Letter Sequence Acceptance Review |
---|
|
|
MONTHYEARML1008205602010-03-19019 March 2010 Acceptance Review Re TP3 SEP Critically Analysis Taking Credit for Boraflex (ME3443 and ME3444) Project stage: Acceptance Review ML1009601762010-04-0606 April 2010 Acceptance Letter Regarding the Spent Fuel Pool Criticality Analysis Taking Credit for Boraflex License Amendment Request Project stage: Acceptance Review ML1007407222010-07-21021 July 2010 License Handout - NRC-FPL Turkey Point Units 3 and 4 Continuing Credit for Boraflex in the Spent Fuel Pool Project stage: Other ML1007407202010-07-23023 July 2010 Summary of Meeting with Florida Power & Light, on the Proposed License Amendment Request Regarding Taking Credit for Boraflex in the Spent Fuel Pool Project stage: Meeting ML1028709942010-10-28028 October 2010 Withdrawal of an Amendment Request Project stage: Withdrawal 2010-04-06
[Table View] |
|
---|
Category:Acceptance Review Letter
MONTHYEARML23109A1862023-04-19019 April 2023 and Turkey Point Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML17268A2542017-10-0606 October 2017 Turkey Point Nuclear Plant, Units 3 and 4 - Supplemental Information Needed for Acceptance of License Amendment Request 255 for the Relocation of the Requirements for Explosive Gas Monitoring, Gas Decay Tanks, and Standby Generator Feed Pumps ML12277A0222012-10-10010 October 2012 Acceptance of License Amendment Request for National Fire Protection Association Standard NFPA-805 ML1024602052010-09-0303 September 2010 E-mail Acceptance Review TSTF-448 ML1024400682010-08-27027 August 2010 Acceptance Review: Fuel Storage Criticality Analysis LAR (ME4470 and ME4471) ML1009601762010-04-0606 April 2010 Acceptance Letter Regarding the Spent Fuel Pool Criticality Analysis Taking Credit for Boraflex License Amendment Request ML1008205602010-03-19019 March 2010 Acceptance Review Re TP3 SEP Critically Analysis Taking Credit for Boraflex (ME3443 and ME3444) ML0933403202009-11-30030 November 2009 Request for Exemption from Certain Requirements of the Fitness for Duty Rule for Managing Fatigue ML0915507692009-06-0404 June 2009 Acceptance Review Regarding Adoption of TSTF-511, Rev. 0 (ME1177 and ME1178) ML0909106822009-03-31031 March 2009 Email Acceptance Letter License Amendment Request to Delete TS 3.4.10 and to Implement TS Improvement to Extend the Inspection Interval for Reactor Coolant Pump Flywheels ML0506801972005-04-0707 April 2005 Results of Acceptance Regarding Request from 10 CFR Part 50 Appendix R, Section III.G.3. (MC5542 and MC5543) (L-2004-176) 2023-04-19
[Table view] Category:E-Mail
MONTHYEARML24024A0182024-01-24024 January 2024 LTR-23-0216-1 - (E-Mail) Turkey Point Nuclear Plant, Units 3 and 4 - 10 CFR 2.206 Petition -Turkey Point and PWR RPV Embrittlement E-Mail Closure Letter to Petitioner, January 23, 2024 ML24023A0622024-01-10010 January 2024 10 CFR 2.206 Petition - LTR-23-0216-1 - Turkey Point and PWR RPV Embrittlement - E-mail Final Determination Status to Petitioner - 1-10-2024 - L-2023-CRS-0005 IR 05000250/20240102024-01-0505 January 2024 Focused Engineering Inspection 05000250/2024010 and 05000251/2024010 ML23347A0772023-12-13013 December 2023 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - LAR to Transition to 24-Month Fuel Cycles (L-2023-LLA-00161) ML23341A0602023-12-0707 December 2023 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Exemption Request for Use of Axiom Fuel Cladding (L-2023-LLE-0036) ML23317A3752023-11-0808 November 2023 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - LAR to Update SFP Criticality Analysis (L-2023-LLA-0142) ML23307A2382023-11-0303 November 2023 10 CFR 2.206 Petition - LTR-23-0216-1 - Initial Assessment; Turkey Point Subsequent License Renewal with Petitioner 11/3/2023 - L-2023-CRS-0005 ML23333A0092023-10-27027 October 2023 Attachment a - NRC Extension of Comment Period-1 ML23265A2692023-09-15015 September 2023 Turkey Point,_Rp Document Request 2023-004 ML23226A0752023-08-14014 