Technical Requirements Manual
ML101260534
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 04/28/2010
From:
Susquehanna
To: Gerlach R
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML101260534 (28)


Text

Apr. 28, 2010 Page 1 of 2 MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2010-19852 USER INFORMATION:

GERLACH*ROSE M EMPL#:028401 CA#: 0363 Address: NUCSA2 Phone#: 254-3194 TRANSMITTAL INFORMATION:

TO: GERLACH*ROSE M 04/28/2010 LOCATION: USNRC FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF ERRORS.

ATTENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no TOC will be issued with the updated material.

TRMI - TECHNICAL REQUIREMENTS MANUAL UNIT 1 REMOVE MANUAL TABLE OF CONTENTS DATE: 04/20/2010 ADD MANUAL TABLE OF CONTENTS DATE: 04/27/2010 CATEGORY: DOCUMENTS TYPE: TRMI

,utiC

Apr. 28, 2010 Page 2 of 2 ID: TEXT 3.4.6 ADD: REV: 0 CATEGORY: DOCUMENTS TYPE: TRMI ID: TEXT B3.4.6 ADD: REV: 0 CATEGORY: DOCUMENTS TYPE: TRM1 ID: TEXT LOES REMOVE: REV:58 ADD: REV: 59 CATEGORY: DOCUMENTS TYPE: TRMI ID: TEXT TOC ADD: REV: 18 REMOVE: REV:17 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS @ X3107 OR X3136 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

SSEq MANUAL Manual Name: TRM1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 Table Of Contents Issue Date: 04/27/2010 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 59 04/27/2010

Title:

LIST OF EFFECTIVE SECTIONS TEXT TOC 18 04/27/2010

Title:

TABLE OF CONTENTS TEXT 1.1 0 11/18/2002

Title:

USE AND APPLICATION DEFINITIONS TEXT 2.1 1 02/0205 >

Title:

PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMS TEXT 2.2 8 A/0i2/-2/2010

Title:

PLANT PROGRAMS AND SETPOINTS INSTRUMENT TRIP SETPOINT TABLE NV LDCN 4414 TEXT 3.0 4 05/23/2008

Title:

TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY & SURVEILLANCE (TRS)

APPLICABILITY TEXT 3.1.1 1 11/09/2007

Title:

REACTIVITY\ CONTROL SYSTEMS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD INJECTION *ARI) INSTRUMENTATION (ATWS TEXT 3.1.2 K0 11/18/2002

Title:

REACTIV*I-TY\ CONTROL SYSTEMS CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT 3.1.3 5 04/16/2009

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.1.4 0 11/18/2002

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION &

CHECK VALVE TEXT 3.2.1 11 03/16/2010

Title:

CORE OPERATING LIMITS REPORT (COLR)

Report Date: 04/27/10 PagelI Page of of ~16 Report Date: 04/27/10

SSES MANUAL Manual Name: TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3. 4.1 1 04/26/2006

Title:

REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY-TEXT 3.4.2 1 04/16/2009

Title:

REACTOR COOLANT SYSTEM STRUCTURAL INTEGRITY TEXT 3.4.3 1 11/09/2007

Title:

REACTOR COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS TEXT 3.4.4 2 04/17/2008

Title:

REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5 1 04/26/2006

Title:

REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS TEXT 3.5.1 1 02/04/2005

Title:

EMERGENCY CORE COOLING AND RCIC ADS MANUAL INHIBIT TEXT 3.5.2 1 11/09/2007

Title:

EMERGENCY CORE COOLING AND RCIC ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT 3.5.3 0 11/18/2002

Title:

EMERGENCY CORE COOLING AND RCIC LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/18/2002

Title:

CONTAINMENT VENTING OR PURGING TEXT 3.6.2 0 11/18/2002

Title:

CONTAINMENT SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3 0 11/18/2002

Title:

CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION TEXT 3.6.4 0 11/18/2002

Title:

CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES Page 3 . of 16 Report Date: 04/27/10

SSES MANUAL Manual Name: TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.7.5.2 0 11/18/2002

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3 1 04/26/2006

Title:

PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3. 7.6 2 06/27/2008

Title:

PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3. 7.7 2 09/05/2008

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING TEXT 3.7.8 4 06/21/2007

Title:

PLANT SYSTEMS SNUBBERS TEXT 3.7.9 1 08/28/2006

Title:

PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10 1 12/14/2004

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)

TEXT 3.7.11 0 04/16/2009

Title:

STRUCTURAL INTEGRITY TEXT 3.8.1 2 04/05/2010

Title:

ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1 2 11/09/2007

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

CONTINUOUS TEXT 3.8.2.2 2 12/14/2004

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

AUTOMATIC TEXT 3.8.3 1 04/05/2010

Title:

ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES Page 5 . of 16 Report Date: 04/27/10

SSES MANUA-L Manual Name: TRM1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.1.2 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3.11.1.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3.11.1.4 1 12/14/2004

Title:

RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.1.5 2 05/02/2007

Title:

RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION TEXT 3.11.2.1 3 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11.2.2 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES TEXT 3.11.2.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3.11.2.4 0 11/18/2002

Title:

RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3.11.2.5 3 11/14/2006

Title:

RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM TEXT 3.11.2.6 4 09/16/2009

Title:

RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3.11.3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS TOTAL DOSE TEXT 3.11.4.1 4 08/08/2006

Title:

RADIOACTIVE EFFLUENTS MONITORING PROGRAM Report Date: 04/27/10 Page 2 Page7 of of 16 16 Report Date: 04/27/10

SSES MANUAL

  • Manual Name: TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.0 4 05/23/2008

Title:

APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.1.1 1 11/09/2007

Title:

REACTIVITY CONTROL SYSTEMS BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERN.ATE ROD INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.1.2 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.1.3 3 03/31/2006

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD BLOCK INSTRUMENTATION TEXT B3.1.4 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTA TION ION AND CHECK VALVE TEXT B3.2.1 0 11/19/2002

Title:

CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR)

TEXT B3.3.1 0 11/19/2002

Title:

INSTRUMENTATION BASES RADIATION MONITORING INSTRUMENTATION TEXT B3.3.2 1 11/09/2007

Title:

INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3 3 12/18/2008

Title:

INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4 3 11/09/2007

Title:

INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT B3.3.5 2 11/09/2007

Title:

INSTRUMENTATION BASES THIS PAGE INTENTIONALLY LEFT BLANK TEXT B3.3.6 3 10/19/2005

Title:

INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION Page 9 of .16 Report Date: 04/27/10

SSES MANUAL Manual Name: TRM1 Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.5.2 1 11/09/2007

