ML102010548
| ML102010548 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 07/19/2010 |
| From: | Beltz T Plant Licensing Branch III |
| To: | Flentje F Point Beach |
| beltz T, NRR/DORL/LPL3-1, 301-415-3049 | |
| References | |
| TAC ME3282, TAC ME3283 | |
| Download: ML102010548 (1) | |
Text
From:
Beltz, Terry Sent:
Monday, July 19, 2010 1:19 PM To:
Flentje, Fritzie Cc:
Costedio, Jim; Basturescu, Sergiu; Matharu, Gurcharan
Subject:
Point Beach Nuclear Plant, Units 1 and 2 - Draft RAIs re: License Amendment Request Associated with Diesel Fuel Oil Requirements (TAC Nos. ME3282 &
ME3283)
Attachments:
Draft RAIs_EEEB (ME3282 & ME3283.docx
Dear Ms. Flentje:
This e-mail is in reference to the NextEra Energy Point Beach, LLC (the licensee) submittal of a license amendment request (LAR) dated January 27, 2010 (ADAMS Accession No. ML100280230), to revise Technical Specification 3.8.3, Diesel Fuel Oil and Starting Air. The licensee proposes to revise the diesel fuel oil storage volume requirements for the emergency diesel generators.
The U.S. Nuclear Regulatory Commission staff (NRC) in the Electrical Engineering Branch of the Office of Nuclear Reactor Regulation has reviewed the information provided in the LAR and determined that additional information is required to continue its review. In an effort to complete the review, the staff has developed draft requests for additional information (RAIs), which are provided as an attachment to this e-mail.
If required, the NRC staff can discuss the draft RAIs with your staff in a conference call or meeting prior to formal issuance. Among other things, the discussion will include how the NRC would formally issue these questions and how the licensee will respond to them.
The sole purpose of this e-mail and its attachment is to prepare you and others for the proposed conference call or meeting. This e-mail and its attachment do not convey a formal NRC staff position, and do not formally request for additional information.
Please don't hesitate to contact me if you have any questions or concerns.
Sincerely, Terry A. Beltz, Senior Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation (301) 415-3049 Terry.Beltz@nrc.gov E-mail Properties Mail Envelope Properties ()
Subject:
Point Beach Nuclear Plant, Units 1 and 2 - Draft RAIs re: License
Amendment Request Associated with Diesel Fuel Oil Requirements (TAC Nos. ME3282 &
ME3283)
Sent Date: 7/19/2010 10:58:16 AM Received Date: 7/19/2010 1:18:00 PM From: Beltz, Terry Created By: Terry.Beltz@nrc.gov Recipients:
fritzie.flentje@nexteraenergy.com (Flentje, Fritzie)
Tracking Status: None james.costedio@nexteraenergy.com (Costedio, Jim)
Tracking Status: None Sergiu.Basturescu@nrc.gov (Basturescu, Sergiu)
Tracking Status: None Gurcharan.Matharu@nrc.gov (Matharu, Gurcharan)
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 41230 7/19/2010 Draft RAIs_EEEB (ME3282 & ME3283.docx 28387 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: