|
---|
Category:Acceptance Review Letter
MONTHYEARML21320A2122021-11-17017 November 2021 Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request Concerning Revised Dose Calculations ML20083G1522020-03-23023 March 2020 Acceptance of Requested Licensing Action License Amendment Request to Revise Loss of Voltage Relay Allowable Values ML19059A1782019-02-28028 February 2019 Acceptance Review Results for Relief Request No. EN-19-RR-1 to Use ASME Code Case N-831-1 for Entergy Fleet ML18124A0682018-05-15015 May 2018 Acceptance of Requested Licensing Action License Amendment Request to Adopt Technical Specifications Task Force Traveler (TSTF)-425, Revision 3 ML18095A0892018-04-11011 April 2018 Acceptance of Requested Licensing Action License Amendment Request to Adopt Technical Specifications Task Force Traveler (TSTF)-425, Revision 3 ML16348A4212016-12-21021 December 2016 Acceptance of Requested Licensing Action License Amendment Request to Revise the National Fore Protection Association Standard 805 Modifications ML14140A2922014-05-20020 May 2014 Acceptance Review Email, Relief Request ANO1-ISI-024, Alternative from Volumetric/Surface Examination Frequency Requirements of ASME Code Case N-729-1, Fourth 10-year ISI Interval ML14139A2702014-05-20020 May 2014 One. Unit 1 - Acceptance of Licensing Action, Request to Adopt National Fire Protection Association NFPA 805, Performance-Based Standard for Fire Protection for LWR Generating Plants (2001 Edition) ML13282A5822013-10-0909 October 2013 Acceptance Review Email, Relief Request ANO2-ISI-004 - Alternative to Extend the Third 10-Year Inservice Inspection Interval for Reactor Vessel Weld Examinations ML13224A2072013-08-12012 August 2013 Acceptance Review Email, License Amendment Request to Revise Technical Specification 2.1.1.1 to Add a New Fuel Centerline Melt Temperature and Burnup Relationship Using Copernic Code ML13182A3332013-07-0101 July 2013 Acceptance Review Email, License Amendment Request to Adopt Technical Specification Task Force (TSTF)-422, Revision 2 Change in Technical Specifications End States (CE NPSD-1186) ML13130A2172013-05-10010 May 2013 Acceptance Review Email, License Amendment Request to Adopt Technical Specifications Task Force (TSTF)-431, Revision 3, Change in Technical Specifications End States (BAW-2441) ML13092A3462013-04-0202 April 2013 Email, Acceptance Review, Relief Request ANO2-ISI-015, from Pressure Testing Requirements for Reactor Vessel Flange Seal Leak Detection Piping for the Fourth 10-Year Inservice Inspection Interval ML13092A3642013-04-0202 April 2013 Email, Acceptance Review, Request for Approval of Revised Loss-of-Coolant Accident (LOCA) Dose Calculations for the ANO-1 Control Room Based on Alternate Source Term ML13078A4262013-03-19019 March 2013 Acceptance Review Email, License Amendment Request, Adoption of Technical Specifications Task Force (TSTF)-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 ML13043A1342013-02-15015 February 2013 Acceptance Review, Request to Adopt National Fire Protection Association Standard NFPA-805, Performance-Based Standard for Fire Protections for Light-Water Reactor Electric Generating Plants, 2001 ML12311A1342012-11-0505 November 2012 Entergy Fleet and ISFSI-Acceptance Review Email, Direct License Transfer and Conforming Amendments for Arkansas Nuclear Units 1 & 2; Grand Gulf Unit 1, and Grand Gulf Early Site Permit; Indirect License Transfer for River Bend and Waterford ML12250A7612012-09-0606 September 2012 Acceptance Review E-mail, Request for Relief No. ANO1-ISI-021, from ASME Volumetric Requirements for Full Penetration Welded Nozzles in Vessels - Inspection Program B; Fourth 10-Year ISI Interval ML1213105622012-05-10010 May 2012 Acceptance Review Email, License Amendment Request to Revise Technical Specifications Related to Revised Fuel Assembly Drop Analysis and Adoption of TSTF-51, TSTF-272, TSTF-286, and TSTF-471 ML1211802232012-04-27027 April 2012 Acceptance Review E-mail, Relief Request ANO2-ISI-012, from Volumetric and Surface Exam Requirements for Pressure Retaining Welds in Pressure Vessels, Third 10-Year Inservice Inspection Interval ML1202607432012-01-26026 January 2012 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2, and 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Acceptance Review Email, Amendment to Revise Quality