MONTHYEARML0829503862008-10-24024 October 2008 Acceptance Review Revised Request to Extend the Inservice Inspection Interval for Reactor Vessel Weld Examinations (Relief Requests ISI-020 and ISI-021)-Calvert Cliffs Nuclear Power Plant, Unit No. 2 Project stage: Acceptance Review ML0833101232008-12-0505 December 2008 Request for Additional Information Proposed Relief Request ISI-020 for Reactor Vessel Weld Examinations - Calvert Cliffs Nuclear Power Plant, Unit No. 2 Project stage: RAI ML0835309802008-12-18018 December 2008 Response to Request for Additional Information: Ccnpp, Unit No. 2 Proposed Relief Request ISI-020 Project stage: Response to RAI ML0835309762008-12-18018 December 2008 Response to Request for Additional Information: Proposed Alternative ISI-020 Reactor Vessel Weld Examination Extension Project stage: Response to RAI ML0902305172009-01-23023 January 2009 Transmittal of Response to Request for Additional Information Calvert Cliffs 2 (Clarification): Proposed Alternative ISI-020 Reactor Vessel Weld Examination Extension Project stage: Response to RAI ML0902305182009-01-23023 January 2009 Response to Request for Additional Information Calvert Cliffs 2 (Clarification): Proposed Alternative ISI-020 Reactor Vessel Weld Examination Extension Project stage: Response to RAI ML0905400622009-02-18018 February 2009 Request to Extend the Inservice Inspection Interval for Reactor Vessel Weld Examinations - Relief Requests (ISI-022 and ISI-023) Project stage: Request ML0907100252009-03-11011 March 2009 Acceptance Review for Calvert Cliffs ISI-022 and ISI-023 (TAC Nos. ME0668 & ME0669) Project stage: Acceptance Review ML0909200772009-04-0808 April 2009 Safety Evaluation for Relief Requests ISI-020 & 021 Reactor Vessel Weld Examination Extension - Calvert Cliffs Nuclear Power Plant, Unit No. 2 (TAC Nos. MD9773 and MD9774) Project stage: Approval ML0930300522009-11-0909 November 2009 Relief Request ISI-022 & ISI-023 to Extend Reactor Vessel and Reactor Vessel Internal Weld Examinations-Calvert Cliffs Nuclear Power Plant, Unit 1 Project stage: Other ML1005396372010-03-0202 March 2010 Correction Letter to Relief Requests ISI-04-020 & ISI-04-022-Calvert Cliffs Nuclear Power Plant, Units 1 & 2 Project stage: Other 2009-11-09
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000317/20230042024-02-0101 February 2024 Integrated Inspection Report 05000317/2023004 and 05000318/2023004 ML24029A0102024-01-29029 January 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000317/2024010 and 05000318/2024010 ML24003A8872024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0033 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000318/LER-2023-004, Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-01-16016 January 2024 Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer ML24011A0732024-01-11011 January 2024 Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping 05000318/LER-2023-002, Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-01-0808 January 2024 Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer 05000318/LER-2023-003, Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip2024-01-0808 January 2024 Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip ML24005A0222024-01-0505 January 2024 Revised Steam Generator Tube Inspection Reports ML23304A0642024-01-0202 January 2024 Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program RS-23-125, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) ML23331A2992023-11-27027 November 2023 Submittal of Condition Prohibited by Technical Specifications Due to Failure to Sample Diesel Generator Fuel Oil Storage Tank IR 05000317/20230102023-11-20020 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000317/2023010 and 05000318/2023010 ML23318A4722023-11-14014 November 2023 Supplement to License Amendment Request to Adopt TSTF-59-A ML23317A1032023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML23310A0442023-11-0707 November 2023 Project Manager Assignment IR 05000317/20230402023-11-0202 November 2023 95001 Supplemental Inspection Report 05000317/2023040 and Follow-Up Assessment Letter IR 05000317/20230032023-11-0101 November 2023 Integrated Inspection Report 05000317/2023003 and 05000318/2023003 IR 05000317/20230902023-10-26026 October 2023 Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation; Inspection Report 05000317/2023090 ML23289A1202023-10-16016 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23279A1202023-10-0606 October 2023 Response to NRC Inspection Report and Preliminary White Finding IR 05000317/20230502023-09-29029 September 2023 Special Inspection Report 05000317/2023050 and Preliminary White Finding and Apparent Violation ML23272A1032023-09-29029 September 2023 Condition Prohibited by Technical Specifications Due to Inoperable Nuclear Instrumentation at Very Low Power IR 05000317/20234012023-09-18018 September 2023 Cyber Security Inspection Report 05000317/2023401 