MONTHYEARML1002607162010-01-22022 January 2010 Request for Exemption from Physical Security Requirements (Redacted) Project stage: Request ML1006007132010-03-16016 March 2010 Exemption from the Requirements of 10 CFR Part 73, Section 73.55 Implementation Deadline for Physical Security Plans Project stage: Approval 2010-01-22
[Table View] |
|
---|
Category:Exemption from NRC Requirements
MONTHYEARML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report ML19281D7432020-01-0909 January 2020 FRN, Exemption from 10 CFR 50.54(w)(1) - Onsite Property Damage Insurance ML19282A0192020-01-0707 January 2020 FRN, Exemption from 10 CFR 140.11(a)(4) - Primary and Secondary Liability Insurance ML19281D7402020-01-0606 January 2020 Exemption from 10 CFR 50.54(w)(1) - Onsite Property Damage Insurance ML19282A0362020-01-0606 January 2020 Exemption from 10 CFR 140.11(a)(4) - Primary and Secondary Liability Insurance ML19282A1922020-01-0606 January 2020 Letter, Exemption from 10 CFR 140.11(a)(4) - Primary and Secondary Liability Insurance and Amendment No. 14 to Indemnity Agreement No. B-48 ML19142A0602019-12-18018 December 2019 Exemption to Allow Reduced Emergency Planning Requirements; Revise Radiological Emergency Response Plan Consistent with Permanently Defueled Reactor ML19142A0432019-12-18018 December 2019 Letter and Safety Evaluation, Exemption to Allow Reduced Emergency Planning Requirements; Revise Radiological Emergency Response Plan Consistent with Permanently Defueled Reactor ML19142A0732019-12-18018 December 2019 Federal Register Notice, Exemption to Allow Reduced Emergency Planning Requirements; Revise Radiological Emergency Response Plan Consistent with Permanently Defueled Reactor ML19192A0872019-08-22022 August 2019 FRN, Request to Exempt Holtec Decommissioning International from Requirements of 10 CFR 50.82(a)(8)(i)(A) Related to Decommissioning Trust Fund ML19192A0862019-08-22022 August 2019 Exemption for Holtec Decommissioning International from Requirements of 10 CFR 50.82(a)(8)(i)(A) Related to Decommissioning Trust Fund ML19192A0832019-08-22022 August 2019 Letter, Request to Exempt Holtec Decommissioning International from Requirements of 10 CFR 50.82(a)(8)(i)(A) Related to Decommissioning Trust Fund ML19163A0022019-07-23023 July 2019 FRN, Exemption from 10 CFR 50.82(a)(8)(i)(A) to Allow Use of Funds from Nuclear Decommissioning Trust for Spent Fuel Management and Site Restoration Activities ML19162A3342019-07-22022 July 2019 Letter, Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) to Allow Use of Funds from Nuclear Decommissioning Trust for Spent Fuel Management and Site Restoration Activities ML19087A1122019-05-21021 May 2019 Partial Exemption from Record Retention Requirements of 10 CFR 50.71(c), 10 CFR 50.59(d)(3), and 10 CFR 50 Appendix B ML19087A1522019-05-21021 May 2019 Letter, Partial Exemption from Record Retention Requirements of 10 CFR 50.71(c), 10 CFR 50.59(d)(3), and 10 CFR 50 Appendix B ML19088A0502019-03-25025 March 2019 (PNPS) - Request for Exemption from Portions of 10 CFR 50.54(w)(1) ML19088A1272019-03-25025 March 2019 (PNPS) - Request for Exemption from 10 CFR 140.11 (a)(4) ML19050A1912019-02-14014 February 2019 Response to Request for Additional Information - Exemption from the Requirements of 10CFR50.47 and Appendix E to 10CFR50 CNRO-2018-00047, Application for Order Consenting to Direct and Indirect Transfers of Control of Licenses and Approving Conforming License Amendment; and Request for Exemption from 10 CFR 50.82(a)(8)(i)(A)2018-11-16016 November 2018 Application for Order Consenting to Direct and Indirect Transfers of Control of Licenses and Approving Conforming License Amendment; and Request for Exemption from 10 CFR 50.82(a)(8)(i)(A) ML17059D7672017-05-16016 May 2017 Pilgrim Nuclear Power Station - FRN, Exemption from Specific Provisions in 10 CFR 73.55 Related to Suspension of Security Measures for Licensed Senior Operator or Certified Fuel Handler (CAC No. MF9274) ML1006007132010-03-16016 March 2010 Exemption from the Requirements of 10 CFR Part 73, Section 73.55 Implementation Deadline for Physical Security Plans ML1002607162010-01-22022 January 2010 Request for Exemption from Physical Security Requirements (Redacted) ML0813603262008-06-0909 June 2008 Exemption from the Schedule Requirements of 10 CFR 50.75(f)(3) ML0810001762008-02-28028 February 2008 Request for Exemption from the Schedule Requirements of 10 CFR 50.75(f)(3) ML0225505592002-09-12012 September 2002 Exemption from Requirements of 10 CFR Part 20, Section 20.1003 Definition of Total Effective Dose Equivalent (TEDE) 2022-08-29
