ML102440586

From kanterella
Jump to navigation Jump to search
Mid-Cycle Performance Review & Inspection Plan 2010
ML102440586
Person / Time
Site: Robinson, 07200003  Duke Energy icon.png
Issue date: 09/01/2010
From: Randy Musser
NRC/RGN-II/DRP/RPB4
To: Mccartney E
Carolina Power & Light Co
Shared Package
ML102440585 List:
References
Download: ML102440586 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 September 1, 2010 Carolina Power and Light Company ATTN: Mr. Eric McCartney Vice President H.B. Robinson Steam Electric Plant Unit 2 3581 West Entrance Road Hartsville, SC 29550

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - H. B.

ROBINSON STEAM ELECTRIC PLANT UNIT 2

Dear Mr. McCartney:

On August 11, 2010, the NRC staff completed its performance review of the H. B. Robinson Steam Electric Plant. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from July 1, 2009, through June 30, 2010.

The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and the enclosed inspection plan do not include security information.

A separate letter designated and marked as Official Use Only-Security Related Information will include the security cornerstone performance review and a resultant inspection plan.

Plant performance for the most recent quarter at Robinson Unit 2 was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. In addition to ROP baseline inspection activities, we also plan on conducting Temporary Instruction (TI) 2515/179, Verification of Licensee Responses to NRC Requirements for Inventories for Materials Tracked in NSTS.

The enclosed inspection plan details the inspections, less those related to security, scheduled through December 31, 2011. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite.

Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.

CP&L 2 In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

As you may know, the NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible.

Please contact me at 404-997-4603 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Randall A. Musser, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No.: 50-261, Docket No. 72-3 License No.: DPR-23, License No. SNM-2502

Enclosure:

Robinson Inspection/Activity Plan (09/01/2010 - 12/31/2011) cc w/encl. (See page 3)

__PKG: ML102440585 _ X SUNSI REVIEW COMPLETE RAM 09/01/2010 OFFICE RII:DRP RII:DRP SIGNATURE JGW1 RAM NAME JWorosilo RMusser DATE 09/01/2010 09/01/2010 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO CP&L 3 cc w/encl: John H. O'Neill, Jr.

Eric McCartney, Vice President Shaw, Pittman, Potts & Trowbridge H. B. Robinson Steam Electric Plant Unit 2 2300 N. Street, NW Carolina Power & Light Company Washington, DC 20037-1128 Electronic Mail Distribution Susan E. Jenkins R. J. Duncan, II, Vice President Director, Division of Waste Management Nuclear Operations Bureau of Land and Waste Management Carolina Power & Light Company S.C. Department of Health and Electronic Mail Distribution Environmental Control Electronic Mail Distribution Brian C. McCabe Manager, Nuclear Regulatory Affairs Scott Saunders Progress Energy Carolinas, Inc. Plant General Manager Electronic Mail Distribution Carolina Power & Light Company Electronic Mail Distribution Christos Kamilaris, Director Fleet Support Services Robert P. Gruber, Executive Director Carolina Power & Light Company Public Staff - NCUC Electronic Mail Distribution 4326 Mail Service Center Raleigh, NC 27699-4326 Curt A. Castell, Supervisor Licensing/Regulatory Programs W. Lee Cox, III, Section Chief Carolina Power & Light Company Radiation Protection Section Electronic Mail Distribution N.C. Department of Environmental Commerce & Natural Resources B. C. White, Manager Electronic Mail Distribution Support Services - Nuclear Carolina Power & Light Company Mark Yeager Electronic Mail Distribution Division of Radioactive Waste Mgmt.

S.C. Department of Health and S. D. West Environmental Control Superintendent Security Electronic Mail Distribution H. B. Robinson Steam Electric Plant Progress Energy Public Service Commission Electronic Mail Distribution State of South Carolina P.O. Box 11649 Joseph W. Donahue Columbia, SC 29211 Vice President Nuclear Oversight Chairman Carolina Power and Light Company North Carolina Utilities Commission Electronic Mail Distribution Electronic Mail Distribution David T. Conley Senior Resident Inspector Associate General Counsel U.S. Nuclear Regulatory Commission Legal Dept. H. B. Robinson Steam Electric Plant Progress Energy Service Company, LLC 2112 Old Camden Rd Electronic Mail Distribution Hartsville, SC 29550

CP&L 4 Letter to Eric McCartney from Randall A. Musser dated September 1, 2010

SUBJECT:

MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - H. B.

ROBINSON STEAM ELECTRIC PLANT UNIT 2 Distribution w/encl:

C. Evans, RII EICS OE Mail RIDSNRRDIRS PUBLIC T. Orf, NRR RidsNrrPMRobinson Resource ROP Reports Institute of Nuclear Power Operations (INPO)