Email Boska (NRC) to Prussman (Entergy), ME4234, ME4235, Acceptance Review for Indian Point 3 Relief Requests
ML102210425
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 08/09/2010
From: Boska J
Plant Licensing Branch 1
To: Prussman S
Entergy Nuclear Operations
Boska J, NRR, 301-415-2901
References
TAC ME4234, TAC ME4235
Download: ML102210425 (2)


Text

From:

Boska, John Sent:

Monday, August 09, 2010 3:09 PM To:

'Prussman, Stephen G' Cc:

'Walpole, Robert W'

Subject:

ME4234 ME4235 Indian Point 3 Relief Requests 3-49 and 3-50, Acceptance Review By letter dated July 5, 2010, Entergy Nuclear Operations, Inc. submitted relief requests for Indian Point 3. This document is available from the Agencywide Documents Access and Management System as accession number ML101950041. The proposed relief requests would allow less than 100% examination of some welds in the previous 10-year inservice inspection interval due to difficulties with access to 100% of the weld. The purpose of this email is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to commence its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Pursuant to Sections 50.55a(a)(3)(i) and 50.55a(a)(3)(ii) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to commence its detailed technical review and make an independent assessment regarding the acceptability of the proposed relief request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the NRC staffs detailed technical review by separate correspondence.

If you have any questions, please contact me at 301-415-2901.

John Boska Indian Point Project Manager, NRR/DORL U.S. Nuclear Regulatory Commission 301-415-2901 email: john.boska@nrc.gov E-mail Properties Mail Envelope Properties ()

Subject:

ME4234 ME4235 Indian Point 3 Relief Requests 3-49 and 3-50, Acceptance

Review Sent Date: 8/9/2010 2:49:09 PM Received Date: 8/9/2010 3:08:00 PM From: Boska, John Created By: John.Boska@nrc.gov Recipients:

SPrussm@entergy.com ('Prussman, Stephen G')

Tracking Status: None rwalpol@entergy.com ('Walpole, Robert W')

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 13195 8/9/2010 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: