICE EXAMINATION 15.1 A reactor building pressure test will be performed after de-tensioned and replaced tendons have been re-tesioned. The test willbe 'conducted as specified in EC 63016 (Reference 19.28), which incorporates the applicable-requirements of/ASME Section XI Article` IWi5000 (Reference 19.2). The iWL Responsible Engineer will authorize performance of the test.

15.2 The pressure test will be conducted at the design basis accident pressure, Pa = 54;2 psig (calculated peak containmentDBA pressure), as specified in Reference 19.2, prior to returning. reactor building to service.

15.3 The surface'of all containment concrete placed during repair/replacement activities will be visually examined in accordance with the requirements developed in EC 63016 (Reference 19.28), which incorporates therequirements of ASME Section XI, Article IWL-5250 (Reference 19.2). The examinations will be done (1) ppdor tobthe start of pressurizationS(2) at test pressure, and (3) following completion of depressurization, In laddition, concrete surrounding the' bearing plates of all new, and detensioned I re-tensioned tendons will be

ýexamined per ASME SectionXI, Subsection IWL Section 2524.1(Reference 19.2) following the completion of depressurization. The preservice examination required by IWL-2230 will be conducted in accordance with procedure EGR-NGGC-0015 (Reference, 19.23) following completion of depressurization2 2 A single examination can satisfy the requirements of both IWL-5250 and IWL-2230..

If the results of the post-test and preservice e'xamrinations do not meet the acceptance standards developed by the IWL Responsible Engineer in accordance with IWVL-31 10, corrective action will be taken as required by IWL-3113 and IWL-5260.

Misc Notes:

[ptX Ques4tons Page 80 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Response By:

Reviewed By: Date Response Provided:

Status: Open Date Closed:

rptAII Questons Page 81 of 94

2009 NRC Specal, Inspection - RB ConcreteiSeparation 20-Jan-10 7:05:20 AM Request Number: 74 Individual Contacted: !Garry Miller Date Contacted: 12/2/2009 Requestor/Inspector: 1,Louis Lake Category:

Request: Refer to photos on Slide 14 of the 11/20 pubic meeting presentation.

"Explain the gap between the liner and the concrete? Have you verified how far it goes?

It is our understanding that there is bulging in the containment liner with air voiding between liner and concrete at several locations all around between approximate EL 180 and 225 ft; and that it was dispositioned as construction/fabrication errors that existed prior to concrete pour. If this existed prior to original concrete pour, explain how there is voiding between the liner and concrete. What was the acceptance criteria used to evaluate this? Provide the engineering evaluation for accepting the bulging as-is and explain how this evaluation is consistent with CR3 current design..basis.

References:

Response Assigned to: j'aul'Fagan .....

--- i.

... Date Due to Inspector::__ .. ...... ......

Response

Misc Notes:

Response By:

Reviewed By: Date Response Provided:'

Status: Open Date Closed:

rptAll Questions Page 82 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 75 Individual Contacted: !Garry Miller Date Contacted: 12/2/2009 Requestor/Inspector: Louis Lake Category:

Request: Describe your plans [P1I] for finite element simulation of the delamination to confirm the root cause(s)?

References:

Response Assigned to: Charles Willaims Date Due to Inspector:

Response

,Multiple finite element analyses are being performed to confirm the rooticause. These include'the use of the.,

computer code Merlin to perform a 2-D simulation of a vertical cross sectionof the wall, and Abaqus to perform 3-D simulations. The models include the various parameters considered in the root cause analysis, including

,concrete strength, creep, thermal gradients, and fracture energy. This subject was'also discussed between PIH and the NRC SIT on 1/7/10 Misc Notes:

Response By: Craig Miller Reviewed By: Date Response Provided: 1/8/2010!

Status: Open Date Closed:

a-4tI.Jt Question~s *Page 83 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 76 Individual Contacted: Garry Miller-, i Date Contacted:,-..... 12/2/2009 Requestor/Inspector: 'Louis Lake Category:

Request: *Refer to the Refuting evidence for failure mode 2.8 "inadequate Support of Tendons during Pouring." There are photographs of the SGR opening area that show that the as-found hoop tendon sheathing are all not centered on a vertical line.

