Response to Confirmatory Order Modifying License (Effective Immediately) (Office of Investigations Report No. 4 2007-009), Condition 2
ML100490860
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/17/2010
From: Caniano R
Division of Reactor Safety IV
To: Edington R
Arizona Public Service Co
References
4-2007-009, EA-07-162
Download: ML100490860 (5)


Text

UNITED STATES NUC LE AR RE G UL AT O RY C O M M I S S I O N R E GI ON I V 612 EAST LAMAR BLVD , SU I TE 400 AR LI N GTON , TEXAS 76011-4125 February 17, 2010 EA-07-162 Randall K. Edington, Executive Vice President, Nuclear And Chief Nuclear Officer Mail Station 7602 Arizona Public Service Company P.O. Box 52034 Phoenix, AZ 85072-2034

SUBJECT:

RESPONSE TO CONFIRMATORY ORDER MODIFYING LICENSE (EFFECTIVE IMMEDIATELY) [OFFICE OF INVESTIGATIONS REPORT NO. 4-2007-009], CONDITION 2

Dear Mr. Edington:

On December 22, 2009, NRC Region IV completed an in-office review of the actions you have taken to address Condition 2 in Section V of Confirmatory Order EA-07-162, issued on October 19, 2007. Conditions 1, 3, 4, 5, 6, and 7 were confirmed to be satisfied in prior NRC correspondence, dated February 28, 2008; May 29, 2008; and April 13, 2009.

Condition 2: APS will perform assessments of its independent verification process in the Operations and Maintenance Departments. The assessments will be completed within 12 months of the date of the Confirmatory Order, and applicable actions resulting from the assessment will be tracked to completion. In addition, within this same time period, APS will incorporate in a QA audit plan, a follow-up assessment to ensure the actions to improve the independent verification processes were effective.

In our letter dated April 13, 2009, we advised you that in order to ensure actions taken to improve the independent verification process were effective, we would keep Condition 2 open pending NRC review of future audits. The Region IV staff reviewed the Verification Process Audit Report, 2009-011, Revision 1, that was approved on October 1, 2009. The staff noted that the actions from the Operations and Maintenance self-assessments of the independent verification process were effective in improving the overall performance of Operations, Maintenance and Nuclear Projects verifications.

The Region IV staff concludes that you completed Condition 2 in Section V of Confirmatory Order EA-07-162, issued on October 19, 2007.

All seven Conditions of Confirmatory Order EA-07-162 have been verified complete by the Region IV staff. Any action items generated that are associated with this Confirmatory Order may be subject to future inspections.

Arizona Public Service Company You are not required to respond to this letter. However, should you choose to respond, your response should be sent to the U.S. Nuclear Regulatory Commission, ATTN: Regional Administrator, Region IV, 612 East Lamar Boulevard, Suite 400, Arlington, TX, 76011 and marked "Open by Addressee Only," within 30 days of the date of this letter. If you have any questions, you should contact Mark Haire, Senior Enforcement Specialist, at 817-860-8121.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Roy J. Caniano, Director Division of Reactor Safety Dockets: 50-528; 50-529; 50-530 Licenses: NPF-41; NPF-51; NPF-74 cc.

Mr. Steve Olea Arizona Corporation Commission 1200 W. Washington Street Phoenix, AZ 85007 Mr. Douglas Kent Porter Senior Counsel Southern California Edison Company Law Department, Generation Resources P.O. Box 800 Rosemead, CA 91770 Chairman Maricopa County Board of Supervisors 301 W. Jefferson, 10th Floor Phoenix, AZ 85003 Mr. Aubrey V. Godwin, Director Arizona Radiation Regulatory Agency 4814 South 40 Street Phoenix, AZ 85040

Arizona Public Service Company Mr. Ronald Barnes, Director Regulatory Affairs Palo Verde Nuclear Generating Station Mail Station 7636 P.O. Box 52034 Phoenix, AZ 85072-2034 Mr. Dwight C. Mims Vice President Regulatory Affairs and Plant Improvement Palo Verde Nuclear Generating Station Mail Station 7605 P.O. Box 52034 Phoenix, AZ 85072-2034 Mr. Jeffrey T. Weikert Assistant General Counsel El Paso Electric Company Mail Location 167 123 W. Mills El Paso, TX 79901 Mr. Eric Tharp Los Angeles Department of Water & Power Southern California Public Power Authority P.O. Box 51111, Room 1255-C Los Angeles, CA 90051-0100 Mr. James Ray Public Service Company of New Mexico 2401 Aztec NE, MS Z110 Albuquerque, NM 87107-4224 Mr. Geoffrey M. Cook Southern California Edison Company 5000 Pacific Coast Hwy. Bldg. D21 San Clemente, CA 92672 Mr. Robert Henry Salt River Project 6504 East Thomas Road Scottsdale, AZ 85251

Arizona Public Service Company Mr. Brian Almon Public Utility Commission William B. Travis Building P.O. Box 13326 Austin, TX 78701-3326 Environmental Program Manager City of Phoenix Office of Environmental Programs 200 West Washington Street Phoenix, AZ 85003 Mr. John C. Taylor Director, Nuclear Generation El Paso Electric Company 340 East Palm Lane, Suite 310 Phoenix, AZ 85004 Chief, Technological Hazards Branch FEMA Region IX 1111 Broadway, Suite 1200 Oakland, CA 94607-4052

Arizona Public Service Company Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Chuck.Casto@nrc.gov)

DRP Director (Dwight.Chamberlain@nrc.gov)

DRP Deputy Director (Anton.Vegel@nrc.gov)

DRS Director (Roy.Caniano@nrc.gov)

DRS Deputy Director (Troy.Pruett@nrc.gov)

Senior Resident Inspector (Ryan.Treadway@nrc.gov)

Resident Inspector (Michelle.Catts@nrc.gov)

Resident Inspector (Joseph.Bashore@nrc.gov)

Resident Inspector (Mica.Baquera@nrc.gov)

Branch Chief, DRP/D (Ryan.Lantz@nrc.gov)

PV Administrative Assistant (Regina.McFadden@nrc.gov)

Senior Project Engineer, DRP/D (Don.Allen@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Laura.Uselding@nrc.gov)

Branch Chief, DRS/TSB (Michael.Hay@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Regional Counsel (Karla.Fuller@nrc.gov)

Congressional Affairs Officer (Jenny.Weil@nrc.gov)

OEMail Resource ROPreports DRS/TSB STA (Dale.Powers@nrc.gov)

OEDO RIV Coordinator (Leigh.Trocine@nrc.gov)

OEMail Resource SUNSI Review Completed: ___Y__ ADAMS: 6Yes No Initials: _GWA_

6 Publicly Available Non-Publicly Available Sensitive 6 Non-Sensitive ML OE:OB C:OB C:PBD ACES D:DRS GWApger SGarchow RELantz WBJones RJCaniano

/RA/ /RA/ /RA/ /RA/ /RA/

12/23/09 12/23/09 12/8/09 12/23/09 2/17/10 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax