ML102640740

From kanterella
Jump to navigation Jump to search
Initial Exam 2010-301 Final Administrative Documents
ML102640740
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 08/30/2010
From:
NRC/RGN-II
To:
Duke Energy Carolinas, Duke Power Co
References
50-369/10-301, 50-370/10-301, ES-201, ES-201-1 50-369/10-301, 50-370/10-301
Download: ML102640740 (64)


Text

ES-201 Examination Preparation Checklist Form ES-201-1 Facility: McGuire Nuclear Station Date of Examination: 81212010 Developed by: Written - Facility El NRC El II Operating - Facility El NRC El Target Chief Date* Task Description (Reference) Examiners Initials

-180 1. Examination administration date confirmed (Cia; C.2.a and b) 2/3/2010

-120 2. NRC examiners and facility contact assigned (C.1.d; C.2.e) 4/4/2010 2/17/10

-120 3. Facility contact briefed on security and other requirements (C.2.c) 4/4/2010 2/17/10

-120 4. Corporate notification letter sent (C.2.d) 4/4/2010 2/17/10

[-90] [5. Reference material due (C.l .e; C.3.c; Attachment 3)] 5/4/2010

{-75} 6. Integrated examination outline(s) due, including Forms ES-201-2, ES- 5/19/2010 201-3, ES-301-1, ES-301-2, ES-301-5, ES-D-Vs, ES-401-112, ES-401-3, 4/30/2010(0) and ES-401-4, as applicable (C.1.e and f; C.3.d)

{-70} {7. Examination outline(s) reviewed by NRC and feedback provided to facility 5/24/2010 licensee (C.2.h; C.3.e)} 5/07/2010

{-45} 8. Proposed examinations (including written, walk-through JPMs, and 6/18/2010 scenarios, as applicable), supporting documentation (including Forms 5/17/2010 (W)

ES-301-3, ES-301-4, ES-301-5, ES-301-6, and ES-401-6, and any Form 5/24/2010(0)

ES-201-3 updates), and reference materials due (C.1.e, f, g and h; C.3.d)

-30 9. Preliminary license applications (NRC Form 398s) due (C.1.l; C.2.g; 7/3/2010 ES-202)

-14 10. Final license applications due and Form ES-201-4 prepared (C.1.l; C.2.i; 7/19/2010 ES-202)

-14 11. Examination approved by NRC supervisor for facility licensee review 7/19/2010 (C.2.h; C.3.t)

-14 12. Examinations reviewed with facility licensee (Cli; C.2.f and h; C.3.g) 7/19/2010

-7 13. Written examinations and operating tests approved by NRC supervisor 7/26/2010 (C.2.i; C.3.h)

-7 14. Final applications reviewed; 1 or2 (if>10) applications audited to confirm 7/26/2010 qualifications / eligibility; and examination approval and waiver letters sent (C.2.i; Attachment 5; ES-202, C.2.e; ES-204)

-7 15. Proctoring/written exam administration guidelines reviewed 7/26/2010 with facility licensee (C.3.k)

-7 16. Approved scenarios, job performance measures, and questions 7/26/2010 distributed to NRC examiners (C.3.i)

Target dates are generally based on facility-prepared examinations and are keyed to the examination date identified in the corporate notification letter. They are for planning purposes and may be adjusted on a case-by-case basis in coordination with the facility licensee.

[Applies only] {Does not apply} to examinations prepared by the NRC.

Note: Dates in BLUE are the calendar date populated by the excel program from Exelon. These are the true due dates required by NUREG 1021.

Date in RED are the agreed to submittal dates with Ron Aiello. Some of these are different from the calendar dates.

Where there is no RED date, the original calendar date is being used as the required date for this exam.

ES-201 Exarniration Outline Quality Checklist Form ES-201-2 FacEhty: McGuire Date of Exarriiriation: 8/2/10 I!Pas ftem Task Description

1. a. Verify that the outline(s) fit(s) the appropriate model per ES-401.
b. Assess whether the outline was systematically and randomly prepared in accordance W with Section 0 1 of ES-401 and Whether all KtA categories are appropriately sampled
0. Assess kiether the outline over-emphasizss any systems, evolutions, or generic topics.

T d. Assess whether the justifications for deselected or rejected K/A statements are t appropriate.

Øi iiV \

2. a. Using Form ES3OI -5, verify that the proposed scenario sets cover the required number of normal evolutions, instrument and component failures, technical specifications, and major transients.
b. Assess whether there are enough scenario sets (and spares) to test the projected number and mix of applicants in accordance with the expected crew composition and M

rotatkn schedule without compromising exam integrity; arid ensure that each applicant can be tested using at least one new or significantly modified scenario, that no L scenarios are duplicated from the applicants audit test(s), and scenarios will not be A repeated an subsequent days.

e. To the extent possible, assess whether the outline(s) conform(s) with the qualitative and 0 quantitative criteria specified on Form ES.-301 4 and described in Appendix D. y1 s.
3. a. Verify that systems walk-through outline meets the criteria specified on Form ES-301 -2:

(1) the outline(s) contain(s) the required number of control room and in-plant tasks, W distributed among the safety functions as specified on the form

. (2) task repetition from the last two NRC examinations is within the limits specified on the form, yt *7i (3)* no tasks are duplicated from the applicants audit test(s)

(4) the number of alternate patti, low-power, emergency and RCA tasks meet the criteria on the form.

b. Verify that the administrative outline meets the criteria specified on Form ES-3d -1; (1) the tasks are distributed among the topics as specified on the form (2) at least one task is new or significantly modified (3) no more than one task is repeated from the last two NRC licensing examinations c.Deterrnine if there are enough different outlines to test the projected number and mix of applicants end ensure that rio items are duplicated on subsequent days.
4. a. Assess whether plant-specific priorities (Including PRA and IPE insights) are covered in the appropriate exam section.

G b. Assess whether the 1 OCFR 5541143 and 55.45 sampllng is appropriate.

c. Ensure that K/A importance ratings (except for plant-specific priorities) are at least 2.5.

E d. Check for duplication and overlap among exam sections.

R a Check the entire exam for balance of coverage.

A L f. Assess whether the exam fits the appropriate job level (RO or SRO).

Date k/Jt NamTh

a. Author David Lazarony14estern Technical ersI 4/29)10
b. Facility Reviewer (*) Vti A J&s- cJ 6_J_ - i C. NRC Chief Examiner (#) / Q//, /

NRC Supervisor 7 uJ,Q,A .

w6r: /P t- 7 f:

--7--- - -

-- t 1 /*,i, NOTE: # Independent NRC reviewer initial items in Column cs, chief examiner concurrence required.

Not applicable for NRC-prepared examination outlines NUREG-1021, Fevision 9

ES-201 Examination Security Agreement Form ES-201-3

1. Pre-Examination I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of /0 as of the date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not seen authorized by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or provide direct or indirect feedback). Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensees procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.
2. Post-Examination To the best of my knowleçige/I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of y/p/.ofO From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or prvidé performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.

PRINTED NAME JOB TITLE / RESPONSIBILITY SIGNATURE (I) DATE SIGNATURE (2) DATE NOTE NEC- &atm D&vi9pa & cFJ4vf-f G4

2. /recJ /%J .Øo //7 9 r7-3 JOi+tJIc5dP7A
4. Mis4e-[te t k 1 je1o*
5. 4 H.pq 14t& fI 6.j&LCfl Cni VY Lv
7. fAcu- V4i-L- Co 7i(o 325- c (A141
8. .STC4C reACThi ho ePjQ Vzh /:-°
9. ELi7 1

I o/c_ 3&-7_/p

10. 4iC 5,/.J .c r 4*/) J/& -WL-- v/

en

11. 1ort C. M

-C

12. c&r..- t/1pfr) ,J - ;l.iJ)O I
14. tA-F4
15. jLi ,_1r&

NOTES:

ES-201, Page 27 of 28

ES-201 Examination Security Agreement Form ES-201-3

1. Pre-Examination I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of 0 as of the date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or provide direct or indirect feedback). Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensees procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.
2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.

PRINTED NAME JOB TITLE I RESPONSIBILITY SIGNATURE (1) DATE SIGNATURE (2) DATE NOTE

1. L p-k. o /(:cw -
2. i/ . cL,,fMc //e4.7
3. /4vttf ao -Irr lb 1:
4. Rim :i 4 tlPc vi 1/W
5. /4c 7//o ft-1

/4J2

8. G1 Lf&. -. yAw $ c: /c?//

. ci L)ii.Lispc-i Pe ce)JJ - Q122 -1 )CA4 //lO

8. oG.Eg. DE%Ak*.r, -

rfr-Jio F1,/,p

9. fflFVft 43(AcL(&cL1. - 3fS1fQi*4?, g(iq1(O io]A r /3/2lo
11. £. fV y C 7-?C/Q c/Ito  ?)-.)
12. IJ4.. Fi 4 1 R
13. LI 2O -g4o tc/t 14.1fl, NA-/I A, *f;/o 77hzi.1 7f?/ID
15. S,i T1-iAJ NOTES:

ES-201, Page 27 of 28

ES-201 Examination Security Agreement Form ES-201-3

1. Pre-Examination I acknowledge that I have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of of my signature. I

/ 10 as of the date agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or provide direct or indirect feedback). Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensees procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.

2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.

PRINTED NAME JOB TITLE / RESPONSIBILITY IGNATURE (1) DATE SIGNATURE (2) DATE NOTE SE1CCNj ecid, 1-7-jo 3i()

2.-I -c-.- 2 swic fa.- -t-j, 7/t/tC -

  • Sh 4

- -c A1M- A4Ut/L&-7 )4 4.

OT5 -

5.(r-,- fl,.(1 / 1-/(V -

6. II-1 5 c.r /1 cil/iq r
7. .

I4.rt/ L1( F &h <n z-i ,Lc-4-14 -fo

8. .-

-. L/

9.

10.

11.

12.

13.

14.

15.

NOTES:

ES-201, Page 27 of 28

ES-201 Examination Security Agreement Form ES-2014

1. Pre-Examination I acknowledge that have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of j21 as of the date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below and authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or provide direct or indirect feedback). Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensees procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement actiori against me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.
2. Post-ExamInation To the best of my knowledge, 1 did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.

PRINTED NAME JOB TITLE (RESPONSIBILITY Q$Rl) DATE SIGNATURE (2) DATE NOTE

1. i Ftpcr eorz(
2. a.1 5J1-ID
3. e94Ufj2 kE -

././O

4. F.J n -

- EzI-Iv tz

5. 9/E9P. Simi - S1131, T - 31-jO 6.7 -
7. Lorry d&.é - - .4,ko
8. flp j 5 çpcoe 1 - LIz? e/

. - /i.1//c ak Siek,.r Md g4-tc v4FcT4i W c1.I3fQ 11.

12. -L)..N/1/s Ao 7?n..- i/ /4-- (i s irw /J  ?-j i7IiQ 9/7//s 13.DENfJLc k/e cplr7 9PJ MA /z1i
14. (dope 9P. 7 A44i(4-vt 7/l/37J M dJr 7
15. /111C\/ Ps rm c-Lct ,l1?.  ?/o/, 6-4 NOTES:

ES-201, Page 27 of 28

ES-201 - - Examination Security Agreement Form ES-20I-3

1. Pre-Examination I acknowledge that have acquired specialized knowledge about the NRC licensing examinations scheduled for the week(s) of ?.)/2/i0 as of the date of my signature. I agree that I will not knowingly divulge any information about these examinations to any persons who have not been authorized by the NRC chief examiner. I understand that I am not to instruct, evaluate, or provide performance feedback to those applicants scheduled to be administered these licensing examinations from this date until completion of examination administration, except as specifically noted below arid authorized by the NRC (e.g., acting as a simulator booth operator or communicator is acceptable if the individual does not select the training content or provide direct or indirect feedback). Furthermore, I am aware of the physical security measures and requirements (as documented in the facility licensees procedures) and understand that violation of the conditions of this agreement may result in cancellation of the examinations and/or an enforcement action against me or the facility licensee. I will immediately report to facility management or the NRC chief examiner any indications or suggestions that examination security may have been compromised.
2. Post-Examination To the best of my knowledge, I did not divulge to any unauthorized persons any information concerning the NRC licensing examinations administered during the week(s) of . From the date that I entered into this security agreement until the completion of examination administration, I did not instruct, evaluate, or provide performance feedback to those applicants who were administered these licensing examinations, except as specifically noted below and authorized by the NRC.

PRINTED NAME JOB TITLE I RESPONSIBILITY SIONATU (1) DATE S1ONATURE (2) DATE NOTE I AS6L-7 ,J/,o - - o NOTES:

ES-201, Page 27 of 28

ES-301 Administrative Topics Outline Form ES-301-1 FINAL Facility: McGuire Date of Examination: 8/2/10 Examination Level: RO Operating Test Number: N 10-1 Administrative Topic Type Code* Describe activity to be performed (see Note) 2.1.37 (4.3) Knowledge of procedures, guidelines or Conduct of Operations limitations associated with reactivity M, R management JPM: Perform an ECP 2.1.25 (3.9) Ability to interpret reference materials, such Conduct of Operations as graphs, curves, tables, etc.

D, P, R JPM: Determine Boric Acid Addition to FWST 2.2.12 (3.7) Knowledge of Surveillance Procedures.

Equipment Control M, R JPM: Perform a Manual NC Leakage Calculation 2.3.1 1 (3.8) Ability to control radiation releases Radiation Control M, R JPM: Perform a Unit Vent Flow Calculation of a Containment Air Release NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.

  • Type Codes & Criteria: (C)ontrol room, (0) (S)imulator, (0) or Class(R)oom (4)

(D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes) (1)

(N)ew or (M)odified from bank (> 1) (3)

(P)revious 2 exams ( 1; randomly selected) (1)

NUREG-1 021, Revision 9

ES-301 Administrative Topics Outline Form ES-3d-i RNAL RO Admin JPM Summary Ala This is a modified JPM using Bank JPM-RT-RB:073 as its basis. The operator will be told that Reactor Startup is an hour away, and provided with a set of initial conditions.

