ML102700477

From kanterella
Jump to navigation Jump to search
Closure of Investigation (OI4-2009-028)
ML102700477
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 09/27/2010
From: William Jones
NRC Region 4
To: Sheppard J
Southern California Edison Co
References
4-2009-028
Download: ML102700477 (1)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 612 EAST LAMAR BLVD, SUITE 400 ARLINGTON, TEXAS 76011.4125 SEP 27 Mr. James J. Sheppard Senior Vice President and Chief Nuclear Officer Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, CA 92674-0128

SUBJECT:

CLOSURE OF INVESTIGATION (014-2009-028)

Dear Mr. Sheppard:

This refers to an investigation conducted by the NRC's Office of Investigations regarding activities at San Onofre Nuclear Generating Station. The Office of Investigations initiated the investigation to determine whether a nuclear maintenance machinist willfully failed to follow procedures and falsified foreign material exclusion verifications.

Based on the evidence developed during the investigation, the allegations that a nuclear maintenance machinist willfully failed to follow procedures or falsified foreign material exclusion verifications were not substantiated. The NRC plans no further action related to the willful aspects of this allegations and considers this investigation closed.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, William 8. Jones, ief Allegations and En orcement Branch Docket:

05000361/05000362 License: NPF-10, NPF-15