Assurance Program Manual and Staff Qualification Technical Speci ML1133901112011-12-0505 December 2011 Acceptance Review Email, Change to Implement Emergency Action Level Schemes Based on Nuclear Energy Institute (NEI) 99-01, Revision 5 ML1121016132011-07-28028 July 2011 Acceptance Review Email, Change to Implement Emergency Action Level Schemes Based on Nuclear Energy Institute (NEI) 99-01, Revision 5 ML1115303232011-06-0202 June 2011 Acceptance Review E-mail, License Amendment Request to Adopt Technical Specification Task Force (TSTF)513, Revision 3, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation ML1031305712010-11-0909 November 2010 Acceptance Review Email, Relief Request ANO1-R&R-014, Request for Use of Non-ASME Code Repair to Service Water Piping in Accordance with NRC Generic Letter 90-05 ML1027802872010-10-0505 October 2010 Acceptance Review Email, License Amendment Request, Revise TS 3.4, Reactor Coolant System (Rcs), and TS 3.9, Refueling Operations, Related to Completion Times for One Inoperable RCS Cooling Loop ML1026402292010-09-20020 September 2010 Nonacceptance with Opportunity to Supplement Email, License Amendment Request to Revise TS 3.7.3, Mfivs, Main Feedwater Block Valves, Low Load Feedwater Control Valves and Startup Feedwater Control Valves ML1024503202010-09-0202 September 2010 Acceptance Review Email, LAR Regarding Changes to Technical Specification 3.9.3, Reactor Building Penetrations ML1023101832010-08-19019 August 2010 Acceptance Review Email - License Amendment Request for Cyber Security Plan ML1020103192010-07-20020 July 2010 Acceptance Review Email, License Amendment Request, Administrative Changes to Technical Specification 6.5.8, Inservice Testing Program, to Adopt TSTF-479-A and TSTF-497-A ML1017601262010-06-25025 June 2010 Acceptance Review Email Technical Specification Change to Extend Type a Test Frequency to 15 Years ML1013105932010-05-14014 May 2010 License Amendment Request for Approval of the Cyber Security Plan ML1012506042010-05-0505 May 2010 E-mail Arkansas Nuclear One, Unit 2 - Acceptance Review Email, License Amendment Request, Technical Specification Changes and Analyses Relating to Use of Alternative Source Term ML1010302132010-04-13013 April 2010 Acceptance Review Email, Relief Request ANO1-R&R-013, Proposed Alternative to Requirements Associated with Repair of Components ML1009501922010-04-0505 April 2010 Acceptance Review Email, Exemption from Requirements of 10 CFR 50.36a(a)(2) Submittal Date for Radioactive Effluent Release Report ML1006704612010-03-0808 March 2010 Acceptance Review Email, Relief Request PRR-ANO2-2010-1, Relief from Requirements of ASME OM Code Section ISTB-5221 and ISTB-5223 for Service Water Pumps ML1003204372010-02-0101 February 2010 Acceptance Review Results for ANO-ISI-006, ME3128 ML1002519102010-01-25025 January 2010 Acceptance Review Email Request for Exemption from 10 CFR Part 73, Physical Security Requirements ML0935004562009-12-16016 December 2009 Arkansas, Unit 2 - Acceptance Review E-mail, Relief Request ANO2-ISI-005 to Extend the Inservice Inspection Interval for the Visual Examination of Accessible Interior to Reactor Vessel Attachment Weld, for Fourth 10-Year Interval ML0932102532009-11-17017 November 2009 Acceptance Review E-mail Relief Request ANO2-ISI-004 to Extend Third 10-Year Inservice Inspection Interval for Reactor Vessel Weld Examinations ML0930802622009-11-0404 November 2009 Acceptance Review Email, Request for Alternative VRR-ANO2-2009-2, Inservice Testing Requirements Re Frequency of Leak Rate Test for Two Service Water Boundary Isolation Valves ML0925901352009-09-16016 September 2009 Acceptance Review Email, Licence Amendment Request for Administrative Changes to Technical Specification 5.5.8, Inservice Testing Program, to Adopt TSTF-479-A and TSTF-497-A ML0922903152009-08-17017 August 2009 Supplemental Information Needed Prior to Acceptance, License Amendment Request to Relocate Heater Requirements Portion of Technical Specification 3.4.4, Pressurizer, to the Technical Requirements Manual ML0918705692009-07-0606 July 2009 E-mail Arkansas Nuclear One, Unit 1 - Acceptance Review Email, Request for Alternative ANO1-ISI-014, to Implement a Risk-Informed Inservice Inspection Program Based on ASME Code Case N-716 ML0918112042009-06-30030 June 2009 Acceptance Review Email, Request