Email, Request for Additional Information Relief Request ISI-3-31
ML102430120
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 08/31/2010
From: Randy Hall
Plant Licensing Branch IV
To: Conklin L
Southern California Edison Co
Hall, J R, NRR/DORL/LPL4,301-415-4032
Shared Package
ML102430125 List:
References
TAC ME3961, TAC ME3962
Download: ML102430120 (1)


Text

From: Hall, Randy Sent: Tuesday, August 31, 2010 9:21 AM To: Linda.Conklin@sce.com Cc: Mark.Morgan@sce.com

Subject:

NRC Request for Additional Information - SONGS 2 and 3: Relief Request ISI-3-31 (TAC NOS. ME3961and ME3962)

Attachments: SONGS RR ISI-3-31 RAI.docx August 31, 2010 Ms. Linda Conklin Manager, Nuclear Licensing San Onofre Nuclear Generating Station Southern California Edison Company Linda:

By letter dated May 19, 2010, Southern California Edison (SCE, the licensee) submitted a request for relief from the requirements of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, for the San Onofre Nuclear Generating Station (SONGS), Units 2 and 3 (ADAMS Accession Number ML101440381). In its letter submitting Relief Request ISI-3-31, the licensee proposed contingency alternative evaluation criteria for temporary acceptance of flaws in certain high energy Class 2 and 3 Emergency Core Cooling System schedule 10S piping. The licensee proposes to follow the requirements of American Society of Mechanical Engineers (ASME) Code Case N-513-2, except that the proposed alternative in Relief Request ISI-3-31 will be applied to piping with a higher operating temperature (greater than the limit of 200 degrees Fahrenheit) and with a smaller diameter (less than 4 inches) than permitted by the code case.

The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed your request and has determined that the information specified in the attached Request for Additional Information (RAI) is needed to complete its evaluation. To support the completion of the review within the scheduled time frame, we request that SCE respond to the attached request for additional information by October 8th, 2010. Please contact me if SCE would like to have a conference call to discuss the RAI.

Sincerely, Randy Hall, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation USNRC (301) 415-4032 Randy.Hall@nrc.gov