August 2023 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - RCP LAR (L-2022-LLA-0128) ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23171B0532023-06-20020 June 2023 NRR E-mail Capture - Change in Estimated Review Schedule for Turkey Point Improved Standard Technical Specifications (ITS) LAR (L-2022-LLI-0002) ML23198A0592023-05-22022 May 2023 FPL to Fws, Notification of Doa Crocodile in CCS on 5/22/23 ML23138A0212023-05-17017 May 2023 Telephone Record, Call with Florida Power and Light Regarding Decommissioning Funding Plan Update Dated March 30, 2021 ML23129A8322023-05-0505 May 2023 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - RCP LAR (L-2022-LLA-0128) ML23109A1862023-04-19019 April 2023 and Turkey Point Acceptance of Requested Licensing Action Proposed Alternative to Asme Section XI Authorizing Implementation of Asme Code Case N-752-1 ML23117A2712023-04-11011 April 2023 NRR E-mail Capture - (External_Sender) Updated Data for Doa Turkey Point American Crocodile at 4/10/2023 ML23067A2812023-03-0808 March 2023 NRR E-mail Capture - (External_Sender) Non-causal American Croc Doa Turkey Point ML23038A1892023-02-0303 February 2023 RP RFI April 2023 ML23006A0262023-01-0505 January 2023 NRR E-mail Capture - Audit Plan - Turkey Point Fire Protection Changes to Support RCP Seal Replacement LAR ML22311A4752022-11-0707 November 2022 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - ITS ML22293B6562022-10-18018 October 2022 Request for 45 Day Extension of Comment Period of Turkey Point Subsequent License Renewal Scoping Process, Docket Id NRC-2022-0172 by Natural Resources Defense Council, Miami Waterkeeper and Counsel for Friends of the Earth ML22265A1522022-09-21021 September 2022 NRR E-mail Capture - Acceptance Review - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - LAR to Revise Fire Protection Program (L-2022-LLA-0128) ML22258A1862022-09-15015 September 2022 NRR E-mail Capture - Turkey Point Unit Nos. 3 and 4 - Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Requests to Replace Instrumentation with Digital Systems ML22181A0562022-06-30030 June 2022 NRR E-mail Capture - Request for Additional Information - Turkey Point U3 Sgtir (L-2022-LRO-0070) ML22178A1032022-06-25025 June 2022 NRR E-mail Capture - (External_Sender) Turkey Point Doa American Crocodile 6/25/22 ML22147A0672022-05-19019 May 2022 NRR E-mail Capture - (External_Sender) Turkey Point Doa Crocodile 05/19/2022 ML22095A0162022-04-0505 April 2022 NRR E-mail Capture - Verbal Authorization of Turkey Point Nuclear Plant Unit 3 - Icw Relief Request No. 10-II ML22081A0292022-03-21021 March 2022 NRR E-mail Capture - Turkey Point Nuclear Generating Unit No. 3 - Request for Additional Information - Icw Alternative ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML21302A0052021-12-23023 December 2021 Email to Nextera/Fpl Re Discussion of Availability of Human Factor Validation Information to Support the Planned Turkey Point Digital I&C License Amendment Request ML21307A2882021-11-18018 November 2021 NRC to Fws, Request to Reinitiate Endangered Species Act Section 7 Consultation for Continued Operation of Turkey Point ML21298A0572021-10-25025 October 2021 NRR E-mail Capture - Final: Tpn Request for Additional Information - Round 2 Concerning Relief Request 10 - Extension EPID: L-2021-LLR-0077 ML21291A1272021-10-14014 October 2021 NRR E-mail Capture - Request for Additional Information - Fifth Ten-Year Inservice Inspection Interval Relief Request No.10 - Extension (L-2021-LLR-0077) ML21270A1652021-09-27027 September 2021 NRR E-mail Capture - Turkey Point Request for Additional Information Concerning Full Spectrum LOCA Methodology - EPID L-2021-LLA-0070 ML21266A2602021-09-22022 September 2021 NRR E-mail Capture - (External_Sender) Partial Sea Turtle Carcass at Turkey Point ML21252A2142021-09-0101 September 2021 NRR E-mail Capture - Final: Turkey Point Units 3 and 4 - Request for Additional Information Concerning Relief