MONTHYEARIR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 ML24009A2432024-01-25025 January 2024 Unit, No. 2 - Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0047 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML24009A2712024-01-24024 January 2024 Revision to Reactor Vessel Material Surveillance Capsule Withdrawal Schedule ML23354A0052024-01-0808 January 2024 Request for Withholding Information from Public Disclosure, H. B. Robinson Steam Electric Plant, Unit No. 2 ML23342A0902023-12-0808 December 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000261/20230032023-11-0707 November 2023 Integrated Inspection Report 05000261 2023003 and 07200060 2023001 ML23226A0862023-10-12012 October 2023 Issuance of Amendment No. 277 Regarding Revision of TSs to Add High-High Steam Generator Level Function to Table 3.3.2-1 and Remove Obsolete Content from TSs 2.1.1.1 and 5.6.5.b ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 ML23235A0552023-08-23023 August 2023 Notification of an Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000261/2023010) and Request for Information (RFI) IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) IR 05000261/20230022023-08-0707 August 2023 Integrated Inspection Report 05000261/2023002 IR 05000261/20234022023-05-30030 May 2023 Cyber Security Inspection Report 05000261/2023402 ML23145A1602023-05-25025 May 2023 Submittal of Updated Final Safety Analysis Report (Revision No. 30), Independent Spent Fuel Storage Installation Safety Analysis Report (Revision No. 28), Technical Specifications Bases Revisions, Quality IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) ML23047A4512023-02-21021 February 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000261/2023402 ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final ML22329A2982023-01-19019 January 2023 Issuance of Amendment No. 274 Regarding Revision of Technical Specification 3.8.1 Surveillance Requirement 3.8.1.16 ML22294A0922022-12-15015 December 2022 Issuance of Amendment No. 273 Regarding Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML22339A1362022-12-0101 December 2022 2023 Requalification Program Inspection - H.B. Robinson Nuclear Plant ML22322A1322022-11-18018 November 2022 301, NRC Operator License Examination Report & Cover Letter Merged ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000261/20220032022-11-0303 November 2022 Integrated Inspection Report 05000261 2022003 IR 05000261/20224022022-10-19019 October 2022 Security Baseline Inspection Report 05000261/2022402 IR 05000261/20220102022-09-26026 September 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports IR 05000261/20220052022-08-26026 August 2022 Updated Inspection Plan for the H.B Robinson Steam Electric Plant - Report 05000261/2022005-Final IR 05000261/20214042022-08-10010 August 2022 Reissue - H.B. Robinson Steam Electric Plant Security Baseline Inspection Report 05000261/2021404 IR 05000261/20220022022-08-0909 August 2022 Integrated Inspection Report 05000261 2022002, 07200060 2022001 and Exercise of Enforcement Discretion ML22213A0682022-08-0505 August 2022 Request for Withholding Information from Public Disclosure for H. B. Robinson Steam Electric Plant, Unit 2 ML22193A2122022-08-0404 August 2022 Request of Alternatives to ASME Code Section XI Subsection IWE Requirements for Containment Inspections ML22159A2952022-08-0303 August 2022 Issuance of Amendment No. 271 Regarding Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/Temperature Limit Cooldown Curves IR 05000261/20220112022-07-19019 July 2022 Biennial Problem Identification and Resolution Inspection Report 05000261/2022011 ML22167A1702022-07-14014 July 2022 Closeout of Generic Letter 2004 02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML22046A0222022-06-14014 June 2022 Issuance of Amendments to Adopt TSTF-439, Eliminate Second Completion Times Limiting Time from Discovery of Failure to Meet an LCO ML22125A1942022-05-12012 May 2022 Request for Withholding Information from Public Disclosure for H.B. Robinson Steam Electric Plant, Unit 2 IR 05000261/20220012022-05-0202 May 2022 Integrated Inspection Report 05000261/2022001 IR 05000261/20224012022-04-19019 April 2022 Security Baseline Inspection Report 05000261/2022401 ML22098A2262022-04-11011 April 2022 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML22083A0032022-03-29029 March 2022 Closeout of Bulletin 2012 01, Design Vulnerability in Electric Power System IR 05000261/20210062022-03-0202 March 2022 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 (Report No. 05000261/2021006) 2024-01-08
[Table view] Category:Inspection Report