and 05000318/2023401 ML23254A0012023-09-0505 September 2023 Registration of Use of Casks to Store Spent Fuel IR 05000317/20230052023-08-31031 August 2023 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2023005 and 05000318/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23241A8412023-08-29029 August 2023 Response to Request for Additional Information - Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping ML23240A3872023-08-28028 August 2023 Senior Reactor and Reactor Operator Initial License Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration ML23219A1662023-08-16016 August 2023 Request for Additional Information Regarding Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping (EPID: L-2023-LLR-0006) - Non-proprietary ML23228A1002023-08-15015 August 2023 Notification of Readiness for NRC 95001 Inspection ML23188A0402023-08-0808 August 2023 Issuance of Amendment Nos. 346 and 324 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML23214A1572023-08-0707 August 2023 Correction to the Renewed Facility Operating License Page 3 in Amendment No 345 IR 05000317/20230022023-08-0303 August 2023 Integrated Inspection Report 05000317/2023002 ML23188A0512023-07-13013 July 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 336 and 314 ML23186A0372023-07-13013 July 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 340 and 318 IR 05000317/20233012023-07-12012 July 2023 Initial Operator Licensing Examination Report 05000317/2023301 and 05000318/2023301 IR 05000317/20230122023-07-10010 July 2023 Commercial Grade Dedication Report 05000317/2023012 and 05000318/2023012 ML23180A2362023-06-29029 June 2023 Correction of Errors on Technical Specification Pages RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators ML23156A6752023-06-20020 June 2023 Request for Withholding Information from Public Disclosure for Proposed Alternative to the Requirements for Repair/Replacement of Saltwater System Buried Piping 2024-02-01
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 HFlrch 2. 201 o Mr. George H. Gellrich, Vice President Calvert Cliffs Nuclear Power Plant, LLC Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702
SUBJECT:
CORRECTION LETTER TO RELIEF REQUESTS ISI-04-020 AND ISI-04-022 CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS. 1 AND 2 - (TAC NOS. MD9773 AND ME0668)
Dear Mr. Gellrich:
Your staff recently informed the Nuclear Regulatory Commission (NRC) staff of apparent deficiencies in Safety Evaluations (SEs) issued by the NRC for Relief Requests ISI-04-020 and ISI-04-022 for the Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2. Specifically, your staff provided the information identified below.
By letter dated October 1, 2008 (Agencywide Document Access and Management System (ADAMS) Accession Nos. ML082760282 and ML082760283), Calvert Cliffs Nuclear Power Plant, LLC, the licensee, submitted Relief Request ISI-04-020 for Calvert Cliffs Nuclear Power Plant, Unit NO.2. ISI-04-020 requested authorization to extend the inservice inspection (lSI) interval for examination of selected reactor pressure vessel welds (Categories B-A and B-D) from 10 to 20 years. As described in your application, the relief request was applicable for six Category B-A and two Category B-D welds. By letter dated April 8, 2009 (ADAMS Accession No. ML090920077), the NRC staff approved Relief Request ISI-04-020. However, Section 3.2 of the SE only identified five Category B-A welds and two category B-D welds for approval. The SE did not specifically address Item B1.40, Head to Vessel Weld, and there was no statement in the SE indicating a reason for not including Item B1.40.
A similar deficiency was identified regarding the NRC SE approving the identical relief request for Calvert Cliffs Nuclear Power Plant, Unit No.1. By letter dated February 18, 2009 (ADAMS Accession No. ML090540062), you submitted Relief Request ISI-04-022. As before, this relief request was applicable for six Category B-A and two Category B-D welds to extend the lSI weld examination period from 10 to 20 years. By letter dated November 9, 2009 (ADAMS Accession No. ML093030052), the NRC approved Relief Request ISI-04-022 but again, the staff's SE only addressed five Category B-A welds and two category B-D welds. Similarly, the NRC's SE did not include Item B1.40, Head to Vessel Weld, and did not include any statement for not including Item B1.40.
G. Gellrich -2 The NRC staff has reviewed the information provided by your staff and agrees that Item B1.40 was inadvertently left out of each SE and should have been included. Therefore, the NRC finds it acceptable to extend the B1.40 weld examination period to 20 years.
Sincerely,
~~'- V f,--ut~
Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-317 and 50-318 cc: Distribution via Listserv
ML100539637 OFFICE LPL 1-1\PM LPL 1-1\LA CVIB/BC LPL 1-1\BC NAME DPickett SLittie MMitcheli NSalgado DATE 03/01/10 03/01/10 03/01/10 03/02/10