[Table view] Category:Federal Register Notice
MONTHYEARML21267A5202021-10-18018 October 2021 Exemption 10 CFR Part 20, Appendix G Acceptance Review Federal Register Notice ML21270A0762021-10-18018 October 2021 Enclosure - Pilgrim Nuclear Power Station - Exemption 10 CFR Part 20, Appendix G Acceptance Review Order ML21097A0412021-02-0202 February 2021 E-Mail Attachment - Copy of Federal Register Notice Vol. 82, No. 20 2-2-2021, Page 7885 ML19281D7432020-01-0909 January 2020 FRN, Exemption from 10 CFR 50.54(w)(1) - Onsite Property Damage Insurance ML19282A0192020-01-0707 January 2020 FRN, Exemption from 10 CFR 140.11(a)(4) - Primary and Secondary Liability Insurance ML19281D7402020-01-0606 January 2020 Exemption from 10 CFR 50.54(w)(1) - Onsite Property Damage Insurance ML19142A0732019-12-18018 December 2019 Federal Register Notice, Exemption to Allow Reduced Emergency Planning Requirements; Revise Radiological Emergency Response Plan Consistent with Permanently Defueled Reactor ML18332A0992019-12-13013 December 2019 Letter, Environmental Assessment and Finding of No Significant Impact; Exemption to Allow Reduced Emergency Planning Requirements; Revise Radiological Emergency Response Plan Consistent with Permanently Defueled Reactor ML18332A0632019-12-13013 December 2019 Environmental Assessment and Finding of No Significant Impact Exemption to Allow Reduced Emergency Planning Requirements; Revise Radiological Emergency Response Plan Consistent with Permanently Defueled Reactor ML19303B7932019-11-25025 November 2019 OEDO-15-00479 - Federal Register Notice with Pilgrim Nuclear Power Station - Director'S Decision 2.206 Petition Regarding Current Licensing Basis for Flooding ML19170A2572019-08-22022 August 2019 Federal Register Notice, Order Approving Direct and Indirect Transfer of Renewed Facility Operating License to Holtec Pilgrim, LLC, Owner and Holtec Decommissioning International, LLC, Operator (L-2018-LLO-0003) ML19192A0872019-08-22022 August 2019 FRN, Request to Exempt Holtec Decommissioning International from Requirements of 10 CFR 50.82(a)(8)(i)(A) Related to Decommissioning Trust Fund ML19191A0052019-08-15015 August 2019 FRN, Environmental Assessment and Finding of No Significant Impact - Request to Exemption Holtec Decommissioning International from Requirements of 10 CFR 50.82(a)(8)(i)(A) Related to Decommissioning Trust Fund ML19163A0022019-07-23023 July 2019 FRN, Exemption from 10 CFR 50.82(a)(8)(i)(A) to Allow Use of Funds from Nuclear Decommissioning Trust for Spent Fuel Management and Site Restoration Activities ML19163A0012019-07-22022 July 2019 Exemption from 10 CFR 50.82(a)(8)(i)(A) to Allow Use of Funds from Nuclear Decommissioning Trust for Spent Fuel Management and Site Restoration Activities ML19136A1762019-06-26026 June 2019 FRN, Environmental Assessment and Finding of No Significant Impact; Exemption from 10 CFR 50.82(a)(8)(i)(A), Allow Use of Funds from Nuclear Decommissioning Trust for Spent Fuel Management and Site Restoration Activities ML20042D6972019-01-31031 January 2019 Federal Register Notice - Pilgrim Nuclear Station; Consideration of Approval of Transfer of License and Conforming Amendment (January 31, 2019; 84 Fr 816) ML18337A4302019-01-0202 January 2019 Letter, Notice of Application for Order for Direct and Indirect Transfer of Renewed Facility Operating License and Conforming License Amendment to Holtec Pilgrim, LLC and Holtec Decommissioning International, LLC ML18337A4182019-01-0202 January 2019 FRN, Notice of Application for Order for Direct and Indirect Transfer of Renewed Facility Operating License and Conforming License Amendment to Holtec Pilgrim, LLC and Holtec Decommissioning International, LLC ML18331A1492018-12-18018 December 2018 Federal Register Notice, Notice of Receipt, Public Meeting, and Request for Comment on Post-Shutdown Decommissioning Activities Report and Site-Specific Decommissioning Cost Estimate ML18331A1292018-12-18018 