Summary of Annual Assessment Meeting with Exelon Generation Co., LLC, to Discuss the Nrc'S Assessment of the Safety Performance of the Peach Bottom Nuclear Power Station for the Calendar Year 2009
ML101121081
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/21/2010
From: Paul Krohn
Reactor Projects Region 1 Branch 4
To:
KROHN P, RI/DRP/PB4/610-337-5120
References
Download: ML101121081 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PENNSYLVANIA 19406-1415 April 21, 2010 LICENSEE: EXELON GENERATION COMPANY, LLC.

FACILITY: PEACH BOTTOM NUCLEAR POWER STATION

SUBJECT:

SUMMARY

OF APRIL 19, 2010, ANNUAL ASSESSMENT MEETING WITH EXELON GENERATION COMPANY, LLC.

On April 19, from 6:00 pm to 7:30 pm, an Annual Assessment Meeting was conducted at the Mount Nebo Methodist Church in Delta Pennsylvania, between the Nuclear Regulatory Commission (NRC) and the Exelon Generation Company, LLC. (Exelon). The NRC requested the meeting with Exelon management to discuss the NRC=s assessment of the safety performance of the Peach Bottom Nuclear Power Station for the calendar year 2009.

The NRC presented and discussed its assessment of the safety performance of Peach Bottom for the period of January 1 through December 31, 2009. The NRC presentation included information on the Reactor Oversight Process (ROP), and the results of NRC=s performance assessment for Peach Bottom. As part of this regulatory performance meeting, Exelon presented its perspective regarding the plant=s performance during 2009 and operational goals for 2010.

The public was invited to observe this meeting. At the end of the meeting between the NRC and Exelon, public attendees were offered the opportunity to communicate with the NRC regarding Exelon=s performance at Peach Bottom and the role of the agency in ensuring safe plant operations. Questions from the public were addressed by the NRC.

The NRC=s assessment letter can be found in ADAMS with an Accession Number of ML100621009. The annual assessment meeting notice with the attached meeting agenda can be found in ADAMS package ML100760523. The NRC slides can be located in ADAMS with an Accession Number of ML101110067. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects

Enclosures:

Public Meeting Sign in Sheet NRC Slides Exelon Slides

2 Name Organization Paul Krohn Nuclear Regulatory Commission (NRC)

Fred Bower Nuclear Regulatory Commission (NRC)

Adam Ziedonis Nuclear Regulatory Commission (NRC)

Andrew Rosebrook Nuclear Regulatory Commission (NRC)

Jeffrey Bream Nuclear Regulatory Commission (NRC)

William McGuire Exelon Generation Company, LLC.

Garey Stathes Exelon Generation Company, LLC.

Members of the Public on Sign-in Sheet.

April 21, 2010 LICENSEE: EXELON GENERATION COMPANY, LLC.

FACILITY: PEACH BOTTOM NUCLEAR POWER STATION

SUBJECT:

SUMMARY

OF APRIL 19, 2010, ANNUAL ASSESSMENT MEETING WITH EXELON GENERATION COMPANY, LLC.

On April 19, from 6:00 pm to 7:30 pm, an Annual Assessment Meeting was conducted at the Mount Nebo Methodist Church in Delta Pennsylvania, between the Nuclear Regulatory Commission (NRC) and the Exelon Generation Company, LLC. (Exelon). The NRC requested the meeting with Exelon management to discuss the NRC=s assessment of the safety performance of the Peach Bottom Nuclear Power Station for the calendar year 2009.

The NRC presented and discussed its assessment of the safety performance of Peach Bottom for the period of January 1 through December 31, 2009. The NRC presentation included information on the Reactor Oversight Process (ROP), and the results of NRC=s performance assessment for Peach Bottom. As part of this regulatory performance meeting, Exelon presented its perspective regarding the plant=s performance during 2009 and operational goals for 2010.

The public was invited to observe this meeting. At the end of the meeting between the NRC and Exelon, public attendees were offered the opportunity to communicate with the NRC regarding Exelon=s performance at Peach Bottom and the role of the agency in ensuring safe plant operations. Questions from the public were addressed by the NRC.

The NRC=s assessment letter can be found in ADAMS with an Accession Number of ML100621009. The annual assessment meeting notice with the attached meeting agenda can be found in ADAMS package ML100760523. The NRC slides can be located in ADAMS with an Accession Number of ML101110067. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html.

Sincerely,

/RA/

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects Distribution J. Clifford, DRP E. Torres, DRP S. Collilns, RA P. Krohn, DRP F. Bower, DRP, SRI M. Dapas, DRA A. Rosebrook, DRP A. Ziedonis, DRP, RI D. Lew, DRP J. Bream, DRP S. Schmitt, DRP, OA SUNSI Review Complete: PGK (Reviewer=s Initials) ML101121081 DOCUMENT NAME: G:\DRP\BRANCH4\Assessment (EOC, MC)\ROP 10\2009 EOC\PBAPS\PBAPS 2009 AAM Summary.doc After declaring this document AAn Official Agency Record@ it will be released to the Public.