KX, Status. Update Regarding the CrystalRiver U nit it3Steam Generator Replacement Outage Crystal River Unit 3 ("CR3") enteredi 'a pla nned unit outage obn Seitember*26e26,
- 29 aspart f the Steaim.Ge-ner*ato~rR Replcmno"G" jc for that unit. CR3 was: scheduled to return to service on Decembeir 19 2009. Duifrin 'thetouirse of the project, however, PEF disco~vere'd:
- c racking in the section of the~containment: wall.that was opened for the SGR project. After.
investigation, PEF discovered a' "dedam inatio n" of some of the concret*
in the section:of the containment wall near the SGR'opening. PEF informed the Nuclear Regulatory Commission
("NRC") of this. discovery and *beghna root cause evalu ation to *detetrmmin'e thel cau.se eof the de-Theco pany and its engineeringctractors are nearing.cornpletion of an. exhaustive*review of the.,root Icause of the de-raination" in ii the unit's ext eior containment structure'.. The analysis tea idntiied ovr 7 difernt~otential, root cause failure modes for the de-lmnto n
has narrowed this list to a handfulof remaining failure modes. Although the analysis-is not c6mplete;, th;.e remaining variables appear to point toward the interplay between several factors.
We expect to:.have this review comp eted by the end ofJianuary, 2010.
The Company has a:lso:deveLoped,*aworkplan to complete the r 1pairstothe building.structure.
We are mobilizing our effo rts,to :b.egin therepairs, which we expect to commence once we have further insight from our root cause a~nalysis. The NRC has-aldesignia'ted team if experts in. place to evalluatea:nd observe our enIt Iire.-approap t hsise.W aerqet etnswt h NRC trepresenta tives to updatethem on ourtwork processes and ire keeping them fully informed':(as to our plans. We.will provide the root:cause analysis to the NRC when it is, completedas:well as our plan-to repair the structure'.
At present; wecdo'not havea firm return'to servicedate forICR3,.nor do we have finalized estimates'on rIhepair,`ad* replachemnt power costs, which will'be:in;large part a functionwof schedule. *nce-ourrepair plans have beeien finalized we Will pr6Ovide'thfose es'tim`atestto you,
- pr1 o 1mptly. Based on w~hat we kno.wat this'tim'e, we do e~xpecf. that all repairs will becomplet ed so that C1R3 willreturn to service by mid-year.
Our currentO cus is on returning CR3,to service safely and.;quickly. Once CR3 returns to service, PEF plans.to ask the Florida Public Service Commission to opeh a docketed matter regardinglt his outage so that the Commission and all interested parties ýcan:reiviewall the relevant factS and informiation:.regarding the outagie,ý,the' root cause, andt the ~epair process.
The Company isCconfidenit :that it will'be able to continue ito meet, peakload and reserve margin requirements througi company-owned generation and tpurchasesif neededa'sit didd'uring
- ea~kýre~cords ear~liertthisý month.