December 2018 Letter, Notice of Receipt, Public Meeting, and Request for Comment on Post-Shutdown Decommissioning Activities Report and Site-Specific Decommissioning Cost Estimate ML18295A7442018-10-25025 October 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 11/06/18 ML17353A1922017-12-21021 December 2017 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 2018 NRC-2017-0238, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 20182017-12-21021 December 2017 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 2018 ML17059D7672017-05-16016 May 2017 Pilgrim Nuclear Power Station - FRN, Exemption from Specific Provisions in 10 CFR 73.55 Related to Suspension of Security Measures for Licensed Senior Operator or Certified Fuel Handler (CAC No. MF9274) ML15356A7352016-02-11011 February 2016 OEDO-15-00479: David Lochbaum and Others 2.206 Petition Regarding Pilgrim'S Current License Basis for Flooding Acknowledgement Letter ML15356A7442016-02-11011 February 2016 OEDO-15-00479: Federal Register Notice 2.206 Petition Regarding Pilgrim'S Current License Basis for Flooding NRC-2016-0035, OEDO-15-00479: Federal Register Notice 2.206 Petition Regarding Pilgrim'S Current License Basis for Flooding2016-02-11011 February 2016 OEDO-15-00479: Federal Register Notice 2.206 Petition Regarding Pilgrim'S Current License Basis for Flooding ML15162A6902015-08-27027 August 2015 G20130211 - Transmittal Letter to Petitioner Judson Regarding Final Director'S Decision for James A. FitzPatrick Power Plant, Pilgrim Nuclear Power Station and Vermont Yankee Nuclear Power Station ML13018A2392015-04-0808 April 2015 G20110171 - Letter to Petitioner Saporito on Proposed Director'S Decision Regarding 2.206 Petition Dated: March 12, 2011 ML15051A0242015-03-0606 March 2015 Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination & Opportunity for a Hearing & Order Imposing Procedures for Document Access (MF5431) NRC-2015-0053, Federal Register Notice - License Amendment Application; Opportunity to Comment, Request a Hearing, and Petition for Leave to Intervene; Order for Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station2015-03-0606 March 2015 Federal Register Notice - License Amendment Application; Opportunity to Comment, Request a Hearing, and Petition for Leave to Intervene; Order for Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station ML15051A0272015-03-0606 March 2015 Federal Register Notice - License Amendment Application; Opportunity to Comment, Request a Hearing, and Petition for Leave to Intervene; Order for Entergy Nuclear Operations, Inc. Pilgrim Nuclear Power Station ML14335A6302015-01-15015 January 2015 G20110262 - Final Response to Paul Gunter and Kevin Kamps Letter 2.206 - Immediately Suspend the Operating License of General Electric Boiling Water Reactors Mark I Units NRC-2015-0009, G20110262 - FRN - Paul Gunter and Kevin Kamps Letter 2.206 - Immediately Suspend the Operating License of General Electric Boiling Water Reactors Mark I Units2015-01-15015 January 2015 G20110262 - FRN - Paul Gunter and Kevin Kamps Letter 2.206 - Immediately Suspend the Operating License of General Electric Boiling Water Reactors Mark I Units ML14335A6482015-01-15015 January 2015 G20110262 - FRN - Paul Gunter and Kevin Kamps Letter 2.206 - Immediately Suspend the Operating License of General Electric Boiling Water Reactors Mark I Units ML14255A4352014-09-15015 September 2014 Transmittal LTR for Individual Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing ML14189A6652014-07-24024 July 2014 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information - August 5, 2014 NRC-2012-0186, G20100454 - Federal Register Notice 2.206 Petition (Pilgrim Watch) - Non-EQ Inaccessible Cables and Wiring at Pilgrim Nuclear Power Station2013-09-26026 September 2013 G20100454 - Federal Register Notice 2.206 Petition (Pilgrim Watch) - Non-EQ Inaccessible Cables and Wiring at Pilgrim Nuclear Power Station ML13255A1912013-09-26026 September 2013 G20100454 - Transmittal Letter 2.206 Petition (Pilgrim Watch)-Non-EQ Inaccessible Cables and Wiring at Pilgrim Nuclear Power Station ML13255A1932013-09-26026 September 2013 G20100454 - Federal Register Notice 2.206 Petition (Pilgrim Watch) - Non-EQ Inaccessible Cables and Wiring