05000260/LER-2010-004, Re HPCI Isolation During Time Delay Relay Calibration

From kanterella
(Redirected from ML102310040)
Jump to navigation Jump to search
Re HPCI Isolation During Time Delay Relay Calibration
ML102310040
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 08/16/2010
From: Polson K
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LER 10-004-00
Download: ML102310040 (6)


LER-2010-004, Re HPCI Isolation During Time Delay Relay Calibration
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(v), Loss of Safety Function

10 CFR 50.73(a)(2)(i)

10 CFR 50.73(a)(2)(vii), Common Cause Inoperability

10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded

10 CFR 50.73(a)(2)(viii)(A)

10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition

10 CFR 50.73(a)(2)(viii)(B)

10 CFR 50.73(a)(2)(iii)

10 CFR 50.73(a)(2)(ix)(A)

10 CFR 50.73(a)(2)(iv)(A), System Actuation

10 CFR 50.73(a)(2)(x)

10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor

10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat

10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown

10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications
2602010004R00 - NRC Website

text

Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 August 16, 2010 10 CFR 50.73 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Unit 2 Facility Operating License No. DPR-52 NRC Docket No. 50-260

Subject:

Licensee Event Report 50-26012010-004-00 The enclosed Licensee Event Report provides details of inadvertent isolation of the high pressure coolant injection system during testing activities. The Tennessee Valley Authority is submitting this report in accordance with 10 CFR 50.73(a)(2)(v)(D), any event or condition that could have prevented the fulfillment of the safety function of structures or systems that are needed to mitigate the consequences of an accident.

There are no new regulatory commitments contained in this letter. Should you have any questions concerning this submittal, please contact Dan Williamson, Acting Site Licensing and Industry Affairs Manager, at (256) 729-2636.

Respectfully, K. J. Polso Vice President Enclosure cc (wI Enclosure):

NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant

NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB NO. 3150-0104 EXPIRES 08/31/2010 (9-2007)

, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

3. PAGE Browns Ferry Nuclear Plant Unit 2 05000260 1 of 5
4. TITLE: HPCI Isolation During Time Delay Relay Calibration
5. EVENT DATE
6. LER NUMBER
7. REPORT DATE
8. OTHER FACILITIES INVOLVED MONTH FACILITY NAME DOCKET NUMBER MNH DY YA YER SEQUENTIAL REV MONTH DAY YEAR N/A N/A DY YA YER NUMBER NO.N/NA FACILITY NAME DOCKET NUMBER 06 16 2010 2010 004 00 08 16 2010 N/A N/A
9. OPERATING MODE
11. THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR §: (Check all that apply) 0J 20.2201(b)

El 20.2203(a)(3)(i)

El 50.73(a)(2)(i)(C)

[E 50.73(a)(2)(vii)

El 20.2201(d)

[E 20.2203(a)(3)(ii)

El 50.73(a)(2)(ii)(A)

El 50.73(a)(2)(viii)(A)

[1 20.2203(a)(1)

El 20.2203(a)(4)

El 50.73(a)(2)(ii)(B)

El 50.73(a)(2)(viii)(B)

El 20.2203(a)(2)(i)

El 50.36(c)(1)(i)(A)

El 50.73(a)(2)(iii)

El 50.73(a)(2)(ix)(A)

10. POWER LEVEL [1 20.2203(a)(2)(ii)

E] 50.36(c)(1)(ii)(A)

[E 50.73(a)(2)(iv)(A)

Dl 50.73(a)(2)(x)

E] 20.2203(a)(2)(iii)

El 50.36(c)(2)

El 50.73(a)(2)(v)(A)

El 73.71(a)(4)

[] 20.2203(a)(2)(iv)

E] 50.46(a)(3)(ii)

[I 50.73(a)(2)(v)(B)

El 73.71(a)(5) 89 El 20.2203(a)(2)(v)

El 50.73(a)(2)(i)(A)

El 50.73(a)(2)(v)(C)

El OTHER [E

20.2203(a)(2)(vi)

El 50.73(a)(2)(i)(B) 0 50.73(a)(2)(v)(D)

Specify n Abstract below or In (if more space is required, use additional copies of (If more space is required, use additional copies of (If more space is required, use additional copies of NRC Form 366A) (17)

E.

Scram With Complications Consideration:

This event did not include a reactor scram.

VIII. COMMITMENTS

None