From:
Beltz, Terry Sent:
Monday, August 02, 2010 11:47 AM To:
Flentje, Fritzie Cc:
Costedio, Jim; Hale, Steve
Subject:
Point Beach Nuclear Plant, Units 1 and 2 - Draft RAIs re: License Amendment Request Associated with Diesel Fuel Oil Requirements (TAC Nos. ME3282 &
ME3283)
Attachments:
Draft RAIs_EEEB (ME3282 & ME3283).docx; EEEB RAIs Fuel Oil Reference Docs.docx
Dear Ms. Flentje:
This e-mail is in reference to the NextEra Energy Point Beach, LLC (the licensee) submittal of a license amendment request (LAR)-264 dated January 27, 2010 (ADAMS Accession No. ML100280230), to revise Technical Specification 3.8.3, Diesel Fuel Oil and Starting Air. The licensee proposes to revise the diesel fuel oil storage volume requirements for the emergency diesel generators.
The U.S. Nuclear Regulatory Commission (NRC) staff in the Electrical Engineering Branch (EEEB) of the Office of Nuclear Reactor Regulation has reviewed the information provided in the LAR and determined that additional information is required to continue its review. In an effort to complete the review, the staff has developed draft requests for additional information (RAIs).
A conference call was held on July 23, 2010, between the licensee and NRC staff to discuss the draft RAIs. During the phone call, you recommended that the proposed draft RAIs should be divided since one of the RAIs appeared directly applicable to LAR-264 and the other to LAR-261 associated with extended power uprate (EPU).
The NRC staff have agreed to split the RAIs, as requested, and the draft RAIs associated with LAR-264 are attached. The staff wants to emphasize that resolution of the licensing bases (7 days versus 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />) concern is a priority since the EPU-related diesel fuel oil questions will be directly impacted by the outcome once the licensing basis is clarified and may potentially delay issuance of the EPU-related safety evaluation.
If required, the NRC staff can still discuss the draft RAIs with your staff in a conference call or meeting prior to formal issuance. Among other things, the discussion will include how the NRC would formally issue these questions and how the licensee will respond to them, including a proposed date for your formal response.
The sole purpose of this e-mail and its attachment is to prepare you and others for the proposed conference call or meeting. This e-mail and its attachment do not convey a formal NRC staff position, and do not formally request for additional information.
Please don't hesitate to contact me if you have any questions or concerns.
Sincerely, Terry A. Beltz, Senior Project Manager Plant Licensing Branch III-1
Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation (301) 415-3049 Terry.Beltz@nrc.gov E-mail Properties Mail Envelope Properties ()
Subject:
Point Beach Nuclear Plant, Units 1 and 2 - Draft RAIs re: License Amendment Request Associated with Diesel Fuel Oil Requirements (TAC Nos. ME3282 &
ME3283)
Sent Date: 7/30/2010 11:11:10 AM Received Date: 8/2/2010 11:46:00 AM From: Beltz, Terry Created By: Terry.Beltz@nrc.gov Recipients:
Fritzie.Flentje@nexteraenergy.com (Flentje, Fritzie)
Tracking Status: None james.costedio@nexteraenergy.com (Costedio, Jim)
Tracking Status: None Steve.Hale@nexteraenergy.com (Hale, Steve)
Tracking Status: None Post Office:
Files Size Date & Time MESSAGE 59585 7/30/2010 Draft RAIs_EEEB (ME3282 & ME3283).docx 25992 EEEB RAIs Fuel Oil Reference Docs.docx 20989 Options Expiration Date:
Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: