MONTHYEARML24270A2612024-10-17017 October 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Concerning Peach Bottom, Units Nos. 2 and 3 Digital Upgrade of the ECCS Compensated Level System ML24206A1782024-07-29029 July 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Concerning Peach Bottom Units Nos. 2 and 3 Digital Upgrade of the ECCS Compensated Level System ML24155A1992024-06-0303 June 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Meeting Summary ML24128A2512024-05-14014 May 2024 Summary of April 11, 2024, Public Meeting with Constellation Energy Generation, LLC Regarding Proposed Alternative to Implement American Society of Mechanical Engineers Operation and Maintenance Code Case OMN-32 ML24113A2872024-04-25025 April 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Regarding Hooded Masks ML24032A0862024-02-0202 February 2024 Summary of Meeting with Constellation Energy Generation, LLC, on Planned Requests to Use Code Case N-932 ML23320A2472023-11-17017 November 2023 Constellation - Summary of November 14, 2023, Public Pre-Application Meeting with Constellation Energy Generation, LLC on Adoption of TSTF-591 ML23276A6522023-10-11011 October 2023 Pre-submittal Meeting Summary, September 14, 2023 ML23263B1062023-09-22022 September 2023 R. E. Ginna Nuclear Power Plant - Constellation - Pre-Application Amse 9/18/2023 Meeting Summary ML23179A0012023-06-28028 June 2023 6/7/2023 - Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - Meeting Summary ML23142A1602023-05-23023 May 2023 Summary of April 11, 2023, Public Observation Meeting with Constellation Energy Generation, LLC Re Proposed Exemption Request from Work Hour Requirements ML23055A0352023-03-24024 March 2023 Summary of February 23, 2023, with Constellation Energy Generation, LLC on Proposed Changes to Emergency Plans to Revise Emergency Action Levels ML22187A1462022-07-0606 July 2022 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Meeting Summary ML21333A1532021-11-30030 November 2021 Summary of November 16, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Extend the Inservice Inspection Interval ML21237A0412021-08-30030 August 2021 Summary of the July 27, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Use Case OMN-28, ML21176A0822021-07-0606 July 2021 June 15, 2021, Summary of Meeting with Exelon Generation Company, LLC Vessel Nozzle Repair Related to a Planned Request for an Alternative Related to Reactor Pressure ML21139A1852021-06-22022 June 2021 Summary of Meeting with Exelon Generation Company, LLC Regarding Its Requested Alternative to Eliminate Certain Documentation Requirements for the Replacement of Pressure Retaining Bolting ML21011A2822021-01-21021 January 2021 Summary of January 6, 2021, Presubmittal Meeting Between the NRC and Exelon Generation Company, LLC Regarding Licensing Activities to Support the Planned Early Closures of Byron, Unit Nos. 1 and 2 and Dresden, Units 2 and 3 ML20351A2832020-12-18018 December 2020 Summary of Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Exemption to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs ML20342A3522020-12-10010 December 2020 Summary of November 13, 2020, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alterantive to Certain Documentation Requirements for the Replacement of Pressure Retaining Bolting (EPID-L-2020-LRM-0102) ML20323A0332020-12-0101 December 2020 Summary of November 4, 2020, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs ML20197A2722020-07-15015 July 2020 2020 Beaver Valley, Calvert Cliffs, Limerick Peach Bottom, Susquehanna Annual Assessment Webinar Summary ML20181A0002020-06-29029 June 2020 Summary of 6/24/20 Meeting with Exelon Generation Company, LLC Regarding Planned Request for Alternative to Supplemental Valve Position Indication Testing Requirements for Braidwood, Calvert Cliffs, Clinton, Limerick, Nine Mile, Peach Botto ML19326A3152019-12-0303 December 2019 Summary of November 18, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Supplemental Valve Position Indication Testing Requirements ML19326C3582019-12-0303 December 2019 Summary of November 20, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Revise the Quality Assurance Program ML19273B9692019-10-0202 October 2019 September 12, 2019 - Public Meeting to Discuss Draft Supplement 10, Second Renewal, to the Generic EIS for License Renewal of Nuclear Plants Regarding Peach Bottom Atomic Power Station Units 2 and 3 SLRA (EPID: L-201-RNW-0013) ML19238A3032019-09-27027 September 2019 Public Clarification Call with Exelon to Discuss Exelon'S Response to NRC Requests for Additional Information on Environmental Fatigue ML19240A3002019-09-27027 September 2019 Public Clarification Call with Exelon to Discuss Questions on Their Coatings and Linings of Certain Components Aging Management Program and Their Inspection of Buried and Underground Piping and Tanks Aging Management Program for SLR ML19246A1452019-09-27027 September 2019 Clarification Call to Discuss Exelon'S Response to NRC Requests for Additional Information (RAI) 3.3.2.1.1-1 ML19191A1882019-07-0909 July 2019 Joint Annual Assessment Meeting (Webinar) for Pennsylvania Power Plants - Meeting Summary ML19162A0272019-06-21021 June 2019 Summary of June 4, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Extend the Test Interval for Safety Relief Valves ML19149A3312019-05-31031 May 2019 Summary of Teleconference with Exelon Generation Company, LLC, Regarding Submittal of a Potential License Amendment Request Related to the Implementation of TSTF-500, DC Electrical Rewrite - Update to TSTF-360 ML19114A2642019-04-30030 April 2019 Summary of Meeting with Exelon Generation Company, LLC Regarding Submittal of a Potential License Amendment Request Related to Replacement of Buried Electrical Cables at Peach Bottom Atomic Power Station, Units 2 and 3 ML19036A8832019-02-0707 February 2019 Summary of Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Use ASME Code Case N-879 ML18354B1712019-01-0202 January 2019 Summary of December 19, 2018, Meeting with Exelon Generation Company, LLC Regarding the Use of Boiling Water Reactor Vessel and Internals Project Guidelines ML18325A1712018-11-28028 November 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Planned Fleet License Amendment Request to Revise Technical Specifications for High Radiation Areas ML18297A1722018-10-26026 October 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Planned License Amendment Request to Adopt TSTF-427 ML18299A0292018-10-24024 October 2018 10/24/2018 Summary of Teleconference with the Fws Regarding Endangered Species Act Section 7 for Peach Bottom Subsequent License Renewal ML18289A5092018-10-18018 October 2018 09/25/2018 Summary of Meeting for Environmental Review of Peach Bottom Atomic Power Station, Units 2 and 3, Subsequent License Renewal Application ML18268A0632018-10-0303 October 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Submittal of Potential License Amendment Request Related to High Pressure Service Water System at Peach Bottom Atomic Power Station, Units 2 and 3 ML18229A1222018-09-17017 September 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding the Response to the 2nd Round of Request for Additional Information (RAI) Questions at Peach Bottom Atomic Power Station, Units 2 and 3 (Pbaps) ML18152A9862018-06-12012 June 2018 Summary of May 31, 2018, Meeting with Exelon Generation Company, Llc Regarding the Potential License Amendment Request to Increase the Number of Power Level Steps for the Use of Lefms at Peach Bottom Atomic Power Station, Units 2 and 3 (PBA ML18151A1632018-06-0404 June 2018 Summary of Peach Bottom Annual Assessment Meeting and Attendee List ML18120A1772018-05-0101 May 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Draft Guidance for Emergency Response Organization Staffing ML18065A8362018-03-0707 March 2018 Summary of February 27, 2018, Meeting with Exelon Generation Company, LLC Planned Fleet License Amendment Request to Relocate Staff Qualification Requirements from TSs to the Quality Assurance Topical Report ML18058A5232018-03-0101 March 2018 Summary of February 26, 2018, Meeting with Exelon Generation Company, LLC Regarding Proposed Alternative to the Main Steam Isolation Valve Testing Requirements ML18044A1632018-02-20020 February 2018 01/18/2018 Summary of Pre-Application Meeting with Exelon Corporation Regarding the Peach Bottom, Units 2 and 3, Subsequent License Renewal Application ML17275A5222017-10-16016 October 2017 09/19/2017, Summary of Meeting with Exelon Regarding Peach Bottom, Units 2 and 3 Subsequent License Renewal Application ML17173A7672017-07-28028 July 2017 Summary of 6/20/2017 Meeting with Entergy to Discuss Plan for Decommissioning Licensing Actions of Palisades, Pilgrim, Indian Point, Units 2 and 3, and Vermont Yankee ML17184A0092017-07-10010 July 2017 Summary of June 29, 2017, Meeting with Exelon Generation Company, LLC, on Proposed Changes to Emergency Plans to Revise Emergency Action Levels (CAC Nos. MF9779-MF9801) 2024-07-29
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 April 21, 2010 LICENSEE: EXELON GENERATION COMPANY, LLC.
