Letter Sequence Request |
|---|
TAC:ME4470, Control Room Habitability, Deletion of E BAR Definition and Revision to RCS Specific Activity Tech Spec (Approved, Closed) TAC:ME1624, Control Room Habitability, Deletion of E BAR Definition and Revision to RCS Specific Activity Tech Spec (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance, Acceptance, Acceptance, Acceptance
- Supplement, Supplement, Supplement, Supplement
|
MONTHYEARL-2009-133, License Amendment Request 196 Alternative Source Term and Conforming Amendment2009-06-25025 June 2009 License Amendment Request 196 Alternative Source Term and Conforming Amendment Project stage: Request L-2009-163, Transmittal of Meteorological Data Cd Supporting Alternative Source Term and Conforming License Amendment Request 196 - Supplemental Information2009-07-21021 July 2009 Transmittal of Meteorological Data Cd Supporting Alternative Source Term and Conforming License Amendment Request 196 - Supplemental Information Project stage: Supplement ML0920205292009-07-22022 July 2009 Supplemental Information Needed for Acceptance of Requested Licensing Action Alternate Source Term Amendment Request (LAR 196) (Tac Nos. ME1624 and ME1625) Project stage: Acceptance Review ML0922206962009-08-18018 August 2009 Supplemental Information Needed for Acceptance of Requested Licensing Action Alternate Source Term Amendment Request (LAR 196) Project stage: Acceptance Review L-2009-195, Response to Request for Additional Information on Proposed Amendments to Revise the Technical Specifications to Adopt Alternative Source Term2009-08-26026 August 2009 Response to Request for Additional Information on Proposed Amendments to Revise the Technical Specifications to Adopt Alternative Source Term Project stage: Response to RAI ML0926005302009-09-25025 September 2009 Acceptance Letter Regarding the Alternative Source Term License Amendment Request Project stage: Acceptance Review L-2009-297, Official Service List Title Change, St. Lucie, Turkey Point, Seabrook Station, Duane Arnold Energy Center, Point Beach2009-12-17017 December 2009 Official Service List Title Change, St. Lucie, Turkey Point, Seabrook Station, Duane Arnold Energy Center, Point Beach Project stage: Request ML0935006652009-12-17017 December 2009 RAI, Regarding Alternative Source Term Project stage: RAI L-2010-021, Response to Request for Additional Information Regarding Alternative Source Term Amendment Request2010-02-10010 February 2010 Response to Request for Additional Information Regarding Alternative Source Term Amendment Request Project stage: Response to RAI ML1005603882010-02-25025 February 2010 Request for Additional Information Regarding Request to Adopt the Alternate Source Term Project stage: RAI L-2010-048, Response to Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) 1962010-03-15015 March 2010 Response to Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) 196 Project stage: Response to RAI ML1007004462010-03-24024 March 2010 Request for Additional Information Regarding Request to Adopt the Alternate Source Team (TAC ME1624 & ME1625) Project stage: RAI L-2010-065, Response to Request for Additional Information (RAI) Regarding Alternative Source Tear (AST) License Amendment Request (LAR) 1962010-04-14014 April 2010 Response to Request for Additional Information (RAI) Regarding Alternative Source Tear (AST) License Amendment Request (LAR) 196 Project stage: Response to RAI L-2010-083, Supplement to License Amendment Request (LAR) 196 and 3/24/2010 Request for Additional Information (RAI) Regarding Alternative Source Term (AST)2010-05-21021 May 2010 Supplement to License Amendment Request (LAR) 196 and 3/24/2010 Request for Additional Information (RAI) Regarding Alternative Source Term (AST) Project stage: Supplement L-2010-121, Revised Meteorological Data for 2005-2009 Supporting Alternative Source Term and Conforming License Amendment Request 1962010-06-11011 June 2010 Revised Meteorological Data for 2005-2009 Supporting Alternative Source Term and Conforming License Amendment Request 196 Project stage: Request L-2010-131, Response to 5/28/2010 Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) 1962010-06-23023 June 2010 Response to 5/28/2010 Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) 196 Project stage: Request L-2010-137, Revised Radiological Dose Consequences for Alternative Source Term and Conforming License Amendment Request 1962010-06-25025 June 2010 Revised Radiological Dose Consequences for Alternative Source Term and Conforming License Amendment Request 196 Project stage: Request 05000250/LER-2010-002, For Turkey Point, Unit 3 Regarding Fuel Transfer Pump Failure Renders 3B Emergency Diesel Generator Inoperable2010-08-0505 August 2010 For Turkey Point, Unit 3 Regarding Fuel Transfer Pump Failure Renders 3B Emergency Diesel Generator Inoperable Project stage: Request ML1024400682010-08-27027 August 2010 Acceptance Review: Fuel Storage Criticality Analysis LAR (ME4470 and ME4471) Project stage: Acceptance Review L-2010-197, Response to Request for Additional Information Regarding Alternative Source Term License Amendment Request (LAR) 196 and Proposed Changes