for Alternative to Use 2001 Edition Through 2003 Addenda in Lieu of the 2004 Edition for Fourth 10-Year Inservice Inspection Interval ML0916603172009-06-15015 June 2009 Acceptance Review Email, Request for Relief Nos. ANO1-ISI-015, ANO1-ISI-016, ANO1-ISI-017, ANO1-ISI-018, ANO1-ISI-019, and ANO1-ISI-020, Relief from the Requirements of the ASME Code, Section XI (TAC Nos. ME1439-ME1433) ML0916206472009-06-11011 June 2009 Acceptance Review Email, License Amendment Request, Modify Technical Specification 2.1.1.1, DNBR, to Revise Departure from Nucleate Boiling Ratio Safety Limit ML0915403712009-06-0303 June 2009 Acceptance Review Email, License Amendment Request for Administrative Changes to Technical Specification 6.6.5, Core Operating Limits Report ML0913400552009-05-14014 May 2009 Acceptance Review Email, License Amendment Request, Technical Specification Changes to TS 3.3.1.1 and TS 3.3.2.1 to Modify the Mode of Applicability for Emergency Feedwater Actuation Signal ML0913200592009-05-12012 May 2009 Entergy - Acceptance Review for License Amendment Request (TAC Nos. ME1198 - ME1207) 2021-11-17
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 May 14, 2010 Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc.
1448 S.R. 333 Russellville, AR 72802
SUBJECT:
ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - LICENSE AMENDMENT REQUEST FOR APPROVAL OF THE CYBER SECURITY PLAN (TAC NOS.
ME2727 AND ME2728)
Dear Sir or Madam:
By letter dated November 19, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML093280950, Not Publicly Available), Entergy Operations Inc. (the licensee), submitted a license amendment request (LAR) for Arkansas Nuclear One, Units 1 and 2 (ANO-1 and 2). The proposed LAR includes the cyber security plan, proposed changes to paragraph 2.cA, "Physical Protection," of Renewed Facility Operating License No. DPR-51 for ANO-1 and paragraph 2.D, "Physical Protection," of Renewed Facility Operating License No. NPF-6 for ANO-2, and a proposed Cyber Security Plan Implementation Schedule. The proposed cyber security plan has been submitted in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Section 73.54. The purpose of this letter is to inform you that the U.S. Nuclear Regulatory Commission (NRC) staff has completed an initial review of this LAR. In accordance with the Office of Nuclear Reactor Regulation Office Instruction L1C-109, "Acceptance Review Procedures" (ADAMS Accession No. ML091810088), Section 3.1.3, the NRC staff has decided to forgo the traditional acceptance review due to the complexity and "first-of-a-kind" nature of this application. While the NRC staff has docketed your application, we are not rendering a jUdgment as to the acceptability of the submittal within the context of an acceptance review.
The cyber security plan submittal prepared for ANO-1 and 2 is based on an earlier version of Nuclear Energy Institute (NEI) guidance. The NRC staff had significant generic concerns with this guidance. As a result of NRC staff discussions with NEI and the Executive Task Force of the industry Nuclear Security Working Group (NSWG), NEI and NSWG committed to representing operating power reactor licensees in resolving these concerns.
Through numerous interactions, the NRC staff has communicated its generic concerns with the NEI guidance. The security-related nature of the information required these interactions to be conducted in closed meetings not open to the public. A publicly available list of the specific issues discussed with NEI and NSWG was communicated to the licensees via e-mail dated March 9, 2010 (ADAMS Accession No. ML100680284).
By letter dated April 28, 2010 (ADAMS Accession Nos. ML101180434), NEI submitted Revision 6 to NEI 08-09, "Cyber Security Plan for Nuclear Power Reactors" (ADAMS Accession No. ML101180437), which contains changes that address the NRC staff concerns associated
- 2 with previous versions. Based on a technical review of the document, the Office of Nuclear Security and Incident Response, in its letter dated May 5, 2010 (ADAMS Accession No. ML101190371), concluded that submission of a cyber security plan using the template provided in NEI 08-09, Revision 6, dated April 2010, would be acceptable for use by licensees to comply with the requirements of 10 CFR 73.54, with the exception of the definition of "cyber attack."