at Pilgrim Nuclear Power Station ML13225A5572013-08-12012 August 2013 Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit ML13154A3312013-08-0707 August 2013 G20130211 - Federal Register Notice - 2.206 Petition from Tim Judson Financial Qualifications Fitzpatrick/Vermont Yankee/Pilgrim ML13154A3132013-08-0707 August 2013 G20130211 Letter to Timothy Judson 2.206 Financial Qualifications Fitzpatrick/Vermont Yankee/Pilgrim ML13018A4572013-03-20020 March 2013 Proposed Director'S Decision - Entergy'S Management of Non-Environmentally Qualified Inaccessible Cables & Wiring at Pilgrim ML13025A3212013-03-14014 March 2013 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2 & 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Correction FRN, Biweekly Notice of Issuance of Amendments Published on 1/22/13, Revise QA Program Manual and Staff Quali ML1034303362012-08-0202 August 2012 G20100454/EDATS: OEDO-2010-0589 - Federal Register Notice - Receipt of Request for Action Under 10 CFR 2.206 Entergy'S Management of Non-Environmentally Qualified Inaccessible Cables & Wiring at Pilgrim ML1219102272012-08-0202 August 2012 G20100454/EDATS: OEDO-2010-0589 - Acknowledgement Letter to Mary Lampert Re 2.206 - Inadequate of Entergy'S Management of Non-Environmentally Qualified Inaccessible Cables & Wiring at Pilgrim ML0910404232012-05-29029 May 2012 Issuance of Renewed License for Pilgrim Nuclear Generating Station NRC-2012-0002, 03/30/2012 Commission Meeting - FRN2012-03-23023 March 2012 03/30/2012 Commission Meeting - FRN 2021-02-02
[Table view] Category:Letter
MONTHYEARL-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary November 2021 Through October 2023 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) L-23-011, 10 CFR 72.48 Biennial Change Summary Report2023-10-27027 October 2023 10 CFR 72.48 Biennial Change Summary Report IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 L-23-008, Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI)2023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI) ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML23069A2782023-03-13013 March 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 ML22356A0712023-01-31031 January 2023 Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 L-22-036, Decommissioning Trust Fund Agreement2022-11-0808 November 2022 Decommissioning Trust Fund Agreement ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22266A1922022-09-23023 September 2022 and Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration ML22272A0352022-09-22022 September 2022 S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions ML22269A4202022-09-22022 September 2022 Citizen Lawsuit ML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22206A1512022-08-0101 August 2022 NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 ML22221A2592022-08-0101 August 2022 LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) ML22193A1662022-07-28028 July 2022 LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) ML22175A1732022-07-28028 July 2022 LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay ML22154A4882022-06-0101 June 2022 Letter from Conservation Law Foundation Regarding Irradiated Water Release from Pilgrim ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22136A2602022-05-16016 May 2022 Submittal of Annual Radiological Environmental Operating Report for January 1 Through December 31, 2021 ML22136A2572022-05-16016 May 2022 Submittal of Annual Radioactive Effluent Release Report for January 1 Through December 31, 2021 ML22102A0932022-05-12012 May 2022 LTR-22-0067 Response to Matthew P. Levesque, President, Barnstable Town Council Regarding Irradiated Water Release from Pilgrim IR 05000293/20220012022-05-11011 May 2022 NRC Inspection Report No. 05000293/2022001 ML22104A0542022-04-30030 April 2022 LTR-22-0093 Response to Sheila Lynch-Benttinen, Regarding Irradiated Water Release from Pilgrim L-22-026, Occupational Radiation Exposure Data Report - 20212022-04-29029 April 2022 Occupational Radiation Exposure Data Report - 2021 ML22152A2592022-04-25025 April 2022 Zaccagnini Letter Dated 04/25/22 ML22152A2642022-04-19019 April 2022 Flynn Letter Dated 04/19/22 ML22091A1062022-04-0101 April 2022 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) L-22-022, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.2022-03-25025 March 2022 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. ML22130A6762022-03-14014 March 2022 Decola Ltr Dtd 03/14/22 Re Potential Discharge of Radioactive Water from Pilgrim Nuclear Power Station ML22041B0762022-03-0707 March 2022 03-07-22 - Letter to the Honorable William R. Keating, Responds to Letter Regarding Proposed Release of Irradiated Water at Pilgrim Nuclear Power Station Into Cape Cod Bay ML22054A2962022-02-23023 February 2022 Annual ISFSI Radioactive Effluent Release Report for 2021 2024-02-02
