ML101800153

From kanterella
Jump to navigation Jump to search
Revision to Technical Requirements Manual
ML101800153
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 06/16/2010
From:
Susquehanna
To: Gerlach R
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML101800153 (30)


Text

Jun. 16, 2010 Page 1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2010-25526 USER INFORMATION:

GERLACH*ROSE M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:

TO: GERLACH*ROSE M 06/16/2010 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.

ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.

TRM2 - TECHNICAL REQUIREMENTS MANUAL UNIT 2 REMOVE MANUAL TABLE OF CONTENTS DATE: 06/02/2010 ADD MANUAL TABLE OF CONTENTS DATE: 06/15/2010 CATEGORY: DOCUMENTS TYPE: TRM2 Awi

Jun. 16, 2010 Page 2 of 2 ID: TEXT 3.10.3 REMOVE: REV:1 ADD: REV: 2 CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT B3.7.3 .1 REMOVE: REV: 2 ADD: REV: 3 CATEGORY: DOCUMENTS TYPE: TRM2 ID: TEXT LOES REMOVE: REV:59 ADD: REV: 60 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE*ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 Table Of Contents Issue Date: 0 6/15/2010 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 60 06/15/2010

Title:

LIST OF EF FECTIVE SECT IONS TEXT TOC 17 04/05/2010

Title:

TABLE OF CONTENTS TEXT 1.1 0 11/19/2002

Title:

USE AND APPLICATION DEFINITIONS TEXT 2.1 1 02/04/2005

Title:

PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS TEXT 2.2 9 02/12/2010

Title:

PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE TEXT 3.0 4 05/23/2008

Title:

APPLICABILITY TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT 3.1.1 11/09/2007

Title:

REACTIVITY CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT 3.1.2 0 11/19/2002

Title:

REACTIVITY'CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 4 05/14/2009

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE TEXT 3.2.1 8 05/14/2009

Title:

CORE OPERATING LIMITS CORE OPERATING LIMITS REPORT (COLR)

LDCN 4712 Report Date: 06/16/10 1

Page 1 of of 15 15 Report Date: 06116110

SSES-MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.3.1 0 11/19/2002

Title:

INSTRUMENTATION RADIATION MONITORING.INSTRUMENTATION TEXT 3.3.2 2 11/09/2007

Title:

INSTRUMENTATION SEISMIC MONITORI*NG INSTRUMENTATION TEXT 3'.3.3 2 11/09/2007

Title:

INSTRUMENTATION METEOROLOGICAL, MONITORING INSTRUMENTATION .

TEXT 3.3.4 5 -05/23/2,008

Title:

INSTRUMENTATION TPN PQST-ACCIDENT MONITORINGINSTRUMENTATION-.

TEXT 3.3.5 0 11A19/2002

Title:

INSTRUMENTATION THIS PAGE 'INTENTIONZA]L3LY -LEFT-BLANK TEXT 3.3.6 2 . i0/19/2005

Title:

INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7 1 11/09/2007

Title:

INSTRUMENTATION MAIN TURBINEOVERSPEEDPROTECTION SYSTEM TEXT 3.3.8 1 10/22/2003

Title:

INSTRUMENTATION TRMRPSINSTRUMENTATION, TEXT 3.3.9 3 .05/14/2009

Title:

INSTRUMENTATION LPRM UPSCALE ALARM INSTRUMENTATION' TEXT 3.3.10 1 12/14/2004

Title:

-INSTRUMENTATION REACTOR RECIRCULATION PUMP.MG.SET STOPS TEXT 3. 3.11 1 ,. 10/22/2003

Title:

INSTRUMENTATION, MVP ISOLATION INSTRUMENTATION TEXT 3.3.12 0 .04/16/2009

Title:

WATER MONITORING INSTRUMENTATION Report Date: 06/16/10

Page,~

Page,,2 of of 15.

15 Report Date: 06/k6/10

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT 3.4.1 1 04/26/2006

Title:

REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2 1 04/16/2009

Title:

REACTOR COOLANT SYSTEM 'STRUCTURAL-INTEGRITY TEXT 3.4.3 1 11/09/2007

Title:

REACTOR COOLANT SYSTEM REACTOR'COOLANT SYSTEM (RCS).:'

TEXT 3.4.4 2 .;05/14/2009

Title:

REACTOR COOLANT> SYSTEM REACTOR RECIRCULATION FLOWAND ROD LINE LIMIT TEXT 3.4.5 1 ' :04Y26/2006

Title:

REACTOR COOLANT SYSTEM.REACTOR: VESSEL MATERIALS' TEXT 3.5.1 1 02/04/2005

Title:

ECCS AND RCIC ADS MANUAL INHIBIT:-

TEXT 3.5.2 1 11/09/2007

Title:

ECCS AND RCICECCS AND RCIC SYSTEM'MONITORING INSTRUMENTATION TEXT 3.5.3 0 11/19/2002

Title:

ECCS AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/19/2002

Title:

CONTAINMENT VENTING OR PURGING TEXT 3.6.2 0 11/19/2002

Title:

CONTAINMENT SUPPRESSIONCHAMBER-TO-DRYWELL VACUUM. BREAKER POSITION INDICATION TEXT 3.6.3 0 11/19/2002

Title:

CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION TEXT 3.6.4 0 11/19/2002

Title:

CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES Pag..eI 15 I II Iof 1l Ilr epo"rt Dae i' 06/16/10....

Page 3 of 15 - Report-Date: 06/16,/10

SSES...MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2.

TEXT 3.7. 1 0 11/19/2002

Title:

PLANT SYSTEMS EMERGENCY SERVICE WATER SYSTEM (ESW) SHUTDOWN TEXT 3.7.2 0 11/19/2002

Title:

PLANT SYSTEMS ULTIMATE HEAT SINK (UHS) AND-GROUND WATER LEVEL TEXT 3.7.3.1 2 04/16./2009

Title:

PLANT SYSTEMS FIRE SUPPRESSION WATER.SUPPLY SYSTEM TEXT 3.7.3.2 3 04/16/2009

Title:

PLANT 'SYSTEMS SPRAY AND SPRINKLER SYSTEMS

{* ", 'T.

