ML100540432

From kanterella
Jump to navigation Jump to search

Correction to Technical Specification Page No. 3/4 3-13, Amendment Nos. 188 and 175, Regarding Relocation of Surveillance Test Intervals to Licensee-Controlled Surveillance Frequency Control Program
ML100540432
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 03/31/2010
From: Thadani M
Plant Licensing Branch IV
To: Halpin E
South Texas
Hall, J R, NRR/DORL/LPL4, 301-415-4032
References
TAC MD7058, TAC MD7059
Download: ML100540432 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 31, 2010 Mr. Edward D. Halpin President and Chief Executive Officer STP Nuclear Operating Company South Texas Project P.O. Box 289 Wadsworth, TX 77483 SUB~IECT:

SOUTH TEXAS PRO~IECT, UNITS 1 AND 2 - CORRECTION TO TECHNICAL SPECIFICATION PAGE NO. 3/43-13, AMENDMENT NOS. 188 AND 175, REGARDING RELOCATION OF SURVEILLANCE TEST INTERVALS TO LICENSEE-CONTROLLED SURVEILLANCE FREQUENCY CONTROL PROGRAM (RISK-INFORMED INITIATIVE 5-b) (TAC NOS. MD7058 AND MD7059)

Dear Mr. Halpin:

On October 31,2008, the Nuclear Regulatory Commission (NRC) staff issued Amendment No. 188 to Facility Operating License No. NPF-76 and Amendment No. 175 to Facility Operating License No. NPF-80 for South Texas Project (STP), Units 1 and 2, respectively. The document was declared in the NRC Agencywide Documents Access and Management System (ADAMS) at ADAMS Accession No. ML082830172.

The amendments revised the Technical Specifications (TS) by relocating the surveillance frequencies of most of the surveillance tests from the TS to a licensee-controlled Surveillance Frequency Control Program.

By electronic mail dated January 5,2010 (ADAMS Accession No. ML100541304), Mr. Ted Koser of your staff informed the NRC staff that TS page 3/4 3-13 item 19f shows "P-8" instead of "P-13." Mr. Koser requested that "P-8" should be corrected to "P-13." The NRC staff has reviewed the error, and has determined that the error was caused by page 3/4 3-13 sent to NRC by the licensee. The NRC staff agrees that the error on page 3/4 3-13 should be corrected in the TS.

Accordingly, corrected TS page 3/4 3-13 showing "P-13" in place of "P-8" is enclosed. Please replace the page 3/4 3-13 in Amendment Nos. 188 and 175 and discard the incorrect page.

E. Halpin

- 2 If you have any questions, please contact me at (301) 415-1476 or bye-mail to mohan.thadani@nrc.gov.

Sincerely,

/llJotftlWhC:::;;~

Mohan C. Thadani, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499 cc w/encl: Distribution via Listserv

Enclosure:

As stated

ENCLOSURE SOUTH TEXAS PRO,JECT, UNITS 1 AND 2 DOCKET NOS. 50-498 AND 50-499 REPLACEMENT TECHNICAL SPECIFICATION PAGE 3/4 3-13 FOR AMENDMENT NOS. 188 AND 174

(J) 0 TABLE 4.3-1 (Continued) c

--l I

REACTOR TRIP SYSTEM INSTRUMENTATION SURVEILLANCE REQUIREMENTS

--l m

~

ANALOG TRIP ACTUATING MODES FOR (J)

CHANNEL DEVICE WHICH CHANNEL CHANNEL OPERATIONAL OPERATIONAL ACTUATION SURVEILLANCE C

FUNCTIONAL UNIT CHECK (20)

CALIBRATION(20j TEST (19)(20)

TEST(20)

LOGIC TEST(20)

ISBEQUIRED Z

--l (J)

19. Reactor Trip System Qo Interlocks N
a. Intermediate Range Neutron Flux, P-6 N.A.

(4)

N.A.

N.A.

2**

b. Low Power Reactor Trips Block, P-7 N.A.

(4)

N.A.

N.A.

1 VJ

c. Power Range Neutron

~

Flux, P-8 N.A.

(4)

N.A.

N.A.

1 VJ I.......

d. Power Range Neutron VJ Flux, P-9 N.A.

(4)

N.A.

N.A.

1

e. Power Range Neutron Flux, P-10 N.A.

(4)

N.A.

N.A.

1,2

f. Turbine Impulse Chamber Pressure, N.A.

N.A.

N.A.

1 cc

J :J P-13 N.......

I I

20. Reactor Trip Breaker N.A.

N.A.

N.A.

(7, 11)

N.A.

1, 2, 3*, 4*, 5*

21. Automatic Trip and N.A.

N.A.

N.A.

N.A.

(7) 1, 2, 3*, 4*, 5*

3 3 CD CD Interlock Logic

J :J
a. a.

3 3

22. Reactor Trip Bypass N.A.

N.A.

N.A.

(15),R(16)

N.A.

1,2,3*,4*,5*

CD CD

J :J Breaker zz

~ ~

-~~

~~

-....!Q:l 010:>

E. Halpin

- 2 If you have any questions, please contact me at (301) 415-1476 or bye-mail to mohan.thadani@nrc.gov.

Sincerely,

/RN Mohan C. Thadani, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-498 and 50-499 cc w/encl: Distribution via Listserv

Enclosure:

As stated DISTRIBUTION:

PUBLIC RidsNrrDraApla Resource LPLIV Reading RidsNrrPMSouthTexas Resource RidsAcrsAcnw_MailCTR Resource RidsNrrLAJBurkhardt Resource RidsNrrDirsltsb Resource RidsOgcRp Resource RidsNrrDorlDpr Resource RidsRgn4MailCenter Resource RidsNrrDorlLpl4 Resource AHowe, NRRIDRNAPLA ADAMS Accession No. ML100540432 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/LPL4/BC NRR/LPL4/PM NAME IVIThadani JBurkhardt MMarkley BSingal for MThadani DATE 3/17/10 3/16/10 3/31/10 3/31/10 OFFICIAL RECORD COpy