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 16, 2010 Site Vice President Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508
SUBJECT:
PILGRIM NUCLEAR POWER STATION - EXEMPTION FROM THE REQUIREMENTS OF 10 CFR PART 73, SECTION 73.55 IMPLEMENTATION DEADLINE FOR PHYSICAL SECURITY PLANS (TAC NO. N1E3213)
Dear Sir or Madam:
The Commission has approved the enclosed exemption from specific requirements of Title 10 of the Code of Federal Regulations (10 CFR), Part 73, Section 73.55, for the Pilgrim Nuclear Power Station (Pilgrim or the licensee). This action is in response to your application dated January 22, 2010, as supplemented by letter dated February 2, 2010.
The licensee requested U.S. Nuclear Regulatory Commission (NRC) approval for an exemption from the March 31, 2010, implementation date for certain security requirements in 10 CFR Part 73, "Physical Protection of Plants and Materials", for Pilgrim, issued by NRC in a Final Rule dated March 27, 2009 (74 FR 13926). The proposed exemption would allow an extension from the March 31, 2010, implementation date for some specific requirements, until September 15, 2010.
A copy of the exemption is enclosed. The exemption has been forwarded to the Office of the Federal Register for publication.
Sincerely, James Kim, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293
Enclosure:
Exemption cc w/encl: Distribution via Listserv
7590-01-P UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ENTERGY NUCLEAR OPERATIONS. INC.
PILGRIM NUCLEAR POWER STATION DOCKET NO. 50-293 EXEMPTION
1.0 BACKGROUND
Entergy Nuclear Operations. Inc. (Entergy or the licensee) is the holder of Facility Operating License No. DPR-35, which authorizes operation of the Pilgrim Nuclear Power Station (Pilgrim). The license provides, among other things. that the facility is subject to all rules, regulations. and orders of the Nuclear Regulatory Commission (NRC or the Commission) now or hereafter in effect.
The facility consists of a boiling-water reactor located in Plymouth County, Massachusetts.
2.0 REQUEST/ACTION Title 10 of the Code of Federal Regulations (10 CFR) Part 73, "Physical protection of plants and materials," Section 73.55, "Requirements for physical protection of licensed activities in nuclear power reactors against radiological sabotage," published March 27, 2009, effective May 26, 2009, with a full implementation date of March 31, 2010, requires licensees to protect, with high assurance, against radiological sabotage by designing and implementing comprehensive site security programs. The amendments to 10 CFR 73.55 published on March 27, 2009, establish and update generically applicable security requirements similar to
-2 those previously imposed by Commission Orders issued after the terrorist attacks of September 11,2001, and implemented by licensees. In addition, the amendments to 10 CFR 73.55 include additional requirements to further enhance site security based upon insights gained from implementation of the post-September 11, 2001, security Orders. It is from four of these new requirements that Pilgrim now seeks an exemption from the March 31,2010, implementation date. All other physical security requirements established by this recent rulemaking have already been or will be implemented by the licensee by March 31, 2010.
By letter dated January 22, 2010, as supplemented by letter dated February 2, 2010, the licensee requested an exemption in accordance with 10 CFR 73.5, "Specific exemptions." The licensee's letters dated January 22,2010, and February 2,2010, contain security-related information and, accordingly, are not available to the public pursuant to 10 CFR 2.390( d)(1).