TEXT 3.7.3.3 3 04/16/2009

Title:

PLANT SYSTEMS C02 SYSTEMS TEXT 3.7.3.4 2 04/,16-/2009

Title:

PLANT SYSTEMS HALON SYSTEMS TEXT 3.7.3.5 2 04/16/2009

Title:

PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6 2 04/16/2009

Title:

PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7 1 04/26/2006

Title:

PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8 8 01/20/2010

Title:

PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION TEXT 3.7.4 1 04/26/2006

Title:

PLANT SYSTEMS SOLID RADWASTE SYSTEM TEXT 3.7.5.1 0 11/19/2002

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR Report Date: .06/16/10 I Page Page44 of of 15 15 Report Date: 06/16/10

SSES MANIUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2' TEXT 3.7.5.2 0 . 11/19/2002

Title:

PLANT 'SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1 04/26/2006

Title:

PLANT SYSTEMS LIQUID HOLDUP. TANKS TEXT 3.7.6 2 06/27/2008

Title:

PLANT SYSTEMS 2-SSW- PUMPHOUSE VENTILATION TEXT 3.7.7 2 09,/05/2008

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT 3.7.8 6 .06121/2007

Title:

PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1 08/28/,2006

Title:

PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1 12/14/2004

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)

TEXT 3.7.11 1 10/02/2009

Title:

PLANT SYSTEMS TEXT 3.8.1 2 02/04/2005

Title:

ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2 11/09/2007

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

CONTINUOUS TEXT 3.8.2.2 2 12/14/2004

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

AUTOMATIC TEXT 3.8.3 1 04/05/2010

Title:

ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES Pae of 1 Reort ate,06/6/1

.Page 5 . . of .15 Report Date: 06/16/10

SSES MANUAL Manual Name: TRM2 .' .. ,,

  • Manual

Title:

TECHNICAL REQUIREMENTS"MANUAL UNIT 2" TEXT 3.8.4 1 02/,04/2005

Title:

ELECTRICAL POWER 24 VDC ,ELECTRICAL ,SUBSYSTEM TEXT 3.8.5 0 11/19/2002

Title:

ELECTRICAL :POWER DEGRADED VOLTAGE PROTECTION:,

TEXT 3.8.6 0 11/19/2002

Title:

ELECTRICAL -POWER EMERGENCY' SWITCHGEAR -ROOM COOLING TEXT 3.8.7 2 10/22/2009

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM . "

TEXT 3.9.1 0 *,11/19/2002

Title:

REFUELING OPERATIONS DECAY' TIME TEXT 3.9.2 0 :11/19/2002

Title:

REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3 0 11/19/2002

Title:

REFUELING OPERATIONS REFUELING PLATFORM.,

TEXT 3.10.1 1 04/26/2006

Title:

MISCELLANEOUS SEALED SOURCE CONTAMINATION TEXT 3.10.2 1 .04/09/2007

Title:

MISCELLANEOUS SHUTDOWN MARGIN TEST RPS, INSTRUMENTATION TEXT 3.10.3 2 06/15/2010

Title:

MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)-'..

TEXT 3.11.1.1 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3.11.1.2 1 04/26/2006 .

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE -

'Page.~. of-i R o .. .

Dae 06/6/1

, Page 6 - of - 15 Report Date: 06/16/10

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL'UNIT .2' TEXT 3.11.1.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3.11.1.4 1 < 12/14/2.004

Title:

RADIOACTIVE EFFLUENTSý LIQUID RADWASTE-EFFLUENT MONITORING 'INSTRUMENTATION TEXT 3.11.1.5 2 05/02/2007

Title:

RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT 3.11.2.1 3 t'*04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE: 'RATE TEXT 3.11.2.2 1 -'"L04/26/2"006

Title:

RADIOACTIVE EFFLUENTS DOSE - NOBLE>GASES~.'°.. " ..- " ,

TEXT 3.11.2.3 1 -

  • 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN-PARTICULATE FORM TEXT 3.11.2.4 0 :11/19/2002

Title:

RADIOACTIVE EFFLUENTS GASEOUS"RADWASTE':TREATMENT SYSTEM TEXT 3.11.2.5 3 11/14/2006

Title:

RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM.

TEXT 3.11.2.6 4 09/16/2009

Title:

RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS TOTAL DOSE .

TEXT 3.11.4.1 3 04/26/2006

Title:

RADIOACTIVE EFFLUENTS MONITORING PROGRAM TEXT 3.11.4.2 2 " 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LAND USE.CENSUS Report Date: 06/16/10 Page77

'Page .. ofiS of - 15 Report Date: 06/16/10

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS-MANUAL UNIT 21 TEXT 3.11.4.3 1 04/26/2006

Title:

,RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1 0 11/19/2002

Title:

LOADS CONTROL PROGRAM CRANE'TRAVEL-SPENT FUEL STORAGE POOL TEXT 3.12.2 4 04/17/2008

Title:

LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS,,

TEXT 3.12.3 0 11/19/2002

Title:

-LOADS CONTROL PROGRAM,LIGHT LOADS REQUIREMENTS.

TEXT 4.1 * , 09/27/2003

Title:

ADMINISTRATIVE CONTROLS: -ORGANIZATION

.:.09/27/2003 TEXT 4.2 0

Title:

ADMINISTRATIVE CONTROLS REPORTABLE:EVENT ACTION TEXT 4.3 0 . 09/27/2003

Title:

ADMINISTRATIVE ,CONTROLS SAFETY LIMIT.: VIOLATION!:.

