JAFP-10-0122, Response to Follow-up Request for Additional Information

From kanterella
(Redirected from ML102460096)
Jump to navigation Jump to search

Response to Follow-up Request for Additional Information
ML102460096
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/02/2010
From: Peter Dietrich
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML102460096 List:
References
JAFP-10-0122, TAC ME3786
Download: ML102460096 (7)


Text

Proprietary Information Withhold from Public Disclosure Per 10 CFR 2.390 Enclosures 1 and 3 to Attachment 1 to this letter contain Proprietary Information which should be withheld from public disclosure per 10 CFR 2.390. When separated from those enclosures this letter is suitable for public disclosure.

Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

James A. FitzPatrick NPP P.O. Box 110 Lycoming, NY 13093 JAFP-10-0122 September 2, 2010 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555

Subject:

Response to Follow-up Request for Additional Information Re: James A.

FitzPatrick Nuclear Power Plant Proposed Change to the James A. FitzPatrick Nuclear Power Plants Technical Specification Concerning the Safety Limit Minimum Critical Power Ratio (TAC No. ME3786)

James A. FitzPatrick Nuclear Power Plant Docket No.

50-333 License No. DPR-59

References:

1. Entergy Letter, JAFP-10-0050, Proposed Change to the James A. FitzPatrick Nuclear Power Plants Technical Specification Concerning the Safety Limit Minimum Critical Power Ratio (TAC No. ME3786), dated April 21, 2010.
2. Revised NRC Request For Additional Information Regarding James A.

FitzPatrick Nuclear Power Plant Proposed Change to the James A.

FitzPatrick Nuclear Power Plants Technical Specification Concerning the Safety Limit Minimum Critical Power Ratio (TAC No. ME3786), dated July 1, 2010.

3. Entergy Letter, JAFP-10-0096, Response to Request for Additional Information Re: James A. FitzPatrick Nuclear Power Plant Proposed Change to the James A. FitzPatrick Nuclear Power Plants Technical Specification Concerning the Safety Limit Minimum Critical Power Ratio (TAC No.

ME3786), dated July 30, 2010.

4. NRC Follow-up Request For Additional Information Regarding James A.

FitzPatrick Nuclear Power Plant Proposed Change to the James A.

FitzPatrick Nuclear Power Plants Technical Specification Concerning the Safety Limit Minimum Critical Power Ratio (TAC No. ME3786), dated August 6, 2010.

5. Revised NRC Follow-up Request For Additional Information Regarding James A. FitzPatrick Nuclear Power Plant Proposed Change to the James A.

FitzPatrick Nuclear Power Plants Technical Specification Concerning the Safety Limit Minimum Critical Power Ratio (TAC No. ME3786), dated August 19, 2010.

Pete Dietrich Site Vice President - JAF

Proprietary Information Withhold from Public Disclosure Per 10 CFR 2.390 JAFP-10-0122 Page 2 of 3

Dear Sir or Madam:

On April 21, 2010, Entergy Nuclear Operations, Inc. (ENO), submitted a proposed change to the James A. FitzPatrick Nuclear Power Plant (JAF) Technical Specification Safety Limit Minimum Critical Power Ratio (SLMCPR) [Reference 1]. On June 7,2010, JAF received Request for Additional Information (RAI) from the Nuclear Regulatory Commission (NRC) staff. In conference calls with the NRC Staff on June 14, June 25 and July 1,2010 the questions were clarified and a revision to the questions was provided to JAF on July 1, 2010 [Reference 2].

ENO submitted its response to the RAI questions by letter dated July 30, 2010 [Reference 3].

Subsequent to that submittal the NRC provided Follow-up RAI questions to ENO [Reference 4],

those follow-up questions were discussed with the NRC in a conference call on August 9,2010.

During the conference call it was determined that the questions required clarification. The NRC provided the clarified questions on August 19, 2010 [Reference 5] The questions were discussed with the NRC staff of August 20,2010, to ensure mutual understanding of the questions.

