Notification of Inspection and Request for Information for NRC PI&R Inspection
ML101470391
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 05/27/2010
From: Hopper G
Reactor Projects Branch 7
To: Mccartney E
Carolina Power & Light Co
References
Download: ML101470391 (9)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVE N.E., SUITE 1200 ATLANTA, GEORGIA 30303 May 27, 2010 Carolina Power and Light Company ATTN: Mr. Eric McCartney Vice President - Robinson Plant H. B. Robinson Steam Electric Plant Unit 2 3581 West Entrance Road Hartsville, SC 29550

SUBJECT:

H.B. ROBINSON STEAM ELECTRIC PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION

Dear Mr. McCartney:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a problem identification and resolution (PI&R) inspection at your Robinson Unit 2 during the weeks of July 12 - 16 and July 26 - 30, 2010. The inspection team will be led by Joel Rivera-Ortiz, a Senior Reactor Inspector from the NRCs Region II office.

This inspection will be conducted in accordance with the baseline inspection procedure, Procedure 71152, Identification and Resolution of Problems Inspection, issued on February 26, 2010.

The biennial PI&R inspection and assessment of the licensees Corrective Action Program (CAP) complements and expands upon the resident baseline inspections of routine daily screening of all corrective action program issues, quarterly focused issue reviews, and semiannual trend PI&R reviews.

On May 26, 2010, Mr. Rivera-Ortiz confirmed with Mr. Garrett Sanders of your staff, arrangements for the two-week onsite inspection.

The enclosure lists documents that will be needed prior to the inspection. Please have the referenced information available no later than June 28, 2010. Contact Mr. Rivera-Ortiz with any questions concerning the requested information. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation.

CP&L 2

If additional documents are needed, they will be requested when identified. The additional information will need to be made available to the team in the Region II office prior to the inspection teams preparation week of July 5, 2010. Prior to the onsite inspection, Mr. Rivera-Ortiz will discuss with your staff the following inspection support administrative details:

availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection; method of tracking inspector requests during the inspection; access to licensee computers; working space; arrangements for site access; and other applicable information.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding the information requested or the inspection, please contact Mr. Rivera-Ortiz at (404) 997-4825.

Sincerely,

/RA/

George T. Hopper, Chief Reactor Projects Branch 7 Division of Reactor Projects Docket No.: 50-261 License No.: DPR-23

Enclosure:

INFORMATION REQUEST FOR H.B. ROBINSON UNIT 2 PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION cc w/encl: (See page 3)

PAPERWORK REDUCTION ACT STATEMENT This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011.

PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.

_ML101470391___

X SUNSI REVIEW COMPLETE (J. Rivera-Ortiz)

OFFICE RII:DRS RII:DRP SIGNATURE JER6 GTH1 NAME JRivera-Ortiz GHopper DATE 05/27/2010 05/27/2010 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO

CP&L 3

cc w/encl:

Eric McCartney, Vice President H. B. Robinson Steam Electric Plant Unit 2 Carolina Power & Light Company Electronic Mail Distribution R. J. Duncan, II, Vice President Nuclear Operations Carolina Power & Light Company Electronic Mail Distribution Brian C. McCabe Manager, Nuclear Regulatory Affairs Progress Energy Carolinas, Inc.

Electronic Mail Distribution Christos Kamilaris, Director Fleet Support Services Carolina Power & Light Company Electronic Mail Distribution Curt A. Castell, Supervisor Licensing/Regulatory Programs Carolina Power & Light Company Electronic Mail Distribution B. C. White, Manager Support Services - Nuclear Carolina Power & Light Company Electronic Mail Distribution S. D. West, Superintendent Security H. B. Robinson Steam Electric Plant Progress Energy Electronic Mail Distribution Joseph W. Donahue, Vice President Nuclear Oversight Carolina Power and Light Company Electronic Mail Distribution David T. Conley Associate General Counsel Legal Dept.

Progress Energy Service Company, LLC Electronic Mail Distribution John H. O'Neill, Jr.

Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128 Susan E. Jenkins Director, Division of Waste Management Bureau of Land and Waste Management S.C. Department of Health and Environmental Control Electronic Mail Distribution Scott Saunders, Plant General Manager Carolina Power & Light Company Electronic Mail Distribution Robert P. Gruber, Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 W. Lee Cox, III, Section Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution Public Service Commission State of South Carolina P.O. Box 11649 Columbia, SC 29211 R. Mike Gandy Division of Radioactive Waste Mgmt.

S.C. Department of Health and Environmental Control Electronic Mail Distribution Chairman North Carolina Utilities Commission Electronic Mail Distribution

CP&L 4

Letter to Eric McCartney from George T. Hopper dated May 27, 2010

SUBJECT:

H.B. ROBINSON STEAM ELECTRIC PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION Distribution w/encl:

C. Evans, RII EICS L. Slack, RII EICS OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMRobinson Resource

Enclosure INFORMATION REQUEST FOR H.B. ROBINSON UNIT 2 PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION (JULY 12-16 AND JULY 26-30, 2010)

A.

Documents Needed Prior to the Information Gathering Visit Note: Unless otherwise noted, the information requested below corresponds to documents generated since June 1, 2008. Please provide the requested documents in electronic format. If the information is not available in electronic format, please contact the inspection team leader to coordinate other available methods to provide the information.

