IR 05000261-10-011, Notification of H.B. Robinson Steam Electric Plant - Component Design Bases Inspection
ML101580491
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 05/27/2010
From: Binoy Desai
NRC/RGN-II/DRS/EB1
To: Mccartney E
Carolina Power & Light Co
References
IR-10-011
Download: ML101580491 (7)


See also: IR 05000261/2010011

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

May 27, 2010

Mr. Eric McCartney

Vice President

Carolina Power and Light Company

H.B. Robinson Steam Electric Plant

3581 West Entrance Road

Hartsville, SC 29550

SUBJECT: NOTIFICATION OF H.B. ROBINSON STEAM ELECTRIC PLANT -

COMPONENT DESIGN BASES INSPECTION - NRC INSPECTION REPORT

05000261/2010011

Dear Mr. McCartney:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a component design bases inspection at your H.B. Robinson Steam

Electric Plant Unit 2 during the period of August 30 - October 1, 2010. The inspection team will

be led by Mr. Shakur Walker, a Senior Reactor Inspector from the NRC's Region II Office. This

inspection will be conducted in accordance with the baseline inspection procedure, Procedure

71111.21, Component Design Bases Inspection, issued August 19, 2008.

The inspection will evaluate the capability of risk significant / low margin components to function

as designed and to support proper system operation. The inspection will also include a review

of selected operator actions, operating experience, and modifications.

During a telephone conversation on May 26, 2010, Mr. Walker confirmed, with Mr. Garrett

Sanders of your staff, arrangements for an information gathering site visit and the three-week

onsite inspection. The schedule is as follows:

  • Information gathering visit: August 9 - 12, 2010
  • Week 1 of onsite inspection: August 30 - September 3, 2010
  • Week 2 of onsite inspection: September 13 - 17, 2010
  • Week 3 of onsite inspection: September 27 - October 1, 2010

The purpose of the information gathering visit is to meet with members of your staff to identify

risk-significant components and operator actions. Information and documentation needed to

support the inspection will also be identified and gathered or requested. Mr. John Hanna and

Mr. Walt Rogers, both Region II Senior Reactor Analysts, may accompany Mr. Walker during the

information gathering visit to review probabilistic risk assessment data and identify risk

significant components which will be examined during the inspection.

CPL 2

The enclosure lists documents that will be needed prior to the information gathering visit. Please

contact Mr. Walker with any questions prior to preparing materials listed in the enclosure and

provide the referenced information to the Region II office by July 15, 2010, unless otherwise

noted. The inspectors will try to minimize your administrative burden by specifically identifying

only those documents required for the inspection preparation.

During the information gathering visit, the team leader will also discuss the following inspection

support administrative details: office space; site, plant and information system access; required

resources; and information exchange protocol.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document Room

or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number 3150-

0011.

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for

information or an information collection requirement unless the requesting document displays a

currently valid Office of Management and Budget control number.

Thank you for your cooperation in this matter. If you have any questions regarding the

information requested or the inspection, please contact Mr. Walker at (404) 997-4639 or me at

(404) 997-4519.

Sincerely,

/RA/

Binoy B. Desai, Chief

Engineering Branch 1

Division of Reactor Safety

Docket Nos.: 50-261

License Nos.: DPR-23

Enclosure: Information Request for H.B. Robinson Steam Electric Plant Component Design

Bases Inspection

cc w/encl: (See page 3)

CPL 3

cc w/encl: David T. Conley

Eric McCartney Associate General Counsel

Vice President Legal Dept.

H. B. Robinson Steam Electric Plant Unit 2 Progress Energy Service Company, LLC

Carolina Power & Light Company Electronic Mail Distribution

Electronic Mail Distribution

John H. O'Neill, Jr.

