ML100550464

From kanterella
Jump to navigation Jump to search
Developmental Revision B - Technical Specifications 3.9 - Refueling Operations
ML100550464
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 02/02/2010
From:
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
References
Download: ML100550464 (13)


Text

Boron Concentration 3.9.1 3.9 REFUELING OPERATIONS 3.9.1 Boron Concentration LCO 3.9.1 Boron concentrations of the Reactor Coolant System, the refueling canal, and the refueling cavity shall be maintained within the limit specified in the COLR.

APPLICABILITY: Mode 6 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Boron concentration A.1 Suspend CORE Immediately not within limit. ALTERATIONS.

AND A.2 Suspend positive Immediately reactivity additions.

AND A.3 Initiate action to restore Immediately boron concentration to within limit.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.1.1 Verify boron concentration is within the limit specified 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in COLR.

Watts Bar - Unit 2 3.9-1 (developmental) A

Unborated Water Source Isolation Valves 3.9.2 3.9 REFUELING OPERATIONS 3.9.2 Unborated Water Source Isolation Valves LCO 3.9.2 Each valve used to isolate unborated water sources shall be secured in the closed position.

APPLICABILITY: Mode 6 ACTIONS


NOTE------------------------------------------------------------

Separate Condition entry is allowed for each unborated water source isolation valve.

CONDITION REQUIRED ACTION COMPLETION TIME A. --------------NOTE-------------- A.1 Suspend CORE Immediately Required Action A.3 must ALTERATIONS.

be completed whenever Condition A is entered. AND A.2 Initiate action to secure Immediately One or more valves valve in closed position.

not secured in closed position. AND A.3 Perform SR 3.9.1.1. 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.2.1 Verify each valve that isolates unborated water 31 days sources is secured in the closed position.

Watts Bar - Unit 2 3.9-2 (developmental) A

Nuclear Instrumentation 3.9.3 3.9 REFUELING OPERATIONS 3.9.3 Nuclear Instrumentation LCO 3.9.3 Two source range neutron flux monitors shall be OPERABLE.

APPLICABILITY: Mode 6 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One required source range A.1 Suspend CORE Immediately neutron flux monitor ALTERATIONS.

inoperable.

AND A.2 Suspend positive Immediately reactivity additions.

B. Two required source range B.1 Initiate action to restore Immediately neutron flux monitors one source range neutron inoperable. flux monitor to OPERABLE status.

AND B.2 Perform SR 3.9.1.1. 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> AND Once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter Watts Bar - Unit 2 3.9-3 (developmental) A

Nuclear Instrumentation 3.9.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.3.1 Perform CHANNEL CHECK. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.9.3.2 ------------------------------NOTE-------------------------------

Neutron detectors are excluded from CHANNEL CALIBRATION.

Perform CHANNEL CALIBRATION. 18 months Watts Bar - Unit 2 3.9-4 (developmental) A

Containment Penetrations 3.9.4 3.9 REFUELING OPERATIONS 3.9.4 Containment Penetrations LCO 3.9.4 The containment penetrations shall be in the following status:

a. The equipment hatch closed and held in place by a minimum of four bolts;
b. One door in each air lock closed; or capable of being closed provided ABGTS is OPERABLE in accordance with TS 3.7.12; and
c. Each penetration providing direct access from the containment atmosphere to the outside atmosphere either:
1. closed by a manual or automatic isolation valve, blind flange, or equivalent, or
2. capable of being closed by an OPERABLE Containment Vent Isolation System.

NOTE--------------------------------------------

Penetration flow path(s) providing direct access from the containment atmosphere to the outside atmosphere may be unisolated under administrative controls provided ABGTS is OPERABLE in accordance with TS 3.7.12.

APPLICABILITY: During movement of irradiated fuel assemblies within containment.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more containment A.1 Suspend movement of Immediately penetrations not in required irradiated fuel assemblies status. within containment.

Watts Bar - Unit 2 3.9-5 (developmental) A

Containment Penetrations 3.9.4 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.4.1 Verify each required containment penetration is in 7 days the required status.

SR 3.9.4.2 Verify each required containment vent isolation valve 18 months actuates to the isolation position on an actual or simulated actuation signal.

Watts Bar - Unit 2 3.9-6 (developmental) A

RHR and Coolant Circulation - High Water Level 3.9.5 3.9 REFUELING OPERATIONS 3.9.5 Residual Heat Removal (RHR) and Coolant Circulation - High Water Level LCO 3.9.5 One RHR loop shall be OPERABLE and in operation.