Title:

ECCS AND RCIC BASES ECCS AND RCIC SYSTEM MONITORING INSTRUMENTATION TEXT B3.5.3 1 11/09/2007

Title:

ECCS AND RCIC BASES LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.1 0 11/19/2002

Title:

CONTAINMENT BASES VENTING OR PURGING TEXT B3.6.2 0 11/19/2002

Title:

CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3 2 04/17/2008

Title:

CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION LDCN 3933 TEXT B3.6.4 1 12/14/2004

Title:

CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.1 0 11/19/2002

Title:

PLANT SYSTEMS BASES EMERGENCY SERVICE WATER SYSTEM (SHUTDOWN)

TEXT B3.7.2 0 11/19/2002

Title:

PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL TEXT B3.7.3.1 2 01/07/2008

Title:

PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2 2 04/26/2006

Title:

PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS TEXT B3.7.3.3 0 11/19/2002

Title:

PLANT SYSTEMS BASES C02 SYSTEMS TEXT B3.7.3.4 1 04/26/2006

Title:

PLANT SYSTEMS BASES HALON SYSTEMS Report Date: 04/27/10 Page2i Page 11 . of of 16

.16 Report Date: 04/27/10

SSES MANUAL Manual Name: TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.10 1 12/14/2004

Title:

PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.11 1 04/14/2010

Title:

STRUCTURAL INTEGRITY TEXT B3.8.1 2 03/10/2010

Title:

ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT B3.8.2.1 0 11/19/2002

Title:

ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

CONTINUOUS TEXT B3.8.2.2 1 09/17/2004

Title:

ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

AUTOMATIC TEXT B3.8.3 0 11/19/2002

Title:

ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4 0 11/19/2002

Title:

ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5 0 11/19/2002

Title:

ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6 1 02/04/2005

Title:

ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7 1 06/15/2009

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT B3.9.1 0 11/19/2002

Title:

REFUELING OPERATIONS BASES DECAY TIME TEXT B3.9. 2 0 11/19/2002

Title:

REFUELING OPERATIONS BASES COMMUNICATIONS Report Date:. 04/27/10 Page i3~

13 of of 2i 16 Report Date: 04/27/10

SSES MANUJAL.

Manual Name: TRMI Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.11.2.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.11.2.4 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3.11.2.5 4 11/14/2006

Title:

RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM TEXT B3.11.2.6 1 01/27/2004

Title:

RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3.11.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.11.4.1 2 01/06/2006

Title:

RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.11.4.2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3.11.4.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PROGRAM TEXT B3.12.1 1 10/04/2007

Title:

LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2 0 11/19/2002

Title:

LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS TEXT B3.12.3 0 11/19/2002

Title:

LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS TEXT 3.4.6 0 04/27/2010

Title:

REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION Report Date: 04/27/10 Page ~

Page 15 of of 16

.16 Report Date: 04/27/10

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 18 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 1.0 USE AND APPLICATION ............................... TRM/1.0-1 1.1 Definitio ns ......................................................................................... T R M/1.0-2 2.0 P LA NT P R O G RA MS ....................................................................................... 2.0-1 2 .1 P la nt P rogra m s .......................................................................................... 2 .0-1 2.2 Instrument Trip Setpoint Table .......................................................... TRM/2.0-5 3.0 A P P LICA B ILITY ...................................................................................... T RM/3.0-1 3.0 TRO) - TR for Operation (TRO) Applicability ..................................... TRM/3.0-1 3.0 (TRS) - TR Surveillance (TRS) Applicability ...................................... TRM/3.0-3 3.1 REACTIVITY CONTROL SYSTEMS ....................................................... TRM/3.1-1 3.1.1 Alternate Rod Injection ...................................................................... TRM/3.1-1 3.1.2 C R D Housing S upport ................................................................................ 3.1-4 3.1.3 Control Rod Block Instrumentation ............................................................. 3.1-5 3.1.4 Control Rod Scram Accumulators Instrumentation and C heck V alve ...................................................................................... T R M/3 .1-9 3.2 CORE OPERATING LIMITS REPORT ................................................... TRM/3.2-1 3.2.1 Core Operating Limits Report ........................................................... TRM/3.2-1 3.3. INSTRUMENTATION .............................................................................. TRM/3.3-1 3.3.1 Radiation Monitoring Instrumentation ................................................ TRM/3.3-1 3.3.2 Seismic Monitoring Instrumentation ................................................... TRM/3.3-4 3.3.3 Meteorological Monitoring Instrumentation ........................................ TRM/3.3-7 3.3.4 TRM Post-Accident Monitoring Instrumentation ................................. TRM/3.3-9 3.3.5 S ection Not Used .............................................................................. TR M/3.3-12 3.3.6 TRM Containment Isolation Instrumentation ...................................... TRM/3.3-13 3.3.7 Turbine Overspeed Protection System .............................................. TRM/3.3-17 3.3.8 S ection Not Used .............................................................................. T R M/3.3-19 3.3.9 OPRM Instrumentation .......................................... I........................... TRM/3.3-22 3.3.10 Reactor Recirculation Pump MG Set Electrical and Mechanical Stops .............................................................................. T R M/3.3-23 3.3.11 MVP Isolation Instrumentation ........................................................... TRM/3.3-25 3.3.12 Water Monitoring Instrumentation ..................................................... TRM/3.3-27 3.4 REACTOR COOLANT SYSTEM ............................................................. TRM/3.4-1 3.4.1 Reactor Coolant System Chemistry ................................................... TRM/3.4-1 3 .4.2 Not Used ........................................................................................... T RM/3 .4-6 3.4.3 High/Low Pressure Interface Leakage Monitors .................. 3.4-9 3.4.4 Reactor Recirculation Flow and Rod Line Limit ................................. TRM/3.4-12 3.4.5 Reactor Vessel Material Surveillances Program................................ TRM/3.4-13 3.4.6 Reactor Recirculation Single Loop Operation (SLO)