R. J. Duncan, II Shaw, Pittman, Potts & Trowbridge

Vice President 2300 N. Street, NW

Nuclear Operations Washington, DC 20037-1128

Carolina Power & Light Company

Electronic Mail Distribution Susan E. Jenkins

Director, Division of Waste Management

Brian C. McCabe Bureau of Land and Waste Management

Manager, Nuclear Regulatory Affairs S.C. Department of Health and

Progress Energy Carolinas, Inc. Environmental Control

Electronic Mail Distribution Electronic Mail Distribution

Christos Kamilaris Scott Saunders

Director Plant General Manager

Fleet Support Services Carolina Power & Light Company

Carolina Power & Light Company Electronic Mail Distribution

Electronic Mail Distribution

Robert P. Gruber

Curt A. Castell Executive Director

Supervisor Public Staff - NCUC

Licensing/Regulatory Programs 4326 Mail Service Center

Carolina Power & Light Company Raleigh, NC 27699-4326

Electronic Mail Distribution

W. Lee Cox, III

B. C. White Section Chief

Manager Radiation Protection Section

Support Services - Nuclear N.C. Department of Environmental

Carolina Power & Light Company Commerce & Natural Resources

Electronic Mail Distribution Electronic Mail Distribution

S. D. West Public Service Commission

Superintendent Security State of South Carolina

H. B. Robinson Steam Electric Plant P.O. Box 11649

Progress Energy Columbia, SC 29211

Electronic Mail Distribution

R. Mike Gandy

Joseph W. Donahue Division of Radioactive Waste Mgmt.

Vice President S.C. Department of Health and

Nuclear Oversight Environmental Control

Carolina Power and Light Company Electronic Mail Distribution

Electronic Mail Distribution

(cc w/encl contd - See page 4)

CPL 4

(cc contd)

Chairman

North Carolina Utilities Commission

Electronic Mail Distribution

Senior Resident Inspector

U.S. Nuclear Regulatory Commission

H. B. Robinson Steam Electric Plant

2112 Old Camden Rd

Hartsville, SC 29550

_________________________ X SUNSI REVIEW COMPLETE

OFFICE RII:DRS RII:DRS

SIGNATURE RA RA

NAME S. Walker B. Desai

DATE 5/27/2010 5/27/2010

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

INFORMATION REQUEST FOR H.B. ROBINSON STEAM ELECTRIC PLANT

COMPONENT DESIGN BASES INSPECTION

Please provide the information electronically in .pdf files, Excel, or other searchable format on

CD/DVD-ROM. The CD/DVD-ROM should be indexed and possibly hyperlinked to facilitate

ease of use. Information in lists should contain enough information to be easily understood to

someone who has knowledge of pressurized water reactor technology.

1. From your most recent probabilistic safety analysis (PSA) excluding external events and

fires, please provide:

a. Two risk rankings of components from your site-specific probabilistic safety

analysis (PSA) - one sorted by Risk Achievement Worth (RAW), and the other

sorted by Birnbaum Importance.

b. A list of the top 500 cutsets.

2. From your most recent probabilistic safety analysis (PSA) including external events and

fires, please provide:

a. Two risk rankings of components from your site-specific probabilistic safety

analysis (PSA) - one sorted by Risk Achievement Worth (RAW), and the other

sorted by Birnbaum Importance.

b. A list of the top 500 cutsets.

3. Risk ranking of operator actions from your site specific PSA sorted by RAW. Provide

copies of your human reliability worksheets for these items.

4. Any pre-existing evaluation or list of components and calculations with low design

margins (i.e., pumps closest to the design limit for flow or pressure, diesel generator close

to design required output, heat exchangers close to rated design heat removal, MOV risk-

margin rankings, etc.).

5. A list of station applicability evaluations/reviews performed and documented in the station

corrective action program in the past two years for industry events, critical equipment

failures, and safety related equipment vulnerabilities (as communicated by NRC generic

communications, industry communications, 10 CFR Part 21 notifications, etc.).

6. A list of operability evaluations completed within the last two years, sorted by associated

component or system.

7. A list of common-cause failures of components that have occurred at H.B. Robinson

Steam Electric Plant and have been identified within the last five years.

8. A list of equipment currently planned for upgrade/improvement by the site (e.g. ONE

List), including a description of the reason(s) why each component (i.e. not a

programmatic or system level concern) is on that list and summaries (if available) of your

plans to address those reasons.

9. A list of equipment currently in RIS 05-020 (formerly GL 91-18) status, or in MR (a)(1)

status.

10. Contact information for a person to discuss PRA information prior to the information

gathering trip: name, title, phone number, and e-mail address.

Enclosure

2

11. Provide two sets of PI&D drawings (11x17) for safety-related systems (for onsite week of

August 9 - 11, 2010)

12. Provide six copies of FSAR (CD/DVD-ROM only) (for onsite week of August 9 - 11, 2010)

13. Provide six copies of Technical Specifications and Bases (CD/DVD-ROM only) (for

onsite week of August 9 - 11, 2010)

Enclosure