TEXT 4.4 1 12/18/2008

Title:

ADMINISTRATIVE ;CONTROLS PROCEDURES & PROGRAMS TEXT 4.5 0 . 09/27/2003

Title:

ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS-TEXT 4.6 0 09/27/2003

Title:

ADMINISTRATIVE CONTROLS RADIATION-.PROTECTION PROGRAM TEXT 4.7 0 09/27/2003

Title:

ADMINISTRATIVE CONTROLS TRAINING * "

TEXT B3.0 4 05/23/2008

Title:

APPLICABILITYBASES TECHNICAL REQUIREMENT FOR'.OPERATION (TRO)-APPLICABILITY Page: 8 of 15 Report Date: 06/16/10

SSES MANU1tAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL'UNIT 2 TEXT B3.1.1 1 11/09/2007

Title:

REACTIVITY CONTROL SYSTEM BASES ANTICIPATED TRANSIENT-WITHOUT SCRAM-ALTERNATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2 0 -11/19/2002

Title:

REACTIVITY CONTROL SYSTEM<BASES CONTROL ROD'DRIVE (CRD)' HOUSING SUPPORT TEXT B3.1.3 3 04/10/2007

Title:

REACTIVITY CONTROL SYSTEM.BASES-CONTROL ROD 'BLOCK INSTRUMENTATION TEXT B3.1.4 0  :` .,11/19/2002  :

Title:

REACTIVITY CONTROLU SYSTEM'BASES<,CONTROL:ROD SCRAM ACCUMOLATORS'INSTRýUMENTATION AND CHECK VALVE TEXT B3.2.1 0 11719/2002

Title:

CORE OPERATING LIMITS BASES CORE'OPERATING LIMITS REPORT:(COLt)

TEXT B3.3.1 0 '.11/19/2002

Title:

INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 1 '.;'11/09/2007

Title:

INSTRUMENTATION BASES SEISMIC-MONITORING INSTRUMENTATION TEXT B3.3.3 2 - 11/09/2007

Title:

INSTRUMENTATION BASES:METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 3 - 11/09/2007

Title:

INSTRUMENTATION BASES TRM:POST ACCIDENT, MONITORING (PAM) INSTRUMENTATION TEXT B3.3.5 2 11/09/2007

Title:

INSTRUMENTATION, BASES THIS PAGE INTENTIONALLY LEFT BLANK' TEXT B3.3.6 3 10/19/2005

Title:

INSTRUMENTATION BASES TRM ISOLATION. ACTUATION INSTRUMENTATION TEXT B3.3.7 1 '`11/09/2007

Title:

INSTRUMENTATIONBASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM Report Date: 06/16/10 Pages Page 9 .' of '15 of .15 Reporý Date: 06/16'/10

SSES MANUTEAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2.

TEXT B3.3.8 1 10/22/2003

Title:

INSTRUMENTATION BASES TRM RPS INSTRUMENTATION TEXT B3.3.9 3 05/14/2009

Title:

INSTRUMENTATION BASES LPRM UPSCALE.ALARM INSTRUMENTATION TEXT B3.3.10 12/18/2008

Title:

INSTRUMENTATION BASES REACTOR RECIRCULATION. PUMP MG SET STOPS TEXT B3.3.11 1 10/22/2003

Title:

INSTRUMENTATION BASES .MVP ISOLATION INSTRUMENTATION TEXT B3.3.12 0 .04/16/2009

Title:

WATER MONITORING INSTRUMENTATION TEXT B3.4.1 0 -11/19/2002

Title:

REACTOR .,COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2 1 04/16/2009

Title:

REACTOR COOLANT SYSTEM BASES STRUCTURAL INTEGRITY TEXT B3.4.3 1 11/09/2007

Title:

REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR TEXT B3.4.4 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD.LINE LIMIT TEXT B3.4.5 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS TEXT B3.5.1 0 11/19/2002

Title:

ECCS AND RCIC BASES ADS MANUAL INHIBIT TEXT B3.5.2 1 11/09/2007

Title:

ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION

'o""f -15 Report Date: 06/16/10

  • SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.5.3 1 11/09/2007

Title:

ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0 11/19/2002

Title:

CONTAINMENT BASES VENTING OR PURGING' TEXT B3.6.2 0 11/19/2002

Title:

CONTAINMENT BASES SUPPRESSION CHAMBER-T0-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 1 04/19/2007

Title:

CONTAINMENT BASES SUPPRESSION'POO ALARM INSTRUMENTATION.

TEXT B3.6.4 1 12/14/2004

Title:

CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0 11/i19/2002

Title:

PLANT SYSTEMS BASES EMERGENCY*SERVICE WATER SYSTEM (SHUTDOWN)

TEXT B3.7.2 0 11/19/2002

Title:

PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL TEXT B3.7.3.1 3 06/15/2010

Title:

PLANT SYSTEMS BASES .FIRE SUPPRESSION'WATER SUPPLY SYSTEM TEXT B3.7.3.2 2 04/26/2006

Title:

PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS TEXT B3.7.3.3 0 11/19/2002

Title:

PLANT SYSTEMS BASES C02 SYSTEMS TEXT B3.7.3.4 1 04/26/2006

Title:

PLANT SYSTEMS BASES HALON SYSTEMS TEXT B3.7.3.5 1 04/26/2006

Title:

PLANT SYSTEMS BASES FIRE HOSE STATIONS Page ii of 15 Report Date: 06/16/10

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.7.3.6 1 04/26/2006

Title:

PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT_.HOSE HOUSES TEXT B3.7.3.7 0 11/19/2002

Title:

PLANT SYSTEMS BASES FIRERATED ASSEMBLIES TEXT B3.7.3.8 1 01/12/2004

'Title: PLANT SYSTEMS BASES FIRE DETECTION:INSTRUMENTATION TEXT B3.7.4 0 ' 11/19/2002

.Title: PLANT SYSTEMS BASES SOLID. RADWASTE. SYSTEM * .J* -

TEXT B3.7.5.1 0 .!11/19/2002

Title:

'PLANT !SYSTEMS-;BASES MAIN CONDENSER OFFGAS HYDROGENAMONITOR'"'.',

TEXT B3.7.5.2 0 ' 11/19/2002

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE' TEXT B3.7.5.3 0 11/19/2002

Title:

PLANT SYSTEMS BASES LIQUID'HOLDUP TANKS TEXT B3.7.6 2 06727/2008

Title:

PLANT SYSTEMS BASES ESSW PUMPHOUSE' VENTILATION:

TEXT B3.7.7 2 01/31/2008

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION TEXT B3.7.8 3 06/2'1/2007

Title:

PLANT SYSTEMS BASES SNUBBERS TEXT B3.7.9 1 12/14/2004

Title:

PLANT SYSTEMS BASES CONTROL. STRUCTURE HVAC TEXT B3.7.10 1 '12/14/2004

Title:

PLANT SYSTEMS BASES.'SPENT FUEL STORAGE POOLS Page 12 of 15ReportDate:.6/16/1 Page 12 of 15 Report Date: 06/16/10

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS;MANUAL UNIT .2 TEXT B3.7.11 2 04/14/2010

Title:

STRUCTURAL INTEGRITY TEXT B3.8.1 2

  • 03/10/2010

Title:

ELECTRICAL POWER BASES PRIMARYCONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES 0 TEXT B3.8.2.1 0 11/19/2002

Title:

ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

CONTINUOUS TEXT B3.8.2.2 1  ; -;09/17/2004

Title:

ELECTRICAL POWER BASES MOTOR.OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

AUTOMATIC TEXT B3.8.3 0 .. 11/19J2002

Title:

ELECTRICAL POWER)BASES DIESEL GENERATOR .(DG) MAINTENANCE` ACTIVITIES TEXT B3.8.4 0 . 11/19/2002 "

Title:

ELECTRICAL POWER!BASES :24 VDC ELECTRICAL'POWER SUBSYSTEM TEXT B3.8.5 0 ..  ; 11/19/2002

Title:

ELECTRICAL POWER BASES DEGRADED.VOLTAGE PROTECTION TEXT B3.8.6 1  ; 02/04/2005

Title:

ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 1 06/15/2009

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT B3.9.1 0 11/19/2002

Title:

REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9.2 0 .11/19/2002

Title:

REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3 0 11/19/2002

Title:

REFUELING OPERATIONS BASES REFUELING PLATFORM.

Report Date: 06/16/10 Page I~.

page 13 . of of 15 15 Report Date: 06/16/10

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 2 TEXT B3.10.1 0 11/19/2002

Title:

MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2 1 04/1OZ2007

Title:

'MISCELLANEQUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3 0 11/19/2002

Title:

MISCELLANEOUS BASES INDEPENDENT.SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT B3.11.1.1 0 11/19/2002 . .. ..

Title:

RADIOACTIVE EFFLUENTS :BASESLIQUID EFFLUENTS CONCENTRATION.

0 , 1/19/2002 2':

  • I"*

TEXT B3.11.1.2

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID.:-EFFLUENT.S.DOSE: .

TEXT B3.11.1.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES, LIQUID WASTE TREATMENT SYSTEM TEXT B3.11.1.4 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES.LIQUID RADWASTEEFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.1.5 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES-,RADIOACTIVE LIQUID PROCESS-MONITORING INSTRUMENTATION TEXT B3.11.2.1 1 12/14/2004

Title:

RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.11.2.2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES TEXT B3.11.2.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.11.2.4 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM Report Date: 06/16/10 Pagei4 Page 14 of 15 -

of .15 Report Date: 06/16/10

SSES MANUAL Manual Name: TRM2 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT*2 TEXT B3.11.2.5 4 11/14/2006

Title:

RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11.2.6 1 01/27/2004

Title:

RADIOACTIVE EFFLUENTS BASES RADIOACTIVE.GASEOUS EFFLUENT*MONITORING INSTRUMENTATION TEXT B3.11.3 0 11/19/2002

Title:

RADIOACTIVE: EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1 2 ':01/06/2006

Title:

RADIOACTIVE- EFFLUENTS BASES"MONITORING-PROGRAM TEXT B3.11.4.2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS.'BASES LAND USE CENSUS'. -

TEXT B3.11.4.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS;,BASES INTERLABORATORY COMPARISON'PROGRAM TEXT B3.12.1 1 10/04/2007 1

Title:

LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 0 11/19/2002

Title:

LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS ....

TEXT B3.12.3 0 11/19/2002

Title:

LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Report -Date: 06/16/10 Page: 2~.