The operator will be asked to perform an Estimated Critical Position (ECP) in accordance with OPIOIA/6 100/06 (Reactivity Balance Calculation), Enclosure 4.2 (Estimated Critical Rod Position). During the course of the ECP, the operator will be given a set of power history conditions, and asked to perform a Shutdown Fission Product Correction calculation in accordance with OP/0/A/6100/06 (Reactivity Balance Calculation), Enclosure 4.8 (Shutdown Fission Product Correction Calculation) in support of the ECP. This is the same JPM as the SRO Exam.

Alb This is a bank JPM, and previously used on the 2009 NRC Operating Test. The operator will be told that a leak, which is now isolated has lowered the FWST level to 440 inches, and that it has been decided to use the Recycle Holdup Tank (RHT) to refill the FWST. The operator will be told that Enclosure 4.4, (FWST Makeup Using the RHT), of OP/IIA/62001014 (Refueling Water System) is in progress and completed through Step 3.9, and provided with Chemistry Data for the BAT and RHT. The operator will then be directed to determine the amount of Boric Acid needed to raise the FWST level to 480 using the RHT in accordance with Step 3.10 of Enclosure 4.4 of OP/l/A16200/014 (Refueling Water System). The operator will be expected to calculate the amount of Boric Acid that must be added from the BAT to refill the FWST.

A2 This is a modified JPM using Bank JPMs ADM-NRC-A2-05 and 12 as its basis. The operator will be told that Unit 1 is at 100% power, the Unit 1 OAC point M1L4554 is out of service, and that PT/1/A/4200/040 (Reactor Coolant Leakage Detection) has been completed showing that NCS Leakage is 1.6 gpm. The operator will be given Enclosure 13.2 (NC Leakage Determination Using Manual Calculations) of PT/l/A/4150/OO1B (Reactor Coolant Leakage Calculation) with the necessary raw data compiled on a Data Sheet; and directed to complete the calculations within the Enclosure. The operator will be expected to complete all calculations, and identify any Technical Specification Limits that have been exceeded.

A3 This is a modified JPM using Bank JPM ADM-NRC-A3-0l0 as its basis. The operator will be told that GWR Package # 2010013 for Unit 1 Containment Air Release is currently in use to conduct a series of Containment air releases, and that during the first release, conducted using Enclosure 4.2 (Air Release Mode With VQ Flow Monitor Operable) of OP/l/A/6450/017 (Containment Air Addition and Release), the Unit 1 VQ Monitor became inoperable. The operator will be told that the crew stopped the release and continued the air release using Enclosure 4.3 (Air Release Mode with VQ Flow Monitor Inoperable) of OP/1/A/6450/017 (Containment Air Addition and Release), and that three previous releases have been made; including the one which was made with the Unit 1 VQ Flow Monitor in operation. Finally, the operator will be provided with the pertinent data for the current release, and then be directed to calculate the volume released for the current release and to determine the total volume released from the Containment during all releases. The operator will be expected to calculate the volume of air released from the Containment during the final release, and determine the total volume of air released in the series of four releases.

NUREG-1 021, Revision 9

ES-301 Administrative Topics Outline Form ES-301-1 flNAL Facility: McGuire Date of Examination: 8/2/10 Examination Level: SRO Operating Test Number: N 10-1 Administrative Topic Type Code* Describe activity to be performed (see Note)

. 2.1.37 (4.6) Knowledge of procedures, guidelines or Conduct of Operations limitations associated with reactivity M, R management JPM: Perform an ECP 2.1.25 (4.2) Ability to interpret reference materials, such Conduct of Operations as graphs, curves, tables, etc.

D, P, R JPM: Determine Boric Acid Addition to FWST 2.2.12 (4.1) Knowledge of Surveillance Procedures.

Equipment Control M,R JPM: Perform/Review a Manual NC leakage Calculation 2.3.11 (3.8) Ability to control radiation releases Radiation Control M, R JPM: Perform a Unit Vent Flow Calculation of a Containment Air Release 2.4.44 (4.4) Knowledge of emergency plan protective Emergency action recommendations.

Procedures/Plan N, R JPM: Provide an updated PAR NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when 5 are required.

  • Type Codes & Criteria: (C)ontrol room, (0) (S)imulator, (0) or Class(R)oom (5)

(D)irect from bank ( 3 for ROs; 4 for SROs & RO retakes) (1)

(N)ew or (M)odified from bank ( 1) (4)

(P)revious 2 exams ( 1; randomly selected) (1)

NUREG-1 021, Revision 9

ES-301 Administrative Topics Outline Form ES-301-1 RNAL SRO Admin JPM Summary Ala This is a modified JPM using Bank JPM-RT-RB:073 as its basis. The operator will be told that Reactor Startup is an hour away, and provided with a set of initial conditions. The operator will be asked to perform an Estimated Critical Position (ECP) in accordance with 0P101A16100106 (Reactivity Balance Calculation),

Enclosure 4.2 (Estimated Critical Rod Position). During the course of the ECP, the operator will be given a set of power history conditions, and asked to perform a Shutdown Fission Product Correction calculation in accordance with OP/0/A/6100/06 (Reactivity Balance Calculation), Enclosure 4.8 (Shutdown Fission Product Correction Calculation) in support of the ECP. This is the same JPM as the RO Exam.

Alb This is a bank JPM, and previously used on the 2009 Operating Test. The operator will be told that a leak, which is now isolated has lowered the FWST level to 440 inches, below the Technical Specification Limit, and that it has been decided to use the Recycle Holdup Tank (RHT) to refill the FWST. The operator will be told that Enclosure 4.4 (FWST Makeup Using the RHT), of OP/l/A/6200/014 (Refueling Water System) is in progress and completed through Step 3.10, and provided with Chemistry Data for the BAT and RHT. The operator will then be directed to perform the Independent Verification (SRO aspect) of the calculation in Step 3.10 of Enclosure 4.4 to determine the amount of Boric Acid that must be added from the Boric Acid Tank (BAT), in order to raise the FWST Level to 480 using the RHT. The operator will discover two errors within the previous calculation, and determine the correct volume of Boric Acid to add. Following this, the operator will be given a makeup flowrate to the FWST and asked to identify the impact on the Technical Specification ACTION.

The operator will be required to identify that ACTION C is applicable after one hour.

A2 This is a modified JPM using Bank JPMs ADM-NRC-A2-05 and 12 as its basis.

The operator will be told that Unit 1 is. at 100% power, the Unit I OAC point M1L4554 is out of service, and that PT/l/A14200/040 (Reactor Coolant Leakage Detection) has been completed showing that NCS Leakage is 1.6 gpm. The operator will be given Enclosure 13.2 (NC Leakage Determination Using Manual Calculations) of PT/1/A14150/OO1B (Reactor Coolant Leakage Calculation) with the necessary raw data compiled on a Data Sheet; and directed to complete the calculations within the Enclosure. The operator will be expected to complete all calculations in accordance with the provided Key, identify any Technical Specification Limits that have been exceeded, and (SRO aspect) identify with all Technical Specification ACTION.

A3 This is a modified JPM using Bank JPM ADM-NRC-A3-010 as its basis. The operator will be told that GWR Package # 2010013 for Unit 1 Containment Air Release is currently in use to conduct a series of Containment air releases, and that during the first release, conducted using Enclosure 4.2 (Air Release Mode NUREG-l 021, Revision 9

ES-301 Administrative Topics Outline Form ES-301-1 FINAL With VQ Flow Monitor Operable) of 0P111A164501017 (Containment Air Addition and Release), the Unit 1 VQ Monitor became inoperable. The operator wiH be told that the crew stopped the release and continued the air release using Enclosure 4.3 (Air Release Mode with VQ Flow Monitor Inoperable) of 0P111A164501017 (Containment Air Addition and Release), and that three previous releases have been made; including the one which was made with the Unit 1 VQ Flow Monitor in operation. Finally, the operator will be provided with the pertinent data for the current release, and then be directed to calculate the volume released for the current release and to determine the total volume released from the Containment during aN releases. The operator will be expected to calculate the volume of air released from the Containment during the final release, and determine the total volume of air released in the series of four releases. This is the same JPM as the RO Exam.

A4 This is a new JPM. The operator will be placed in a post-accident condition with a Large Break LOCA with a release from the Containment. The operator will be told that a General Emergency has been declared, and provided with the initial Protective Action Recommendation (PAR). The operator will be given a subsequent set of plant conditions and meteorological data, and asked to provide an updated PAR in accordance with Enclosure 4.4 (Offsite Protective Recommendations) of RP101B157001029 (Notifications to Offsite Agencies from the Control Room). The operator will be expected to determine the Updated PAR for the subsequent conditions.

NUREG-1 021, Revision 9

ES-301 Control Room/In-Plant Systems Outline Form ES-301 -2 FINAL Facility: McGuire Date of Examination: 8/2/10 Exam Level (circle one): RO (only) / SRO(l) I SRO (U) Operating Test No.: Nb-i Control Room Systems@ (8 for RO; 7 for SRO-l; 2 or 3 for SRO-U, including I ESF)

System / JPM Title Type Code*

Function

a. 006 Emergency Core Cooling System S,D,EN 2 Transfer the NI Pumps from Cold Leg Recirc to Hot Leg Recirc
b. 005 Residual Heat Removal System S,D,A,L 4P Respond to ND System Malfunction While at Mid Loop
c. 056 Condensate System S,N,A 4S Swap HotwelIlCM Booster Pumps
d. 026 Containment Spray System S,P,D,A,EN 5 Manually Actuate Containment Spray System
e. APE 077 Generator Voltage and Electric Grid Disturbances S,N,A 6 Separate From the Electrical Grid Due to Low Grid Frequency
f. 015 Nuclear Instrumentation System S,P,M 7 Restore Repaired Power Range Channel to Service
g. 075 Circulating Water System Isolate the Circulating Water System During Turbine Building S N 8 Flooding
h. 010 Pressurizer Pressure Control System S,N,A 3 Remove Pressurizer Heaters from Seivice In-Plant Systems@ (3 for RO; 3 for SRO-l; 3 or 2 for SRO-U)
i. 055 Condenser Air Removal System D,E 4S Startup Main Vacuum Pump j 008 Component Cooling Water System D,R,E 8 Makeup to the Unit I KC Surge Tanks
k. APE 057 Loss of Vital AC Electrical Instrument Bus D,R,E 6 Restore Power to KXB Power Panel Board Using Inverter SKX NUREG-1 021, Revision 9

ES-301 Control Room/In-Plant Systems Outline Form ES-301 -2 FINAL

@ All RO and SRO-l control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

Type Codes Criteria for RO / SRO-l / SRO-U (A)lternate path 4-6 (5) /4-6 (4) / 2-3 (3)

(C)ontrol room (D)irect from bank 9 (6) / 8 (6) / 4 (4)

(E)mergency or abnormal in-plant 1 (3) / 1 (3) / 1 (2)

(EN)gineered Safety Feature - I I 1 (1) (Control Room System)

(L)ow-Power/Shutdown 1 (1)/1(1)I1 (1)

(N)ew or (M)odifled from bank including I (A) 2 (5) I 2 (4) / 1 (1)

(P)revious 2 exams 3 (2)/ 3 (2)I 2 (1) (Randomly Selected)

(R)CA 1(2)/1(2)/1(2)

(S)imulator JPM Summary JPM A This is bank JPM-PS-NC-1 17. The operator will be told Unit I experienced a Loss of Coolant Accident six (6) hours ago, and that the plant is operating in the Cold Leg Recirculation mode. The operator will be directed to Transfer Recirculation to Hot Leg Recirc EP/1/A/5000/ES-1 .4 (Transfer to Hot Leg Recirculation). The operator will be expected to align the NI System to the Hot Leg Recirc Mode.

JPM B This is bank JPM PS-ND-183A. The operator will be told that Unit I is in Mode 5 with the NC System drained to approximately 10 inches, that IA ND Pump is in service to all four Cold Legs, and that ND flow has suddenly increased. The operator will be directed to implement AP/I/A15500/19 (Loss of ND or ND System Leakage). The operator will be expected to take manual action to control flow, but recognize that attempts to manually control the RHR HX Outlet Valve and the Bypass Valve are ineffective (Alternate Path).

The operator will be expected to throttle ND flow to less than 3000 gpm using the Cold Leg injection valve(s) and position the ND Heat Exchanger Outlet Manual Loaders so that when these valves are repaired, the ND flow will not be affected.

JPM C This is a new JPM. The operator will be told that Unit 1 is operating at 90% power in preparation for a Condensate System Pump Swap. The operator will be directed to start the C Hotwell Pump, and place the A Hotwell Pump in standby, and then start the C Condensate Booster Pump and place the A Condensate Booster Pump in standby using Enclosure 4.5 of OP/I/A16250/001 (Condensate and Feedwater System). The operator will be expected to swap both sets of pumps in accordance with the procedure. During the course of swapping the Condensate Booster Pumps, the operator will recognize that the C Hotwell Pump Strainer High LP Annunciator will alarm (Alternate Path). The operator will be expected to use the Annunciator Response Procedure and re-start the A Hotwell Pump, and stop the C Hotwell Pump.

JPM D This JPM is a bank JPM, and was previously used on the 2008 NRC Operating Test.

The operator will be placed in a Post-Reactor Trip situation and told that the crew has progressed from EP/1/A15000/E-0 (Reactor Trip and/or Safety Injection) to EP/I/A/5000/ES-0.I (Reactor Trip Response) due to a reactor trip. The operator will be told that after entry into ES-0.l a LOCA occurs inside the Containment causing a Safety NUREG-1021, Revision 9

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 H\

Injection; and that the crew has now left ES-0. 1 for EPI1 /AJ5000IFR-Z. 1 (Response to High Containment Pressure) due to the Orange Path condition on the Containment Critical Safety Function, completing steps 1-9. The operator will be directed to check the NS System in Operation in accordance with step 10 of FR-Z.1. Although Containment Pressure will be > 3 psig, automatic actuation of Containment Spray (NS) will have failed. Additionally, the NS manual actuators will fail to operate requiring that the operator take manual action to start the NS Pumps and open the discharge valves. The operator will need to manually open the NS Pump discharge valves and manually start the NS Pumps. When attempts are made to manually open the A Train discharge valves, they will not open (Alternate Path), requiring the operator to make no attempt to start the IA NS pump.