FACILITY: PEACH BOTTOM NUCLEAR POWER STATION
SUBJECT:
SUMMARY
OF APRIL 19, 2010, ANNUAL ASSESSMENT MEETING WITH EXELON GENERATION COMPANY, LLC.
On April 19, from 6:00 pm to 7:30 pm, an Annual Assessment Meeting was conducted at the Mount Nebo Methodist Church in Delta Pennsylvania, between the Nuclear Regulatory Commission (NRC) and the Exelon Generation Company, LLC. (Exelon). The NRC requested the meeting with Exelon management to discuss the NRC=s assessment of the safety performance of the Peach Bottom Nuclear Power Station for the calendar year 2009.
The NRC presented and discussed its assessment of the safety performance of Peach Bottom for the period of January 1 through December 31, 2009. The NRC presentation included information on the Reactor Oversight Process (ROP), and the results of NRC=s performance assessment for Peach Bottom. As part of this regulatory performance meeting, Exelon presented its perspective regarding the plant=s performance during 2009 and operational goals for 2010.
The public was invited to observe this meeting. At the end of the meeting between the NRC and Exelon, public attendees were offered the opportunity to communicate with the NRC regarding Exelon=s performance at Peach Bottom and the role of the agency in ensuring safe plant operations. Questions from the public were addressed by the NRC.
The NRC=s assessment letter can be found in ADAMS with an Accession Number of ML100621009. The annual assessment meeting notice with the attached meeting agenda can be found in ADAMS package ML100760523. The NRC slides can be located in ADAMS with an Accession Number of ML101110067. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
/RA/
Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects
Enclosures:
Public Meeting Sign in Sheet NRC Slides Exelon Slides
2 Name Organization Paul Krohn Nuclear Regulatory Commission (NRC)
Fred Bower Nuclear Regulatory Commission (NRC)
Adam Ziedonis Nuclear Regulatory Commission (NRC)
Andrew Rosebrook Nuclear Regulatory Commission (NRC)
Jeffrey Bream Nuclear Regulatory Commission (NRC)
William McGuire Exelon Generation Company, LLC.
Garey Stathes Exelon Generation Company, LLC.
Members of the Public on Sign-in Sheet.
April 21, 2010 LICENSEE: EXELON GENERATION COMPANY, LLC.
FACILITY: PEACH BOTTOM NUCLEAR POWER STATION
SUBJECT:
SUMMARY
OF APRIL 19, 2010, ANNUAL ASSESSMENT MEETING WITH EXELON GENERATION COMPANY, LLC.
On April 19, from 6:00 pm to 7:30 pm, an Annual Assessment Meeting was conducted at the Mount Nebo Methodist Church in Delta Pennsylvania, between the Nuclear Regulatory Commission (NRC) and the Exelon Generation Company, LLC. (Exelon). The NRC requested the meeting with Exelon management to discuss the NRC=s assessment of the safety performance of the Peach Bottom Nuclear Power Station for the calendar year 2009.
The NRC presented and discussed its assessment of the safety performance of Peach Bottom for the period of January 1 through December 31, 2009. The NRC presentation included information on the Reactor Oversight Process (ROP), and the results of NRC=s performance assessment for Peach Bottom. As part of this regulatory performance meeting, Exelon presented its perspective regarding the plant=s performance during 2009 and operational goals for 2010.
The public was invited to observe this meeting. At the end of the meeting between the NRC and Exelon, public attendees were offered the opportunity to communicate with the NRC regarding Exelon=s performance at Peach Bottom and the role of the agency in ensuring safe plant operations. Questions from the public were addressed by the NRC.
The NRC=s assessment letter can be found in ADAMS with an Accession Number of ML100621009. The annual assessment meeting notice with the attached meeting agenda can be found in ADAMS package ML100760523. The NRC slides can be located in ADAMS with an Accession Number of ML101110067. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.
Sincerely,
/RA/
Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects Distribution J. Clifford, DRP E. Torres, DRP S. Collilns, RA P. Krohn, DRP F. Bower, DRP, SRI M. Dapas, DRA A. Rosebrook, DRP A. Ziedonis, DRP, RI D. Lew, DRP J. Bream, DRP S. Schmitt, DRP, OA SUNSI Review Complete: PGK (Reviewer=s Initials) ML101121081 DOCUMENT NAME: G:\DRP\BRANCH4\Assessment (EOC, MC)\ROP 10\2009 EOC\PBAPS\PBAPS 2009 AAM Summary.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.