Publicly available versions of the licensee's submittals are available at Agencywide Documents Access and Management System (ADAMS) accession numbers ML100260716 and ML100351192. The licensee has requested an exemption from the March 31, 2010, compliance date stating that, due to the scope of the design, procurement, and installation activities and in consideration of impediments to construction such as winter weather conditions and equipment delivery schedules, completion of some of the new requirements contained in 10 CFR 73.55 will require additional time beyond March 31, 2010. Specifically, the request to extend the compliance date is for four specific requirements from the current March 31, 2010, deadline to September 15, 2010. Being granted this exemption for the four items would allow the licensee to complete upgrades to its security system necessary for it to be in full compliance with the 10 CFR Part 73 Final Rule.
-3 3.0 DISCUSSION OF PART 73 SCHEDULE EXEMPTIONS FROM THE MARCH 31, 2010, FULL IMPLEMENTATION DATE Pursuant to 10 CFR 73.55(a)(1), "By March 31, 2010, each nuclear power reactor licensee, licensed under 10 CFR Part 50, shall implement the requirements of this section through its Commission-approved Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Cyber Security Plan referred to collectively hereafter as "security plans." Pursuant to 10 CFR 73.5, the Commission may, upon application by any interested person or upon its own initiative, grant exemptions from the requirements of 10 CFR Part 73 when the exemptions are authorized by law, and will not endanger life or property or the common defense and security, and are otherwise in the public interest.
This exemption would, as noted above, allow an extension from March 31, 2010, until September 15, 2010, to allow temporary non-compliance with the new rule in four specified areas. As stated above, 10 CFR 73.5 allows the NRC to grant exemptions from the requirements of 10 CFR Part 73. The NRC staff has determined that granting of the licensee's proposed exemption will not result in a violation of the Atomic Energy Act of 1954, as amended, or the Commission's regulations. Therefore, the NRC approval of the licensee's exemption request is authorized by law.
In the draft final power reactor security rule provided to the Commission, the NRC staff proposed that the requirements of the new regulation be met within 180 days. The Commission directed a change from 180 days to approximately 1 year for licensees to fully implement the new requirements. This change was incorporated into the final rule. From this, it is clear that the Commission wanted to provide a reasonable timeframe for licensees to achieve full compliance.
As noted in the final rule, the Commission also anticipated that licensees would have to conduct site-specific analyses to determine what changes were necessary to implement the
-4 rule's requirements, and that changes could be accomplished through a variety of licensing mechanisms, including exemptions. Since issuance of the final rule, the Commission has rejected a request to generically extend the rule's compliance date for all operating nuclear power plants, but noted that the Commission's regulations provide mechanisms for individual licensees, with good cause, to apply for relief from the compliance date (
Reference:
June 4, 2009, letter from R. W. Borchardt, NRC, to M. S. Fertel, Nuclear Energy Institute). The licensee's request for an exemption is, therefore, consistent with the approach set forth by the Commission and discussed in the June 4, 2009, letter.
Pilgrim Schedule Exemption Request The licensee provided detailed information in a letter dated January 22,2010, requesting an exemption, as supplemented by letter dated February 2,2010. It describes a comprehensive plan including the scope of work such as the design, procurement, and installation activities, consideration of impediments to construction such as winter weather conditions and equipment delivery schedules, and provides a timeline for achieving full compliance with the new regulation.
Attachment 1 contains (1) proprietary information regarding the site security plan, (2) details of specific portions of the regulation for which the site cannot be in compliance by the March 31, 2010, deadline and the reasons for the same, (3) the required changes to the site's security configuration, and (4) a timeline with critical path activities that would enable the licensee to achieve full compliance by September 15,2010. The timeline provides dates indicating when (1) construction will begin on various phases of the project (i.e., new roads, buildings, and fences), (2) outages are scheduled for each unit, and (3) critical equipment will be ordered, installed, tested and become operational.
Notwithstanding the scheduler exemptions requested for these limited requirements, the licensee will continue to be in compliance with all other applicable physical security requirements as described in 10 CFR 73.55 and reflected in its current NRC-approved physical security
-5 program. By September 15, 2010, Pilgrim indicated that it will be in full compliance with all the regulatory requirements of 10 CFR 73.55 as issued on March 27,2009.