JPM E This is a new JPM. With the plant at 77% power, the operator will be told that the crew has entered AP/1/A15500/05 (Generator Voltage and Electrical Grid Disturbances) due to low Electrical Grid frequency, and that the procedure is completed up to Step 15. The operator will be directed to separate from the Electrical Grid without delay in accordance with Step 15 of AP/1 1A15500/05 (Generator Voltage and Electrical Grid Disturbances).

Since plant power is greater than 60%, the operator will be required to reduce load.

When the operator attempts to operate the turbine in automatic, Turbine power will fail to lower (Alternate Path). The operator will be expected to recognize that the Turbine has failed, and lower power manually, and then disconnect the Turbine Generator from the Electrical Grid.

JPM F This JPM is a modified version of a similar JPM used on the 2009 NRC Operating Test.

The Operator will be placed in a situation with Unit I at 100% power. The operator will be told that Power Range Channel N43 has previously failed low, and that the channel has been defeated in accordance with AP/1/A15500/16, Malfunction of Nuclear Instrumentation, Case Ill, Power Range Malfunction. The operator will be asked to restore Power Range Channel N43 to service in accordance with Step 21 of AP16, Malfunction of Nuclear Instrumentation, Case Ill, Power Range Malfunction. The operator will be required to restore the channel to service in accordance with the procedure.

JPM G This is a new JPM. The operator will be told that there is massive flooding in the Turbine Building and that the crew has implemented AP/0/A/5500/44 (Plant Flooding), Enclosure I (Unit 1 Turbine Bldg Flooding). The operator will be directed to isolate the RC System by performing steps 6.d-v of the procedure, while the crew continues with EP/1/A15000/E-0 (Reactor Trip and/or Safety Injection). The operator will be expected to take all pump and valve control switch manipulations to isolate the RC System. This task was chosen because Internal Flooding events are a large PRA contributor (15%

CDF). This is a Time Critical JPM that must be complete in 40 Minutes.

JPM H This is a new JPM. The operator will be told that plant power has just been raised to 100% per OP/1/A/6100/003 (Controlling Procedure for Unit Operation). The operator will be directed to remove Pzr Heater Groups A, B and D from service per Enclosure 4.6 (Operation of Pzr Heaters) of OP/1/N6100/003. The operator will be expected to remove the A, B and D Pzr Heater Groups from service in accordance with Step 3.4.4 of Enclosure 4.6. After the Pzr Pressure Master has been placed in MANUAL and its output has been adjusted, the Pzr variable Heaters (Group C) will fail (Alternate Path).

The operator will be required to respond to MCB Annunciator 1AD6/D6 (PZR HTR CONTROLLER TROUBLE), and manually control pressure using the other heater NUREG-1 021, Revision 9

ES-301 Control Room/In-Plant Systems Outline Form ES-301 -2 RNAL groups. The operator will be expected to place at least one Pzr Heater Group in service in accordance with Step 3.3.1 (or equivalent) of Enclosure 4.6.

JPM I This is Bank JPM MT-ZM-96. The operator will be told that Unit I has experienced a loss of main condenser vacuum, that the CRS has implemented AP/1/A15500/23 (Loss of Condenser Vacuum), and that the RO reports that main condenser vacuum indicates 24 inches and decreasing. The operator will be directed to start the A Main Vacuum Pump and align it to the Unit 1 Main Condenser per OP/1/B/6300/006 (Main Vacuum and Vacuum Priming) Enclosure 4.7 (ZM Pump Startup). The operator will place the A Main Vacuum Pump in service aligned to Unit 1 Main Condenser.

JPM J This is bank JPM PSS-KC-165T. The operator will be told that Unit I is operating at 100% power when the KC Surge Tank A and B to level computer alarms are received, that the surge tank levels are 3.9 feet and decreasing, and that AP/1/A15500/21 (Loss of KC or KC System Leakage) has been implemented. Since the YM System will be out of service, the operator will be directed to initiate makeup to both Unit 1 KC Surge Tanks APII/N5500121 (Loss of KC or KC System Leakage), Enclosure 3 (Aligning RN Makeup to KC Surge Tank). This is a Time Critical JPM. The operator will be expected to manipulate valves, and communicate with the C/R to restore KC Surge Tank level within ten minutes of dispatch. This is a Time Critical JPM that must be complete in 10 Minutes.

JPM K This is bank JPM EL-EPK-199. The operator will be told that AP/1/A/5500/15 (Loss of Vital or Aux Control Power) has been implemented due to a loss of Aux Control Power Panel Board KXB, and that prior to the event, all electrical systems were aligned in their normal operating configurations. The operator will be directed to energize KXB using inverter SKX per Enclosure 24 of AP/1/A15500/1 5 (Loss of Vital or Aux Control Power).

The operator will be expected to align Inverter SKX to provide power to KXB power panel board.

NUREG-1 021, Revision 9

ES-301 Operating Test Quality Checklist Form ES-301-3 FINAL Facility: McGuire Date of 8/2/10 Operating Test Number: N10-1 Examination:

nrtials

1. GENERAL CRITERIA a b* c#
a. The operating test conforms with the previously approved outline; changes are consistent with sampling requirements (e.g. 10 CFR 55.45, operational importance, safety function distribution).
b. There is no day-to-day repetition between this and other operating tests to be administered r during this examination. cZ\
c. The operating test shall not duplicate items from the applicants audit test(s) (see Section D.1.a). k2 j7l\
d. Overlap with the written examination and between different parts of the operating test is within acceptable limits.
e. It appears that the operating test will differentiate between competent and less-than-competent applicants at the designated license level. = =
2. WALK-THROUGH CRITERIA - -
a. Each JPM includes the following, as applicable:

initial conditions 6<

initiating cues references and tools, including associated procedures reasonable and validated time limits (average time allowed for completion) and specific designation if deemed to be time-critical by the facility licensee operationally important specific performance criteria that include:

- detailed expected actions with exact criteria and nomenclature

- system response and other examiner cues

- statements describing important observations to be made by the applicant

- criteria for successful completion of the task

- identification of critical steps and their associated performance standards

- restrictions on the sequence of steps, if applicable

b. Ensure that any changes from the previously approved systems and administrative walk-through outlines (Forms ES-301-1 and 2) have not caused the test to deviate from any of isl ;J( -$

the acceptance criteria (e.g., item distribution, bank use, repetition from the last 2 NRC examinations) specified on those forms and Form ES-201-2.

3. SIMULATOR CRITERIA - -

The associated simulator operating tests (scenario sets) have been reviewed in accordance with Form ES-301-4 and a copy is attached.

. / Signature Date

a. Author Da tazarony, Western Technical Services, Inc. 7/8/10
b. Facility Reviewer (*) 7/,5/,Q
c. NRC Chief Examiner (#) /7 q /,4 / 7/ / O
d. NRC Supervisor tDLi..i/ (1Iti_ cWZo

/

NOTE:

  • The facility signature is not applicable for NRC-developed tests.
  1. Independent NRC reviewer initial items in Column c; chief examiner concurrence required.

NUREG-1 021, Revision 9

ES-301 Simulator Scenario Quality Checklist Form ES-301-4 FINAL Facility: McGuire Date of Exam: 8/2/10 Scenario Numbers: 1 23 Operating Test No.: Nb-i QUALITATIVE ATTRIBUTES lrtials a b*

1. The initial conditions are realistic, in that some equipment and/or instrumentation may be out of service, but it does not cue the operators into expected events.
2. The scenarios consist mostly of related events. .
3. Each event description consists of 7____

. the point in the scenario when it is to be initiated

. the malfunction(s) that are entered to initiate the event

. the symptoms/cues that will be visible to the crew

. the expected operator actions (by shift position)

. the event termination point (if applicable)

4. No more than one non-mechanistic failure (e.g., pipe break) is incorporated into the scenario without L/

a credible preceding incident such as a seismic event.

5. The events are valid with regard to physics and thermodynamics. f2.. 4<
6. Sequencing and timing of events is reasonable, and allows the examination team to obtain complete evaluation results commensurate with the scenario objectives. w-. 4
7. If time compression techniques are used, the scenario summary clearly so indicates. Operators ,-gj have sufficient time to carry out expected activities without undue time constraints.
8. The simulator modeling is not altered. 63- K.
9. The scenarios have been validated. Pursuant to 10 CFR 55.46(d), any open simulator performance deficiencies or deviations from the referenced plant have been evaluated to ensure that functional fidelity is maintained while running the planned scenarios.
10. Every operator will be evaluated using at least one new or significantly modified scenario. All other scenarios have been altered in accordance with Section D.5 of ES-301.
11. All individual operator competencies can be evaluated, as verified using Form ES-301-6 (submit the j form along with the simulator scenarios).
12. Each applicant will be significantly involved in the minimum number of transients and events specified on Form ES-301-5 (submit the form with the simulator scenarios).
13. The level of difficulty is appropriate to support licensing decisions for each crew position. jt Target Quantitative Attributes (Per Scenario; See Section D.5.d) Actual Attributes - -
1. Total malfunctions (5-8) 9 6 9
2. Malfunctions after EOP entry (1-2) 2 1 2
3. Abnormal events (2-4) 4 3 4 _..
4. Major transients (1-2) 1 1 1
5. EOPs entered/requiring substantive actions (1-2) 1 1 1
6. EOP contingencies requiring substantive actions (0-2) 1 0 1
7. Critical tasks (2-3) 2 2 2 NUREG-1 021, Revision 9

ES-301 Simulator Scenario Quality Checklist Form ES-301-4 FINAL Facility: McGuire Date of Exam: 8/2/10 Scenario Numbers: 4 Operating Test No.: Nb-i QUALITATIVE ATTRIBUTES InWals a b* c#

1. The initial conditions are realistic, in that some equipment and/or instrumentation may be out of service, but it does not cue the operators into expected events. a:w-
2. The scenarios consist mostly of related events.  %
3. Each event description consists of

. the point in the scenario when it is to be initiated

. the malfunction(s) that are entered to initiate the event

. the symptoms/cues that will be visible to the crew

. the expected operator actions (by shift position)

. the event termination point (if applicable)

4. No more than one non-mechanistic failure (e.g., pipe break) is incorporated into the scenario without a credible preceding incident such as a seismic event.
5. The events are valid with regard to physics and thermodynamics.
6. Sequencing and timing of events is reasonable, and allows the examination team to obtain complete ., j evaluation results commensurate with the scenario objectives.
7. If time compression techniques are used, the scenario summary clearly so indicates. Operators have sufficient time to carry out expected activities without undue time constraints. U
8. The simulator modeling is not altered. $PZ
9. The scenarios have been validated. Pursuant to 10 CFR 55.46(d), any open simulator performance deficiencies or deviations from the referenced plant have been evaluated to ensure that functional fidelity is maintained while running the planned scenarios.
10. Every operator will be evaluated using at least one new or significantly modified scenario. All other scenarios have been altered in accordance with Section D.5 of ES-301.
11. All individual operator competencies can be evaluated, as verified using Form ES-301 -6 (submit the p-form along with the simulator scenarios).
12. Each applicant will be significantly involved in the minimum number of transients and events jt 94 specified on Form ES-301-5 (submit the form with the simulator scenarios).
13. The level of difficulty is appropriate to support licensing decisions for each crew position.

Target Quantitative Attributes (Per Scenario; See Section D.5.d) Actual Attributes - -

1. Total malfunctions (5-8) 7
2. Malfunctions after EOP entry (1-2) 2
3. Abnormal events (2-4) 3
4. Major transients (1-2) 1
5. EOPs entered/requiring substantive actions (1-2) 2
6. EOP contingencies requiring substantive actions (0-2) 0
7. Critical tasks (2-3) 2 = k1/

NUREG-1 021, Revision 9

ES-301 Transient and Event Checklist Form ES-301-5 I9NAL Facility: McGuire Date of Exam: 8/2/10 Operating Test No.: Nb-i A E Scenarios P V N010-1-2 N010-1-3 Nb-i-i N10-1-4 T M P E (Spare) 0 I L N T N CREW CREW CREW CREW I T POSITION POSITION POSITION POSITION A I C L M A T U N Y T P 5 A B S A B S A B S A B R I U E R T 0 R T 0 R T 0 R T 0 0 C P 0 C P 0 C P 0 C P RX 0 1 1 0 NOR 4 1 2 1 1 1 10 4 4 2 SROU-1 I/C 1,2, 2,3, 3,5, 4,5, 6 6 MAJ 2 2 2 1 TS 2,3 4,5 4 0 2 2 RX 0 1 1 0 NOR 2 1 1 1 10 4 4 2 SROU-2 /c 1,2, 2,3, 3,5, 4,5, 6 6 MAJ 2 2 2 1 TS 2,3 4,5 4 0 2 2 RX 1 1 1 1 0 NOR 4 1 2 1 1 1 1,2, 2,3 2,3, 12 4 4 2 SROI-1 I/C 3,5, 4,5, 6 6 MAJ 7 3 2 2 1 TS 2,3 2,3, 5 0 2 2 4

RX 1 1 1 0 NOR 1 1 1 1 2,5 56 4 4 2 RO-1 I/C MAJ 2 2 2 1 TS 0 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must service in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SRO5 must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position, If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-i basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

NUREG 1021 Revision 9

ES-301 Transient and Event Checklist Form ES-301-5 RNAL Facility: McGuire Date of Exam: 8/2/10 Operating Test No.: Nb-i A E Scenarios P V N0l0-l-2 N010-1-3 Nb-i-i N10-1-4 T M P E (Spare) 0 I L N T N CREW CREW CREW CREW I T POSITION POSITION A I POSITION POSITION C L M A T u N Y T P S A B S A B S A B S A B R I U E R T 0 R T 0 R T 0 R T 0 0 C P 0 C P 0 C P 0 C P RX 1 1 1 1 0 NOR 1 1 1 1 RO-2 ic 1,6 2,3 2 MAJ 7 7 2 2 2 1 TS 0 0 2 2 RX 1 1 1 1 0 NOR 1 1 1 1 4 4 4 2 RO-4 I/c 1,6 2,3 MAJ 7 7 2 2 2 1 TS 0 0 2 2 R.)( 6 1 1 1 0 NOR 4 1 2 1 1 1 1,6 5,6 3,4 6 4 4 2 RO-5 I/c MAJ 7 3 2 2 1 TS 0 0 2 2 RX 4 1 1 1 0 NOR 1 1 1 1 1 4 4 2 RO-6 I/C MAJ 2 2 2 1 TS 0 0 2 2 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-i event numbers for each event type; TS are not applicable for RO applicants. ROs must service in both the at-the-controls (ATC) and balance-of-plant (BOP) positions; Instant SROs must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-i basis.

