ML101230079

From kanterella
Jump to navigation Jump to search
Notice of Public Meeting with Exelon Generation Co., LLC, for Oyster Creek Annual Assessment
ML101230079
Person / Time
Site: Oyster Creek
Issue date: 05/11/2010
From: Bellamy R
NRC/RGN-I/DRP/PB6
To:
Barber G S, RGN-I/DRP/610-337-5232
Shared Package
ML100620114 List:
References
MN 10-020
Download: ML101230079 (4)


Text

MN No.10-020 U. S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT LICENSEE MEETING May 11,2010 Licensee: Exelon Generation Company, LLC Facilities: Oyster Creek Generating Station Docket No(s). 50-219 Time and Date: May 25,2010 Information Session (Posterboard) 6:00 p.m.

Public Meeting 7:00 p.m Location: Holiday Inn - Toms River, NJ 290 Route 37 East Toms River, NJ

Purpose:

The NRC requested an Annual Assessment Meeting with Exelon management to discuss NRC's assessment of the safety performance of the Oyster Creek Generating Station for calendar year 2009 as described in the Annual Assessment Letter dated March 3,2010. Exelon management will be given the opportunity to respond to the information in the letter and inform the NRC of new or existing programs to maintain or improve their performance. The NRC will also be available to engage interested stakeholders on performance of the plant and our role in ensuring safe plant operations.

NRC Attendees: D. Roberts, Director, Division of Reactor Safety, Region I R. Bellamy, Chief, Projects Branch 6, Region I J. Kulp, Senior Resident Inspector, Oyster Creek J. Ambrosini, Resident Inspector, Oyster Creek H. Chernoff, Branch Chief, Office of Nuclear Reactor Regulation E. Miller, Project Manager, Office of Nuclear Reactor Regulation Licensee Attendees: M. Massaro, Oyster Creek Site Vice President, Exelon P. Orphanos, Oyster Creek Plant Manager, Exelon J. Dostal, Oyster Creek Operations Director, Exelon R. Peak, Oyster Creek Engineering Director, Exelon

2 Public Participation: This is a Category 1 Meeting. The public is invited to observe this meeting and will have the opportunity to communicate with the NRC staff after the business portion, but before the meeting is adjourned. Several NRC representatives will also be available for an information session both prior to and during the Annual Assessment Meeting with Exelon. The information session is being provided to maximize discussion with the public to ensure their issues and concerns may be presented, understood, and considered by the NRC.

Meeting

Contact:

Dr. Ronald Bellamy, Chief, Projects Branch 6 610-337 -5200 E-mail: ronald.bellamv@nrc.gov.

The NRC's Annual Assessment letter for the Oyster Creek Power Station can be located in ADAMS with Accession Number ML100621256. The NRC slides for the meeting can be located in ADAMS with Accession Number ML101230049 ADAIVIS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rm/adams.html.

Additional information relative to the NRC's Annual Assessment process and the safety performance of the Oyster Creek Power Station can be found on the NRC's web site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28,2002, applies to this meeting. The policy statement may be found on the NRC Web site, http://www.nrc.gov/reading rm/doc-collections/commissionipolicv/67fr36920.html and contains information regarding visitors and security.

Handicapped persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.

Attendance by NRC personnel at this meeting should be made known by May 20,2010, via telephon*e to the NRC meeting contact.

Approved by: _-'-/!...!R!....!AI"--_ _ _ _ _ __

Dr. Ronald R. Bellamy, Chief Projects Branch 6 Division of Reactor Projects cc: Distribution via ListServ

3 NRC Annual Assessment Meeting and Information Session May 25,2010

  • Information Session 6:00 p.m.
  • Annual Assessment Meeting 7:00 pm - 9:00 p.m .
  • Introduction
  • Review of NRC Reactor Oversight Process
  • National Summary of Plant Performance
  • Discussion of Oyster Creek Performance Results
  • AmerGen's Response and Remarks
  • NRC Closing Remarks
  • Break
  • NRC available to address additional public questions

4 Distributiorr (Via E-Mail):

Executive Director for Operations, OEDO (RIDSEDOMAILCENTER)

Deputy Ex!~cutive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Deputy Director, Office of Nuclear Reactor Regulation, NRR (RIDSNRROD)

Associate Director, Office of Operating Reactor Oversight and Licensing, NRRfADRO (RIDSNRRADRO)

Director, Division of Inspection and Regional Supprt, NRRfDIRS (RIDSNRRDIRS)

Director, Division of Operating Reactor Licensing, NRRfDORL (RIDSNRRDORL)

Project Directorate 1-1 (PD1-2), NRR (RIDSNRRDORILpI1-2)

Asst. General Counsel Materials Litigation and Enforcement, OGC (RI DSOGCMAILCENTER)

S. Collins, RA N. Sheehan, PAO M. Dapas, DRA N. McNamara, SLO D. Lew, DRP D. Tifft, SLO J. Clifford, DRP R. Barkley, ORA D. Roberts, DRS J. Thompson, NRR P. Wilson, DRS M. Ferdas, SRI R. Bellamy, DRP J. Kulp, RI S. Barber, DRP J. DeVries, Resident OA C. Newport, DRP G. Matakas, ORA L. Trocine, RI OEDO D. Bearde, DRS H. Chernoff, NRR K. Heater, DRP E. Miller, PM, NRR V. Lewis, RI Receptionist J. Hughey, NRR RidsNrrPMOysterCreekResource K. Farrar, ORA ROPreportsResource@nrc.gov D. Scrend, PAO SUNSI REVIEW COMPLETE: RRB (Reviewer's Initials)

DOC NAME G:\DRP\BRANCH6\ROP Assessment Folders\ROP 10\Oyster Creek\End-of-Cycle\

OC AA Meeting Notice ROP10.doc ML101230079 After declaring this document "An Official Agency Record" it ~ be released to the Public.

To receive a cOPl' ofthis document, indicate in the box: "C" = Copy without attachmenVenclosure,"E" = Copy with attachmenVenciosure,"N" =No copy OFFICE: RIfDRP I RIfDRP I I NAME: i SBarberl SB RBeliamyl RRB DATE:

  • 05/03 110 05/03/09 OFFICIAL RECORD COPY