Page- 15 of, 15 of- 15 Report Date: 06/16/10

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 60 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date TOC TABLE OF CONTENTS 03/25/2010 1.0 USE AND APPLICATION Page TRM / 1.0-1 08/31/1998 Page TRM / 1.0-2 10/04/2002 Page TRM / 1.0-3 08/31/1998 2.0 PLANT PROGRAMS Page 2.0-1 08/31/1998 Pages TRM / 2.0-2 and TRM 2.0-3 01/28/2005 Page TRM / 2.0-4 06/25/2002 Page TRM / 2.0-5 04/12/1999 Page TRM / 2.0-6 04/15/2009 Page TRM / 2.0-7 05/15/2008 Page TRM / 2.0-8 04/15/2009 Page TRM / 2.0-9 11/15/2004 Page TRM / 2.0-10 02/02/2010 Page TRM / 2.0-11 11/15/2004 Page TRM / 2.0-12 04/15/2009 Pages TRM / 2.0-13 and TRM / 2.0-14 11/15/2004 Page TRM / 2.0-15 11/15/2005 3.0 APPLICABILITY Pages TRM / 3.0-1 and TRM / 3.0-2 04/14/2008 Page TRM / 3.0-3 03/15/2002 Page TRM / 3.0-4 11/30/2005 3.1 REACTIVITY CONTROL SYSTEMS Page TRM / 3.1-1 10/31/2007 Pages TRM / 3.1-2 through TRM / 3.1-5 08/31/1998 Page TRM /3.1-6 03/27/2007 Page TRM / 3.1-7 04/15/2009 Page TRM / 3.1-8 03/27/2007 Pages TRM / 3.1-9 and TRM / 3.1-9a 02/18/1999 Page TRM / 3.1-10 02/18/1999 3.2 CORE OPERATING LIMITS REPORT Page TRM / 3.2-1 08/31/1998 Pages TRM / 3.2-2 through TRM / 3.2-54 04/17/2009 3.3 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 07/16/1999 Pages TRM / 3.3-4 and TRM / 3.3-5 10/31/2007 Page 3.3-6 08/31/1998 Page TRM 3.3-7 10/31/2007 Page 3.3-8 08/31/1998 SUSQU EHAN NA - UNIT 2 TRM / LOES-1 EFFECTIVE DATE 06/10/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 60 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / 3.3-9 04/12/2007 Page TRM / 3.3-9a 12/17/1998 Page TRM / 3.3-10 10/31/2007 Page TRM / 3.3-11 06/02/2005 Page TRM / 3.3-11 a 04/14/2008 Page TRM / 3.3-12 03/30/2001 Page TRM / 3.3-13 09/13/2005 Page TRM / 3.3-14 12/14/1998 Page TRM / 3.3-15 10/22/2003 Page TRM / 3.3-16 06/27/2001 Page TRM / 3.3-17 06/14/2002 Page TRM / 3.3-18 10/31/2007 Pages TRM / 3.3-19 and TRM / 3.3-20 10/22/2003 Page TRM / 3.3-21 04/15/2009 Page TRM f 3.3-21a 11/15/2004 Pages TRM /3.3-21b through TRM / 3.3-21d 03/27/2007 Page TRM / 3.3-22 12/03/2004 Pages TRM / 3.3-23 and TRM / 3.3-24 05/16/2003 Page TRM / 3.3-25 10/22/2003 Pages TRM / 3.3-26 and TRM / 3.3-27 04/07/2009 3.4 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 03/31/2006 Pages 3.4-2 through 3.4-5 10/23/1998 Pages TRM / 3.4-6 through TRM / 3.4-8 04/01/2009 Page 3.4-9 08/31/1998 Page 3.4-10 10/31/2007 Page 3.4-11 08/31/1998 Page TRM / 3.4-12 04/17/2009 Page TRM / 3.4-13 03/31/2006 3.5 EMERGENCY CORE COOLING AND RCIC Page TRM / 3.5-1 01/28/2005 Pages 3.5-2 and 3.5-3 08/31/1998 Page TRM / 3.5-4 10/31/2007 Pages 3.5-5 through 3.5-7 08/31/1998 3.6 CONTAINMENT Pages 3.6-1 through 3.6-4 08/31/1998 Page TRM / 3.6-5 01/07/2002 Page 3.6-6 08/31/1998 Pages TRM / 3.6-7 through TRM / 3.6-9 12/31/2002 TRM / LOES-2 EFFECTIVE DATE 06/10/2010 SUSQUEHANNA - UNIT SUSQUEHANNA - UNIT 22 TRM / LOES-2 EFFECTIVE DATE 06/10/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 60 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.7 PLANT SYSTEMS Pages TRM / 3.7-1 and TRM / 3.7-2 07/29/1999 Page 3.7-3 08/31/1998 Page TRM / 3.7-4 03/31/2006 Page TRM / 3.7-5 04/07/2009 Pages TRM / 3.7-6 through TRM / 3.7-8 08/02/1999 Pages TRM / 3.7-9 and TRM / 3.7-10 04/07/2009 Page TRM / 3.7-11 01/21/2000 Page TRM / 3.7-12 08/02/1999 Page TRM / 3.7-13 04/07/2009 Page TRM / 3.7-14 08/09/2005 Pages TRM / 3.7-15 and TRM / 3.7-16 08/02/1999 Page TRM / 3.7-17 04/07/2009 Page TRM / 3.7-18 08/02/1999 Page TRM / 3.7-19 04/07/2009 Pages TRM / 3.7-20 through TRM / 3.7-22 08/02/1999 Page TRM / 3.7-23 04/07/2009 Page TRM / 3.7-24 03/31/2006 Pages TRM / 3.7-25 and TRM / 3.7-26 08/02/1999 Page TRM / 3.7-27 10/31/2007 Page TRM / 3.7-28 11/29/2006 Page TRM / 3.7-29 01/13/2010 Page TRM / 3.7-30 11/30/2005 Page TRM / 3.7-31 11/16/2001 Page TRM / 3.7-32 01/09/2004 Page TRM / 3.7-33 10/05/2002 Page TRM / 3.7-34 03/31/2006 Pages TRM / 3.7-35 and TRM / 3.7-36 02/01/1999 Pages 3.7-37 through 3.7-38 08/31/1998 Page TRM / 3.7-39 03/31/2006 Page TRM / 3.7-40 02/14/2005 Page TRM / 3.7-40a 06/20/2008 Page TRM / 3.7-41 09/04/2008 Page TRM / 3.7-42 08/31/1998 Pages TRM / 3.7-43 through TRM / 3.7-45 10/05/2006 Page TRM / 3.7-46 06/07/2007 Page TRM / 3.7-47 10/05/2006 Page TRM / 3.7-48 06/07/2007 Page TRM / 3.7-49 03/09/2001 Page TRM / 3.7-50 08/16/2006 Page TRM / 3.7-51 12/03/2004 Page TRM / 3.7-52 04/15/2003 Page TRM / 3.7-53 07/29/1999 Page TRM / 3.7-54 04/01/2009 Page TRM / 3.7-55 09/25/2009 Page TRM / 3.7-56 04/01/2009 TRM / LOES-3 EFFECTIVE DATE 06/10/2010 SUSQUEHANNA SUSQUEHANNA - UNIT