3 Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

NUREG 1021 Revision 9

ES-301 Transient and Event Checklist Form ES-301-5 I9NAL Facility: McGuire Date of Exam: 8/2/10 Operating Test No,: Nb-i A E Scenarios P V N010-i-2 N010-1-3 Nb-i-i N10-1-4 T M P E (Spare) 0 I L N T N CREW CREW CREW CREW I T POSITION POSITION POSITION A I POSITION C L M A T u N Y T P S A B S A B S A B S A B R I U E R T 0 R T 0 R T 0 R T 0 0 C P 0 C P 0 C P 0 C P RX 1 1 1 0 NOR 1 1 1 1 1 4 4 4 2 RO-7 I/C Z5 5,6 MAJ 7 2 2 2 1 TS 0 0 2 2 RX 1 1 0 NOR 1 1 1 2

I/C MAJ 2 2 1 TS 0 2 2 RX 1 1 0 NOR 1 1 1 2

I/C MAJ 2 2 1 TS 0 2 2 RX 1 1 0 NOR 1 1 1 4 4 2 I/C MAJ 2 2 1 TS 0 2 2 Instructions:

1 check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must service in both the at-the-controls (ATC) and balance-of-plant (SOP) positions; Instant SRO5 must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an Instant SRO additionally serves in the SOP position, one iic malfunction can be credited toward the two I/C malfunctions required for the ATC position.

2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional instrument or component malfunctions on a 1-for-I basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.

NUREG 1021 Revision 9

ES-301 Competencies Checklist Form ES-301-6 FINAL Facility: McGuire Date of Examination: 8/2/10 Operating Test No.: N10-1 APPLICANTS SRO (U/I) RO/ATC BOP Competencies SCENARIO SCENARIO SCENARIO 1 2 3 4 1 2 3 4 1 2 3 4 Interpret/Diagnose 2,3,4 2 1,2,4 1,2,5 1,2,3, 1,4,6 1,4,5 1,3,5 Events and 1-9 1-8 1-8 1-8 5,6, 478 ,6,7, 6,7,

,7 ,6,7 ,6 Conditions 8 8 8,9 Comply With and Use 3,4,5 123 1,2,4 1,5,6 1,4,6 1,5,6 1,3,5 1-9 1-8 1-8 1-8 6,7, 7,8, Procedures (1) 6,7 8 9

,7 ,7 ,6 Operate Control 2,4,5 1,2,4 1,5,6 123 1,4,6 1,5,6 1,3,5 NA NA NA NA ,6,7, 7,8, Boards (2) 6,7 8

.7 ,7 ,6 Communicate and 1-9 1-8 1-8 1-8 1-9 1-8 1-8 1-8 1-9 1-8 1-8 1-8 Interact Demonstrate Supervisory Ability 1-9 1-8 1-8 1-8 NA NA NA NA NA NA NA NA (3)

Comply With and Use 2,3,5 2,3 4,5 3,4 NA NA NA NA NA NA NA NA Tech. Specs. (3)

Notes:

(1) Includes Technical Specification compliance for RO.

(2) Optional for an SRO-U.

(3) Only applicable to SROs.

Instructions:

Circle the applicants license type and enter one or more event numbers that will allow the examiners to evaluate eveiy applicable competency for eveiy applicant.

NUREG-1 021, Revision 9

ES-401 PWR Examination Outline FORM ES-401-2 Facility Name:McGuire Nuclear Station Date of Exam:8/13/10 RO KJA Category_Points SRO-Only Points Tier Group i? K K K K K A A A A G Total A2 G

  • Total j 2 3 4 5 6 1 2 3 4 *
1. Emergency 1 3 3 3 3 3 3 18 3 3 6 Abnormal 2 2 1 1 N/A 2 1 N/A 2 9 2 2 4 Plant Evolutions Tier Totals 5 4 4 5 4 5 27 5 5 10 1 32332323232 28 3 2 5 2.

2 11121101101 10 0 2 1 3 Plant Systems TierTotals43453424333 38 5 3 8 1 2 3 4 1 2 3 4

3. Generic Knowledge and Abilities 10 7 Categories 2 2 3 3 2 2 2 1 Note: 1. Ensure that at least two topics from every applicable K/A category are sampled within each tier of the RO and SRO-only outlines (i.e. except for one category in Tier 3 of the SRO-only outline, the Tier Totals in each KIA category shall not be less than two).
2. The point total for each group and tier in the proposed outline must match that specified in the table.

The final point total for each group and tier may deviate by +/-1 from that specified in the table based on NRC revisions. The final RO exam must total 75 points and the SRO-only exam must total 25 points.

3. Systems/evolutions within each group are identified on the associated outline; systems or evolutions that do not apply at the facility should be deleted and justified; operationally important, site-specific systems that are not included on the outline should be added. Refer to ES-401, Attachment 2, for guidance regarding the elimination of inappropriate K/A statements.
4. Select topics from as many systems and evolutions as possible; sample every system or evolution in the group before selecting a second topic for any system or evolution.
5. Absent a plant-specific priority, only those K/As having an importance rating (IR) of 2.5 or higher shall be selected.

Use the RO and SRO ratings for the RO and SRO-only portions, respectively.

6. Select SRO topics for Tiers 1 and 2 from the shaded systems and K/A categories.

7* The generic (G) K/As in Tiers 1 and 2 shall be selected from Section 2 of the K/A Catalog, but the topics must be relevant to the applicable evolution or system.

8. On the following pages, enter the K/A numbers, a brief description of each topic, the topics importance ratings (IRS) for the applicable license level, and the point totals (#) for each system and category. Enter the group and tier totals for each category in the table above; if fuel handling equipment is sampled in other than Category A2 or G* on the SRO-only exam, enter it on the left side of Column A2 for Tier 2, Group 2 (Note #1 does not apply). Use duplicate pages for RO and SRO-only exams.
9. For Tier 3, select topics from Section 2 of the K/A catalog, and enter the K/A numbers, descriptions, IRs, and point totals (#) on Form ES-401-3. Limit SRO selections to K/As that are linked to 10 CFR 55.43.

ES-401,21 of 33

ES-401 2 Form ES-401-2 ES-401 PWR Examination Outline Form ES-401-2 Emergency and Abnormal Plant Evolutions - Tier 1/Group 1 (RO)

KKKAA Q# E/APE #1 Name / Safety Function G K/A Topic(s) IR #

12312 0

39 00007 Reactor Trip - Stabilization - Recovery I 1 Actions contained in EOP for reactor trip 4 1 0 Thermodynamics and flow characteristics of open or ieaking 40 00008 Pressurizer Vapor Space Accident! 3 3.2 1 1 valves 0

41 00009 Small Break LOCA /3 S/Go 3 1 3

00011 Large Break LOCA / 3 0 00015 RCP Malfunctions / 4 01.

42 00017 RCP Malfunctions (Loss of RC Flow) / 4 Abiiity to expiain and apply all system hmits and precautions. 3.4 32 0

43 00022 Loss of Rx Coolant Makeup! 2 RCP seal flows, temperatures, pressures, and vibrations 3.2 1 9

44 00025 Loss of RHR System / 4 RCS temperature indicators 3.6 1 2

00026 Loss of Component Cooling Water! 8 0 00027 Pressurizer Pressure Control System 0 Controllers and positioners 2.6 1 Malfunction! 3 3 00029 ATWS! 1 0 00038 Steam Gen. Tube Rupture! 3 0 00040 Steam Line Rupture - Excessive Heat Transfer 0 46 Difference between steam line rupture and LOCA 4.6 4 3 VE12 Uncontrolled Depressurization of all Steam Generators / 4 0

47 00054 (CE!E06) Loss of Main Feedwater! 4 Effects of feedwater introduction on dry S/S 3.6 1 2

0 48 00055 Station Blackout! 6 Eoisting vaive positioning on a ioss of instrument air system 3.4 1 5 That load and VAR limits, alarm setpoints, frequency and voltage 49 00056 Loss of 0ff-site Power! 6 2.8 1 0 limits for ED/Gs are not being exceeded 00077 Generator Voltage and Grid Disturbances 0 Sensors, Detectors, indicators 3 1 (Had to add this to the program bacause it is older rev) 3 50 00058 Loss of DC Power! 6 T Knowledge of system purpose and or function. 2.8 1 27 0 Lifect on the nuciear service water discharge flow header of a 51 100062 Loss of Nuclear Svc Water! 4 3,5 1 4 ioss of CCW

04. Knowledge of operational implications of EOP warnings, 3,3 1 52 00065 Loss of Instrument Air! 8 20 cautions, and notes.

0 Annunciators and conditions indicating signais, and remedial 54 V!Eo4 LOCA Outside Containment! 3 3.5 1 3 actions associated with the LOCA Outside Containment 0 Components, and functions of control and safety systems, 56 V/Eli Loss of Emergency Coolant Recirc. I4 ncluding instrumentation, signais, interlocks, tailure modes, and 3.9 1 iitnmatic and manual features BW/E04: W!E05 Inadequate Heat Transfer Loss of- 0 Normai, abnormal and emergency operating procedures 37 1 Secondary Heat Sink ! 4 2 associated with Loss of Secondary Heat Sink KJA Category Totals: 3333 Point Total. 18 ES-401, 22 of 33

ES-401 3 Form ES-401-2 ES-401 PWR Examination Outline Form ES-401-2 Emerqencv and Abnormal Plant Evolutions Tier ltGrouo 2 (RO)

K K K A A Q# E/APE # / Name / Safety Function G K/A Topic(s) IR #

1 23 1 2 00001 Continuous Rod Withdrawal / 1 0 00003 Dropped Control Rod I 1 0 00005 Inoperable/Stuck Control Rod / 1 0 57 00024 Emergency Boration / 1 04 Pumps 2.6 1 58 00028 Pressurizer Level Malfunction / 2 01 PZR reference leak abnormalities 2.8 1 59 00032 Loss of Source Range NI / 7 Knowledge of system purpose and or function. 2.8 1

60 00033 Loss of Intermediate Range NI / 7 03 Manual restoration of power 3 1 00036 Fuel Handling Accident / 8 0 00037 Steam Generator Tube Leak / 3 0 00051 Loss of Condenser Vacuum / 4 0 Types of radiation, their units of intensity and the location of the 61 00059 Accidental Liquid RadWaste Rel. / 9 01 2.7 1 sources of radiation in a nuclear power plant 100060 Accidental Gaseous Radwaste Rel. / 9 0 100061 ARM System Alarms! 7 . . 0 100067 Plant Fire On-site / 8 0 62 100068 Control Room Evac. / 8 01 S/G atmospheric relief valve 4.3 1

04. Ability to verify system alarm setpoints and operate controls 63 00069 Loss of CTMT Integrity / 5 3.3 50 identited in the alarm response manual.

1 V/E14 High Containment Pressure! 5 64 00074 Inad. Core Cooling / 4 01 Subcooling Margin 4.6 V/E06 Degraded Core Cooling! 4 1 V/E07 Saturated Core Cooling / 4 100076 High Reactor Coolant Activity / 9 0 V/E01 Rediagnosis / 3 0

V/E02 SI Termination /3 V!E13 Steam Generator Over-pressure! 4 0 V!E15 Containment Flooding! 5 ...

0 V!E16 High Containment Radiation! 9 0 V!E03 LOCA Cooldown - Depress. / 4 0 Facility operating characteristics during transient conditions.

65 V!E09 Natural Circulation Operations! 4 01 including coolant chemistry and the effects of temperature, 33 V!E10 Natural Circulation with Steam Voide in (essel with/wtthout RVLIS. ! 4 V!E08 RCS Overcooling - PTS ! 4 0 K/A Category Totals: 2 1 2 1 2 Group PointTotal: 9 ES-401, 23 of 33

ES-401 4 Form ES-401-2 ES-401 PWR Examination Outline Form ES-401-2 Plant Systems - Tier 2/Group I (RO)

Q# System # / Name G K/A Topic(s) H #

The relationship between the RCPS flow rate and the 0

1 003 Reactor Coolant Pump nuclear reactor core operating parameters (quadrant power 3.3 1 1

ilt. imbalance. DNB rate, local cower density, difference in 2 004 Chemical and Volume Control . Oemineralizers and ion exchangers 2.5 1 3,4 005 Residual Heat Removal RCS; RHR tlow rate 2 5,6 006 Emergency Core Cooling lAS; Core flood tanks (accumulators) 3; 3.4 2 4 2 7 007 Pressurizer Relief/Quench Tank .- Method of forming a steam bubble in the PZR 3.1 1 0 Operation of the surge tank, including the associated 8 008 Component Cooling Water 2.9 1 9 010 Pressurizer Pressure Control RCS pressure 37 1 10 012 Reactor Protection Lossofinstrumentpower 3.6 1 013 Engineered Safety Features 0 11 . ESFAS/safeguards equipment control 3.6 1 ictuatlon 1

, . 0 04. SWS/cooling system; Ability to prioritize and interpret the 3.5; 12,1 022 Containment Cooling 2 1 45 significance of each annunciator oralarm.

15 025 Ice Condenser Upper and lower doors of the ice condenser 3.4 1 16 026 Containment Spray Radiation hazard potential of BWST 2.5 1 0

17 039 Main and Reheat Steam Automaticisolation of steam line 3.7 1 Loss of steam flowto MFW system, Knowledge of 0 04 2 7 14,1 059 Main Feedwater annunciators alarms and indications, and use of the 2 esponse instructions.

19 061 Auxiliary/Emergency Feedwater AFWsystemMOVs 3.2 1 20 062 AC Electrical Distribution Safety-related indicators and controls 3.5 1

. . . , 0 0 Manuayautomatic transters of control; Meters, 2.7; 21,2 063 DC Electrical Distribution 2 1 1 annunciators, dials, recorders, and indicating lights 2.7 23 064 Emergency Diesel Generator Opening of the ring bus 3.2 1 24 073 Process Radiation Monitoring Those systems served by PRMs 3.6 1 25 076 Service Water . ESF loads 37 1 0 . 0 Systems having pneumatic values and controls; Pressure 3.4; 2

26,2 078 Instrument Air gauges 3.1 2 ..