Therefore, to resolve the NRC staff's concerns with the previously submitted LAR, the licensee is requested to review the list of generic issues provided via e-mail dated March 9, 2010, and provide a revised submittal. Please provide justification for any generic issues that will not be addressed in the revised submittal.
For any changes to the Cyber Security Plan proposed in the LAR, the licensee is requested to indicate that the revised submittal supersedes, in its entirety, the previous submittal or indicate what portions are superseded.
As an alternative to addressing the individual generic issues, the licensee may submit a revised Cyber Security Plan consistent with NRC Regulatory Guide (RG) 5.71
- or submit a revised Cyber Security Plan consistent with NEI 08-09, Revision 6. However, if this option is exercised, the NRC staff expects that the existing application will be withdrawn and the revised application resubmitted at the same time.
The NRC staff requests that the licensee's response or revised application be submitted within 60 days of the date of this letter. Please contact me if circumstances result in the need to revise the requested response date.
Following receipt and review of your response, you will be advised by separate correspondence if any further information is needed to support the NRC staff's detailed technical review.
If you have any questions regarding this matter, I may be reached at (301) 415-1480.
Sincerely, N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-313 and 50-368 cc: Distribution via ListServ
- In January 2010, the NRC staff issued RG 5.71, "Cyber Security Programs for Nuclear Facilities" (ADAMS Accession No. ML090340159). This guidance provides an approach that the NRC staff deems acceptable for complying with the Commission's regulations regarding the protection of digital computers, communications systems, and networks from a cyber security attack.
-2 with previous versions. Based on a technical review of the document, the Office of Nuclear Security and Incident Response, in its letter dated May 5, 2010 (ADAMS Accession No. ML101190371), concluded that submission of a cyber security plan using the template provided in NEI 08-09, Revision 6, dated April 2010, would be acceptable for use by licensees to comply with the requirements of 10 CFR 73.54, with the exception of the definition of "cyber attack."
Therefore, to resolve the NRC staff's concerns with the previously submitted LAR, the licensee is requested to review the list of generic issues provided via e-mail dated March 9, 2010, and provide a revised submittal. Please provide justification for any generic issues that will not be addressed in the revised submittal.
For any changes to the Cyber Security Plan proposed in the LAR, the licensee is requested to indicate that the revised submittal supersedes, in its entirety, the previous submittal or indicate what portions are superseded.
As an alternative to addressing the individual generic issues, the licensee may submit a revised Cyber Security Plan consistent with NRC Regulatory Guide (RG) 5.71* or submit a revised Cyber Security Plan consistent with NEI 08-09, Revision 6. However, if this option is exercised, the NRC staff expects that the existing application will be withdrawn and the revised application resubmitted at the same time.
The NRC staff requests that the licensee's response or revised application be submitted within 60 days of the date of this letter. Please contact me if circumstances result in the need to revise the requested response date.
Following receipt and review of your response, you will be advised by separate correspondence if any further information is needed to support the NRC staff's detailed technical review.
If you have any questions regarding this matter, I may be reached at (301) 415-1480.
Sincerely, IRAJ N. Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-313 and 50-368 cc: Distribution via ListServ
- In January 2010, the NRC staff issued RG 5.71, "Cyber Security Programs for Nuclear Facilities" (ADAMS Accession No. ML090340159). This guidance provides an approach that the NRC staff deems acceptable for complying with the Commission's regulations regarding the protection of digital computers, communications systems, and networks from a cyber security attack.
DISTRIBUTION:
PUBLIC RidsNrrDorlLpl4 Resource RidsRgn4MailCenter Resource LPL4 Reading RidsNrrLAJBurkhardt Resource C. Erlanger, NSIRIDSP/ISCPB RidsAcrsAcnw_MailCTR Resource RidsNrrPMANO Resource P. Pederson, NSIRIDSPIISCPB RidsNrrDirsltsb Resource RidsNsirDsp Resource RidsNrrDorlDpr Resource RidsOgcRp Resource ADAMS Accession No ML101310593 OFFICE NRRlLPL4/PM NRRlLPL4/LA NRRlLPL4/BC NRRlLPL4/PM NAME NKalyanam JBurkhardt MMarkley NKalyanam DATE 5/12/10 5/12/10 5/14/10 5/14/10 OFFICIAL RECORD COpy