MONTHYEARIR 05000261/20230042024-01-31031 January 2024 Integrated Inspection Report 05000261/2023004 IR 05000261/20234202023-11-30030 November 2023 Security Baseline Inspection Report 05000261/2023420 (Cover Letter with Report) IR 05000261/20230102023-11-28028 November 2023 Fire Protection Team Inspection Report 05000261/2023010 IR 05000261/20230032023-11-0707 November 2023 Integrated Inspection Report 05000261 2023003 and 07200060 2023001 IR 05000261/20230052023-08-21021 August 2023 Updated Inspection Plan for H.B. Robinson Steam Electric Plant (Report 05000261/2023005) IR 05000261/20230022023-08-0707 August 2023 Integrated Inspection Report 05000261/2023002 IR 05000261/20234022023-05-30030 May 2023 Cyber Security Inspection Report 05000261/2023402 IR 05000261/20230012023-05-0202 May 2023 Integrated Inspection Report 05000261/2023001 IR 05000261/20220062023-03-0101 March 2023 Annual Assessment Letter for H.B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2022006) ML23041A2272023-02-13013 February 2023 2022 Q4 Robinson_Workflow Final IR 05000261/20220032022-11-0303 November 2022 Integrated Inspection Report 05000261 2022003 IR 05000261/20224022022-10-19019 October 2022 Security Baseline Inspection Report 05000261/2022402 IR 05000261/20220102022-09-26026 September 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000261/2022010 IR 05000261/20223012022-09-23023 September 2022 301 Operator License Exam Approval Letter (05000261/2022301) IR 05000261/20220052022-08-26026 August 2022 Updated Inspection Plan for the H.B Robinson Steam Electric Plant - Report 05000261/2022005-Final IR 05000261/20214042022-08-10010 August 2022 Reissue - H.B. Robinson Steam Electric Plant Security Baseline Inspection Report 05000261/2021404 IR 05000261/20220022022-08-0909 August 2022 Integrated Inspection Report 05000261 2022002, 07200060 2022001 and Exercise of Enforcement Discretion IR 05000261/20220112022-07-19019 July 2022 Biennial Problem Identification and Resolution Inspection Report 05000261/2022011 IR 05000261/20220012022-05-0202 May 2022 Integrated Inspection Report 05000261/2022001 IR 05000261/20224012022-04-19019 April 2022 Security Baseline Inspection Report 05000261/2022401 IR 05000261/20210062022-03-0202 March 2022 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 (Report No. 05000261/2021006) IR 05000261/20210042022-01-25025 January 2022 Integrated Inspection Report 050000261/2021004 ML21342A2122021-12-0808 December 2021 Security Baseline Inspection Report 05000261/2021404 IR 05000261/20214032021-11-29029 November 2021 Material Control and Accounting Program Inspection Report 05000261/2021403 (OUO Removed) IR 05000261/20213012021-11-19019 November 2021 NRC Operator License Examination Report 05000261/2021301 IR 05000261/20210032021-11-0404 November 2021 Integrated Inspection Report 05000261/2021003 IR 05000261/20214022021-11-0303 November 2021 Security Baseline Inspection Report 05000261/2021402 IR 05000261/20210052021-08-25025 August 2021 Updated Inspection Plan for H. B. Robinson Steam Electric Plant, Unit 2 (Report 05000261/2021005) IR 05000261/20210022021-08-0303 August 2021 Integrated Inspection Report 05000261/2021002 IR 05000261/20214012021-07-0808 July 2021 Cyber Security Inspection Report 05000261/2021401 (Public) IR 05000261/20210012021-05-10010 May 2021 Integrated Inspection Report 05000261/2021001 IR 05000261/20210102021-03-22022 March 2021 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000261/2021010 IR 05000261/20200062021-03-0303 March 2021 Annual Assessment Letter for H.B. Robinson Steam Electric Plant Unit 2 Report 05000261/2020006 IR 05000261/20200042021-02-0909 February 2021 Integration Inspection Report 05000261/2020004 and Independent Spent Fuel Storage Fuel Storage Installation Inspection (ISFSI) Report 0720060/2020002 IR 05000261/20200112020-12-21021 December 2020 Design Basis Assurance Inspection (Programs) Inspection Report 05000261/2020011 ML20351A2682020-12-15015 December 2020 Requalification Program Inspection Notification Letter W Materials List IR 05000261/20200032020-10-30030 October 2020 Integrated Inspection Report 05000261/2020003 IR 05000261/20204012020-10-28028 October 2020 Security Baseline Inspection Report 05000261/2020401 ML20289A6362020-10-21021 October 2020 Security Inspection Report 05000261/2020420 - Cover Letter IR 05000261/20204202020-10-14014 October 2020 Security Inspection Report 05000261/2020420 - IP 92707 IR 05000261/20200122020-09-30030 September 2020 Fire Protection Team Inspection Report 05000261/2020012 IR 05000261/20200022020-07-23023 July 2020 Integrated Inspection Report 05000261-2020002, and Independent Spent Fuel Storage Installation Inspection Isfi Report 0720060-2020001 IR 05000261/20200012020-04-15015 April 2020 Integrated Inspection Report 05000261/2020001 IR 05000261/20200102020-03-18018 March 2020 Biennial Problem Identification and Resolution Inspection Report 05000261/2020010 IR 05000261/20190062020-03-0303 March 2020 Annual Assessment Letter for H. B. Robinson Steam Electric Plant Unit 2 NRC Report 05000261/2019006 IR 05000261/20190042020-02-13013 February 2020 Integrated Inspection Report 05000261/2019004, and Independent Spent Fuel Storage Installation Inspection (ISFSI) Report 0720060/2019002 IR 05000261/20204022020-01-23023 January 2020 Information Request for the Cyber-Security Baseline Security Inspection, Notification to Perform Inspection 05000261/2020402 IR 05000261/20193012019-11-19019 November 2019 NRC Operator License Examination Report 05000261/2019301 IR 05000261/20190032019-11-14014 November 2019 Integrated Inspection Report 05000261/2019003 IR 05000261/20190122019-09-19019 September 2019 NRC Inspection Report 05000261/2019012, and Investigation Report 2-2018-004; and Apparent Violations 2024-01-31