to Technical Specification (TS) 3/4.7.5 on Control Room Emergency Ventilation System2010-09-15015 September 2010 Response to Request for Additional Information Regarding Alternative Source Term License Amendment Request (LAR) 196 and Proposed Changes to Technical Specification (TS) 3/4.7.5 on Control Room Emergency Ventilation System Project stage: Response to RAI L-2010-226, Summary of NRC Public Meeting Discussion on Meteorological Data for Alternative Source Term and Conforming License Amendment Request 1962010-10-13013 October 2010 Summary of NRC Public Meeting Discussion on Meteorological Data for Alternative Source Term and Conforming License Amendment Request 196 Project stage: Meeting L-2010-293, Response to Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) No. 196 and Meteorological Data Sensitivity2010-12-14014 December 2010 Response to Request for Additional Information (RAI) Regarding Alternative Source Term (AST) License Amendment Request (LAR) No. 196 and Meteorological Data Sensitivity Project stage: Response to RAI ML1028710232010-12-16016 December 2010 Summary of Meeting with Florida Power & Light Company to Discuss Turkey Point, Units 3 and 4, Alternative Source Term License Amendment Request Project stage: Meeting ML1035500302011-01-19019 January 2011 Summary of Meeting with Florida Power & Light Company, Regarding Turkey Point, Units 3 & 4, Spent Fuel Criticality Analysis License Amendment Request Project stage: Meeting L-2011-141, Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues2011-05-11011 May 2011 Response to NRC Request for Additional Information Regarding Extended Power Uprate License Amendment Request No. 205 and Reactor Systems Issues Project stage: Response to RAI L-2011-154, Response to NRC Request for Additional Information Regarding Fuel Storage Criticality Analysis License Amendment Request No. 2072011-05-20020 May 2011 Response to NRC Request for Additional Information Regarding Fuel Storage Criticality Analysis License Amendment Request No. 207 Project stage: Response to RAI ML1108006662011-06-23023 June 2011 Issuance of Amendments Regarding Alternative Source Term Project stage: Approval L-2011-277, Confirmatory Dose Assessment for Control Room Emergency Ventilation System Air Intake Modification to Satisfy Operating License Conditions 3.H.12011-08-11011 August 2011 Confirmatory Dose Assessment for Control Room Emergency Ventilation System Air Intake Modification to Satisfy Operating License Conditions 3.H.1 Project stage: Request ML11217A0032011-08-16016 August 2011 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance L-2011-386, License Amendment Request No. 207, Fuel Storage Criticality Analysis Supplement 22011-09-14014 September 2011 License Amendment Request No. 207, Fuel Storage Criticality Analysis Supplement 2 Project stage: Supplement ML11229A1192011-09-23023 September 2011 Correction of Amendment Nos. 244 Ad 240 Regarding Alternative Source Term Project stage: Other ML11216A0572011-10-31031 October 2011 Issuance of Amendments Regarding Fuel Criticality Analysis Project stage: Approval L-2011-540, Safety Evaluation Report Review Supporting Fuel Storage Criticality Amendments 246 and 2422011-12-22022 December 2011 Safety Evaluation Report Review Supporting Fuel Storage Criticality Amendments 246 and 242 Project stage: Other L-2012-313, Administrative License Amendment Request No. 223 Regarding Control Room Emergency Ventilation System Technical Specification2012-08-0707 August 2012 Administrative License Amendment Request No. 223 Regarding Control Room Emergency Ventilation System Technical Specification Project stage: Request L-2012-314, License Amendment Request No. 224 Regarding Technical Specification 3/4.6.2.3 - Recirculation Ph Control System and Natb Basket Minimum Loading Requirement2012-09-0606 September 2012 License Amendment Request No. 224 Regarding Technical Specification 3/4.6.2.3 - Recirculation Ph Control System and Natb Basket Minimum Loading Requirement Project stage: Request L-2013-019, Supplement to Administrative License Amendment Request No. 217 Regarding Operating License Conditions and Technical Specifications2013-01-29029 January 2013 Supplement to Administrative License Amendment Request No. 217 Regarding Operating License Conditions and Technical Specifications Project stage: Supplement 2010-06-23
[Table View] |
Text
FP.!JUN 251209 FPL./
L-2010-137 POWERING TODAY.
10 CFR 50.90 EMPOWERING TOMORROW."
U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555-0001 Re:
Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Revised Radiological Dose Consequences for Alternative Source Term and Conforming License Amendment Request 196
References:
(1) W. Jefferson (FPL) to U.S. Nuclear Regulatory Commission (L-2009-133),
"License Amendment Request 196: Alternative Source Term and Conforming Amendment," Accession No. ML092050277, June 25, 2009.
(2) W. Jefferson (FPL) to U.S. Nuclear Regulatory Commission (L-2009-163),
"Transmittal of Meteorological Data CD Supporting Alternative Source Term and Conforming License Amendment Request 196 - Supplemental Information,"
Accession No. ML100680718, July 21, 2009.