What was the design location of the tendon sheathing?

Was the installation of the tendon sheathing out-of-tolerance in the as-found condition (Tendon installation specification must have had a tolerance for tendon sheathing installation)?

References:

Response Assigned to: iCharles Williams Date'Due to Insp'ector:

Response

Misc Notes:

Response By:

Reviewed By: Date Response Provided:

Status: Open Date Closed:

rptAtl Cuestions Page 84 of 94

2009 NRC Special Inspection - RB Concrete-Separation 20-Jan-10 7:05:20 AM Request Number: 77 Individual Contacted: Garry Miller Date Contacted: 12/2/2009 Requestor/Inspector: Louis Lake Category:

Request: Confirm whether "the lack of bond between the smooth tendon sheathing and the concrete" is included as a possible failure mode in the root cause' investigation.

References:

Response Assigned to: Chades Williams Date Due to Inspector:

Response

The lack of bond between the smooth tendon sheathing and the concrete is not identified as a specific failure

,mode, but it is included as a condition in failure mode 6.4, "Added Stress from Differences Between Rigid and

'Flexible Sleeves". The finite element analyses also recognize this condition, and take no credit for any tensile

load carrying strength at the sleeve-to-concrete interface.

Misc Notes:

Response By: Craig Miller Reviewed By: Date Response Provided: 1/8/2010 Status: Open Date Closed:

rp!Atl 0ýuesfions Page 85 of 94

2009 NRC Special Inspection -1RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 78 Individual Contacted: !Garry Miller Date Contacted: 12/2/2009 Requestor/Inspector: L1ouis Lake Category:

Request: Considering the delamination and subsequent repair of the CR3 dome during original construction, what non-destructive examination, core boring and/or other appropriate testing was extended to the dome during the current investigation of the containment wall delamination issue to confirm that the 1976 dome repairs remaind good? Provide results of the examinations performed on the dome. Also, explain how the results for these examinations would help i address/resolve the concerns raised in the previous Requests #1 and #40 with regard to the low spot or depressed area on the dome. . . ....

References:

Response Assigned to: Paul Fagan Date Due to Inspector:-

Response

Res p o..

n ...

s B y...

Misc Notes:

Response By:

Reviewed By: Date Response Provided:

Status: Open Date Closed:

rptAJI Questions Page 86 of 94

2009 NRC Special Inspection - RB Concrete Separation' 20-Jan-10 7:05:20 AM Request Number: 79 Individual Contacted: iGarry Miiler Date Contacted: 12/2/2009 Requestor/Inspector: Louis Lake Category:

Request: Explain how your condition assessment performed in accordance with Procedure PT-407T (NDE testing, core bore sampling: boroscopic examination etc.) provides a reasonable assurance of a comprehensive and accurate determination of the extent of delaminated condition of the containment.

References:

Response Assigned to: Paul Fagan Date Due to Inspector:

Response

M isc----

Note s: ... . . . . . . ... .. .... .. . .. ......

Misc Notes:

Response By:

Reviewed By: Date Response Provided:

Status: Open Date Closed:

rptAl ()Luestiorns Page 87 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 80 Individual Contacted: ;Garry Miller Date Contacted: 12/2/2009 Requestor/inspector: Louis LakeC Request: ýProvide information of the total number of,cre samples that were sent for petrographic examination for.the containment delamination issue. lndicate the labs to which each sample was!

sent. How did you determine/ensure consistency of the examination and results between the labs? How did you establish that a reasonable number os samples were sent for petrographic examination?