- UNIT 22 TRM / LOES-3 EFFECTIVE DATE 06/10/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 60 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.8 ELECTRICAL POWER Page TRM / 3.8-1 04/02/2002 Pages TRM / 3.8-2 and TRM / 3.8-3 01/28/2005 Page TRM / 3.8-4 01/31/2005 Pages TRM / 3.8-5 and TRM / 3.8-6 04/02/2002 Pages TRM / 3.8-7 through TRM / 3.8-10 10/31/2007 Page TRM / 3.8-11 08/10/2004 Page TRM / 3.8-12 12/03/2004 Page TRM / 3.8-13 03/25/2010 Page TRM / 3.8-14 08/31/1998 Page TRM / 3.8-15 01/28/2005 Pages TRM / 3.8-16 and TRM / 3.8-17 04/02/2002 Page 3.8-18 02/01/1999 Page TRM / 3.8-19 04/02/2002 Page TRM / 3.8-20 02/01/1999 Pages TRM / 3.8-21 through TRM / 3.8-23 06/06/1999 Pages 3.8-24 and 3.8-25 08/31/1998 Page TRM / 3.8-26 05/28/2009 Page TRM / 3.8-27 11/29/2006 Page TRM / 3.8-28 05/28/2009 Page TRM / 3.8-2,9 10/20/2009 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/31/1998 3.10 MISCELLANEOUS Page TRM / 3.10-1 03/31/2006 Pages 3.10-2 through 3.10-4 08/30/1998 Pages TRM / 3.10-5 and TRM / 3.10-6 03/27/2007 Page TRM / 3.10-7 06/10/2010 3.11 RADIOACTIVE EFFLUENTS Page TRM / 3.11-1 03/31/2006 Pages 3.11-2 through 3.11-3 08/31/1998 Page TRM / 3.11-4 03/31/2006 Page 3.11-5 08/31/1998 Page TRM / 3.11-6 03/31/2006 Pages 3.11-7 through 3.11-9 08/31/1998 Page TRM /3.11-10 12/03/2004 Pages 3.11-11 and 3.11-12 08/31/1998 Page TRM /3.11-13 04/12/2007 Page TRM / 3.11-14 12/03/1004 Pages 3.11-15 and 3.11-16 09/01/1998 Page TRM / 3.11-17 03/31/2006 TRM / LOES-4 EFFECTIVE DATE 06/10/2010 SUSQUEHANNA - UNIT SUSQUEHANNA -

UNIT 2 2 TRM / LOES-4 EFFECTIVE DATE 06/10/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 60 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page 3.11-18 08/31/1998 Page TRM / 3.11-19 08/15/2005 Pages TRM / 3.11-20 and TRM / 3.11-21 03/31/2006 Page TRM / 3.11-22 04/02/2002 Page TRM / 3.11-23 11/14/2006 Page TRM / 3.11-24 05/13/2005 Page TRM / 3.11-25 04/12/2007 Pages TRM / 3.11-26 and TRM / 3.11-27 01/21/2004 Page TRM / 3.11-28 09/08/2009 Page TRM / 3.11-29 12/03/2004 Pages TRM 3.11-30 through TRM / 3.11-32 01/21/2004 Page TRM / 3.11-33 03/31/2006 Page 3.11-34 08/31/1998 Page TRM / 3.11-35 03/31/2006 Pages TRM / 3.11-36 through TRM / 3.11-39 11/30/2005 Pages 3.11-40 through 3.11-44 08/31/1998 Page TRM / 3.11-45 03/31/2006 Page 3.11-46 08/31/1998 Page TRM / 3.11-47 03/31/2006 3.12 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 02/05/1999 Page TRM / 3.12-4 03/14/2008 Page TRM / 3.12-5 02/05/1999 4.0 ADMINISTRATIVE CONTROLS Pages TRM / 4.0-1 through TRM / 4.0-3 08/31/1998 Page TRM / 4.0-4 12/11/2008 Pages TRM / 4.0-5 through TRM / 4.0-8 08/31/1998 TRM / LOES-5 EFFECTIVE DATE 06/10/2010 SUSQUEHANNA SUSQUEHANNA - UNIT

- UNIT 22 TRM / LOES-5 EFFECTIVE DATE 06/10/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 60 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.0 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 08/31/1998 Page TRM / B 3.0-4 01/10/2007 Page TRM / B 3.0-5 04/14/2008 Page TRM / B 3.0-6 08/31/1998 Page TRM / B 3.0-7 04/12/2007 Pages TRM / B 3.0-8 through TRM / B 3.0-10 08/31/1998 Pages TRM / B 3.0-11 and TRM / B 3.0-12 03/15/2002 Pages TRM / B 3.0-13 and TRM / B 3.0-14 11/30/2005 Page TRM / B 3.0-15 03/15/2002 B 3.1 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 07/13/1999 Pages TRM / B 3.1-2 and TRM / B 3.1-3 10/31/2007 Page B 3.1-4 08/31/1998 Pages TRM / B 3.1-5 through TRM / B 3.1-7 03/27/2007 Page TRM / B 3.1-8 02/18/1999 B 3.2 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 B 3.3 INSTRUMENTATION BASES Page TRM / B 3.3-1 04/07/2000 Pages TRM / B 3.3-2 and TRM / B-3.3-2a 10/31/2007 Pages TRM / B 3.3-3 and TRM / B 3.3-3a 10/31/2007 Pages TRM / B 3.3-4 and TRM / B 3.3-5 05/30/2006 Pages TRM / B 3.3-6 through TRM / B 3.3-9 10/31/2007 Page B 3.3-10 08/31/1998 Pages TRM / B 3.3-11 and TRM / B 3.3-12 09/13/2005 Page TRM / B 3.3-13 12/03/2004 Page TRM / B 3.3-14 06/25/2002 Page TRM / B 3.3-14a 10/31/2007 Page TRM / B 3.3-14b 06/14/2002 Pages TRM / B 3.3-15 through TRM / B 3.3-17 10/22/2003 Pages TRM / B 3.3-18 and TRM / B 3.3-19 03/27/2007 Pages TRM / B 3.3-19a and TRM / B 3.3-19b 03/27/2007 Page TRM / B 3.3-19c 04/17/2009 Pages TRM / B 3.3-19d and TRM / B 3.3-19e 03/27/2007 Page TRM / B 3.3-20 12/11/2008 Page TRM / B 3.3-21 05/16/2003 Page TRM / B 3.3-22 10/22/2003 Page TRM / B 3.3-23 05/16/2003 Pages TRM / B 3.3-24 and TRM / B 3.3-25 04/07/2009 TRM / LOES-6 EFFECTIVE DATE 06/10/2010 SUSQUEHANNA - UNIT SUSQUEHANNA- 2 UNIT 2 TRM / LOES-6 EFFECTIVE DATE 06/10/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 60 LIST OF EFFECTIVESECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.4 REACTOR COOLANT SYSTEM BASES Page TRM / B 3.4-1 08/31/1998 Pages TRM / B 3.4-2 and TRM / B3.4-3 04/01/2009 Pages TRM / B 3.4-4 and TRM / B 3.4-4a 10/31/2007 Page TRM / B 3.4-5 10/15/1999 Page B 3.4-6 08/31/1998 B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 08/31/1998 Pages TRM / B 3.5-3 and TRM / B 3.5-3a 10/31/2007 Page B 3.5-4 08/31/1998 Page TRM / B 3.5-5 10/31/2007 B 3.6 CONTAINMENT BASES Page TRM / B 3.6-1 07/26/2001 Page TRM / B 3.6-2 02/01/1999 Page B 3.6-3 08/31/1998 Page TRM / B 3.6-4 03/29/2007 Page TRM / B 3.6-5 04/04/2007 Page TRM / B 3.6-6 12/03/2004 Pages TRM / B 3.6-7 through TRM / B 3.6-11 12/31/2002 B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 08/31/1998 Page TRM / B 3.7-3 06/10/2010 Page TRM / B 3.7-3a 12/27/2007 Page TRM / B 3.7-4 03/31/2006 Page TRM / B 3.7-5 08/02/1999 Pages TRM / B 3.7-6 and TRM / B 3.7-6a 03/31/2006 Pages TRM/ B 3.7-7 and TRM / B 3.7-7a 08/02/1999 Page TRM / B 3.7-8 08/02/1999 Page TRM / B 3.7-9 03/31/2006 Page TRM / B 3.7-10 08/02/1999 Pages TRM / B 3.7-1Oa through TRM / B 3.7-a1 a 03/31/2006 Pages TRM / B 3.7-12 through TRM / B 3.7-14 08/02/1999 Pages TRM / B 3.7-14a and TRM / B 3.7-14b 01/09/2004 Pages TRM / B 3.7-15 and TRM / B 3.7-16 02/01/1999 Pages B 3.7-17 through B 3.7-20 08/31/1998 Page TRM / B 3.7-21 02/14/2005 Page TRM / B 3.7-21a 06/20/2008 Pages TRM / B 3.7-22 and TRM / B 3.7-23 01/30/2008 Pages TRM / B 3.7-24 through TRM / B 3.7-29 10/05/2006 TRM / LOES-7 EFFECTIVE DATE 06/10/2010 UNIT 2 SUSQUEHANNA - UNIT SUSQUEHANNA- 2 TRM / LOES-7 EFFECTIVE DATE 06/10/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 60 LIST OF EFFECTIVESECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / B 3.7-30 06/07/2007 Pages TRM / B 3.7-30a and TRM / B 3.7-30b 10/05/2006 Page TRM / B 3.7-32 03/09/2001 Page TRM / B 3.7-33 04/15/2003 Page TRM / B 3.7-34 12/03/2004 Page TRM / B 3.7-35 07/05/2000 Pages TRM / B 3.7-36 and TRM / B 3.7-37 04/01/2009 Page TRM / B 3.7-38 09/25/2009 Page TRM / B 3.7-39 04/01/2009 Page TRM / B 3.7-40 04/08/2010 B 3.8 ELECTRICAL POWER BASES Page TRM / B 3.8-1 04/02/2002 Pages TRM / B 3.8-2 and TRM / B 3.8-2 01/28/2005 Page TRM / B 3.8-2a 03/01/2010 Page TRM / B 3.8-3 04/02/2002 Page TRM / B 3.8-3a 04/02/2002 Page TRM / B 3.8-4 04/02/2002 Page TRM / B 3.8-4a 08/10/2004 Page TRM / B 3.8-5 08/31/1998 Pages TRM / B 3.8-6 through TRM / B 3.8-16 04/02/2002 Page TRM / B 3.8-17 01/28/2005 Pages TRM / B 3.8-18 through TRM / B 3.8-20 11/29/2006 Pages TRM / B 3.8-21 through TRM / B 3.8-24 05/28/2009 B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 and B 3.9-2 08/31/1998 Pages B 3.9-3 through B 3.9-7 10/23/1998 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 08/31/1998 Pages TRM / B 3.10-2 and TRM / B 3.10-3 03/27/2007 Pages TRM / B 3.10-4 and TRM / B 3.10-5 08/23/1999 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 08/31/1998 Page TRM / B 3.11-10 02/01/1999 Pages TRM/B 3.11-11 and TRM/B 3.11-11 a 04/07/2000 Pages TRM/B 3.11-12 and TRM/B 3.11-13 02/01/1999 Page TRM / B 3.11-14 12/03/2004 Page TRM / B 3.11-15 02/01/1999 Pages B 3.11-16 through B 3.11-19 08/31/1998 Page TRM /B 3.11-20 04/02/2002 Page TRM / B 3.11-20a 04/02/2002 TRM / LOES-8 EFFECTIVE DATE 06/10/2010 UNIT 2 SUSQUEHANNA - UNIT SUSQUEHANNA- 2 TRM / LOES-8 EFFECTIVE DATE 06/10/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 60 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / B 3.11-21 05/13/2005 Pages TRM / B 3.11-22 and TRM / B 3.11-23 11/14/2006 Page TRM / B 3.11-23a 05/13/2005 Pages TRM / B 3.11-24 and TRM / B 3.11-25 01/21/2004 Pages B 3.11-26 through B 3.11-27 08/31/1998 Pages TRM / B 3.11-28 and TRM / B 3.11-29 11/30/2005 Page TRM / B 3.11-30 12/03/2004 Pages B 3.11-31 through B 3.11-35 08/31/1998 Page TRM / B 3.11-36 02/12/1999 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B 3.12-1 09/19/2007 Pages TRM / B 3.12-2 and TRM / B 3.12-3 02/05/1999 TRM2 text LOES.doc 6/10/10 SUSQUEHANNA - UNIT 2 TRM / LOES-9 EFFECTIVE DATE 06/10/2010

Independent Spent Fuel Storage Installation (ISFSI)

PPL Rev. 2 3.10.3 3.10 Miscellaneous 3.10.3 Independent Spent Fuel Storage Installation (ISFSI)

TRO 3.10.3 All loaded Horizontal Storage Module (HSM) shall be OPERABLE.

APPLICABILITY: At all times.

ACTIONS


NOTE -----------------------------

1. The provisions of TRO 3.0.4 are not applicable.

CONDITION REQUIRED ACTION COMPLETION TIME A. Complete blockage of Clear blockage. 40 hours4.62963e-4 days <br />0.0111 hours <br />6.613757e-5 weeks <br />1.522e-5 months <br /> any HSM air inlet or outlet (front wall and roof birdscreen).

B. An HSM otherwise B.1 Initiate actions to restore the Immediately.

inoperable HSM to OPERABLE status.

C. Concrete temperature C.1 Initiate actions to move the Immediately.

> 350°F for more than associated DSC to an 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. OPERABLE HSM.

OR C.2 Initiate actions to move the associated DSC to the Cask Storage Pit/Spent Fuel Pool.

TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY TRS 3.10.3.1 Verify Front Wall and Roof Birdscreens, and spaces 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> between loaded HSM's have no debris that can block the air flow.

TRS 3.10.3.2 Verify concrete temperature < 350°F for each loaded 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> HSM.

SUSQUEHANNA - UNIT 2 TRM / 3.10-7 EFFECTIVE DATE 06/10/2010

Fire Suppression Water Supply System PPL Rev. 3 B 3.7.3.1 B 3.7.3.1 Fire Suppression Water Supply System BASES TRO The OPERABILITY of the fire suppression water supply systems ensures that adequate fire suppression capability is available to confine and extinguish fires occurring on any portion of the facility where safety related equipment is located. The fire suppression system consists of the water supply system, spray and/or sprinklers, C02 systems, Halon systems, fire hose stations, and fire hydrants. The collective capability of the fire suppression systems is adequate to minimize potential damage to safety related equipment and is a major element in the facility fire protection program.

Two fire suppression water supply subsystems shall be OPERABLE. A fire suppression subsystem shall consist of the following:

1. One OPERABLE fire suppression pump (either electric motor driven (OP512) or Diesel engine driven (OP511) having a capacity of 2500 gpm with the discharge aligned to the fire suppression header, and
2. At least one water supply (either Unit I or Unit 2 cooling tower basin, or the clarified water storage tank (OT523) having a minimum volume of 300,000 gallons, and
3. An OPERABLE flow path capable of taking a suction from at least one designated water supply, and transferring the water through distribution piping with OPERABLE sectionalizing control or isolation valves to the yard hydrant curb valves, hose stations, or the last valve ahead of the water flow alarm device on each deluge or spray system required to be OPERABLE per TROs 3.7.3.2, 3.7.3.5, and 3.7.3.6.

(Note: A single water supply is not sufficient for two fire suppression water supply subsystems to be OPERABLE. Portions of the flow path are common to each of the two OPERABLE fire suppression subsystems.)

Sectionalizing control or isolation valves allow portions of the underground fire main to be isolated for maintenance while still maintaining the remainder of the yard loop operable.

Closure of a single sectionalizing valve has no impact on the operability of the fire water system. If the individual valve isolates a hydrant, hose station or suppression system, compensatory actions will be taken in accordance with the applicable TRO for the SSC's impaired as listed in TRO 3.7.3.2, 3.7.3.5, and 3.7.3.6.

(continued)

SUSQUEHANNA - UNIT 2 TRM / B 3.7-3 EFFECTIVE DATE 06/10/2010

Fire Suppression Water Supply System PPL Rev. 3 B 3.7.3.1 B 3,7.3.1 Fire Suppression Water Supply System BASES TRO Closure of multiple sectionalizing valves does not render the fire (continued) suppression water system inoperable, provided that water is still supplied to both sides of the isolated section. When multiple sectionalizing valves are closed the suppression systems and components supplied by the isolated section of the underground fire main will have compensatory actions taken in accordance with the Required Actions for any TRO required SSC's impaired as listed in TRO 3.7.3.2, 3.7.3.5, and 3.7.3.6.

The backup fire protection system (defined in the Fire Protection Review Report as consisting of a 2500 gpm diesel engine driven fire pump, a jockey pump, and a dedicated water supply) is not part of this TRO. However, it does satisfy the requirements of the Required Actions when cross-tied to the main plant fire protection system loop, with the backup system OPERABLE (i.e. - backup diesel driven fire pump OP592 is OPERABLE and well water tank OT594 contains greater than 300,000 gallons of water).

(Reference 1)

(continued)

SUSQUEHANNA - UNIT 2 TRM / B 3.7-3a EFFECTIVE DATE 12/27/2007

Fire Suppression Water Supply System PPL Rev. 3 B 3.7.3.1 B 3.7.3.1 Fire Suppression Water Supply System BASES (continued)

ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components. In the event that portions of the fire suppression water supply systems are inoperable, an alternate fire suppression water supply system is required to be made available until the inoperable equipment is restored to service.

TRS The TRSs provide assurances that the minimum OPERABILITY requirements of the fire suppression water supply systems are met.

The Surveillances are modified by a Note to indicate that when a system is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. Upon completion of the test, or expiration of the 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> allowance, the system must be restored to an operable condition, or the applicable Condition entered, based on the original out of service time.

The 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> allowance is a reasonable out of service time based on prior plant test performance. This allowance also does not result in an increased risk of a fire. Required Surveillances include those surveillances under other subsections of TRM 3.7.3.

TRS 3.7.3.1.9 Diesel fuel oil sample is to be obtained in accordance with ASTM-D270-75.

The sample is to be within the acceptable limits specified in Table 1 of ASTM-D975-77.

TRS 3.7.3.1.13 System functional test is to include simulated automatic actuation of the system throughout its operating sequence.

TRS 3.7.3.1.19 Pump diesel engine inspection is to be done in accordance with procedures prepared in conjunction with its manufacturer's recommendations for the class of service.

TRS 3.7.3.1.20 Flow test is to be performed in accordance with Chapter 5, Section 11 of the Fire Protection 'Handbook, 14th Edition, published by the National Fire Protection Association REFERENCES 1. FPRR Section 4.1 SUSQUEHANNA - UNIT 2 TRM / B 3.7-4 EFFECTIVE DATE 03/31/2006