1 28 103 Containment Phase A and phase B resets 3,5 1 K/A Category Totals: 3233232323 2 IGr0Lp Point Total; 28 ES-401 Page 24 of 33

ES-401 5 Form ES-401-2 ES-401 PWR Examination Outline Form ES-401-2 Plant Systems Tier 2/Group 2 (RO)

KKKKKKAAAA Q# System #1 Name G K/A Topic(s) IR #

1 2 3 4 5 6 1 2 3 29 01 Control Rod Drive Location and operation of RPiS 3.6 1 02 Reactor Coolant 0 30 Ml Pressurizer Level Control RCS 3.5 1

- - 04. Knowledge of annunciators alarms and indications, and use of 31 14 Rod Position Indication 3 3 1 31 the response instructions.

32 115 Nuclear Instrumentation NIS channels, components, and interconnections 3.3 1 33 116 Non-nuclear Instrumentation Reading of NNiS channel values outside controi room 2.8 1 117 In-core Temperature Monitor *:- 0 127 Containment Iodine Removal 0 128 Hydrogen Recombiner and Purge 0 Hydrogen recombiner power setting, determined by using 1 plant data book 34 ontroI 129 Containment Purge  : 0 35 133 Spent Fuel Pool Cooling Spent tuei ieak or rupture 2.9 1 134 Fuel Handling Equipment 0 36 135 Steam Generator - MFW/AFW systems 4.2 1 141 Steam Dump/Turbine Bypass Control 0 2 Relationship between rod control and RCS boron 37 45 Main Turbine Generator V

2.7 1 3 concentration during T/G ioad increases 55 Condenser Air Removal -. 0 156 Condensate 0 68 Liquid Radwaste 0 0

71 Waste Gas Disposal 1 V

38 Sampling and monitoring of waste gas reiease tanks 2.7 6

172 Area Radiation Monitoring 0 75 Circulating Water 0 79 Station Air 0 86 Fire Protection . ti 0

<IA Category Totals: 1 1 2 1 1 0 1 1 0 1 IGr0p Point Total: 10 ES-401, Page 25 of 33

ES-401 2 Form ES-401-2 ES-401 PWR Examination Outline Form ES-401-2 Emergency and Abnormal Plant Evolutions Tier 1/Group 1 (SRO)

Q# F/APE # / Name / Safety Function G K/A Topic(s) IR #

00007 Reactor Trip Stabilization Recovery / 1

- - 0 00008 Pressurizer Vapor Space Accident / 3 0 00009 Small Break LOCA /3 0 00011 Large Break LOCA /3 0 0 Abnormalities in RCP air vent flow paths and/or oil cooling 84 00015 RCP Malfunctions / 4 2 system 00017 RCP Malfunctions (Loss of RC Flow) /4

04. Ability to verity that the alarms are consistent with the plant 85 00022 Loss of Rx Coolant Makeup / 2 3.6 1 46 conditions.

00025 Loss of RHR System I 4 0 00026 Loss of Component Cooling Water! 8 0 00027 Pressurizer Pressure Control System 1 - -

86 PZR heater energized/dc-energized condition 3.6 1 Malfunctlon!3 0 00029 ATWS / 1 0 87 00038 Steam Gen. Tube Rupture! 3 Knowledge of abnormal condition procedures. 3.6 1 00040 Steam Line Rupture - Excessive Heat Transfer 4

0 VE12 Uncontrolled Depressurization of all Steam Generators / 4 00054 (CE/E06) Loss of Main Feedwater / 4 0 00055 Station Blackout 1 6 0 00056 Loss of Off-site Power! 6 0 00057 Loss of Vital AC Inst. Bus / 6 0 88 00058 Loss of DC Power / 6 125V dc bus voltage, low/critical low, alarm 3.6 1 04 Ability to diagnose and recognize trends in an accurate and 89 00062 Loss of Nuclear Svc Water / 4 timely manner utilizing the appropriate control room reference 3.7 1 00065 Loss of Instrument Air! 8 o V!E04 LOCA Outside Containment! 3 0 V/Eli Loss of Emergency Coolant Recirc. ! 4 .

- 0 BW!E04; W!E05 Inadequate Heat Transfer - Loss of 0

Secondary Heat Sink / 4 K/A Category Totals: 0 0 0 0 3 3 Group Point Total: 6 ES-401, 22 of 33

ES-401 3 Form ES-401-2 ES-401 PWR Examination Outline Form ES-401-2 Emergency and Abnormal Plant Evolutions Tier llGrouo 2 (SRO Q# E/APE #1 Name I Safety Function G KIA Topic(s) IR #

00001 Continuous Rod Withdrawal / 1 0 90 00003 Dropped Control Rod / 1 02 Signal inputs to rod control system 2.8 1 00005 Inoperable/Stuck Control Rod? 1 0 00024 Emergency Boration / 1 0 00028 Pressurizer Level Malfunction / 2 0 00032 Loss of Source Range NI / 7 0 00033 Loss of Intermediate Range NI / 7 . 0 00036 Fuel Handling Accident / 8 0 00037 Steam Generator Tube Leak / 3 0 00051 Loss of Condenser Vacuum?4 0 00059 Accidental Liquid RadWaste Rel. / 9 0 00060 Accidental Gaseous Radwaste Rd. I 9 0 00061 ARM System Alarms / 7 0 00067 Plant Fire On-site /8 0 00068 Control Room Evac. / 8 0 91 00069 Loss of CTMT Integrity I 5 02 Verification of automatic and manual means of restoring integrity 4.4 V/E14 High Containment Pressure / 5 00074 Inad. Core Cooling / 4 V/E06 Degraded Core Cooling? 4 0 V/Eo7 Saturated Core Cooling / 4 92 00076 High Reactor Coolant Activity? 9 Knowledge of abnormal condition procedures. 3.6 1 V/E01 Rediagnosis /3 0

V?E02 SI Termination? 3 V/E13 Steam Generator Over-pressure / 4 0 V?E15 Containment Flooding? 5  : 0 V/E 16 High Containment Radiation? 9 .

.: 0 that the alarms are consistent with the plant 93 V?203 LOCA Cooldocat Depress / 4 conditions V?E09 Natural Circulation Operations? 4 0

V?E10 Natural Circulation with Steam Voide in easel with/without RVLIS. I 4 V/E08 RCS Overcooling - PTS /4 0

<IA Category Totals: 0 0 0 0 2 2 Group PointTotal: 4 ES-401, 23 of 33

ES-401 4 Form ES-401-2 ES-401 PWR Examination Outline Form ES-401-2 Plant Systems - Tier 2/Group 1 (SRO)

KKKKKKAAAA Q# System #1 Name 1 2 3 4 5 6 1 2 3 4 G K/A Topic(s) IR #

Knowledge of the purpose and function of major system 76 003 Reactor Coolant Pump , components and 4.1 1 controls.

004 Chemical and Volume Control 0 77 005 Residual Heat Removal Pressure transient protection during cold shutdown 3.7 1 006 Emergency Core Cooling 0 007 Pressurizer Relief/Quench Tank 0 008 Component Cooling Water 0 010 Pressurizer Pressure Control 0 012 Reactor Protection 0 013 Engineered Safety Features 0

ctuation 022 Containment Cooling 0 025 Ice Condenser 0 026 Containment Spray 0 039 Main and Reheat Steam 0 059 Main Feedwater 0 78 061 Auxiliary/Emergency Feedwater Back leakage of MFW 3 1 062 AC Electrical Distribution 0 063 DC Electrical Distribution 0 064 Emergency Diesel Generator 0 073 Process Radiation Monitoring 0 79 076 Service Water Loss of SWS 3.7 1 80 078 Instrument Air Knowledge of system purpose and/or function. 4 1 103 Containment 0 K/A Category Totals: 0 0 0 0 0 0 0 3 0 0 j 2 IGroup Point Total: 5 ES-401, Page 24 of 33

ES-401 c 5 Form ES-401-2 25-401 PWR Examination Outline Form ES-401-2 Plant Systems ler 2/Group 2 (SRO)

KKKKKKAAAA Q# System #1 Name G K/A Topic(s) IR #

1 2 3 4 5 6 1 2 3 01 Control Rod Drive 0 83 02 Reactor Coolant Loss of coolant pressure 4.4 1 1 1 Pressurizer Level Control 0 14 Rod Position Indication 0 81 15 Nuclear Instrumentation Power supply loss or erratic operation 3.9 1 16 Non-nuclear Instrumentation 0 17 In-core Temperature Monitor 0 82 27 Containment Iodine Removal Knowedge of abnomiat condition procedures. 3.6 1 28 Hydrogen Recombiner and Purge 0

Control 29 Containment Purge 0 33 Spent Fuel Pool Cooling 0 34 Fuel Handling Equipment . .* 0 35 Steam Generator 1 0 41 Steam Dump)Turbine Bypass Control 0 45 Main Turbine Generator 0 55 Condenser Air Removal 0 56 Condensate 0 68 Liquid Radwaste 0 71 Waste Gas Disposal 0 72 Area Radiation Monitoring 0 75 Circulating Water 0 79 Station Air ,:: 0 86 Fire Protection 0

<IA Category Totals: 0 0 0 0 0 0 0 2 0 0 1 Group Point Total: 3 ES-401, Page 25 of 33

ES-401 Generic Knowledge and Abilities Outline (Tier 3) Form ES-401-3 Facility Name:McGuire Nuclear Station Date of Exam:8/13/10 RO SRO-Onlv Category K/A # Topic Q# IR # IR #

1 Ability to obtain and interpret station reference materials such as graphs, monographs, and tables 66 2 25 which contain performance data.

Knowledge of industrial safety procedures (such as rotating equipment, I 67 2.1 26 . electrical, high temperature, high pressure, caustic, chlorine, oxygen and I 3.4 1 2.1 . 04 Knowledge of shift staffing requirements. 3.4 1 Conduct of 2.1 08 .

Ability to coordinate personnel activities outside the control room. 3.6 1 Operations 2.1.

2.1.

Subtotal 2 2 68 2.2. 25 Knowledge of bases in technical specifications for limiting conditions for operations and safety limits. 3.2 1 A Ability to recognize system parameters that are entry-level conditions for I 39 1 69 22 2 Technical Specifications.

96 2.2. 40 Abilityto apply Technical Specifications for a system. 4*7 1 2

Equipment 2.2. 06 Knowledge of the process for making changes in procedures as described in the safety analysis report. 3.6 1 Control 2.2.

2.2.

Subtotal 2 2 Q 14 Knowledge of radiation or contamination hazards that may arise during normal, 1 2 .

abnormal, or emergency conditions or activities.

(55 Ability to use radiation monitoring systems, such as fixed radiation monitors and (

2 )

  • alarms, portable survey instruments, personnel monitoring equipment, etc.

2 1 Ability to comply with radiation work permit requirements during normal or I 3 5 1 72 .

abnormat conditions.

3 Radiation Knowledge of radiological safety principles pertaining to licensed operator I 98 2.3. 12 duties, such as containment entry requirements, fuel handling responsibilities, I 3.7 1 Control 14 Knowledge of radiation or contamination hazards that may arise during normal, 2*3 abnormal, or emergency conditions or activities.

8 1 2.3.

Subtota 3 2 73 2.4. 1 7 Knowledge of EOP terms and definitions. 3.9 1 74 2.4. 39 Knowledge of the ROs responsibilities in emergency plan implementation. 3.9 1 75 4. 2.4. 50 Ability to verify system alarm setpoints and operate controls identified in the alarm response manual. 4.2 1 Emergency 100 Procedures I 2.4. 40 Knowledge of the SROs responsibilities in emergency plan implementation. 4 1 Plan 2.4.

2.4.

Subtotal 3 1 Tier 3 Point Total 10 7 ES-401, Page 26 of 33

Paper saver KA Paper Saver

ES-401 Record of Rejected K/As Form ES-401-4 Tier / Randomly Reason for Rejection Group Selected KA 2/ 1 SYSO08 K4.07 (Q8) Rejected KA due to no swing bus. Replacement KA (SYSOO8K4.02) provided by Lead Examiner. 02/19/10 2/ 1 SYSO22 2.4.47 Q(12) Rejected K/A due to no reference material associated with the Containment Cooling System in the MNS data Book. New K/A SYS022 2.4.45 ramdomly select4d by Lead Examiner 2/19/10 2/ 1 SYSO25 A2.06 Q(14) Rejected K/A because it is not possible to develop a discriminating question concerning decreasing Ice condenser temperature. New K/A (SYSO59 A2.06) randomly selected by Lead Examiner. 2/19/10 2/ 1 SYSO78 K3.03 Q(27) Rejected K/A because it is not possible to develop a discriminating question concerning lAS and cross tied units. This configuration is static and there is nothing to test. New K/A (SY5078 K3.02) randomly selected by Lead Examiner. 2/19/10 2/ 2 SYSO14 2.4.35 Q(31) Rejected K/A because there are no local auxiliary operator tasks associated with RPIS. New K/A (SYSO14 GEN 2.4.31) randomly selected by Lead Examiner. 2/19/10 2/2 5Y5033 A3.02 Q(35) Rejected KA due to impossible to meet at MNS as there are not auto actions for KF (except Sequencer). New KA (SYSO33A1.02) randomly selected by Lead Examiner.