The attachment to this letter provides responses to the clarified questions. The attachment contains a transmittal letter from Global Nuclear Fuels (GNF) with enclosures that contain verified response to the staff RAI questions. GNF has identified the proprietary information in and provided a nonproprietary version in enclosure 2, enclosure 3 contains specific information requested by the staff the GNF considers proprietary and enclosure 4 contains GNF's affidavit attesting to the proprietary nature of the material.

The attached response does not affect the No Significant Hazards Determination submitted with the proposed technical specification change, dated April 21,2010.

There are no new commitments made in this letter.

Questions concerning this submittal may be addressed to Mr. Joseph Pechacek, Licensing Manager, at (315) 349-6766.

I declare under penalty of perjury~he foregoing is true and correct.

Executed on the ~ day of ~tember2010.

Sin, Pete Dietrich Site Vice President - JAF PD/JP/ed

Attachment:

1.

GNF Response to NRC Supplemental RAls 1, 4, 5, and 6 for James A FitzPatrick Cycle 20 SLMCPR Submittal cc: (Next Page)

Enclosures 1 and 3 to Attachment 1 to this letter contain Proprietary Information which should be withheld from public disclosure per 10 CFR 2.390. When separated from those enclosures this letter is suitable for public disclosure.

Proprietary Information Withhold from Public Disclosure Per 10 CFR 2.390 JAFP-10-0122 Page 3 of 3 Enclosures 1 and 3 to Attachment 1 to this letter contain Proprietary Information which should be withheld from public disclosure per 10 CFR 2.390. When separated from those enclosures this letter is suitable for public disclosure.

Mr. Marc Dapas Mr. Paul Eddy Acting Regional Administrator, Region I New York State Department of Public U. S. Nuclear Regulatory Commission Service 475 Allendale Road 3 Empire State Plaza, 10th Floor King of Prussia, PA 19406-1415 Albany, NY 12223 Resident Inspectors Office Mr. Francis J. Murray Jr., President U.S. Nuclear Regulatory Commission New York State Energy and Research James A. FitzPatrick Nuclear Power Plant Development Authority P.O. Box 136 17 Columbia Circle Lycoming, NY 13093 Albany, NY 12203-6399 Mr. Bhalchandra Vaidya, Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop O-8-C2A Washington, DC 20555-0001 Document contents: 001 Transmittal letter with GNF letter 002 GNF Enclosure 1 (Proprietary) 003 GNF Enclosure 2 (Non-Proprietary) 004 GNF Enclosure 3 (Proprietary) 005 GNF Enclosure 4 - Affidavit

Proprietary Information Withhold from Public Disclosure Per 10 CFR 2.390 Enclosures 1 and 3 of this Attachment contain Proprietary Information which should be withheld from public disclosure per 10 CFR 2.390. When separated from those enclosures this letter is suitable for public disclosure.

JAFP-10-0122 GNF Response to NRC Supplemental RAIs 1, 4, 5, and 6 for James A FitzPatrick Cycle 20 SLMCPR Submittal (84 Pages with index)

INDEX GNF Letter 3 Pages GNF Enclosures 1

RAI Responses (Proprietary Version) 12 Pages (with Cover Sheet) 2 RAI Responses (Non-proprietary Version) 12 Pages (with Cover Sheet)

3.

NRC Requested Information (Proprietary) 53 Pages (with Cover Sheet)

4.

Proprietary Information Affidavit 4 Pages (with Cover Sheet)

Rich Augi Customer Project Manager Proprietary Notice This letter transmits proprietary information in accordance with 10CFR2.390. Upon the removal of Enclosure 1 and 3, the balance of the letter may be considered non-proprietary.

RA-ENO-EP1-10-135 August 24, 2010 Mr. George Rorke ecc:

Jim Lee Entergy Nuclear Northeast Lynn Leatherwood (GNF) 440 Hamilton Road Ed Gibbs (GNF)

White Plains, NY 10601 Jim Harrison (GEH)

Nela Szwarc Gene Dorman

Subject:

GNF Response to NRC Supplemental RAIs 1, 4, 5, and 6 for James A FitzPatrick Cycle 20 SLMCPR Submittal

References:

1.