Flow Rate Restriction ....................................................................... TRM/3.4-14 SUSQUEHANNA - UNIT 1 TRM /TOC-1 EFFECTIVE DATE 04/14/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 18 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 3.5 EMERGENCY CORE COOLING AND RCIC ........................................... TRM/3.5-1 3.5.1 ADS Manual Inhibit ................................. TRM/3.5-1 3.5.2 ECCS and RCIC System Monitoring Instrumentation ................................. 3.5-3 3.5.3 Long Term Nitrogen Supply to ADS ........................................................... 3.5-6 3 .6 C O NTA INME NT ............................................................................................... 3 .6-1 3.6.1 VENTING or PURGING ............................................................................. 3.6-1 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position Ind ica tio n .................................................................................................... 3 .6-2 3.6.3 Suppression Pool Alarm Instrumentation .................................................... 3.6-3 3.6.4 Primary Containment Closed System Boundaries ............................. TRM/3.6-6 3 .7 P LA NT SY S T E MS ........................................................................................... 3.7-1 3.7.1 Emergency Service Water System (Shutdown) .......................................... 3.7-1 3.7.2 Ultimate Heat Sink and Ground Water Level .............................................. 3.7-3 3.7.3.1 Fire Suppression Water Supply System ............................................ TRM/3.7-4 3.7.3.2 Spray and Sprinkler Systems ............................................................ TRM/3.7-8 3.7.3.3 C 0 2 System s .................................................................................... T R M/3.7-12 3.7.3.4 Halon Systems .................................................................................. TRM/3.7-16 3.7.3.5 Fire Hose Stations ............................................................................. TRM/3.7-18 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses ................................. TRM/3.7-22 3.7.3.7 Fire Rated Assemblies ..................................................................... TRM/3.7-24 3.7.3.8 Fire Detection Instrumentation ......................................................... TRM/3.7-26 3.7.4 Solid Radwaste System .................................................................... TRM/3.7-35 3.7.5.1 Main Condenser Offgas Hydrogen Monitor ................................................ 3.7-38 3.7.5.2 Main Condenser Explosive Gas Mixture .................................................... 3.7-39 3.7.5.3 Liquid Holdup Tanks ......................................................................... TRM/3.7-40 3.7.6 ESSW Pumphouse Ventilation .......................................................... TRM/3.7-41 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation ................................................................ TRM/3.7- 42 3 .7.8 S nubbers ........................................................................................... T RM/3 .7-44 3.7.9 Control Structure HVAC .................................................................... TRM/3.7-50 3.7.10 Spent Fuel Storage Pools ................................................................. TRM/3.7-52 3.7.11 Structural Integrity ............................................................................. TRM/3.7-55 SUSQUEHANNA - UNIT 1 TRM / TOC-2 EFFECTIVE DATE 04/14/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 18 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 3.8 ELECTRICAL POW ER ........................................................................... TRM/3.8-1 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective Devices ............................................................................ TRM/3.8-1 3.8.2.1 Motor Operated Valves Thermal Overload Protection -

Continuous ......................................................................................... TRM/3.8-5 3.8.2.2 Motor Operated Valves Thermal Overload Protection -

Automatic .......................................................................................... TRM/3.8-1 1 3.8.3 Diesel Generator (DG) Maintenance Activities .................................. TRM/3.8-13 3.8.4 24VDC Electrical Power Subsystem .................................................. TRM/3.8-15 3.8.5 Degraded Voltage Protection ............................................................ TRM/3.8-21 3.8.6 Emergency Switchgear Room Cooling ....................................................... 3.8-24 3.8.7 Battery Monitoring and Maintenance Program .................................. TRM/3.8-26 3.9 REFUELING OPERATIONS ............................................................................ 3.9-1 3.9.1 D e cay T im e ................................................................................................ 3 .9-1 3.9.2 Communications ........................................................................................ 3.9-2 3.9.3 Refueling Platform ...................................................................................... 3.9-3 3.10 MISCELLANEOUS ............................... .......... .................................... TRM/3.10-1 3.10.1 Sealed Source Contamination ............................................................. TRM/3.10-1 3.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation ............................... 3.10-4 3.10.3 Independent Spent Fuel Storage Installation (ISFSI) ......................... TRM/3.10-7 3.11 RADIOACTIVE EFFLUENTS............................. TRM/3.11-1 3.11.1.2 Liquid Effluents Concentration ........................................................... TRM/3.11-1 3.11.1.2 Liquid Effluents Dose ........................................................................ TRM/3.11-4 3.11.1.3 Liquid Waste Treatment System ....................................................... TRM/3.11-6 3.11.1.4, Liquid Radwaste Effluent Monitoring Instrumentation .............. 3.11-8 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation ................... TRM/3.11-13 3.11.2.1 Dose Rate ........................................................................................ TRM/3.11-17 3.11.2.2 Dose - Noble Gases ......................................................................... TRM/3.11-20 3.11.2.3 Dose - Iodine, Tritium, and Radionuclides in Particulate Form ................................................................................ TRM/3.11-21 3.11.2.4 Gaseous Radwaste Treatment System ............................................. TRM/3.11-22 3.11.2.5 Ventilation Exhaust Treatment System .............................................. TRM/3.11-23 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrumentation ................................................................................... TRM/3.11-25 3.11.3 Total Dose ........................................................................................... TRM/3.11-33 3.11.4.1 Monitoring Program ............................................................................. TRM/3.11-35 3.11.4.2 Land Use Census ................................................................................ TRM/3.11-45 3.11.4.3 Interlaboratory Comparison Program .................................................. TRM/3.11-47 SUSQUEHANNA - UNIT 1 TRM /TOC-3 EFFECTIVE DATE 04/14/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 18 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE 3.12 LOADS CO NTROL PROGRAM .............................................................. TRM/3.12-1 3.12.1 Crane Travel - Spent Fuel Storage Pool ................................................. TRM/3.12-1 3.12.2 Heavy Loads Requirements .................................................................... TRM/3.12-3 3.12.3 Light Loads Requirements ...................................................................... TRM/3.12-5 4.0 ADMINISTRATIVE CONTROLS ...................................................................... 4.0-1 4.1 Organization .................................................................................................... 4.0-1 4.2 Reportable Event Action .................................................................................. 4.0-2 4.3 Safety Limit Violation ....................................................................................... 4.0-3 4.4 Procedures and Programs ............................................................................... 4.0-4 4.5 Reporting Requirements .................................................................................. 4.0-5 4.6 Radiation Protection Program ......................................................................... 4.0-7 4.7 Training ............................................................................................................ 4.0-8 SUSQUEHANNA - UNIT 1 TRM / TOC-4 EFFECTIVE DATE 04/14/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 18 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE B 3 .0 A pplicability ................................................................................................ B 3.0-1 B 3.0 (TRO) - TR for Operation (TRO) Applicability ............................................. B 3.0-1 B 3.0 (TRS) - TR Surveillance (TRS) Applicability ............................................... B 3.0-9 B 3.1.1 Alternate Rod Injection ...................................................................... TRM/B 3.1-1 B 3.1.2 CRD Housing Support ....................................................................... TRM/B 3.1-4 B 3.1.3 Control Rod Block Instrumentation .................................................... TRM/B 3.1-5 B 3.1.4 Control Rod Scram Accumulators Instrumentation and C heck Valve ...................................................................................... T RM/B 3.1-8 B 3.2.1 Core Operating Limits Report (COLR) ....................................................... B 3.2-1 B 3.3.1 Radiation Monitoring Instrumentation ................................................ TRM/B 3.3-1 B 3.3.2 Seismic Monitoring Instrumentation ................................................... TRM/B 3.3-2 B 3.3.3 Meteorological Monitoring Instrumentation ........................................ TRM/B 3.3-3 B 3.3.4 TRM Post-Accident Monitoring Instrumentation ................................. TRM/B 3.3-4 B 3.3.5 Section Not Used .............................................................................. TRM/B 3.3-9, B 3.3.6 TRM Containment Isolation Instrumentation ............................................... B 3.3-10 B 3.3.7 Turbine Overspeed Protection System .............................................. TRM/B 3.3-14 B 3.3.8 Section Not Used .............................................................................. TRM/B 3.3-15 B 3.3.9 OPRM Instrumentation ...................................................................... TRM/B 3.3-17 B 3.3.10 Reactor Recirculation Pump MG Set Electrical and Mechanical Stops .............................................................................. TRM/B 3.3-18 B 3.3.11 MVP Isolation Instrumentation ........................................................... TRM/B 3.3-20 B 3.3.12 Water Monitoring Instrumentation ..................................................... TRM/B 3.3-22 B 3.4.1 Reactor Coolant System Chemistry ............................................................ B 3.4-1 B 3.4 .2 Not Used ........................................................................................... T R M/B 3.4-2 B 3.4.3 High/Low Pressure Interface Leakage Monitors ................................ TRM/B 3.4-4 B 3.4.4 Reactor Recirculation Flow and Rod Line Limit ................................. TRM/B 3.4-5 B 3.4.5 Reactor Vessel Material Surveillances Program .................. B 3.4-6 B 3.4.6 Reactor Recirculation Single Loop Operation (SLO)

