Text
From:
Kalyanam, Kaly Sent:
Thursday, August 19, 2010 2:42 PM To:
Linda.Conklin@sce.com Cc:
Hall, Randy
Subject:
Acceptance Report Review Result - Email to SCE
Subject:
Acceptance Report Review Result - Email to SCE Plant: SONGS 2 and 3 Docket Nos.: 50-361 and 50-362 TAC No.: ME4508 and ME4509
- Linda, By letter dated August 16, 2010 (ADAMS Accession No. ML102290073), Southern California Edison (SCE, the licensee) submitted a license amendment request for San Onofre Nuclear Generating Station, Units 2 and 3 (SONGS 2 and 3). The proposed amendment requested the Completion Time of Condition A of Technical Specification 3.8.1, AC Sources - Operating, be revised on a one-time basis to allow a Completion Time of 10 days..
The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff=s acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the TSs) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.
If you have any questions, please contact me at (301) 415-4032.
(sent by Kaly N. Kalyanam for Randy Hall)
Randy Hall, Senior Project Manager Plant Licensing Branch 4 Division of Operating Reactor Licensing
Office of Nuclear Reactor Regulation E-mail Properties Mail Envelope Properties ()
Subject:
Acceptance Report Review Result - Email to SCE Sent Date: 8/19/2010 2:36:48 PM Received Date: 8/19/2010 2:41:00 PM From: Kalyanam, Kaly Created By: Kaly.Kalyanam@nrc.gov Recipients:
Linda.Conklin@sce.com (Linda.Conklin@sce.com)
Tracking Status: None Randy.Hall@nrc.gov (Hall, Randy)
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 9387 8/19/2010 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: