ML101610192

From kanterella
Jump to navigation Jump to search
Summary of Public Meeting with Exelon Generation Company to Discuss the 2009 Byron Nuclear Power Station Unit 1 and 2 End-of-Cycle Performance Assessment
ML101610192
Person / Time
Site: Byron  Constellation icon.png
Issue date: 06/09/2010
From: Richard Skokowski
Region 3 Branch 3
To:
References
Download: ML101610192 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 9, 2010 LICENSEE:

Exelon Generation Company, LLC FACILITY:

Byron Station, Units 1 and 2

SUBJECT:

SUMMARY

OF THE JUNE 2, 2010, PUBLIC MEETING TO DISCUSS THE 2009 BYRON NUCLEAR POWER STATION UNIT 1 AND 2 END-OF-CYCLE PERFORMANCE ASSESSMENT On June 2, 2010, the U.S. Nuclear Regulatory Commission (NRC) held a public meeting at the Byron Station Training Building, Room 107 in Byron, Illinois. The meeting was between NRC Region III and Exelon Generation Company representatives to discuss the NRCs 2009 End-of-Cycle Assessment of Byron Station, Units 1 and 2, safety performance. The results of that assessment were discussed in a letter to the licensee dated March 3, 2010, which can be found in the Agencywide Documents Access and Management System (ADAMS) at ML100610236.

The NRC began the meeting with an overview of the NRC and the nuclear industry, the NRCs Reactor Oversight Process (ROP) and national ROP results. This was followed by a summary of the NRCs 2009 assessment of safety performance for Byron Station, Units 1 and 2. The NRCs meeting presentation slides can be found in ADAMS at ML101590172 and the licensees presentation slides can be found at ML101590197. A list of principal meeting attendees can be found in the attached Enclosure.

Mr. B. Adams, Byron Plant Manager, provided an oral response to the NRCs assessment.

Mr. Adams concurred with the NRCs assessment that Byron Station, Units 1 and 2 were operated in a manner that preserved the health and safety of the public and the environment.

In addition, Mr. Adams discussed the licensee's view on human performance improvements.

Mr. Adams also described some of the actions the licensee is taking to address these issues.

At the end of the meeting, both the NRC staff and the licensee answered a number of questions from member of the public.

/RA by David Passehl for/

Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects Docket No. 50-454, 50-455 License No. NPF-37, NPF-66

Enclosure:

As stated cc w/encl: Distribution via ListServ

Enclosure PUBLIC MEETING PRINCIPAL ATTENDEES June 2, 2010 Exelon Generation Company, LLC B. Adams, Plant Manager, Byron Station D. Gudger, Regulatory Assurance Manager, Byron Station P. Dempsey, Communication Manager, Byron Station S. Greenlee, Engineering Director, Byron Station B. Youman, Work Control Manager, Byron Station Nuclear Regulatory Commission R. Skokowski, Branch Chief, Division of Reactor Projects, Region III B. Bartlett, Senior Resident Inspector, Braidwood Station J. Robbins, Resident Inspector, Braidwood Station S. Campbell, Chief, Plant Licensing Branch 3-2, Division of Operating Reactor Licensing, NRR M. David, Senior Project Manager, Plant Licensing Branch 3-2, Division of Operating Reactor Licensing, NRR Other Attendees C. Settles, Section Head, Illinois Emergency Management Agency C. Thompson, Resident Inspection - Byron, Illinois Emergency Management Agency

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 June 9, 2010 LICENSEE:

Exelon Generation Company, LLC FACILITY:

Byron Station, Units 1 and 2

SUBJECT:

SUMMARY

OF THE JUNE 2, 2010, PUBLIC MEETING TO DISCUSS THE 2009 BYRON NUCLEAR POWER STATION UNIT 1 AND 2 END-OF-CYCLE PERFORMANCE ASSESSMENT On June 2, 2010, the U.S. Nuclear Regulatory Commission (NRC) held a public meeting at the Byron Station Training Building, Room 107 in Byron, Illinois. The meeting was between NRC Region III and Exelon Generation Company representatives to discuss the NRCs 2009 End-of-Cycle Assessment of Byron Station, Units 1 and 2, safety performance. The results of that assessment were discussed in a letter to the licensee dated March 3, 2010, which can be found in the Agencywide Documents Access and Management System (ADAMS) at ML100610236.

The NRC began the meeting with an overview of the NRC and the nuclear industry, the NRCs Reactor Oversight Process (ROP) and national ROP results. This was followed by a summary of the NRCs 2009 assessment of safety performance for Byron Station, Units 1 and 2. The NRCs meeting presentation slides can be found in ADAMS at ML101590172 and the licensees presentation slides can be found at ML101590197. A list of principal meeting attendees can be found in the attached Enclosure.

Mr. B. Adams, Byron Plant Manager, provided an oral response to the NRCs assessment.

Mr. Adams concurred with the NRCs assessment that Byron Station, Units 1 and 2 were operated in a manner that preserved the health and safety of the public and the environment.

In addition, Mr. Adams discussed the licensee's view on human performance improvements.

Mr. Adams also described some of the actions the licensee is taking to address these issues.

At the end of the meeting, both the NRC staff and the licensee answered a number of questions from member of the public.

/RA by David Passehl for/

Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects Docket No. 50-454, 50-455 License No. NPF-37, NPF-66

Enclosure:

As stated cc w/encl: Distribution via ListServ DOCUMENT NAME: G:\\Branch TSS\\ALL EOC\\EOC CY 2009\\EOC letters\\EOC Meeting Summaries\\Byron Summary Letter 06-02-2010.doc G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME RNg:dtp RSkokowski DP for DATE 06/09/10 06/09/10 OFFICIAL RECORD COPY

Letter to Exelon Generation Company, LLC from R. Skokowski dated June 9, 2010.

SUBJECT:

SUMMARY

OF THE JUNE 2, 2010, PUBLIC MEETING TO DISCUSS THE 2009 BYRON NUCLEAR POWER STATION UNIT 1 AND 2 END-OF-CYCLE PERFORMANCE ASSESSMENT DISTRIBUTION:

Susan Bagley RidsNrrDorlLpl3-2 Resource RidsNrrPMByron Resource RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPreports Resource