[Table view] |
See also: IR 05000261/2010011
Text
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
May 27, 2010
Mr. Eric McCartney
Vice President
Carolina Power and Light Company
H.B. Robinson Steam Electric Plant
3581 West Entrance Road
Hartsville, SC 29550
SUBJECT: NOTIFICATION OF H.B. ROBINSON STEAM ELECTRIC PLANT -
COMPONENT DESIGN BASES INSPECTION - NRC INSPECTION REPORT
05000261/2010011
Dear Mr. McCartney:
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)
Region II staff will conduct a component design bases inspection at your H.B. Robinson Steam
Electric Plant Unit 2 during the period of August 30 - October 1, 2010. The inspection team will
be led by Mr. Shakur Walker, a Senior Reactor Inspector from the NRC's Region II Office. This
inspection will be conducted in accordance with the baseline inspection procedure, Procedure
71111.21, Component Design Bases Inspection, issued August 19, 2008.
The inspection will evaluate the capability of risk significant / low margin components to function
as designed and to support proper system operation. The inspection will also include a review
of selected operator actions, operating experience, and modifications.
During a telephone conversation on May 26, 2010, Mr. Walker confirmed, with Mr. Garrett
Sanders of your staff, arrangements for an information gathering site visit and the three-week
onsite inspection. The schedule is as follows:
- Information gathering visit: August 9 - 12, 2010
- Week 1 of onsite inspection: August 30 - September 3, 2010
- Week 2 of onsite inspection: September 13 - 17, 2010
- Week 3 of onsite inspection: September 27 - October 1, 2010
The purpose of the information gathering visit is to meet with members of your staff to identify
risk-significant components and operator actions. Information and documentation needed to
support the inspection will also be identified and gathered or requested. Mr. John Hanna and
Mr. Walt Rogers, both Region II Senior Reactor Analysts, may accompany Mr. Walker during the
information gathering visit to review probabilistic risk assessment data and identify risk
significant components which will be examined during the inspection.
CPL 2
The enclosure lists documents that will be needed prior to the information gathering visit. Please
contact Mr. Walker with any questions prior to preparing materials listed in the enclosure and
provide the referenced information to the Region II office by July 15, 2010, unless otherwise
noted. The inspectors will try to minimize your administrative burden by specifically identifying
only those documents required for the inspection preparation.
During the information gathering visit, the team leader will also discuss the following inspection
support administrative details: office space; site, plant and information system access; required
resources; and information exchange protocol.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be available electronically for public inspection in the NRC Public Document Room
or from the Publicly Available Records (PARS) component of NRC's document system
(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
This letter does not contain new or amended information collection requirements subject to the
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, control number 3150-
0011.
The NRC may not conduct or sponsor, and a person is not required to respond to, a request for
information or an information collection requirement unless the requesting document displays a
currently valid Office of Management and Budget control number.
Thank you for your cooperation in this matter. If you have any questions regarding the
information requested or the inspection, please contact Mr. Walker at (404) 997-4639 or me at
(404) 997-4519.
Sincerely,
/RA/
Binoy B. Desai, Chief
Engineering Branch 1
Division of Reactor Safety
Docket Nos.: 50-261
License Nos.: DPR-23
Enclosure: Information Request for H.B. Robinson Steam Electric Plant Component Design
Bases Inspection
cc w/encl: (See page 3)
CPL 3
cc w/encl: David T. Conley
Eric McCartney Associate General Counsel
Vice President Legal Dept.
H. B. Robinson Steam Electric Plant Unit 2 Progress Energy Service Company, LLC
Carolina Power & Light Company Electronic Mail Distribution
Electronic Mail Distribution
John H. O'Neill, Jr.