Flow Rate Restriction ....................................................................... TRM/B 3.4-7 B 3.5.1 A DS Manual Inhibit .................................................................................... B 3.5-1 B 3.5.2 ECCS and RCIC System Monitoring Instrumentation ........................ TRM/B 3.5-3 B 3.5.3 Long Term Nitrogen Supply to ADS .................................................. TRM/B 3.5-4 I TOC-5 TRM / TOC-5 EFFECTIVE DATE 04/14/2010 SUSQUEHANNA - UNIT I1 SUSQUEHANNA-UNIT TRM EFFECTIVE DATE 04/14/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 18 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE B 3.6.1 VENTING or PURGING .................................................................... TRM/B 3.6-1 B 3.6.2 Suppression Chamber-to-Drywell Vacuum Breaker Position Ind ica tio n .................................................................................................... B 3 .6-3 B 3.6.3 Suppression Pool Alarm Instrumentation ........................................... TRM/B 3.6-4 B 3.6.4 Primary Containment Closed System Boundaries ............................. TRM/B 3.6-6 B 3.7.1 Emergency Service Water System (Shutdown) .......................................... B 3.7-1 B 3.7.2 Ultimate Heat Sink and Ground Water Level .............................................. B 3.7-2 B 3.7.3.1 Fire Suppression Water Supply System ........................................... TRM/B 3.7-3 B 3.7.3.2 Spray and Sprinkler Systems ............................................................ TRM/B 3.7-5 B 3.7.3.3 C02 systems .................................................................................... TRM/B 3.7-7 B 3.7.3.4 Halon Systems .................................................................................. TRM/B 3.7-8 B 3.7.3.5 Fire Hose Stations ............................................................................ TRM/B 3.7-10 B 3.7.3.6 Yard Fire Hydrants and Hydrant Hose Houses .................................. TRM/B 3.7-11 B 3.7.3.7 Fire Rated Assemblies ...................................................................... TRM/B 3.7-12 B 3.7.3.8 Fire Detection Instrumentation .......................................................... TRM/B 3.7-14 B 3.7.4 Solid Radwaste System .................................................................... TRM/B 3.7-15 B 3.7.5.1 Main Condenser Offgas Hydrogen Monitor ................................................ B 3.7-17 B 3.7.5.2 Main Condenser Explosive Gas Mixture ..................................................... B 3.7-19 B 3.7.5.3 Liquid Holdup Tanks .................................................................................. B 3.7-20 B 3.7.6 ESSW Pumphouse Ventilation .......................................................... TRM/B 3.7-21 B 3.7.7 Main Condenser Offgas Pretreatment Logarithmic Radiation Monitoring Instrumentation ................................................................ TRM/B 3.7-22 B 3.7.8 S nubbers .......................................................................................... T R M/B 3.7-24 B'3.7.9 Control Structure HVAC .................................................................... TRM/B 3.7-31 B 3.7.10 Spent Fuel Storage Pools ................................................................. TRM/B 3.7-33 B 3.7.11 Structural Integrity ............................................................................. TRM/B 3.7-36 B 3.8.1 Primary Containment Penetration Conductor Overcurrent Protective D evices ............................................................................ T RM/B 3.8-1 B 3.8.2.1 Motor Operated Valves Thermal Overload Protection -

C ontinuous ........................................................................................ T R M/B 3 .8-3 B 3.8.2.2 Motor Operated Valves Thermal Overload Protection -

A utom atic .......................................................................................... T R M/B 3 .8-4 B 3.8.3 Diesel Generator (DG) Maintenance Activities ........................................... B 3.8-5 B 3.8.4 24VDC Electrical Power Subsystem ........................................................... B 3.8-6 B 3.8.5 Degraded Voltage Protection ............................................................ TRM/B 3.8-16 B 3.8.6 Emergency Switchgear Room Cooling .............................................. TRM/B 3.8-17 B 3.8.7 Battery Monitoring and Maintenance Program .................................. TRM/B 3.8-18 B .3 .9 .1 De cay T ime ................................................................................................ B 3 .9-1 B 3.9.2 C om m unications ........................................................................................ B 3.9-2 TRM / TOC-6 EFFECTIVE DATE 04/14/2010 SUSQUEHANNA - UNIT SUSQUEHANNA -

UNIT I1 TRM / TOC-6 EFFECTIVE DATE 04/14/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 18 TABLE OF CONTENTS (TECHNICAL REQUIREMENTS MANUAL)

SECTION TITLE PAGE B 3.9.3 Refueling Platform ...................................................................................... B 3.9-3 B 3.10.1 Sealed Source Contamination .................................................................... B 3.10-1 B 3.10.2 MODE 5 Shutdown Margin Test RPS Instrumentation ...................... TRM/B 3.10-2 B 3.10.3 Independent Spent Fuel Storage Installation (ISFSI) ......................... TRM/B 3.10-4 B 3.11.1.1 Liquid Effluents Concentration .................................................................... B 3.11-1 B 3.11.1.2 Liquid Effluents Dose ................................................................................. B 3.11-4 B 3.11.1.3 Liquid W aste Treatment System ................................................................ B 3.11-6 B 3.11.1.4 Liquid Radwaste Effluent Monitoring Instrumentation ................................. B 3.11-7 B 3.11.1.5 Radioactive Liquid Process Monitoring Instrumentation .................... TRM/B 3.11-10 B 3.11.2.1 Dose Rate ......................................................................................... TRM/B 3.11-12 B 3.11.2.2 Dose - Noble Gases ................................................................................... B 3.11-16 B 3.11.2.3 Dose - Iodine, Tritium, and Radionuclides in Particulate Form ......................................................................................... B 3.11-18 B 3.11.2.4 Gaseous Radwaste Treatment System ............................................. TRM/B 3.11-20 B 3.11.2.5 Ventilation Exhaust Treatment System .............................................. TRM/B 3.11-21 B 3.11.2.6 Radioactive Gaseous Effluent Monitoring Instrumentation ................................................................................. TRM/B 3.11-24 B 3.11.3 T o ta l Do se .................................................................................................. B 3 .11-2 6 B 3.11.4.1 Monitoring Program ........................................................................... TRM/B 3.11-28 B 3.11.4.2 Land Use Census ....................................................................................... B 3.11-34 B 3.11.4.3 Interlaboratory Comparison Program ................................................ TRM/B 3.11-36 B.3.12.1 Crane Travel - Spent Fuel Storage Pool ........................................... TRM/B 3.12-1 B.3.12.2 Heavy Loads Requirements .............................................................. TRM/B 3.12-2 B.3.12.3 Light Loads Requirements ................................................................ TRM/B 3.12-3 TRM1 text TOC 04/14/2010 SUSQUEHANNA - UNIT 1 TRM /TOC-7 EFFECTIVE DATE 04/14/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 59 LIST OF EFFECTIVESECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date TOC TABLE OF CONTENTS 04/14/2010 1.0 USE AND APPLICATION Pages TRM / 1.0-1 through TRM / 1.0-3 10/04/2002 2.0 PLANT PROGRAMS Page 2.0-1 08/31/1998 Pages TRM / 2.0-2 and TRM / 2.0-3 01/28/2005 Page TRM / 2.0-4 06/25/2002 Page TRM / 2.0-5 04/02/1999 Page TRM / 2.0-6 03/27/2008 Page TRM / 2.0-7 05/15/2008 Page TRM / 2.0-8 03/27/2008 Page TRM / 2.0-9 11/15/2004 Page TRM / 2.0-10 02/02/2010 Page TRM / 2.0-11 11/15/2004 Page TRM / 2.0-12 03/27/2008 Pages TRM / 2.0-13 and TRM / 2.0-14 11/15/2004 Page TRM /2.0-15 11/15/2005 3.0 APPLICABILITY Page TRM / 3.0-1 04/14/2008 Page TRM / 3.0-2 04/12/2007 Page TRM / 3.0-3 03/15/2002 Page TRM / 3.0-4 11/30/2005 3.1 REACTIVITY CONTROL SYSTEMS Page TRM / 3.1-1 10/31/2007 Pages TRM / 3.1-2 through TRM / 3.1-5 08/31/1998 Page TRM / 3.1-6 03/22/2006 Page TRM / 3.1-7 04/07/2009 Page TRM / 3.1-8 03/27/2008 Pages TRM / 3.1-9 and TRM / 3.1-9a 02/18/1999 Page TRM / 3.1-10 02/18/1999 3.2 CORE OPERATING LIMITS REPORT Page TRM / 3.2-1 07/07/1999 Pages TRM / 3.2-2 through TRM / 3.2-54 03/11/2010 3.3 INSTRUMENTATION Pages TRM / 3.3-1 through TRM / 3.3-3 07/16/1999 Page TRM / 3.3-4 and TRM / 3.3-5 10/31/2007 Page TRM / 3.3-6 08/31/1998 Page TRM / 3.3-7 10/31/2007 Page 3.3-8 08/31/1998 Page TRM / 3.3-9 04/12/2007 TRM / LOES-1 EFFECTIVE DATE 04/14/2010 SUSQUEHANNA - UNIT SUSQUEHANNA -