(03/24/10) 2/2 SY5033 A3.01 Q(35) Rejected K/A because it is not possible to develop a discriminating question concerning SPCS Temperature Control Valves. These valves are manual and are rarely manipulated. New K/A (5YS033 A3.02) randomly selected by Lead Examiner. 2/19/10 2/ 2 SYSO71 A4.07 Q(38) Rejected K/A because at MNS operations does not operate the WG equipment therefofe an ability K/A (A4) associated with WG release flow meter is not appropriate for this ean. New K/A (SYSO71 K4.06) randomly selected by Lead Examiner. 2/19/10 1 / 1 APEO26 AA1.04 Q(44) Rejected KA due to no CRDM Hi Temp Alarm system at MNS. New KA (APEO25AA1.12) provided by Lead Examiner. 02/19/10 1/ 1 APEO58 2.1.25 Q(50) Rejected KA due to no reference materials for DC Power. New KA (058G2.1.27) provided by Lead Examiner. 02/19/10 3/0 GEN2.3 2.3.6 Q(72) Rejected K/A because the ability to approve release permits is an SRO task and therefore not appropriate for the RO exam. New K/A (Gen 2.3.7) randomly selected by Lead Examiner. 2/19/10 3/0 GEN2.4 2.4.38 Q(74) Rejected K/A because the original K/A was not appropriate for the RO exam. New K/A (Gen 2.4.39) randomly selected by Lead Examiner. 2/19/10 2/ 1 5Y5003 2.1.28 Q(76) Rejected KA. Not possible to meet at SRO level. New KA (5Y5003G2,1.20) randomly selected by Lead Examiner (03/24/10) 2/ 1 SYSO61 A2.08 Q(78) KA rejected due to inability to write SRO level question. New KA (SYSO61A2.06) randomly selected by Lead Examiner. (HCF 03/17/10) 2/ 1 5Y5078 2.1.27 Q(80) Rejected KA. Not possible to meet at SRO level. New KA (SYSO63G2.1.23) randomly selected by Lead Examiner. (03/24/10) 2/ 1 5Y5078 2.1.25 Q(80) Rejected K/Abcause there are no graphs, curves or tables associated with the lAS in the MNS Data Book. New K/A (5Y5078 GEN 2.1.27) randomly selected by Lead Examiner. 2/19/10 2/2 SYSO27 2.1.32 Q(82) KA rejected due to inability to write SRO level question. New KA (SYSO27 G2.4.11) randomly selected by Lead Examiner. (HCF 03/17/10) 2/2 SYSO27 2.4.11 Q(82) Rejected KA. Not possible to meet any CIRS KA at the SRO level. New KA (SYSO41G2.4.11) randomly selected by Lead Examiner. (03/24/10)

ES-40 1 Record of Rejcted K/As Form ES-401-4 Tier I Randomly Reason for Rejection Group Selected KA 1/2 APEOO3 AA2.02 (Q90) Rejected KA. Not possible to meet this KA at the SRO level. New KA (APEOO3G2.2.40) randomly selected by Lead Examiner. (03/24/10)

ES-401 Written Examinaton QuaNty Checklist (FINAL) Form ES4016 Facility: McGure Nuclear Station Date of Exam: 8/2/2010 Exam Level: RD SRO Initial Item Description a b* c

1. Questions and answers are technically accurate and applicable to the facility.
2. a. NRC K/As are referenced for all questions.
b. Facility learning objectives are referenced as available.

9

3. SRO questions are appropriate in accordance with Section D.2.d of ES-401
4. The sampling process was random and systematic (If more than 4 RD or 2 SRO questions were ,, . j repeated from the last 2 NRC licensing exams, consult the NRR CL program office). 7 2
5. Question duplication from the license screening/audit exam was controlled as indicated below (check the item that applies) and appears appropriate:

the audit exam was systematically and randomly developed; or the audit exam was completed before the license exam was started; or the examinations were developed independently; or the licensee certifies that there is no duplication; or other (explain)

6. Bank use meets limits (no more than 75 percent Bank Modified New from the bank, at least 10 percent new, and the rest new or modified); enter the actual RD / SRO-only question distribution(s) at right. 33 I 9 2 / 0 40 I 16
7. Between 50 and 60 percent of the questions on the RD Memory C/A exam are written at the comprehension/ analysis level; the SRO exam may exceed 60 percent if the randomly selected K/As support the higher cognitive levels; enter the actual RD / SRO question distribution(s) at right.

32 I ii 43 I 14

8. References/handouts provided do not give away answers or aid in the elimination of distractors. o4c
9. Question content conforms with specific K/A statements in the previously approved examination outline and is appropriate for the tier to which they are assigned; deviations are justified. 9. 4
10. Question psychometric quality and format meet the guidelines in ES Appendix B.
11. The exam contains the required number of one-point, multiple choice items; the total is correct and agrees with the value on the cover sheet.

Printed Name / Signature Date

a. Author LI.
b. Facility Reviewer (*) / (7/3
c. NRCChiefExaminer(#) /2 v LiLA.

4

/C

,1/J6/

d. NRC Regional Supervisor T Note:
  • The facility reviewers initials/signature are not applicable for NRC-deve oped examinations.
  1. Independent NRC reviewer initial items in Column c; chief examiner concurrence required.

C C ES-401 Written Examination Form ES-401-9 Review Worksheet McGuire 2010-301

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7.

Q#I LOK LOD (C/A) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #1 Back- Q= SRO UIEIS Explanation Focus Dist. Link units ward KJA Only Instructions

[Refer to Section D of ES-401 and Appendix B for additional information regarding each of the following concepts.]

1. Enter the level of knowledge (LOK) of each question as either (F)undamental or (H)igher cognitive level.
2. Enter the level of difficulty (LOD) of each question using a 1 - 5 (easy difficult) rating scale (questions in the 2 -4 range are acceptable).
3. Check the appropriate box if a psychometric flaw is identified:
  • The stem lacks sufficient focus to elicit the correct answer (e.g., unclear intent, more information is needed, or too much needless information).

The stem or distractors contain cues (i.e., clues, specific determiners, phrasing, length, etc).

  • The answer choices are a collection of unrelated true/false statements.
  • One or more distractors is not credible.
  • One or more distractors is (are) partially correct (e.g., if the applicant can make unstated assumptions that are not contradicted by stem).
4. Check the appropriate box if a job content error is identified:
  • The question is not linked to the job requirements (i.e., the question has a valid KIA but, as written, is not operational in content).

The question requires the recall of knowledge that is too specific for the closed reference test mode (i.e., it is not required to be known from memory).

  • The question contains data with an unrealistic level of accuracy or inconsistent units (e.g., panel meter in percent with question in gallons).

The question requires reverse logic or application compared to the job requirements.

5. Check questions that are sampled for conformance with the approved K/A and those that are designated SRO-only (K/A and license level mismatches are unacceptable).
6. Based on the reviewers judgment, is the question as written (U)nacceptable (requiring repair or replacement), in need of(E)ditorial enhancement, or (S)atisfactory?
7. At a minimum, explain any U ratings (e.g., how the Appendix B psychometric attributes are not being met).

RO/SRO Combined Question Generic:

Many of the questions do NOT have the System KA defined )e.g. SYSOO3G2.1 .20 (Q 76), SY50063G2.1 .23 (Q 80),

SYSO4IG2.4.11 (Q 82, etc)

U = Unsat but one or two words would fix.

NP = Not Plausible Check all stems to make sure the word should is NOT used. Words like Shall, must, will are the proper words.

003K5.O1 I

c 3 Y N S Nocomment 05/16/10 004K6.02 2

M 2 Y N S Nocomment 05/16/10

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7.

Q#/ LOK LOD (C/A) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #1 Back- Q= SRO U/E/S Explanation Focus Dist. Link units ward K/A Only 005A1.02 M

2 Y N S Nocomment 05/16/10 005K3.0l C

3 Y N S Nocomment 05/16/10 006K1 .14 M

2 X Y N E Distractors A and C: Change align VI to Maintain its alignment because some of the modulating valves do not reposition in the event of a loss of VI. This will lend the 2 part of distractors A and C more plausible.

05/16/10 Changed align VI to to maintain VI aligned to in proposed revision of question.

05/31/10 Approved revised question. RFA 06/07/10 006K6.02 6

M 2 X Y N U Change A to 1 B ONLY is inoperable Change B to iC ONLY is inoperable 1 or None are poor distractors and rarely picked if applican

... not sure. 1 B and 1 C have the lowest pressure and level respectively.

Delete (if at all) from the stem This Q is U because there are 2 NP distractors 05/17/10 ed question per Lead Examiners recommendation.

roved revised question. RFA 06/07/10 M

2 Y N S )comment 05/17/10 008K4.02 8

M 2 Y N S Nocomment 05/17/10 J O1OA1.07 C

3 Y N S Nocomment 05/17/10 012A2.02 10 M 2 X Y N U Change what to Which in the WOOTF statement.

Please verity that B is in fact not a correct answer in and of

A - 0

. C..) N) -

I C) C)

C..) C..) N) N) QN)

,3Q 10) 3 Ci)

C) -o C

CD <

Ci) CD 1

x

-o D)

Q)

!E

-)r 0

o Ci) 0 C CD 2.

2 S?

0-

-< -< -< -< J1 0

CC,)

z z z z -

.zo

- I C Cl) Cl) Cl) m OzC 03 <HQ o

C)D N (Y), - Q1CDD CDD-O

0) N QZ C) < . CO C 0 - 0) -
  • 0 N
  • 0

<o c DCDC D c3 co o-CD

-;r CD a C CO g CD -

01 CD -

. - E1C C C Eg)CO9 CD DO 3C 5

O g .

C$CD m

- 0 CI) 0) . = CD ,- CD -, CD )<

rJ 9: (9.co 9 CD CO Ci) 3c S CDZ

0) CD D -

0 (DO.

QD -,,CD C)

D 0)

CCDD s,0Cfl0 CD0) CDCD =0) o 0 ... 0 C) s ,-.0 CD

-. 0 3 (1 9_ 0)-.n (j)

- g-g Q_Q_ 2.)CD00) 0

( D. - Bo 0 oo 5

0) 5 CDDo CDD 0_ 3co -<

---,, 3 t)D 9: B CD CD Cl) CD 0 -O T) 0)

Ci) 0O0)CD(D 3 D ss

0) D CD- < -

CDD .-..

0 Cl) D -

p (fl)(D 0

C fl)

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7.

Q#/ LOK LOD I

(C/A) (1-5) Stem Cues T/F Cred. Partial Focus Dist.

Job-Link Minutia #1 units I Back-ward Q= I SRO U/E/S Explanation j K/A Only

  • 025K6.01 C 3 Y N S Nocomment 05/17/10 026A2.09 16 (*

C 3 N E A procedure of reference needs to be in affect to satisfy Part 2 of the KA Suggestion: Add a procedure to part two of the stem:

What alignment per procedure XXXX would be required 05/17/10 Added procedure reference to question 2 of the stem.

05/31/10 Approved revised question. RFA 06/07/10 039K4.05 17 C 3 X Y N E In Cand D: add be between must and reduced.

C is a subset of D. If C was correct, D would be also. C needs an only.

05/19/10 Added be in distracters C and 0 and ONLY at the end of distracter C as recommended by Lead Examiner.

05/31/10 Approved revised question. RFA 06/07/10 059G2.4.31 18 C 3 X Y N E In distractor C: add the before Loss.

Change cannot to can NOT 05/19/10 Changed question per Lead Examiners recommendation.

Distracter A needed a the before Loss also.

05/31/10 Approved revised question. RFA 06/07/10 361K2.01 19 M 2 Y N S Nocomment 05/19/10 062A3.05 20 M 2 Y N S Nocomment

1. 2. 3. Psychometric Flaws 4. Job Content Flaws

(-s.

5. Other 6. 7.

n Q#/ LOK LOD (C/A) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #1 Back- 0= SRO U/E/S Explanation Focus Dist. Link units ward KJA Only i19/10 evisited this question due to high miss rate during validation. Chose replacement question.

Approved replacement question. RFA 07/06/10 063A3.01 21 M 2 X Y N U C and D are NP. I disagree with distractor analysis for Cl and Dl. In order to give Cl and Dl plausibility, you will have to significantly increase the loss of AC down time to S almost battery exhaustion (within minutes).

This Q is U because C and D are NP Ib° Believe that C and D are plausible. We had one alidator that picked C. When asked why they picked J they commented that they had mistakenly oncIuded that 1 was asking for the status of the 1 25VDC Battery Charger instead of the Distribution Denter.

5131110 Accepted response. Question accepted as is.

Changed U to S. RFA 06/07/10.

Ui 22 C 3 Y N S )mment 1/10 4A4.08 23 M 2 X Y N E An SI has not occurred. In order to give starting the EDG in priority mode some credibility, can you state in another bullet that SI has NOT been reset (because one has not occurred but the applicant will have to figure that out)?

This will lend B2 and C2 additional credibility or put something in the stem that might indicate an SI might have occurred but didnt.

This Q is E because of 2 weak distracters..

05/20/10 Dont feel that theres a way to add the SI angle and maintain plausibility. Actually, two validators have picked B.

Wrote a potential replacement question that asks the applicant to differentiate between the Commited and Accelerated Sequences.

05/31/10

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7.

Q#I LOK LCD r I (C/A) (1-5) Stem Cues T/F Cred. Partial Focus 01st.

Job-Link Minutia #1 units Back-ward I

Q= SRO K/A Only UJEIS Explanation Approved revised question. RFA 06/07/10 073K1.01 24 M 2 X Y N U It would appear from the reference that B is also a correct S answer since since 1 EMF 36(L) and 1 EMF37 are both called out as tripping mechanisms. The reference does NOT discern between particulate or gas.

The Q is U until facility re-verifies because of 2 potentially orrect answers.

/20/1 0 Trip 2 alarm on 1EMF 36(L) will ONLY close 1WG16O. It iiII NOT stqp the Auxiliary Building Unfiltered Exhaust Fans.

, a Trip 2 alarm on 1 EMF 35(L) or 1 EMF 37 will p the Auxiliary Building Unfiltered Exhaust Fans. It a 1WG16O. They are two separate actions fron

. Therefore B cannot be correct because

, ....] not stop the Auxiliary Building Unfiltered

... ..t tans.

05/31/10 Accepted response. Question accepted as is.

Changed U to S. RFA 06/07/10.

J76K3.07 25 M 2 Y N S Nocomment 05/20/10 078A4.01 26 C 3 Y N S No comment 05/20/101 078K3.02 27 C 3 X Y N £ Distractor D is a long shot and I do not believe it is plausible s especially since other, more pronounced reactor trip criteria

s. Consider replacing distractor D.

D is NP.

05/20/101 Jistracter D is not the strongest distracter. However, it is possible and is therefore plausible. Would like to keep this one.

05/31/10 Accepted response. Question accepted as is.

Changed E to S. RFA 06/07/10.

I I J4

C. C

2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7.

Q#/ LOK LOD (C/A) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #1 Back- Q= SRO U/E/S Explanation Focus Dist. Link units ward K/A Only M 2 Y ]i Since Phase B is actuated (3.5 psig), it would appear that the KC valves are closed as stated. The distractor analysis for D appears to indicate that Cntmt pressure must be reduced to < 3 psig before phase B can be reset (because phase A is still in). In other words can one reset phase B without phase A being reset? Please re-verify this because the reference was not clear on this issue.