R. J. Duncan, II Shaw, Pittman, Potts & Trowbridge
Vice President 2300 N. Street, NW
Nuclear Operations Washington, DC 20037-1128
Carolina Power & Light Company
Electronic Mail Distribution Susan E. Jenkins
Director, Division of Waste Management
Brian C. McCabe Bureau of Land and Waste Management
Manager, Nuclear Regulatory Affairs S.C. Department of Health and
Progress Energy Carolinas, Inc. Environmental Control
Electronic Mail Distribution Electronic Mail Distribution
Christos Kamilaris Scott Saunders
Director Plant General Manager
Fleet Support Services Carolina Power & Light Company
Carolina Power & Light Company Electronic Mail Distribution
Electronic Mail Distribution
Robert P. Gruber
Curt A. Castell Executive Director
Supervisor Public Staff - NCUC
Licensing/Regulatory Programs 4326 Mail Service Center
Carolina Power & Light Company Raleigh, NC 27699-4326
Electronic Mail Distribution
W. Lee Cox, III
B. C. White Section Chief
Manager Radiation Protection Section
Support Services - Nuclear N.C. Department of Environmental
Carolina Power & Light Company Commerce & Natural Resources
Electronic Mail Distribution Electronic Mail Distribution
S. D. West Public Service Commission
Superintendent Security State of South Carolina
H. B. Robinson Steam Electric Plant P.O. Box 11649
Progress Energy Columbia, SC 29211
Electronic Mail Distribution
R. Mike Gandy
Joseph W. Donahue Division of Radioactive Waste Mgmt.
Vice President S.C. Department of Health and
Nuclear Oversight Environmental Control
Carolina Power and Light Company Electronic Mail Distribution
Electronic Mail Distribution
(cc w/encl contd - See page 4)
CPL 4
(cc contd)
Chairman
North Carolina Utilities Commission
Electronic Mail Distribution
Senior Resident Inspector
U.S. Nuclear Regulatory Commission
H. B. Robinson Steam Electric Plant
2112 Old Camden Rd
Hartsville, SC 29550
_________________________ X SUNSI REVIEW COMPLETE
OFFICE RII:DRS RII:DRS
SIGNATURE RA RA
NAME S. Walker B. Desai
DATE 5/27/2010 5/27/2010
E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
INFORMATION REQUEST FOR H.B. ROBINSON STEAM ELECTRIC PLANT
COMPONENT DESIGN BASES INSPECTION
Please provide the information electronically in .pdf files, Excel, or other searchable format on
CD/DVD-ROM. The CD/DVD-ROM should be indexed and possibly hyperlinked to facilitate
ease of use. Information in lists should contain enough information to be easily understood to
someone who has knowledge of pressurized water reactor technology.
1. From your most recent probabilistic safety analysis (PSA) excluding external events and
fires, please provide:
a. Two risk rankings of components from your site-specific probabilistic safety
analysis (PSA) - one sorted by Risk Achievement Worth (RAW), and the other
sorted by Birnbaum Importance.
b. A list of the top 500 cutsets.
2. From your most recent probabilistic safety analysis (PSA) including external events and
fires, please provide:
a. Two risk rankings of components from your site-specific probabilistic safety
analysis (PSA) - one sorted by Risk Achievement Worth (RAW), and the other
sorted by Birnbaum Importance.
b. A list of the top 500 cutsets.
3. Risk ranking of operator actions from your site specific PSA sorted by RAW. Provide
copies of your human reliability worksheets for these items.
4. Any pre-existing evaluation or list of components and calculations with low design
margins (i.e., pumps closest to the design limit for flow or pressure, diesel generator close
to design required output, heat exchangers close to rated design heat removal, MOV risk-
margin rankings, etc.).
5. A list of station applicability evaluations/reviews performed and documented in the station
corrective action program in the past two years for industry events, critical equipment
failures, and safety related equipment vulnerabilities (as communicated by NRC generic
communications, industry communications, 10 CFR Part 21 notifications, etc.).
6. A list of operability evaluations completed within the last two years, sorted by associated
component or system.
7. A list of common-cause failures of components that have occurred at H.B. Robinson
Steam Electric Plant and have been identified within the last five years.
8. A list of equipment currently planned for upgrade/improvement by the site (e.g. ONE
List), including a description of the reason(s) why each component (i.e. not a
programmatic or system level concern) is on that list and summaries (if available) of your
plans to address those reasons.
9. A list of equipment currently in RIS 05-020 (formerly GL 91-18) status, or in MR (a)(1)
status.
10. Contact information for a person to discuss PRA information prior to the information
gathering trip: name, title, phone number, and e-mail address.
Enclosure
2
11. Provide two sets of PI&D drawings (11x17) for safety-related systems (for onsite week of
August 9 - 11, 2010)
12. Provide six copies of FSAR (CD/DVD-ROM only) (for onsite week of August 9 - 11, 2010)
13. Provide six copies of Technical Specifications and Bases (CD/DVD-ROM only) (for
onsite week of August 9 - 11, 2010)
Enclosure