Entergy Nuclear Operations, Inc. Fixed Services Agreement No. 50012776 (formerly 4500551802) for the Supply of Fuel and Fuel Related Work to FitzPatrick with Global Nuclear Fuel - Americas, LLC, as amended

Enclosures:

1. Response to NRC Supplemental RAIs 1, 4, 5, and 6 for James A FitzPatrick Cycle 20 SLMCPR Submittal - Proprietary
2. Response to NRC Supplemental RAIs 1, 4, 5, and 6 for James A FitzPatrick Cycle 20 SLMCPR Submittal - Non-Proprietary
3. Specific Attachments Committed in August 10, 2010 NRC Audit - Proprietary
4. Affidavit

Dear George:

Attached, please find GNFs verified responses to the NRC Supplemental RAIs 1, 4, 5, and 6 on the FitzPatrick Cycle 20 SLMCPR Submittal.

contains the GNF response to RAIs 1, 4, 5, and 6. Please note that Enclosures 1 and 3 contain proprietary information of the type that GNF maintains in confidence and withholds from public disclosure. The information has been handled and classified as proprietary to GNF as indicated in the enclosed affidavit. The affidavit contained in Enclosure 4 identifies that the information contained in Enclosures 1 and 3 have been handled and classified as proprietary to GNF. GNF hereby requests that the information in Enclosures 1 and 3 be withheld from public disclosure in accordance with the provisions of 10 CFR 2.390 and 9.17. Enclosure 2 is a non-proprietary version of Enclosure 1. Enclosure 3 contains specific information discussed at the NRC Audit on August 10, 2010. Because the information in Enclosure 3 is of a type not normally submitted for NRC review, it is deemed proprietary in its entirety and no non-proprietary version is provided.

RA-ENO-EP1-10-135 Page 2 of 2 GNF requests that any transmittal of this proprietary information to the NRC be accompanied by the enclosed affidavit and proprietary notice. In order to maintain the applicability of the affidavit and to meet the requirements of 10CFR2.390, the transmittal to the NRC should:

1) Faithfully reproduce the proprietary information,
2) Preserve the proprietary annotations, and
3) Include the words similar to GNF Proprietary Information at the top of first page and each page containing the proprietary information.

Further, 10CFR2.390 requires that the proprietary information be incorporated, as far as possible into a separate paper. Therefore, Enclosures 1 and 3 hereto contain the proprietary information, and the non-proprietary and redacted information is provided in Enclosure 2.

Based on past discussions with the NRC, GNF has been encouraged to request its customers to provide a paragraph similar to the following in the customer letters transmitting proprietary information to the NRC in order to clearly indicate the proprietary nature of the information and to document the source of the proprietary information as indicated in the GNF affidavit.

The enclosed RAI responses contain proprietary information as defined by 10CFR2.390.

GNF, as the owner of the proprietary information, has executed the enclosed affidavit, which identify that the enclosed proprietary information has been handled and classified as proprietary, is customarily held in confidence, and has been withheld from public disclosure.

The proprietary information was provided to Entergy Nuclear Northeast in a GNF transmittal that is referenced by the affidavit. The proprietary information has been faithfully reproduced in the enclosed RAI responses such that the affidavit remains applicable. GNF hereby requests that the enclosed proprietary information be withheld from public disclosure in accordance with the provisions of 10CFR2.390 and 9.17. A non-proprietary version of the RAI responses also is provided.

The verified inputs associated with these RAI responses are included eDRF Sections 0000-0108-3676, 0000-0122-1518, and 0000-0122-3282. A signed copy of this letter is also included in eDRF Section 0000-0108-3702 R1. If you have any questions, please do not hesitate to contact me.

Regards, Rich Augi Customer Project Manager