UNIT I1 TRM / LOES-1 EFFECTIVE DATE 04/14/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 59 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / 3.3-9a 12/17/1998 Page TRM / 3.3-10 10/31/2007 Page TRM / 3.3-11 06/02/2005 Page TRM / 3.3-11 a 04/14/2008 Page TRM / 3.3-12 03/30/2001 Page TRM / 3.3-13 09/13/2005 Page TRM / 3.3-14 12/14/1998 Page TRM / 3.3-15 10/22/2003 Page TRM / 3.3-16 06/27/2001 Page TRM / 3.3-17 06/14/2002 Page TRM / 3.3-18 10/31/2007 Pages TRM / 3.3-19 through TRM / 3.3-21 10/22/2003 Page TRM / 3.3-22 03/27/2008 Page TRM / 3.3-22a 11/15/2004 Pages TRM / 3.3-22b through TRM / 3.3-22d 03/22/2006 Page TRM / 3.3-23 12/03/2004 Pages TRM / 3.3-24 and TRM / 3.3-25 05/16/2003 Page TRM / 3.3-26 10/22/2003 Pages TRM / 3.3-27 and TRM / 3.3-28 04/07/2009 3.4 REACTOR COOLANT SYSTEM Page TRM / 3.4-1 03/31/2006 Pages 3.4-2 through 3.4-5 10/23/1998 Pages TRM / 3.4-6 through TRM / 3.4-8 04/01/2009 Page TRM / 3.4-9 08/31/1998 Page TRM / 3.4-10 10/31/2007 Page TRM / 3.4-11 08/31/1998 Page TRM / 3.4-12 03/27/2008 Page TRM / 3.4-13 03/31/2006 Page TRM / 3.4-14 04/14/2010 3.5 EMERGENCY CORE COOLING AND RCIC EPage TRM / 3.5-1 01/28/2005 Pages 3.5-2 and 3.5-3 08/31/1998 Pages TRM / 3.5-4 and TRM / 3.5-5 10/31/2007 Pages 3.5-6 and 3.5-7 08/31/1998 3.6 CONTAINMENT Pages 3.6-1 through 3.6-3 08/31/1998 Page TRM / 3.6-4 01/07/2002 Page 3.6-5 08/31/1998 Pages TRM / 3.6-6 through TRM / 3.6-8 12/31/2002 SUSQUEHANNA - UNIT 1 TRM / LOES-2 EFFECTIVE DATE 04/14/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 59 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.7 PLANT SYSTEMS Pages 3.7-1 through 3.7-3 08/31/1998 Page TRM / 3.7-4 03/31/2006 Pages TRM / 3.7-5 04/07/2009 Pages TRM / 3.7-6 through TRM / 3.7-8 08/02/1999 Pages TRM / 3.7-9 and TRM / 3.7-10 04/07/2009 Page TRM / 3.7-11 12/29/1999 Page TRM / 3.7-12 08/02/1999 Page TRM / 3.7.13 04/07/2009 Page TRM / 3.7-14 08/09/2005 Pages TRM / 3.7-15 and TRM / 3.7-16 08/02/1999 Page TRM / 3.7-17 04/07/2009 Page TRM / 3.7-18 08/02/1999 Page TRM / 3.7-19 04/07/2009 Pages TRM / 3.7-20 through TRM / 3.7-22 08/02/1999 Page TRM / 3.7-23 04/07/2009 Page TRM / 3.7-24 03/31/2006 Pages TRM / 3.7-25 and TRM 3.7-26 08/02/1999 Page TRM 3.7-27 10/31/2007 Page TRM / 3.7-28 11/29/2006 Page TRM / 3.7-29 08/09/2005 Page TRM / 3.7-30 01/13/2010 Pages TRM / 3.7-31 and TRM / 3.7-32 11/16/2001 Page TRM / 3.7-33 01/09/2004 Page TRM / 3.7-34 11/16/2001 Page TRM / 3.7-34a 10/05/2002 Page TRM / 3.7-35 03/31/2006 Pages TRM / 3.7-36 and TRM / 3.7-37 02/01/1999 Pages 3.7-38 and 3.7-39 08/31/1998 Page TRM / 3.7-40 03/31/2006 Page TRM / 3.7-41 02/14/2005 Page TRM / 3.7-41a 06/20/2008 Page TRM / 3.7-42 09/04/2008 Page TRM / 3.7-43 08/31/1998 Pages TRM / 3.7-44 through TRM / 3.7-46 10/05/2006 Page TRM / 3.7-47 06/07/2007 Page TRM / 3.7-48 10/05/2006 Page TRM / 3.7-49 06/07/2007 Page TRM / 3.7-50 03/09/2001 Page TRM / 3.7-51 08/16/2006 Page TRM / 3.7-52 12/03/2004 Page TRM / 3.7-53 04/15/2003 Page TRM / 3.7-54 07/29/1999 Pages TRM / 3.7-55 through TRM / 3.7-57 04/01/2009 TRM/LOES-3 EFFECTIVE DATE 04/14/2010 SUSQUEHANNA - UNIT SUSQUEHANNA - UNIT I 1 TRM / LOES-3 EFFECTIVE DATE 04114/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 59 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date 3.8 ELECTRICAL POWER Page TRM / 3.8-1 04/02/2002 Page TRM / 3.8-2 01/28/2005 Pages TRM / 3.8-3 and TRM /3.8-4 03/25/2010 Pages TRM / 3.8-5 and TRM / 3.8-6 04/02/2002 Page TRM / 3.8-7 10/31/2007 Pages TRM / 3.8-8 through TRM / 3.8-10 12/03/2004 Page TRM / 3.8-11 09/03/2004 Page TRM / 3.8-12 12/03/2004 Page TRM / 3.8-13 03/25/2010 Page TRM / 3.8-14 08/31/1998 Pages TRM / 3.8-15 through TRM / 3.8-17 04/02/2002 Page 3.8-18 08/31/1998 Page TRM / 3.8-19 04/02/2002 Page 3.8-20 08/31/1998 Pages TRM / 3.8-21 through TRM / 3.8-23 06/06/1999 Pages 3.8-24 and 3.8-25 08/31/1998 Page TRM / 3.8-26 05/28/2009 Page TRM / 3.8-27 11/29/2006 Pages TRM / 3.8-28 and TRM / 3.8-29 05/28/2009 3.9 REFUELING OPERATIONS Pages 3.9-1 through 3.9-3 08/31/1998 3.10 MISCELLANEOUS Page TRM / 3.10-1 03/31/2006 Pages 3.10-2 and 3.10-3 08/31/1998 Pages 3.10-2 and 3.10-3 08/31/1998 Page TRM / 3.10-4 08/01/2006 Pages TRM / 3.10-5 and TRM / 3.10-6 03/22/2006 Page TRM / 3.10-7 03/31/2006 3.11 RADIOACTIVE EFFLUENTS Page TRM /3.11-1 03/31/2006 Pages 3.11-2 and 3.11-3 08/31/1998 Page TRM / 3.11-4 03/31/2006 Page 3.11-5 08/31/1998 Page TRM /3.11-6 03/31/2006 Pages TRM / 3.11-7 through TRM / 3.11-9 08/31/1998 Page TRM / 3.11-10 12/03/2004 Pages 3.11-11 and 3.11-12 08/31/1998 Page TRM / 3.11-13 04/12/2007 SUSQUEHANNA - UNIT 1 TRM / LOES-4 EFFECTIVE DATE 04/14/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 59 LIST OF EFFECTIVESECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Page TRM / 3.11-14 12/03/2004 Pages 3.11-15 and 3.11-16 09/01/1998 Page TRM /3.11-17 03/31/2006 Page 3.11-18 08/31/1998 Page TRM / 3.11-19 08/15/2005 Pages TRM / 3.11-20 and TRM / 3.11-21 03/31/2006 Page TRM / 3.11-22 04/02/2002 Page TRM / 3.11-23 11/14/2006 Page TRM / 3.11-24 05/13/2005 Page TRM / 3.11-25 04/12/2007 Pages TRM / 3.11-26 and TRM / 3.11-27 01/21/2004 Page TRM / 3.11-28 09/08/2009 Page TRM / 3.11-29 12/03/2004 Pages TRM / 3.11.30 through TRM / 3.11.32 01/21/2004 Page TRM / 3.11-33 03/31/2006 Page 3.11-34 08/31/1998 Page TRM / 3.11-35 03/31/2006 Pages TRM / 3.11-36 through TRM / 3.11-39 11/30/2005 Pages 3.11-40 through 3.11-43 08/31/1998 Page TRM / 3.11-44 08/01/2006 Page TRM / 3.11-45 03/31/2006 Page 3.11-46 08/31/1998 Page TRM / 3.11-47 03/31/2006 3.12 LOADS CONTROL PROGRAM Pages TRM / 3.12-1 through TRM / 3.12-3 02/05/1999 Page TRM / 3.12-4 03/14/2008 Page TRM / 3.12-5 02/05/1999 4.0 ADMINISTRATIVE CONTROLS Pages TRM / 4.0-1 through TRM / 4.0-3 08/31/1998 Page TRM / 4.0-4 12/11/2008 Pages TRM / 4.0-5 through TRM / 4.0-8 08/31/1998 SUSQUEHANNA - UNIT 1 TRM / LOES-5 EFFECTIVE DATE 04/14/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 59 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.0 APPLICABILITY BASES Pages TRM / B 3.0-1 through TRM / B 3.0-3 08/31/1998 Page TRM / B 3.0-4 01/10/2007 Page TRM / B 3.0-5 04/14/2008 Page TRM / B 3.0-6 08/31/1998 Page TRM / B 3.0-7 04/12/2007 Pages TRM / B 3.0-8 through TRM / B 3.0-10 08/31/1998 Pages TRM / B 3.0-11 and TRM / B 3.0-12 03/15/2002 Pages TRM / B 3.0-13 and TRM / B 3.0-14 11/30/2005 Page TRM / B 3.0-15 03/15/2002 B 3.1 REACTIVITY CONTROL SYSTEMS BASES Page TRM / B 3.1-1 07/13/1999 Pages TRM / B 3.1-2 and TRM / B 3.1-3 10/31/2007 Page B 3.1-4 08/31/1998 Page TRM / B 3.1-5 11/15/2005 Pages TRM / B 3.1-6 and TRM / B 3.1-7 03/22/2006 Page TRM / B 3.1-8 02/18/1999 B 3.2 CORE OPERATING LIMITS BASES Page B 3.2-1 08/31/1998 B 3.3 INSTRUMENTATION BASES Page TRM / B 3.3-1 04/07/2000 Pages TRM / B 3.3-2 and TRM / B 3.3-2a 10/31/2007 Page TRM / B 3.3-3 12/11/2008 Page TRM / B 3.3-3a 10/31/2007 Pages TRM / B 3.3-4 and TRM / B 3.3-5 05/30/2006 Pages TRM / B 3.3-6 through TRM / B 3.3-9 10/31/2007 Page B 3.3-10 08/31/1998 Pages TRM / B 3.3-11 and TRM / B 3.3-12 09/13/2005 Page TRM / B 3.3-13 12/03/2004 Page TRM / B 3.3-14 06/25/2002 Page TRM / B 3.3-14a 10/31/2007 Page TRM / B 3.3-14b 10/31/2007 Pages TRM / B 3.3-15 and TRM / B 3.3-16 10/22/2003 Page TRM / B 3.3-17 03/22/2006 Pages TRM / B 3.3-17a through TRM / B 3.3-17c 03/22/2006 Page TRM / B 3.3-17d 03/27/2008 Pages TRM / B 3.3-17e and TRM / B 3.3-17f 03/22/2006 Page TRM /B 3.3-18 03/25/2010 Page TRM / B 3.3-19 05/16/2008 Page TRM / B 3.3-20 10/22/2003 Page TRM / B 3.3-21 05/16/2003 Pages TRM / B 3.3-22 and TRM / B 3.3-23 04/07/2009 SUSQUEHANNA - UNIT 1 TRM / LOES-6 EFFECTIVE DATE 04/14/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 59 LIST OF EFFECTIVESECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date B 3.4 REACTOR COOLANT SYSTEM BASES Page B 3.4-1 08/31/1998 Pages TRM / B 3.4-2 and TRM / B 3.4-3 04/01/2009 Pages TRM / B 3.4-4 and TRM / B 3.4-4a 10/31/2007 Page TRM / B 3.4-5 10/15/1999 Page B 3.4-6 08/31/1998 Page TRM / B 3.4-7 04/14/2010 B 3.5 ECCS AND RCIC BASES Pages B 3.5-1 and B 3.5-2 08/31/1998 Pages TRM / B 3.5-3 through TRM / B 3.5-5 10/31/2007 B 3.6 CONTAINMENT BASES Page TRM / B 3.6-1 07/26/2001 Page TRM / B 3.6-2 02/01/1999 Page B 3.6-3 08/31/1998 Page TRM / B 3.6-4 03/27/2008 Page TRM / B 3.6-5 04/04/2007 Page TRM / B 3.6-6 12/03/2004 Pages B.3.6-7 through TRM / B 3.6-11 12/31/2002 B 3.7 PLANT SYSTEMS BASES Pages B 3.7-1 and B 3.7-2 08/31/1998 Pages TRM / B 3.7-3 and TRM / B 3.7-3a 12/27/2007 Page TRM / B 3.7-4 03/31/2006 Page TRM / B 3.7-5 08/02/1999 Page TRM / B 3.7-6 03/31/2006 Pages TRM / B 3.7-7 and TRM / B 3.7-7a 08/02/1999 Page TRM / B 3.7-8 08/02/1999 Page TRM / B 3.7-9 03/31/2006 Page TRM / B 3.7-10 08/02/1999 Page TRM / B 3.7-10a 03/31/2006 Page TRM / B 3.7-11 08/02/1999 Page TRM / B 3.7-11a 03/31/2006 Pages TRM / B 3.7-12 through TRM / B 3.7-14 08/02/1999 Page TRM / B 3.7-14a 08/02/1999 Page TRM / B 3.7-14b 01/09/2004 Pages TRM / B 3.7-15 and TRM / B 3.7-16 02/01/1999 Pages B 3.7-17 through B 3.7-20 08/31/1998 Page TRM / B 3.7-21 02/14/2005 Page TRM / B 3.7-21a 06/20/2008 Page TRM / B 3.7-22 and TRM / B 3.7-23 01/30/2008 Pages TRM / B 3.7-24 through TRM / B 3.7-28 10/05/2006 Pages TRM / B 3.7-29 and TRM / B 3.7-30 06/07/2007 TRM I LOES-7 EFFECTIVE DATE 04/14/2010 SUSQUEHANNA - UNIT SUSQUEHANNA -