This Q is E until re-verified.

05/20/101 Phase A does not have to be reset in order to reset Phase B. And, Phase B can be reset with containmentpressure greater than 3.0 psig. The wording in distracter D analysis is incorrect. Instead of prevent resetting the Phase A signal unless Containment pressure is reduced is should have said prevent resetting the Phase B signal unless Containment pressure is reduced. Changed analysis for distracter D accordingly.

05/31/10 Approved. RFA 06/07/10 001K6.13 29 M 2 X X Y N E B is NP as written. Place in the stem what is the FIRST action and remove and do not move them from distractor B.

E because distractor B is NP as written.

05/20/101 Revised question per Lead Examiners recommendation.

Then rearranged distracters A and B for psychometrics mading B the new correct answer. If this is acceptable the distracter analysis will need to be reworked.

05/31/10 Approved revised question. RFA 06/07/10 011K3.02 30 C 3 X Y N E Consider Modifing Q to a fill in the blank. It will read better.

Pressurizer level is and pressurizer heaters are Is there enough information for the applicant to calc whether or not heaters are on or off? Facility re-confirm.

05/20/101 Re-wrote question to be fill in the blank. The applicant does not need to calculate whether the heaters are on or off. With charging flow reduced to less than 20 GPM for 20 sec.,

letdown is automatically isolated and the heaters are

fl

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7.

Q#/ LOK LOD (C/A) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #/ Back- Q= SRO U/E/S Explanation Focus Dist. Link units ward K/A Only automatically secured.

05/31/10 Removed Assume no other operator actions have been taken from stem. Revised question approved. RFA 06/07/10 Revisited question due to high miss rate. Changed 8 GPM ti 18 GPM to be more operationally valid.

Approved revised question. RFA 07/06/10 01 4G2.4.31 31 C 3 x Y N E think the answer is obvious as written. Can you reduce the stem indications to make it less obvious?

D is NP because of the 3 rd bullet (Red RB is indicated for rod D-4)

Replace D 05/20/101 Revised question and removed third bullet. Didnt really see how we could replace D with anything that was more plausible. Removing third bullet gives D plausibility.

05/31/10 Approved revised question. RFA 06/07/10 015K2.01 32 M 2 Y N S No comment 05/20/101 016K4.01 M 1+ Y N E Consider adding an additional indication to increase LOD.

A,A (none good)

A,B (B good only)

B,B (All good)

B,A (B good only 05/20/101 Developed a revised question with two answers per distracter. If revised question is used the distracter analysis will need to be revised.

05/31/10 Approved revised question. RFA 06/07/10

0

2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7.

Q#/ LOK LCD I 1 (C/A) (1-5) Stem Cues T/F ICred. Partial Job- Minutia #1 Back- Q= SRO UIEIS Explanation Focus j Dist. Link units ward K/A Only j

028A2.01 C 3 Y N S No comment 05/20/101

  • Replaced should with will in stem of question based on Lead Examiners General Comments.

D5/31/10 l.02 C 3 X Y N U The distractor analysis said I EMF-42 will have little to no E effect. If A is marginally correct then it can be arguabiy correct. Therefore, 2 potentially correct answers exist. This must be re-evaluated.

This Q is U until resolved due to 2 possible correct answers.

05/20/101 The discussion should have stated that 1EMF-42 will have no effect instead of little to no effect. This event would be dealt with via entry into AP-41 (Loss of Spent Fuel Pool Cooling or Level). An alarm on 1EMF-17 is one of the symptoms that prompts entry into AP-41. There is plausibility for 1 EMF-42 in that an alarm on this monitor would prompt entry into AP-25 (Spent Fuel Damage).

However, 1 EMF-42 is a beta gas monitor and will only respond if there is damage to the fuel in the SFP. Revised the discussion and distracter analysis for A2 and C2.

05/31/10 Accepted revised analysis. Changed question from U to E.

RFA 06/07/10 035K1.01 36 C 3 Y N S No comment 05/20/101 045K5.23 C 3 X X Y N E Of the 4 bullets: I think you can delete all but the second bullet.

In Stem 1. add at 3% per hr In Cl and Dl state Control rod withdrawal is restricted.

In Al and Bl cap the word NOT Change B2 and D2 to No dilution will be required because Xenon burnout will compensate for the power defect 05/20/101

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7.

Q#/ LOK LOD (C/A) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #1 Back- Q= SRO UIEIS Explanation Focus Dist. Link units ward K/A Only Deleted last two bullets. You need the first two bullets as a minimum. Made the rest of changes as recommended by Lead Examiner.

05/31/10 Approved revised question. RFA 06/07/10 071K4.06 38 M 2 X Y N IJ Distrsactors A and B are NP because there is no case E where an isolation will not occur without a malfunction.

Replace A and B.

This Q is U because of 2 NP distractors.

05/20/101 Believe there is plausibility for A and B. Will discuss.

Have developed a proposed replacement question if this question is still unacceptable.

05/31/10 Revised distracter A. Rearranged distracters. Revised question approved. Changed from U to E. RFA 06/07/10 EPEOO7EK3.01 M? 3 Y N E I believe this Q should be hi cog due to the fact that it involves a higher level of analysis.

05/20/101 Agree. Changed to hig cog and provided justification.

05/31/10 APEOO8AKI.01 40 C 3 Y N S No comment 05/21/101 EPEOO9EK2.03 41 C 3 X X Y N E Distractor D is NP because of the way it is written. One would not say NC pumps are not running. SGs are not required for NC system heat removal. Consider setting up A D in a table format and ALL distractors will be plausible.

05/21/10 Not sure that I completely understood what were looking for here. However, wrote a proposed replacement question with the answers in table format.

05/31/10 Revised question approved. RFA 06/07/10

fl

2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7.

Q#/LOKLOD (C/A) (1-5) Stem Cues TIF Cred. Partial Job- Minutia #1 Back- Q SRO UIEIS Explanation Focus Dist. Link units ward KJA Only APEOI5/017G2.1.32 42 C 3 X X Y N E The question needs to be tightened up a bit. It is common knowledge that the max number of starts within a certain time period is 3. Suggest reducing the number of starts in the table to 2. Set the parameters and apply the restart criteria and answer D will still be good. Raise the stator T to

> 248 with a cool down and this should work.

05/21/10 Tried to rewrite this question with two starts and then requesting a third start. However, the only way to do this an still maintain plausibility you end up with three NO answers and one YES answer with the correct answer being the YES answer. Its not really plausible to make the restart time less than 30 minutes because it is common knowledge that you have to wait 30 minutes (more so than the 3 starts in two hours). Even with temperature above 248°F, as long as youve waited 30 minutes, you can attempt a third start.

Given the plant conditions, you have to wait 30 minutes for the restart regardless of the motor stator conditions.

05/31/10 Due to high validation miss rate, question stands as written.

RFA 06/07/10 Revisited question due to continued high miss rate during validation. Selected replacement question.

Replacement question approved. RFA 07/07/10 APEO22AAI .09 C 3 X Y N E The answer choices are very difficult to read. Consider setting this Q up as a fill in the blank as follows:

The #1 Seal Leak off Flow is going Pump number 2 Seal Standpipe level alarm is LIT A. Down Low B, Down High C, Up High D. Up Low 05/21/10

fl)

2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7.

Q#/ LOK LOD (C/A) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #1 Back- Q= SRO U/E/S Explanation Focus Dist. Link units ward K/A Only Revised question per Lead Examiners recommendation.

05/31/10 Revised question approved. RFA 06/07/10 APEO25AA1.12

M 2 Y N S NOTE: I would like to see where 212 degrees is frequently referenced just to make sure. No examples were provided.

05/21/10 L

APEO27AK2.03 C 3 X Y N U Why would the applicant select 2230 psig based on this logic? I dont believe Al and Cl are plausible. Facility please explain.

This Q is U until facility explains why Al and Cl are plausible.

05/21/10 There are better choices for plausibility. Decided to change 2230 PSIG to 2240 PSIG. Since the algorithm picks the highest median select signal it would be plausible for the applicant to pick the highest reading channel as the output

to the Master Controller.

05/31/10 Approved revised question. RFA 06/07/10 APEO4OAA2.03 46 C 3 X Y N U Its common knowledge that power would not go up for a LOCA. Drop the first bullet and C and D will be plausible.

. The Q is currently a U because C and D are NP.

21/10

)ving power completely from the question, the it has no way to discriminate whether the event is a Leak or a LOCA. As a compromise, removed power idication and pressurizer pressure indication bullets and dded a bullet providing Rod Control system Power ismatch (PMM). By doing this the applicant is not given ower indication directly and has to interpret the Rod Contro ystem indication to determine that Nuclear Power is reasing faster than Turbine Power which would indicate a steam leak. Also, replaced should with will in the stem of he question per Lead Examiners General Comments. See attached file for proposed question revision.

05/31//10

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7.

Q#/LOKLOD (C/A) (1-5) Stem Cues TIF Cred. Partial Job- Minutia #1 Back- Q SRO OlE/S Explanation Focus Dist. Link units ward K/A Only Approved revised question. RFA 06/07/10 APEO54AK1.02 C 3 Y N S Nocomment 05/21/10 EPEO55EA2.0l C 3 Y N Nocomment S

05/21/10 APEO56AA2.50 C 3 Y N S No comment 05/21/10 APEO58G2.1.27 M 2 Y N S Nocomment 05/21)10 APEO62AK3.04 51 C 3 X Y N E The second part of A needs the word train after RN.

05/21/10 Corrected answer A per Lead Examiners comment.

05/31/10 Approved. RFA 06/07/10 APEO65G2.4.20 52 M 2 X Y N E C is NP as written. PTS is way too a significant event for thE initial conditions. Consider changing to C to CA pump run out 05/21/10 Developed revised question per Lead Examiners recommendation. Rearranged distracters for psychometrics.

Distracter analysis will need work if revised question is acceptable.

05/31/10 Approved revised question. RFA 06/07/10 APEO77AK2.03 C 3 X Y N E The stem requires an action. Distractor A is NOT an action and therefore is NP. Consider using raise for A and B in some fashion.

05/21/10 Revised answers A and B to include raise.

C C

2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7.

Q#I LOK LOD 1

(C/A) (1-5) Stem Cues T/F Cred. Partial Focus Dist.

Job-Link Minutia #1 units I Back-ward Q=

K/A SRO Only U/E/S Explanation 05/31/10 Added if any to stem and approved revised question. RFA 06/07/10 WEO4EK1 .3 C 3 X Y N U The stem requires an action to mitigate the event. Delaying depletion of the FWST is not an action to mitigate a LOCA outside containment event, Isolating the brealc is ALWAYS

---j. Distractors B2 and D2 are NP. Replace these istractor .

sQ is U because of 2 NP distractors.

rl flr ND pumps are tripped to stem of question to q to A and B. Replaced should with in t stem of the question per Lead Examiners meral Comments.

ed revised question. RFA 06/07/10 WEO5EK3.2 M 2 X Y N U Al and Bl are borderline NP because seal leak off is so insignificant with respect to a LOCA unless the seal is blown. Consider changing both to prevent NC pump impeller damage to low pressure operations or something iequivalent.

L..:S Q is U because of 2 NP distractors.

5121/10 Revised per Lead Examiners recommendation.

J5/31/lO Revised question approved. RFA 06/07/10

..ilEAl.l 56 M 2 X Y N E Since A and B are both actions in ECA 1.1, the WOOTF statement should include the word FIRST to completely rule out A and B.

Facility please reevaluate.

05/21/10 Reworded stem of question to include FIRST per Lead Examiners recommendation.

05/31/10

C

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7.

Q#/ LOK LOD (C/A) (1-5) Stem Cues TIF Cred. Partial Job- Minutia #1 Back- Q= SRO U/E/S Explanation Focus Dist. Link units ward K/A Only Approved revised question. RFA 06/07/10 APEO24AK2.04 M 2 X Y N E Stems should not include a should. I did NOT find it anywhere in the procedure. The word should be shall or wHI or must 05/21/10 Changed should to will per Lead Examiners recommendation.

05/31/10 Approved revised question. RFA 06/07/10 APEO28AK1 .01 58 C 3 Y N S No comment 05/21/10 APEO32G2.1.27 C 3 Y N S No comment 05/21/10 The way these are written, if B is correct then A is correct. It 60 D is correct, C would be correct too. Qualifiers need to be M 2 X Y N u I to eliminate the subsets. This Q is U because of two id responses.

05/21/10 We had lengthy discussions about subset issues when we wrote this question and specifically wrote the question to ude a Reactor Trip will occur when because we felt it was a qualifier that eliminated the subset issue. However, re-wrote the stem to add another qualifier there too.

Revised question approved. RFA 06/07/10 APEO59AK1.01 61 M 2 X Y N E I am not convinced that the stem excludes alpha. The distractor analysis is not clear on it either. The reference states that it is an internal hazard. The stem references an airborne concern. Add something to the stem to eliminate C as a potential correct answer.

05/21/10 Changed stem of question to read The radiation emitted from the water on the floor is primarily . This will

2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7.

Q#/ LOK LOD (C/A) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #1 Back- Q= SRO U/E/S Explanation Focus Dist. Link units ward K/A Only eliminate alpha as a potential answer because it eliminates the airborne contamination. The only reason the airborne contamination is included is to give plausibility to the EMF 41 alarm.

05/31/10 Approved revised question. RFA 06/07/10 APEO68AAI.01 62 M 2 X Y N j I believe the interior doghouse will be readily eliminated due to common knowledge. Replace Bi and Dl. This Q is U due to Bi and Dl being NP 05/21/10 that if we replace Bi and Dl with anything else it will e less plausible than it is right now. Open to suggestions.

5/31/10 explained that Interior Doghouse contained the for B and C SGs and the Exterior Doghouse s the PORs for A and D SGs. Question accepted

. Changed question from U to S. RFA 06/07/10 PE069G2..4.50 63 C 3 X Y N E Suggestion:

Change A2 and D2 to verify 1VQ-1A remains open to make these a little more plausible.

05/21/10 Revised question per Lead Examiners recommendation.

Also, changed first should to will and second should to shall in the stem of the question per Lead Examiners General Comments.