References:

Response Assigned to: :Chades Williams Date Due to Inspector:

Response

There have been a total of seven core samples that received some form of petrographic examination. The core 1

'identification numbers and test labs are:

il L.,]Core 51-OMACTEC (1/2 of Core 5 tested at MACTEC) 2.GCore 5C i[ CTL (1/2 of Core 5 tested at CTL)

3. ,ILCore 6 EliLPhotometrics

ý4."ACore 700MACTEC 5.1u]Core 18L Photometrics

6. 0Core 19L Photometrics 17.LiCore 870MACTEC MACTEC and CTL performed petrographic examinations in accordance with ASTM C 856. Photometrics
evaluated similar conditions and attributes as those evaluated under the ASTM standard, but used tools and techniques more frequently used in material science, e.g., scanning electron microscope (SEM) and micro- I 1hardness examinations that are more thorough. Progress Energy did not provide any directions that would iinfluencehow a particular test'or examination was performed, other than convey the main objective-of the particular examination (i.e., determine age of the break). Thepurpose of using multiple labs was to obtain
independent results; therefore there was no explicit effort to ensure consistency .in.the examination techniques0or1 tresults.

Note that not all samples were examined for fracture age determination. For example, Core 87 was taken from I ithe containment dome (area repaired in 1976). The purpose of the petrographic examination on this sample was to compare the aggregate from the dome to the aggregate from the wall.

iThe number of samples that received petrographic examinations is believed to be adequate based on the consistent results obtained from the various labs and the diversity of the sample locations.

Misc Notes:

Roensspe~ ~ iie*........... :...............................

g... . ........

i.... .... .....

Response By: Craig Miller Reviewed By: Date Response Provided: 12/7/20091 Status: Open Date Closed:

rptAll Ouestions Page 88 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 81 Individual Contacted: ýGarry Miller Date Contacted: 12/2/2009 Requestor/Inspector: ýLouis Lake Category:

Request: According to MacTec petrographic report dated November 11, 2009, limited observations were to' be performed on sample 21270A (Core #2) which was used as a control sample. However, there is no discussion of how it was used. Also, it does not appear that any results from these observations were reported. What examinations were performed on this sample, what were the results and where is it documented?

References:

Response Assigned to: Charles Williams Date Due to Inspector:

Response

iPer discussion with the MACTEC petrographer, the lab did do some limited observations on Core 2, but I did not

see anything particularly useful in their analysis. It was originally intended to use the fracture surface of Core 2
as the "control sample" since the fracture was made during the core removal process. However, the lab created

.a fresh fracture surface in a portion of Core 5 instead for the "fresh vs. existing" comparison. Therefore, Core 2

  • w nstea~.! unused
was essentially n s e ~inththe examination.

xam!.a..........

! n. ... . . ....................................

Misc Notes:

Response By: Craig Miller Reviewed By: Date Response Provided: 12/7/2009.

Status: Open Date Closed:

r9-AI1 Questions Page 89 of 94

2009 NRC Special Inspection- RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 82 Individual Contacted: :Garry Miller Date Contacted: 12/2/2009 Requestor/Inspector: Louis Lake Category:

Request: According to MacTec petrographic report dated Niovember" 11, 2009 from MacTec, one-halfof o I sample 21270 (Core #2) was sent to CTL for petrographic examination. In the CTL report dated 1 November 2, 2009 there does not appear to be any reference to this sample.. Were petrographic I examinations performed on this sample, and if so, what artethe results and where is it documented?

References:

Response Assigned to: Charles Williams Date Due to Inspector:

Response

'The MACTEC report does say that half of core #2 was sent to CTL, but it does not specify what tests are to be

performed on it. CTL has this half of Core #2, but has not done any testing on it at this time. This sample was Itaken from an area that did not contain delamination. There are currently no, plans to perform any tests.on this Isample.

Misc Notes:

Response By: Craig Miller Reviewed By: Date Response Provided: 12/7/20091 Status: .Open Date Closed:

rp%.11 QuestioIs Page 90 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 83 Individual Contacted: ,Garry Miller Date Contacted: 12/22.00..........

Requestor/Inspector: 'Louis Lake Category:

Request: Describe what confirmatory NDE would be performed, after detensioning of additional tendons, in, the areas that did not show any delamination in order to verify that the delamination has not

ýpropagated any further due to additional detensioning.

References:

Response Assigned to: Paul Fagan Date Due to Inspector:

Response

Misc Notes:

Response By:

Reviewed By: Date Response Provided:

Status: Open Date Closed:

qptAII Questions Page 91 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan-10 7:05:20 AM Request Number: 84 Individual Contacted: Ch*arles Wiliams . Date Contacted: 111,2*2010 Requestor/Inspector: lGeorge Thomas Category: - -

Request: With reference to the evidence sheets that refuted the root cause failure mode 8.4 - Inadequate Concrete Structure Monitoring/Maintenance (IWL), the SIT has the following observations:

1. The scope and description of this failure mode is unclear and not accurate. The monitoring of:

the concrete structure under the Containment ISI Program in accordance with ASME Section Xl, Subsection IWL, infact includes examination of concrete surfaces and the unbonded post-tensioning system (tendon surveillance) of the Class CC containment. Program referenced does:

not seem accurate.,

2.The inadequacy of a C0SI program in accordance with ASME Section XI, Subsection IWL.is ani issue of regulatory and procedural compliance. It is not by itself a failure mode., The program may help detect-early signs of a degradation or potential failure mode or a failuremode after it has occurred. The implemnetaion of the program may be inadequate if early signs of degradation identified during inservice inspection were not perperly addressed and the degradation progressed into failure. Clarify what failure mode is being addressed by FM 8.4 represent?

3. The "Data to be collected" is incomplete/inadequate since (i) it does not look at past IWL inspection results of the concrete surfaces; (ii) it does not look at past IWL tendon surveillance resports. Documents referenced are not accurate.

4.The refuting and supporting evidence is incomplete/inadequte because: (i) Exhibit 2 is in fact results of visual examination of concrete surfaces between buttresses 3 and 4 performed during RF 16 after the delamination was discovered, and not "conducted a few days prior to beginning the SGR hole cut activities (FM 8.4 Exhibit 2...) as stated in the evidence sheet. None of the_

reports from past IWL inspections, of the concrete surfaces were reviewed as evidence. (ii)The

ýCR-3 containment has had a history of a significant numebr Of hoop tendons, including some that!

go through the SGR Openign, not meeting the IWL acceptance by examination criteria during

.the recent three surveillances (I.e. Surveillances 6, 7 & 8). This could provide supporting evidence for the delamination root cuase. None of the tendon surveillance reports from past surveillance were reviewed as evidence.

5. Further, the results of tendon surveillances 6, 7 & 8 were accepted by engineering evaluation, The cause (could be physical or calculation of predicted forces or both) of the lift-off forces of a large numberof hoop tendonssampled (including extended sampling) not meeting the IWL

'acceptance by examination criteria was not adequately addressed and eliminated/corrected in the CR-3 tendon surveillance program. Is the cause fo the larger than anticipated losses of prestressing force in several hoop tendons being addressed as part of the root cause

assessment and, if so, where is it addressed?

References:

Response Assigned to: ýCharles Williams Date Due to Inspector:

Response

rptAII Questions Page 92 of 94

2009 NRC Special Inspection -,RB Concrete Separation 20-Jan-10 7:05:20 AM Misc Notes:

Response By:

i .....

Reviewed By: Date Response Provided: L Status: :Open Date Closed:

rptAll Quesaran9 Page 93 of 94

2009 NRC Special Inspection - RB Concrete Separation 20-Jan 7:05:20 AM Request Number: 85 Individual Contacted: iCharles Williams Date Contacted: 1/12/2010 Requestor/Inspector: GeorgeThomas Category: I Request: The description and exhibit photographs indicate presence of a secondary delamination near the liner. What is the location and extent of the secondary delamination?. Is it being investigated in the root cause analysis?

References:

References:

~~ .. ~ ~.~~~~................ .. ..... . ... .. ...

Response Assigned to: rCharles Williams Date Due to Inspector:

Response

Misc Notes:

Response By:

Reviewed By: Date Response Provided:1 Status: Date Closed:

rptAII Questions Page 94 of 94