Requests 8 and 9 ML21207A1212021-06-30030 June 2021 Fws to NRC, Biological Opinion Notifications to Fws Law Enforcement ML21158A2332021-06-0707 June 2021 NRR E-mail Capture - Acceptance Review: Turkey Point Units 3 and 4 Fifth Ten-Year ISI Extension of ISI RPV Welds from 10 to 20 Years (L-2021-LLR-0038) ML21154A0872021-06-0202 June 2021 NRR E-mail Capture - 06/02/2021 Print a Logbook Entry: Turkey Point Endangered Species Report Regarding Injured American Crocodiles ML21154A0862021-05-25025 May 2021 NRR E-mail Capture - Acceptance Review: Turkey Point - Update Listing of Approved LOCA Methodologies to Adopt Full Spectrum LOCA Methodology ML21140A0672021-05-13013 May 2021 NRR E-mail Capture - (External_Sender) Regarding Doa American Crocodile Report 5-13-21 ML21131A1362021-05-0404 May 2021 NRR E-mail Capture - (External_Sender) 5/4/2021 Report Regarding Doa American Crocodile ML21097A1832021-03-30030 March 2021 NRR E-mail Capture - Endangered Species Death Report from Turkey Point Regarding Incident on 03/30/2021 ML21084A1312021-03-18018 March 2021 NRR E-mail Capture - (External_Sender) Deceased American Crocodile Found Outside FPL Property Line ML21056A0002021-02-24024 February 2021 NRR E-mail Capture - Endangered Species - 2/24/2021 Logbook Entry Regarding an American Crocodile ML21029A0172021-01-25025 January 2021 NRR E-mail Capture - 1/25/2021 Logbook Entry Regarding an American Crocodile Reported in the Owner Controlled Area ML21025A4152021-01-25025 January 2021 NRR E-mail Capture - 10 CFR 2.206 Petition Dated January 10, 2021 - Open Phase Condition Implementation ML20346A1022020-12-0808 December 2020 NRR E-mail Capture - Response: September 17, 2020 Submittal to the Nuclear Regulatory Commission ML20218A5502020-08-0505 August 2020 Florida Power & Light Letter L-2020-127: FPL QAPD for 10 CFR 52 Licenses FPL-2 Revision Summary 2024-01-05
[Table view] |
Text
From: Paige, Jason Sent: Friday, March 19, 2010 11:19 AM To: Tomonto, Bob
Subject:
Acceptance Review RE TP3 SFP Criticality Analysis Taking Credit for Boraflex (ME3443 and ME3444)
- Bob, The NRC staff has reviewed the Spent Fuel Pool Criticality Analysis Taking Credit for Boraflex license amendment request and concludes that it does not provide sufficient technical information to enable the NRC staff to proceed with its detailed technical review. The NRC staff found exceptions with both the Boraflex Remedy analysis referenced in the application and the comparative analysis submitted with the application. For the reasons stated below, the NRC staff recommends that the subject application be processed as unacceptable for review without opportunity to supplement, in accordance with LIC-109.
- 1) MCNP4a code bias and bias uncertainty used in the maximum keff calculations are non-conservative. Using the recently corrected numbers indicates that the unborated keff will exceed 1.0, violating the requirements of 10 CFR 50.68. Therefore, the analysis used to support TP Amendment 234 no longer provides reasonable assurance that TP U3 complies with 10 CFR 50.68.
- 2) Depletion uncertainty was not used for the unborated cases (Ref: Tables 4.6.4 and 4.6.5 in Holtec Report, HI-2043149). Proper use of a depletion uncertainty in the unborated cases exacerbates the condition described in item number 1.
- 3) The core-exit temperature used during the depletion simulations was 611.3°F, which was identified as the maximum average core-exit temperature. This is not the maximum core-exit temperature. According to Table 3.2.2-1 of the TP UFSAR the maximum core-exit temperature is approximately 643°F. This temperature difference is worth approximately 0.01 keff.
As I stated earlier, we can proceed with setting up a teleconference to discuss in more detail.
Looking at the staff's availability, the tech staff is available on Tuesday, March 23, 2010 at 10am or anytime after 3pm.
Jason Paige, Turkey Point Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Phone: (301) 415-5888