1.

Copies of the corporate and site level procedures and sub-tier procedures associated with the corrective action program. This should include procedures related to:

a) Corrective action process b) Cause evaluation c) Operating experience program d) Employee concerns program e) Self-assessment program f) Maintenance rule program and implementing procedures g) Operability determination process h) Degraded/non-conforming condition process (e.g., RIS 2005-20) i) System health process or equivalent equipment reliability improvement programs j) Preventive maintenance deferral and nuclear condition report (NCR) extension process If any of the procedures requested above were revised after June 1, 2008, please provide (or have available) copies of all revisions during the onsite inspection.

2.

List of top ten risk significant systems, top ten risk significant components for each one of the top ten risk significant systems, and top ten risk significant operator manual actions.

3.

List of all NCRs initiated including the following information for each NCR:

a) NCR Number b) Brief, but complete problem description c) Priority or level d) Affected system e) Affected component f) Responsible plant department g) NCR completion status If possible, provide this list in a format compatible with spreadsheet software (example shown below)

NCR #

Problem Priority System Component Org Status NCR001 A RHR Pump failed flow criteria per SR 5.0.5.4 2

RHR 2-RHR-PMP-A ENG Open

2 Enclosure

4.

List of outstanding corrective actions including the following information for each action:

a) Corrective action number b) Corrective action type (e.g., corrective action to prevent recurrence, enhancement, maintenance rule evaluation, etc) c) Brief, but complete corrective action description d) Associated NCR number e) Corrective action initiation date f) Number of Extensions g) Corrective action due date h) Completion status If possible, provide this list in a format compatible with spreadsheet software (example shown below)

Corrective Action #

Type Description NCR Initiation Date Extensions Due Date Status AR0034 CAPR Revise Procedure NGK-003-4585 NCR0058 01/05/08 2

06/15/08 Closed

5.

List of control room deficiencies with a brief description and corresponding NCR and/or work order (WO) number.

6.

List of operator workarounds and operator burdens with a brief description and corresponding NCR number

7.

List of all currently extended NCRs or overdue, sorted by initiation date, with the following information:

a) NCR #

b) Priority or Significance c) NCR title and short description

8.

List of all NCRs that have been voided or cancelled. Please provide the following information for each NCR:

a) NCR Number b) Brief, but complete problem description c) Reason voided or cancelled

9.

List of all structures, systems, and components (SSCs) which were classified as (a)(1) in accordance with the Maintenance Rule since June 1, 2008. Please include the following information for each system in (a)(1):

a) Date of classification in (a)(1) b) Reason for being placed in (a)(1)

3 Enclosure c) Planned actions and their status

10.

List of Maintenance Preventable Functional Failures (MPFF) of risk significant systems.

Please include actions completed and current status.

11.

List of corrective maintenance work orders. Please include the following information for each work order:

a) WO number b) Brief, but complete work description c) Affected system and components c) Date of initiation d) Date of completion (if completed)

If possible, provide this list in a format compatible with spreadsheet software (example shown below)

Work Order #

Description System Component Initiation Date Due Date Status WO01345 Replace breaker 2A-BKR-08-BB4 for 2A SI Pump.

SI 2A-SI-PMP, BKR-08-BB4 01/05/08 03/15/09 Closed

12.

Corrective action closeout packages, including NCRs with description of corrective actions, for all NRC findings and Licensee identified violations.

13.

Corrective action closeout packages, including NCRs with description of corrective actions, for all licensee event reports (LERs) issued.

14.

List of all NRC generic communications (e.g., Information Notices, Generic Letters, etc.)

and industry operating experience (OE) documents (e.g., Part 21 reports, vendor information letters, information from other sites, etc.,) evaluated by the site for applicability to the station, regardless of the determination of applicability. Please include the reference number (e.g., NCR #) for the documents that evaluated the aforementioned OE information.

15.

Copies of all quality assurance audits and/or assessments issued, including the last two audits/assessments of the corrective action program.

16.

Copies of all department self-assessments for those programs related to the Corrective Action Program (e.g. Operating Experience, Maintenance Rule, etc)

17.

Copy of the most recent integrated plant trend report, departmental trend report(s), and corrective action trend report, including any human performance and equipment reliability trends.

4 Enclosure

18.

Copy of the latest Corrective Action Program statistics (if exists) such as the number of NCRs initiated by department, human performance errors by department, and others as may be available.

19.

Copies of any minutes of meetings by the offsite safety review boards/groups. In addition, please provide a list of routine meetings involving the CAP to be held while team is onsite.

20.

List of NCRs related to equipment aging issues in the top ten risk significant systems since June 1, 2005 (e.g., system erosion and/or corrosion problems; electronic component aging or obsolescence of circuit boards, power supplies, relays, etc.;

environmental qualification). Please provide the following information for each NCR:

a) NCR number b) Priority c) NCR problem description

21.

If performed, please provide any recent self-assessment of the site safety culture..

22.

Copies of corrective action program documents related to cross-cutting issues (human performance, problem identification and resolution, and safety conscious work environment) identified via trending, self-assessments, safety review committee or other oversight methods.

23.

List of all root cause evaluations with a brief description.

24.

Copy of Probabilistic Risk Assessment importance measures report, if available.

25.

System Health Reports, system design basis documents, and system description information for the top ten risk significant systems.