NOTE--------------------------------------------

The required RHR loop may be removed from operation for 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> per 8 hour9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> period, provided no operations are permitted that would cause reduction of the Reactor Coolant System boron concentration.

APPLICABILITY: MODE 6 with the water level 23 ft above the top of reactor vessel flange.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. RHR loop requirements not A.1 Suspend operations Immediately met. involving a reduction in reactor coolant boron concentration.

AND A.2 Suspend loading Immediately irradiated fuel assemblies in the core.

AND A.3 Initiate action to satisfy Immediately RHR loop requirements.

AND (continued)

Watts Bar - Unit 2 3.9-7 (developmental) A

RHR and Coolant Circulation - High Water Level 3.9.5 ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. (continued) A.4 Close all containment 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> penetrations providing direct access from containment atmosphere to outside atmosphere.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.5.1 Verify one RHR loop is in operation and circulating 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> reactor coolant at a flow rate of 2500 gpm.

Watts Bar - Unit 2 3.9-8 (developmental) A

RHR and Coolant Circulation - Low Water Level 3.9.6 3.9 REFUELING OPERATIONS 3.9.6 Residual Heat Removal (RHR) and Coolant Circulation - Low Water Level LCO 3.9.6 Two RHR loops shall be OPERABLE, and one RHR loop shall be in operation.

APPLICABILITY: MODE 6 with the water level < 23 ft above the top of reactor vessel flange.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Less than the required A.1 Initiate action to restore Immediately number of RHR loops required RHR loops to OPERABLE. OPERABLE status.

AND A.2 Initiate action to establish Immediately 23 ft of water above the top of reactor vessel flange.

(continued)

Watts Bar - Unit 2 3.9-9 (developmental) A

RHR and Coolant Circulation - Low Water Level 3.9.6 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME B. No RHR loop in operation. B.1 Suspend operations Immediately involving a reduction in reactor coolant boron concentration.

AND B.2 Initiate action to restore Immediately one RHR loop to operation.

AND B.3 Close all containment 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> penetrations providing direct access from containment atmosphere to outside atmosphere.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.6.1 Verify one RHR loop is in operation and circulating 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> reactor coolant at a flow rate of 2000 gpm.

SR 3.9.6.2 Verify correct breaker alignment and indicated power 7 days available to the required RHR pump that is not in operation.

Watts Bar - Unit 2 3.9-10 (developmental) A

Refueling Cavity Water Level 3.9.7 3.9 REFUELING OPERATIONS 3.9.7 Refueling Cavity Water Level LCO 3.9.7 Refueling cavity water level shall be maintained 23 ft above the top of reactor vessel flange.

APPLICABILITY: During movement of irradiated fuel assemblies within containment.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Refueling cavity water level A.1 Suspend movement of Immediately not within limit. irradiated fuel assemblies within containment.

AND A.2 Initiate action to restore Immediately refueling cavity water level to within limit.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.7.1 Verify refueling cavity water level is 23 ft above the 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> top of reactor vessel flange.

Watts Bar - Unit 2 3.9-11 (developmental) A

Reactor Building Purge Air Cleanup Units 3.9.8 3.9 REFUELING OPERATIONS 3.9.8 Reactor Building Purge Air Cleanup Units LCO 3.9.8 Two Reactor Building Purge Air Cleanup Units shall be OPERABLE.

APPLICABILITY: During movement of irradiated fuel assemblies within the containment.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One Reactor Building Purge A.1 Isolate the inoperable air Immediately Air Cleanup Unit inoperable. cleanup unit.

AND A.2 Verify the OPERABLE air Immediately cleanup unit is in operation.

B. Two Reactor Building Purge B.1 Suspend movement of Immediately Air Cleanup Units irradiated fuel assemblies inoperable. within containment.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.8.1 Perform required filter testing in accordance with the In accordance with Ventilation Filter Testing Program (VFTP). the VFTP Watts Bar - Unit 2 3.9-12 (developmental) A

Spent Fuel Pool Boron Concentration 3.9.9 3.9 REFUELING OPERATIONS 3.9.9 Spent Fuel Pool Boron Concentration LCO 3.9.9 Boron concentration of the spent fuel pool shall be 2000 ppm.

APPLICABILITY: During fuel movement in the flooded spent fuel pool.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Boron concentration A.1 Suspend fuel movement. Immediately not within limit.

SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.9.1 Verify boron concentration in the spent fuel pool is Prior to movement of 2000 ppm. fuel in the spent fuel pool AND 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> thereafter Watts Bar - Unit 2 3.9-13 (developmental) A