(3) J. Paige (NRC) to M. Nazar (FPL), "Turkey Point Units 3 and 4 - Request for Additional Information Regarding Request to Adopt the Alternate Source Term (TAC Nos. ME1624 and ME1625)," Accession No. ML100700446, March 24, 2010.
(4) Email from J. Paige (NRC) to S. Franzone (FPL), "Follow-up Requests for Additional Information Re: Turkey Point, Unit 3 and 4 AST LAR," Accession No. ML101480750, May 28, 2010.
(5) M. Kiley (FPL) to U.S. Nuclear Regulatory Commission (L-2010-121), "Revised Meteorological Data for 2005-2009 Supporting Alternative Source Term and Conforming License Amendment Request 196," Accession No. ML101650648, June 11, 2010.
(6) M. Kiley (FPL) to U.S. Nuclear Regulatory Commission (L-2010-13 1), "Response to 5/28/2010 Request for Additional Information (RAI) Regarding Alternative Source Term (TAC Nos. ME1624 and ME1625)," June 23, 2010.
By letter L-2009-133 dated June 25, 2009 [Reference 1], Florida Power and Light (FPL) requested to amend Facility Operating Licenses DPR-31 and DPR-41 and revise the Turkey Point Units 3 and 4 Technical Specifications (TS). The proposed amendments revise the TS to adopt the Alternative Source Term (AST) as allowed in 10 CFR 50.67.
The meteorological data for 2003-2007 originally used to support the AST License Amendment Request (LAR) was transmitted to the NRC staff by letter dated July 21, 2009 [Reference 2]. Subsequent NRC review of this meteorological data resulted in questions regarding the quality of the data as submitted for this period [References 3, 4].
Based on further review of the data, FPL revised the meteorological data set to include more recent meteorological data from years 2008-2009 that was not previously available.
AbD) an FPL Group company
Turkey Point Units 3 and 4 L-2010-137 Docket Nos. 50-250 and 50-251 Page 2 of 3 On June 11, 2010, FPL submitted revised meteorological data for years 2005-2009
[Reference 5]. Resolution of the quality issues raised regarding the calibration of the meteorological tower temperature sensors has resulted in a conservative decision to bias vertical temperature differentials (AT) with the average (mean) calculated value for each channel over each six month instrument calibration interval for the hourly meteorological data. On June 23, 2010, FPL provided its RAI response in which the basis for using the temperature biased meteorological data was discussed in detail [Reference 6].
The averaged AT value for each channel was applied as a bias or correction factor to the hourly meteorological data. This correction resulted in changes to the calculated stability classes for the hourly meteorological data and in corresponding changes to the calculated onsite and offsite atmospheric dispersion factors (X/Qs). Where the resultant AT biased X/Q values exceeded the unbiased X/Qs, the more conservative X/Q value was used.
This technical approach was chosen to assure that the calculated radiological dose consequences for the AST analyzed design basis accidents would remain conservative.
In addition, FPL previously retracted the proposed SR 4.7.5.c.2 change on tightening the methyl iodide penetration test criterion [Reference 6] and therefore, reduced the credited control room filter efficiencies for elemental iodines and organic iodides from 97.5% to 95%. To partially offset the effect of this change, FPL has increased the credited control room filter efficiency for particulates from 97.5% to 99% consistent with test results. In addition, FPL has reduced the amount of unfiltered air inleakage into the Control Room from 115 scfm to 100 scfm in order to preclude any encroachment on the AST LAR 196 indicated margin to the regulatory dose limits. These changes in inputs and assumptions and the revised results of the radiological dose consequence analyses for the design basis accidents are contained in Attachment 1 to this letter, Numerical Applications, Inc. (NAI)
Report No. NAI-1396-045, "AST Licensing Technical Report (LTR) for Turkey Point Units 3 and 4," Revision 2, June 24, 2010.
In accordance with 10 CFR 50.91(b)(1), a copy of this letter is being forwarded to the State Designee of Florida.
This submittal does not alter the significant hazards consideration or the environmental assessment previously submitted by FPL letter L-2009-133 [Reference 1].
This letter contains no new commitments and no revisions to existing commitments.
Should you have any questions regarding this submittal, please contact Mr. Robert J.
Tomonto, Licensing Manager, at (305) 246-7327.
Turkey Point Units 3 and 4 L-2010-137 Docket Nos. 50-250 and 50-251 Page 3 of 3 I declare under penalty of perjury that the foregoing is true and correct.
Executed on June 5E, 2010.
Very truly yours, Michael Kiley Site Vice President Turkey Point Nuclear Plant
Attachment:
NAI Report No. NAI-1396-045, "AST Licensing Technical Report for Turkey Point Units 3 and 4," Revision 2, June 24, 2010 cc:
USNRC Regional Administrator, Region II USNRC Project Manager, Turkey Point Nuclear Plant USNRC Resident Inspector, Turkey Point Nuclear Plant Mr. W. A. Passetti, Florida Department of Health