UNIT 11 TRM / LOES-7 EFFECTIVE DATE 04/1412010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 59 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Pages TRM / B 3.7-30a and TRM / B 3.7-30b 10/05/2006 Page TRM / B 3.7-31 12/03/2004 Page TRM / B 3.7-32 03/09/2001 Page TRM / B 3.7-33 04/15/2003 Page TRM / B 3.7-34 12/03/2004 Page TRM / B 3.7-35 07/05/2000 Pages TRM / B 3.7-36 through TRM / B 3.7-39 04/01/2009 Page TRM / B 3.7-40 04/08/2010 B 3.8 ELECTRICAL POWER BASES Page TRM / B 3.8-1 04/02/2002 Pages TRM / B 3.8-2 and TRM / B 3.8-2 01/28/2005 Page TRM / B 3.8-2a 03/01/2010 Page TRM / B 3.8-3 04/02/2002 Page TRM / B 3.8-3a 04/02/2002 Page TRM / B 3.8-4 08/10/2004 Page TRM / B 3.8-4a 04/02/2002 Page TRM / B 3.8-5 08/31/1998 Pages TRM / B 3.8-6 through TRM / B 3.8-16 04/02/2002 Page TRM / B 3.8-17 01/28/2005 Pages TRM / B 3.8-18 through TRM / B 3.8-20 11/29/2006 Pages TRM / B 3.8-21 through TRM / B 3.8-24 05/28/2009 B.3.9 REFUELING OPERATIONS BASES Pages B 3.9-1 through B 3.9-7 08/31/1998 B 3.10 MISCELLANEOUS BASES Page B 3.10-1 08/31/1998 Pages TRM / B 3.10-2 and TRM / B 3.10-3 03/22/2006 Pages TRM / B 3.10-4 and TRM / B 3.10-5 08/23/1999 B 3.11 RADIOACTIVE EFFLUENTS BASES Pages B 3.11-1 through B 3.11-9 08/30/1998 Page TRM / B 3.11-10 02/01/1999 Pages TRM/B 3.11-11 and TRM/B 3.11-1l a 04/07/2000 Pages TRM/B 3.11-12 and TRM/B 3.11-13 02/01/1999 Page TRM / B 3.11-14 12/03/2004 Page TRM / B 3.11-15 02/01/1999 Pages B 3.11-16 through B 3.11-19 08/30/1998 Page TRM / B 3.11-20 04/02/2002 Page TRM / B 3.11-20a 04/02/2002 Page TRM / B 3.11-21 05/13/2005 Pages TRM / B 3.11-22 and TRM / B 3.11.23 11114/2006 Page TRM / B 3.11.23a 05/13/2005 TRM / LOES-8 EFFECTIVE DATE 04/14/2010 SUSQUEHANNA - UNIT SUSQUEHANNA -