05/31/10 Approved revised question. RFA 06/07/10 EPEO74EA2.01 64 M 2 X Y N U It is common knowledge that (-) WRT subcooling means subcooling is lost, and C are NP.

This Q is U because of two NP distractors 05/21/10 Dhose replacement question.

5/31/10

C C

2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7.

Q#/ LOK LCD (CIA) (1-5) Stem Cues T/F ICred. Partial Focus Dist.

Job-Link Minutia #1 units Back-ward Q=F K/A I Only U/E/S Explanation iApproved revised question. RFA 06/07/10 izK3.1 65 M 2 X Y N E Stem 2. The basis, per procedure XXX, for checking Include the basis procedure to completely rule out enhancing NC flow since the distractor analysis stated that it was a small beneficial reason.

05/22/10 Changed question 2 to The basis, per ES-0.2 Background Document for checking per Lead Examiners recommendation.

05/31/10 Approved revised question. RFA 06/07/10 G2.1 .25 66 C 3 X Y N E What reference is provided for this Q? It was not included as part of the Q.

This Q is E until verified.

05/22/10 Page from F-0 was missing from reference we provided.

Added page to reference.

05/31/10 Approved. RFA 06/07/10 G2.1.26 67 M 2 Y N S No comment 05/22/10 (52.2.25 68 M 2 X Y N U Its common knowledge that the SD system is not safety related.

2 and C2 are NP.

Replace A2 and C2.

This Q is U because of two NP distractors..

Thanged Steam Dump System and provided several option

,ith regards to replacements for Steam Dump System.

wever, have serious concerns about this being too Jlicult after revision.

C.

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7.

Q#/ LOK LOD i (C/A) (1-5) Stem Cues T/F ICred. Partial Job- Minutia

  1. 1 Back- Q= SRO UIEIS Explanation Focus I Dist. Link units ward K/A Only 31/10 lApproved revised question. RFA 06/07/10 Revisited this question due to high miss rate during validation. Refocused stem by changing TS 2.0 to TS 2.1.1 nd reactor core safety limit to Departure from Nucleate 3oiling (DNB) Reactor Core safety limit.

Approved revised question. RFA 07/06/10

.; M 2

Y N

S G2.2.42 Nocomment 05/22/10 02.3.14 70 c 3 x Y N E Change can and cannot to may and may not.

Can refers to ability, may refers to permission.

05/22/10 Changed question per Lead Examiners recommendation.

05/31/10 Approved revised question. RFA 06/07/10 G2.3.5 71 M 2 Y N S No comment 05/22/10 G2.3.7 72 o 3 Y N S No comment 05/22/10 (3Z.4.1 I 73 M 2 X Y N E A is NP because 100% in 1A and 38% and stable in 1D in the stem are diametrically apposed because both indicate stable in distractorA.

Replace A.

05/22/10 Replaced 1A distracter in answer A with Faulted instead of Intact and 10 in answer A with Intact.

05/31/10 Approved revised question. RFA 06/07/10 74

1. 2. 3. Psychometric Flaws 4. Job Content Flaws n5. Other 6. 7.

Q#I LOKLOD (C/A) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #1 I Back- Q SRO U/E/S Explanation Focus Dist. Link units ward K/A Only j

r M 2 W LNo comment G2.4.50 C 3 Y N S No comment fl5/22/10 SRO ONLY 003G2.1.20 76 C 3 Y Y s No comment 05/16/10 005A2.02 C 3 Y Y S No comment Note: The justification on page B3.4. 12-8 of the reference z:i be before distractors C and D NOT A and B.

3/16/10 the justification on reference page B 3,4.12-8 to sa provides plausibility for distracters C and D.

/3i/i 0 lA2.06 78 C 3 X Y Y Must reference the procedure in the stem to fully meet the E

nd 2

part of the KA.

05/16/10 Revised question 1 in the stem to read In accordance with OP/i /AJ6250/002 (Auxiliary Feedwater System), what method would FIRST be used to reduce the temperature at the check valve?

05/31/10 Approved revised question. RFA 06/08/10 076A2.0i 79 M 2 X Y Y E Change the stem from is limited to less than to shall not exceed even though the procedure uses is limited to less than. This bullet proofs the Q so there is NO question that A could be construed as a possible correct answer.

Changed is limited to less than to shall not exceed.

Another option would be to say In accordance with AP-20, RN flow shall be throttled to maintain I B RN pump flow less than This would be in line with the wording in the AP.

05/31/10

C

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7.

Q#/LOKLOD I

(C/A) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #1 Back- Q= SRO U/E/S Explanation Focus Dist. Link units ward K/A Only Approved revised question. RFA 06/08/10 Revisited question due to high miss rate during validation.

Chose replacement question.

Approved replacement question. RFA 07/06/10 063G2.1.23 80 C 3 Y Y S No comment 05/16/10 015A2.01 81 M 2 Y Y S No comment 05/16/10

  • J 041G2.4.11 82 C 3 Y Y S No comment
  • 05/17/10 002A2.02 83 C 3 X Y Y E Put The crew shall wait until the reactor is tripped in the stem and start each choice with AND / OR as indicated.

It will read much better.

05/17/10 Revised question but in order to make this work as suggested had to make this two separate fill-in-the-blank questions.

05/31/10 Approved revised question. RFA 06/08/10 I-IzU1t/U1 fIkI-kLUZ 84 M 2 X Y Y highest power level is listed in distractor C, therefore C is NP.

f there is no ATWS, why would power be 10%? Distractor A is NP. Nothing in the reference supports 10%.

The Q is U because of 2 NP distractors

)5/1 7/10 vised two of the distracters to eliminate potential NP

tracters.

31/10

,ised proposed question to reduce power to less than lu_/a and 5% respectively in answers C and D. Approved

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7.

Q#/ LOKLOD (C/A) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #1 Back- Q= SRO U/E/S Explanation Focus Dist. Link units ward K/A Only vised question. RFA 06/08/10

. i-E022G2.4.46 85 c 3 X Y Y E #2 in the stem can be deleted. This Q is asked in stem #1.

Or you can state in #2: What are the restorative actions.

As written, the stem seems a bit convoluted.

Change Bi and Dl to ensure letdown orifice isolation valves I NV XXX auto close. The way it currently reads can be construed as teaching even though it is not true.

05/17/10 Revised question as suggested by Lead Examiner.

05/31/10 Combined two versions of question into one version.

Approved revised question. RFA 06/08/10 APEO27AA2.10 86 C 3 X X Y Y E Change Stem 1 st bullet to 1A and lB Change Choices B and D from 1 D to 1 B Change correct answer to D Reason: Q becomes more discriminatory.

05/17/10 Revised question as recommended by Lead Examiner.

However, by changing question as requested, believe that answers C and D are both correct. Suggest we leave it as is.

05/31/10 Revised question per Lead Examiners recommendation.

Approved revised question. RFA 06/08/10

-cuio.,z.4.1 1 87 M 2 X Y Y U I was not able to deduce that the lowest intact SG pressure is an acceptable distractor because it was not made clear in the distractor analysis that this choice would be applicable in another circumstance. A reference was not provided to this distractor either. FAC provide a case where thh y be true.

s Q is a U until this information is provided because of entially 2 NP distractors.

17/10 IDeveloped proposed replacement question. Replaced first art of question with another basis question from the AP.

105/31/10

C

2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7.

LOK LOD (C/A) (1-5) Stem Cues T/F ICred. Partial Job- Minutia #1 Back 0= SRO U/E/S Explanation Focus Dist. Link units ward K/A Only Approved revised question. RFA 06/08/10 Revisited question due to high miss rate. Revised A2 and B2 to say to ensure that there is sufficient NC System cooling following depressurization.

Approved revised question. RFA 07/08/10 APEO58AA2.02 88 M 2 Y Y S No comment 05/17/10 APEO62G2.4.47 89 C 3 X Y Y u Add the word initially before the word INOPERABLE.

Otherwise, if the first part of B and D were correct, A and C would be correct too.

The 0 is a U because there are potentially 2 correct answers if the correct time was 1040 for the first part of the

,.,R.

05/17/10 Added the word initially per Lead Examiners comment.

5/31/10 4*.

Approved revised question. RFA 06/08/10 APEOO3G2.2.40 90 M 2 X Y Y E Due to the fact the 0 is written in two parts renders s distractor 0 NP. Change Dl to something other than 75.

0 is E because of 1 NP distractor.

17/10 I distracter D to 50% RTP as this was the only answer remaining.

05/31/10 Keep original version of question. Kept distracter D as is

. it was picked during validation. Changed question S.,. n E to S. RFA 06/08/10 APEO69AA2.02 91 M 2 X Y Y g Is it ever possible that the WCC SRO is ever the containment closure coordinator? If so B could be a

2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7.

Q#/ LOK LOD (C/A) (1-5) Stem Cues T/F Cred. Partial Job- Minutia #1 Back- Q SRO U/E/S Explanation Focus Dist. Link units ward K/A Only potential correct answer.

FAC please confirm one way or the other.

This Q is E until confirmed.

05/17/10 IThe WCC SRO is never used to perform the function of the Containment Closure Coordinator. The Containment Closun Coordinator position is filled by individuals separate from the WCC SRO position.

05/31/10 on facility comments, accepted question as is.

Cr..... .J from E to S. RFA 06/08/10.

APEO76G2.4.i1 92 C 3 X X Y Y -IJ Failed fuel is NP for Cobolt and Manganese. Either rewrite s the stem or change distractors A and B.

The Q is U because of 2 NP distractors.

05/17/10 Believe that there is plausibility since two validators picked failed fuel as the correct answer. Went through AP-18 and

-18 Background document again to determine if there is

)ther possible direction for the first part of this question.

  • ... a is very little content in AP-18 and very few options for replacing the first part without testing something that is minutia with little operational validity.

05/31/10 l version of question due to validators picking Changed from U to S. RFA 06/08/10 03G2.4.46 93 C 3 X N Y U I fail to see the connection between this Q and LOCA y E cooldown and depressurization. The stem bullets involve it by referencing ES-i .2, but the Q stem and choices do not.

This Q is a U until FAC justifies.

05/17/10 OBTAIN PEER REVIEW ON THIS ONE In ES-i .2, the check for FWST level less than 250 inches with the Containment Sump Level Alarms DARK is a continuous action step to ensure that there is sufficent level in the sump to prevent vortexing at the suction of the ND pumps when the auto swapover level in the FWST is reached. This is an important step during Post LOCA Cooldown and Depressurization.

C

2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7.

Q#/ LOKLOD (CIA) (1-5) Stem Cues TIF Cred. Partial Job- Minutia #1 Back- Q= SRO U/E/S Explanation Focus Dist. Link units ward K/A Only 05/31/10 Revised question per Lead Examiners comments to make fill in the blank. Accepted facilities explanation for this being Post LOCA Cooldown actions. Changed question from U to E Lead Examiner now agrees that this meets the KA. RFA 06/08/10 G2.1.4 94 M 2 X Y Y E For this particular question, since the times are the same for s C and D, do not make this a fill in the blank. Consider writing C and D as follows:

An El STA may assume the duties of the CRS

.. f SRO is available to both return to the 1 room A ) the periods which the STA assumes SRO ities do not exceed 10/15 minutes in duration respectively therwise, C and D will be ruled out due to the way they are iorded.

his Q is E until modified.

eworded per Lead Examiners suggestion.

5/31/10 Decided to leave question as is since validation data ports the plausibility of the distracters. Changed from E j S. RFA 06/08/10 G2.1.8 5 M 2 Y Y S No comment 05/17/10 G2.2.40 96 M 2 X Y Y E Bullet proof B by adding somethingto the stem to completely rule out performinq a SDM calc as stated in A since a SDM cal can be used if there is an issue with rod insertion limits or an inoperable control rod.

05/17/10 Added qualifier to the stem that rules out performing a SDM calculation as an option.

05/31/10 Approved revised question. RFA 06/08/10 Revisited question due to high miss rate during validation.

Selected replacement question.

C

1. 2. 3. Psychometric Flaws 4. Job Content Flaws 5. Other 6. 7.

Q#/ LOK LOD (CIA) (1-5) Stem Cues TIF Cred. Partial Job- Minutia #1 Back- Q= SRO U/E/S Explanation Focus Dist. Link units ward K/A Only Approved replacement question. RFA 07/06/10.

G2.2.6 97 M 2 X X Y Y E Since 50.59 evaluations are NOT ever required for a minor change, I am not convinced that A is plausible.

Consider rewriting distractor A or modifying the question stem to validate A.

05/17/10 Revised question to ask a separate question about IOCFR5O.59 reviews in general. Also, in the stem of the question, changed should to shall per Lead Examiners General Comments.

05/31/10 Approved revised question. RFA 06/08/10 G2.3.12 98 M 2 Y Y S No comment 05/17/10 G2.3.14 C 2 Y Y S No comment 05/17/10 IRevitd this question due to overlap with JPM on 2010

. Chose replacement question.

Approved replacement question. RFA 07/08/10 G2.4.40 100 C 2 Y Y S No comment 05/17/10 j

Before After 20 Us I 12 37 Es / 37 43 Ss / 51

ES-403, Rev. 9 Written Examination Grading Form ES-403-1 Quality Checklist 4 U.

Facility: McGuire Date of Exam: August 12, 2010 Exam Level: ROISRO Initials a b c Item Description

1. Clean answer sheets copied before grading kds N/A rfa
2. Answer key changes and question deletions justified and kds N/A rfa documented
3. Applicants scores checked for addition errors kds N/A na (reviewers spot check> 25% of examinations)
4. Grading for all borderline cases (80 +/-2% overall and 70 or 80, kds N/A rfa as applicable, +/-4% on the SRO-only) reviewed in detail
5. All other failing examinations checked to ensure that grades kds N/A rfa are justified
6. Performance on missed questions checked for training kds N/A rfa deficiencies and wording problems; evaluate validity of questions missed by half or more of the applicants Printed Name/Signature - Date
a. Graderjer Kenneth D.
b. Facility Reviewer(*) N/A N/A
c. NRC Chief Examiner (*) Ronald F. Aiello/

,.tj,

d. NRC Supervisor (*) Malcolm T. Widmann/i ItffJ9f/O

(*) The facility reviewers signature is not applicable for examinations graded by the NRC; two independent NRC reviews are required.