Report 22 - Browns Ferry Inspection/Activity Plan 09/01/2010 - 12/31/2011
ML102440604
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 09/01/2010
From:
NRC/RGN-II
To:
Tennessee Valley Authority
Shared Package
ML102440599 List:
References
Download: ML102440604 (2)


Text

Inspection / Activity Plan Page 1 of 2 09/01/2010 13:26:33 Report 22 09/01/2010 - 12/31/2011 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Browns Ferry RPB6 SUP

- 95002 SUPPLEMENTAL INSPECTION 1

1, 2, 3 IP Inspection For One Degraded Cornerstone Or Any Three White Inputs In A Strategic Performance Area 95002 10/11/2010 10/22/2010 PI&R

- PROBLEM IDENTIFICATION AND RESOLUTION IN 6

1, 2, 3 IP Identification and Resolution of Problems 71152B 08/30/2010 09/03/2010 1, 2, 3 IP Identification and Resolution of Problems 71152B 09/20/2010 09/24/2010 OL RQ

- REQUAL INSPECTION 5

1, 2 IP Licensed Operator Requalification Program 7111111B 10/11/2010 10/15/2010 EB3ISI

- UNIT 1 INSERVICE INSPECTION 1

1 IP Inservice Inspection Activities - BWR 7111108G 11/01/2010 11/05/2010 SCCI F/U

- SUBSTANTIVE CROSS CUTTING ISSUE FOLLOWUP 2

1, 2, 3 IP In-depth Reviews 71152-Reviews 12/06/2010 12/10/2010 ORD INSP

- ORDER INSPECTION FOLLOW UP ITEMS 6,7,10 2

1, 2, 3 IP Followup On Corrective Actions For Violations And Deviations 92702 12/06/2010 12/08/2010 OL EXAM

- INITIAL PREP WEEK 4

1 BROWNS FERRY/FEBRUARY 2011 EXAM AT POWER FACILITIES V23344 01/17/2011 01/21/2011 MODS

- MODS/50.59 INSPECTION 6

1, 2, 3 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 01/17/2011 01/21/2011 1, 2, 3 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 01/31/2011 02/04/2011 EB3HS

- HEAT SINK 1

1, 2, 3 IP Heat Sink Performance 7111107T 02/07/2011 02/11/2011 OL EXAM

- INITIAL EXAM - WEEK 1 4

1 BROWNS FERRY/FEBRUARY 2011 EXAM AT POWER FACILITIES V23344 02/07/2011 02/11/2011 OL EXAM

- INITIAL EXAM - WEEK 2 4

1 BROWNS FERRY/FEBRUARY 2011 EXAM AT POWER FACILITIES V23344 02/14/2011 02/18/2011 PSB1 RP

- RP OCCUPATIONAL WEEK1 3

1, 2, 3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 02/28/2011 03/04/2011 1, 2, 3 IP Occupational ALARA Planning and Controls 71124.02 02/28/2011 03/04/2011 1, 2, 3 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 02/28/2011 03/04/2011 1, 2, 3 IP Occupational Dose Assessment 71124.04 02/28/2011 03/04/2011 1, 2, 3 IP Performance Indicator Verification 71151 02/28/2011 03/04/2011 PSB1-TI

- TI-179 NSTS VERIFICATION 3

1, 2, 3 IP Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2515/179 02/28/2011 03/04/2011 1, 2, 3 IP Verification of Licensee Responses to NRC Requirement for Inventories of Materials Tracked in NSTS 2515/179 03/07/2011 03/19/2011 EB3ISI

- UNIT 2 INSERVICE INSPECTION 1

2 IP Inservice Inspection Activities - BWR 7111108G 03/07/2011 03/11/2011 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure

Inspection / Activity Plan Page 2 of 2 09/01/2010 13:26:33 Report 22 09/01/2010 - 12/31/2011 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Browns Ferry PSB1-RP

- RP OCCUPATIONAL WEEK 2 2

1, 2, 3 IP Radiological Hazard Assessment and Exposure Controls 71124.01 03/15/2011 03/19/2011 1, 2, 3 IP Occupational ALARA Planning and Controls 71124.02 03/15/2011 03/19/2011 1, 2, 3 IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 03/15/2011 03/19/2011 1, 2, 3 IP Occupational Dose Assessment 71124.04 03/15/2011 03/19/2011 1, 2, 3 IP Performance Indicator Verification 71151 03/15/2011 03/19/2011 PSB1EP

- EMERGENCY PREPAREDNESS EXERCISE 3

1, 2, 3 IP Exercise Evaluation 7111401 06/13/2011 06/17/2011 1, 2, 3 IP Emergency Action Level and Emergency Plan Changes 7111404 06/13/2011 06/17/2011 1, 2, 3 IP Performance Indicator Verification 71151 06/13/2011 06/17/2011 OL EXAM

- INITIAL EXAM PREP 4

1 BROWNS FERRY/AUGUST 2011 EXAM AT POWER FACILITIES V23353 07/18/2011 07/22/2011 OL EXAM

- INITIAL EXAM - WEEK 1 4

1 BROWNS FERRY/AUGUST 2011 EXAM AT POWER FACILITIES V23353 08/08/2011 08/12/2011 OL EXAM

- INITIAL EXAM - WEEK 2 4

1 BROWNS FERRY/AUGUST 2011 EXAM AT POWER FACILITIES V23353 08/15/2011 08/19/2011 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Enclosure