UNIT I1 TRM / LOES-8 EFFECTIVE DATE 04/14/2010

SUSQUEHANNA STEAM ELECTRIC STATION PPL Rev. 59 LIST OF EFFECTIVE SECTIONS (TECHNICAL REQUIREMENTS MANUAL)

Section Title Effective Date Pages TRM / B 3.11-24 and TRM / B 3.11-25 01/21/2004 Pages B 3.11-26 and B 3.11-27 08/30/1998 Pages TRM / B 3.11-28 and TRM / B 3A11-29 11/30/2005 Page TRM / B 3.11-30 12/03/2004 Pages B 3.7-31 through B 3.7-35 08/30/1998 Page TRM / B 3.11-36 02/12/1999 B.3.12 LOADS CONTROL PROGRAM BASES Page TRM / B 3.12-1 09/19/2007 Pages TRM / B 3.12-2 and TRM / B 3.12-3 02/05/1999 TRM1 text LOES 4/14/2010 SUSQUEHANNA - UNIT 1 TRM / LOES-9 EFFECTIVE DATE 04/14/2010

PPL Rev. 0 Reactor Recirculation Single Loop Operation (SLO) Flow Rate Restriction 3.4.6 3.4 Reactor Coolant System (RCS) 3.4.6 Reactor Recirculation Single Loop Operation (SLO) Flow Rate Restriction TRO 3.4.6 In single loop operation, establish operating Reactor Recirculation Loop Flow Rate to less than or equal to 53.0 MIbm/hr APPL ICABILITY: MODES 1 and 2 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Requirements of the TRO A.1 Restore reactor recirculation 30 minutes not met loop flow rate to within limits B. Requirements of B.1 Place Reactor Mode Switch in Immediately Condition A not met Shutdown AND B.2 Restore reactor recirculation Immediately loop flow rate to within limits TECHNICAL REQUIREMENT SURVEILLANCE SURVEILLANCE FREQUENCY TRS 3.4.6.1 Verify the operating loop flow rate is less than or Once every four hours equal to 53.0 Mlbm/hr.

SUSQUEHANNA UNIT 1 TRM / 3.4-14 EFFECTIVE DATE 04/14/2010

PPL Rev. 0 Reactor Recirculation Single Loop Operation (SLO) Flow Rate Restriction B 3.4.6 B 3.4.6 Reactor Recirculation Single Loop Operation (SLO) Flow Rate Restriction BASES TRO TRO 3.4.6 requires that the operating loop flow rate be maintained less than or equal to 53.0 Mlbm/hr during single loop operation. Note that the parameter of concern is the 3 minute average recirculation system loop flow (e.g., PICSY point NJF02B and NJF03B) not core flow. This restriction avoids excessive vibration of jet pump components. Fatigue usage can be accumulated when loop flow rates are above 54 Mlbm/hr if large gaps are present. In reference 2 the analysis determined that during Unit 1 1 7th cycle operation, the normal dual loop operation flow rates are limited to 53 Mlbm/hr on the "A" loop and 54 Mlbm/hr on the "B" loop. The single loop operation limits in either loop are set at 53 Mlbm/hr to provide margin to the limit of 54 Mlbm/hr. Excessive vibration can lead to cracking of the jet pump riser brace welds. The limitation contained in this TRO will assure jet pump integrity will be maintained and thus the FSAR Chapter 15 analysis assumption of maintaining 2/3 core height will be met. Additionally, these measures will assure asset preservation and avoid lengthy repairs due to potential riser brace cracking. The required action to place the reactor mode switch in shutdown in 30 minutes assures the flow rate is established within limits. The time frames are required to avoid excessive vibrations that occur at higher loop flow rates and the subsequent impact on jet pump riser brace.

APPLICABILITY This Requirement is applicable whenever in reactor recirculation single loop operation in Modes 1 and 2.

ACTIONS The Actions assure that excessive jet pump vibration can not occur when in single loop operation.

TRS The required surveillance assures that the maximum loop flow rate is not exceeded.

REFERENCES 1. FSAR Section 15.6

2. GE Report "Fatigue Usage Evaluation for Jet Pump Assembly with Set Screw Gap Condition and Justification for Continued Operation,"

April 2010 SUSQUEHANNA - UNIT 1 TRM / B 3.4-7 EFFECTIVE DATE 04/14/2010