4.0 CONCLUSION
FOR PART 73 SCHEDULE EXEMPTION REQUEST The NRC staff has reviewed the licensee's submittals and concludes that the licensee has justified its request for an extension of the compliance date with regard to four specified requirements of 10 CFR 73.55 to September 15, 2010.
Accordingly, the Commission has determined that pursuant to 10 CFR 73.5, "Specific exemptions," an exemption from the March 31,2010, compliance date is authorized by law and will not endanger life or property or the common defense and security, and is otherwise in the public interest. Therefore, the Commission hereby grants the requested exemption.
The NRC staff has determined that the long-term benefits that will be realized when the design, procurement, and installation activities are complete, justifies extending the full compliance date in the case of this particular licensee. The security measures Pilgrim needs additional time to implement are new requirements imposed by March 27,2009, amendments to 10 CFR 73.55, and are in addition to those required by the security Orders issued in response to the events of September 11, 2001. Therefore, the NRC has concluded that the licensee's actions are in the best interest of protecting the public health and safety through the security changes that will result from granting this exemption.
As per the licensee's request and the NRC's regulatory authority to grant an exemption from the March 31, 2010, deadline for the four items specified in the licensee's letter dated January 22, 2010, as supplemented by letter dated February 2, 2010, the licensee is required to be in full compliance with the provisions of 10 CFR 73.55 by September 15, 2010. In achieving compliance, the licensee is reminded that it is responsible for determining the appropriate licensing mechanism (i.e., 10 CFR 50.54(p) or 10 CFR 50.90) for incorporation of all necessary changes to its security plans.
-6 Pursuant to 10 CFR 51.32, "Finding of no significant impact," the Commission has previously determined that the granting of this exemption will not have a significant effect on the quality of the human environment (75 FR 11205; dated March 10, 2010).
This exemption is effective upon issuance.
Dated at Rockville, Maryland, this 16th day of March 2010.
FOR THE NUCLEAR REGULATORY COMMISSION
.\2\ ~'<i
~
.. I
,,~-- ", Ii
-" . - . _~
~
I. ,-J
/
/
J seph G. Giitter, Director
( . lvision of Operating Reactor Licensing
<; Office of Nuclear Reactor Regulation
March 16,2010 Site Vice President Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508
SUBJECT:
PILGRIM NUCLEAR POWER STATION - EXEMPTION FROM THE REQUIREMENTS OF 10 CFR PART 73, SECTION 73.55 IMPLEMENTATION DEADLINE FOR PHYSICAL SECURITY PLANS (TAC NO. ME3213)
Dear Sir or Madam:
The Commission has approved the enclosed exemption from specific requirements of Title 10 of the Code of Federal Regulations (10 CFR), Part 73, Section 73.55, for the Pilgrim Nuclear Power Station (Pilgrim or the licensee). This action is in response to your application dated January 22, 2010, as supplemented by letter dated February 2, 2010.
The licensee requested U.S. Nuclear Regulatory Commission (NRC) approval for an exemption from the March 31, 2010, implementation date for certain security requirements in 10 CFR Part 73, "Physical Protection of Plants and Materials", for Pilgrim, issued by NRC in a Final Rule dated March 27,2009 (74 FR 13926). The proposed exemption would allow an extension from the March 31,2010, implementation date for some specific requirements, until September 15, 2010.
A copy of the exemption is enclosed. The exemption has been forwarded to the Office of the Federal Register for publication.
Sincerely, IRA!
James Kim, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293
Enclosure:
Exemption cc w/encl: Distribution via Listserv DISTRIBUTION:
PUBLIC LPL1-1 RlF RidsNrrDorlLpl-1 RidsOGCMailCenter RidsNsirDspRsrlb RidsAcrsAcnwMailCenter RidsNrrPMPilgrim (paper copy) RidsNrrDlrRerb DJackson, RI RidsNrrLASUttle (paper copy) RidsRgn1MailCenter RidsOgcRp Resource LTrocine, OEDO Region 1 ADAMS Accession No' .. ML100600713 OFFICE LPL1-1/PM LPL 1-1/LA NSIRIDSP/RSRLB/BC NRC/NSIRIDSP/DD OGC NAME IKim SUttle Dl-luvck SMorris (w comments) MSpencer DATE 3/8/10 3/8/10 3/9/10 3/10/10 3/16/10 OFFICE LPL 1-1/BC DORUD NAME NSalQado JGiitter DATE 3/16/10 3/16/10 OFFICIAL RECORD COpy