Submittal of Environmental Assessment and Finding of No Significant Impact
ML100431403
Person / Time
Site: Pilgrim
Issue date: 03/03/2010
From: James Kim
Plant Licensing Branch 1
To:
Entergy Nuclear Operations
References
tac me3123
Download: ML100431403 (7)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Harch 3, 2010 Site Vice President Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508

SUBJECT:

PILGRIM NUCLEAR POWER STATION - ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT (TAC NO. ME3123)

Dear Sir or Madam:

Enclosed is a copy of the Environmental Assessment and Finding of No Significant Impact related to your application for an exemption dated January 22, 2010, as supplemented on February 2, 2010. The proposed exemption from specific requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 73, for the Pilgrim Nuclear Power Station would extend the deadline from March 31, 2010, until September 15, 2010, for the implementation of certain measures in 10 CFR Part 73.

The assessment is being forwarded to the Office of the Federal Register for publication.

Sincerely,

~ 10--'

James Kim, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosure:

Environmental Assessment cc w/encl: Distribution via Listserv

7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION ENTERGY NUCLEAR OPERATIONS, INC DOCKET NO. 50-293 PILGRIM NUCLEAR POWER STATION ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an exemption, pursuant to Title 10 of the Code of Federal Regulations (10 CFR) Section 73.5, "Specific exemptions," from the implementation date for certain new requirements of 10 CFR Part 73, "Physical protection of plants and materials," for Facility Operating License No. DPR-35, issued to Entergy Nuclear Operations, Inc. (Entergy or the licensee), for operation of Pilgrim Nuclear Power Station (Pilgrim), located in Plymouth County, MA. In accordance with 10 CFR 51.21, the NRC prepared an environmental assessment documenting its finding. The NRC concluded that the proposed action will have no significant impact.

ENVIRONMENTAL ASSESSMENT Identification of the Proposed Action The proposed action would exempt Pilgrim from the required implementation date of March 31, 2010, for several new requirements of 10 CFR Part 73. Specifically, Pilgrim would be granted an exemption from being in full compliance with certain new requirements contained in 10 CFR 73.55 by the March 31,2010, deadline. Entergy has proposed an alternate full compliance implementation date of September 15, 2010, approximately 6-1/2 months beyond the date required by 10 CFR Part 73. The proposed action, an extension of the schedule for completion of certain actions required by the revised 10 CFR Part 73, does not involve any physical changes to the reactor, fuel, plant structures, water, or land at the Pilgrim site.

-2 The proposed action is in accordance with the licensee's application dated January 22,2010 (Agencywide Documents Access and Management System (ADAMS)

Accession No. ML100260716), as supplemented on February 2,2010 (ADAMS Accession No. ML100351182).

The Need for the Proposed Action:

The proposed action is needed to provide the licensee with additional time to perform the required upgrades to the Pilgrim security system due to resource and logistical impacts. The request for an exemption from the March 31, 2010, implementation date to September 15, 2010, is based on the delivery dates for the new equipment and the time needed to install this new equipment to meet the revised requirements.

Environmental Impacts of the Proposed Action:

The NRC has completed its environmental assessment of the proposed exemption. The staff has concluded that the proposed action to extend the implementation deadline would not significantly affect plant safety and would not have a significant adverse effect on the probability of an accident occurring.

The proposed action would not result in an increased radiological hazard beyond those previously analyzed in the environmental assessment and finding of no significant impact made by the Commission in promulgating its revisions to 10 CFR Part 73, as discussed in a Federal Register notice dated March 27, 2009 (74 FR 13967). There will be no change to radioactive effluents that affect radiation exposures to plant workers and members of the public. Therefore, no changes or different types of radiological impacts are expected as a result of the proposed exemption.

The proposed action does not result in changes to land use or water use, or result in changes to the quality or quantity of non-radiological effluents. No changes to the National Pollution Discharge Elimination System permit are needed. No effects on the aquatic or

-3 terrestrial habitat in the vicinity of the plant, or to threatened, endangered, or protected species under the Endangered Species Act, or impacts to essential fish habitat covered by the Magnuson-Steven's Act are expected. There are no impacts to the air or ambient air quality.

There are no impacts to historical and cultural resources. There would be no impact to socioeconomic resources. Therefore, no changes to or different types of non-radiological environmental impacts are expected as a result of the proposed exemption.

Accordingly, the NRC concludes that there are no significant environmental impacts associated with the proposed action. In addition, in promulgating its revisions to 10 CFR Part 73, the Commission prepared an environmental assessment and published a finding of no significant impact [Part 73, Power Reactor Security Requirements, 74 FR 13926, 13967 (March 27,2009)].

The NRC staff's safety evaluation will be provided in the exemption that will be issued as part of the letter to the licensee approving the exemption to the regulation, if granted.

Environmental Impacts of the Alternatives to the Proposed Action:

As an alternative to the proposed action, the NRC staff considered denial of the proposed action (Le., the "no-action" alternative). Denial of the application would result in no change in current environmental impacts. If the proposed action was denied, the licensee would have to comply with the March 31, 2010, implementation deadline. The environmental impacts of the proposed action and the "no action" alternative action are similar.

Alternative Use of Resources:

The action does not involve the use of any different resources than those previously considered in the Final Environmental Statement for Pilgrim, dated January 1972, and the "Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Pilgrim Nuclear Power Station," I\lUREG-1437, Supplement 29, published in July 2007 (ADAMS Accession No. ML071990027).

- 4 Agencies and Persons Consulted:

In accordance with its stated policy, on February 5, 2010, the NRC staff consulted with the Massachusetts State official of the Massachusetts Emergency Management Agency regarding the environmental impact of the proposed action. The State official had no comments.

FINDING OF NO SIGNIFICANT IMPACT On the basis of the environmental assessment, the NRC concludes that the proposed action will not have a significant effect on the quality of the human environment. Accordingly, the NRC has determined not to prepare an environmental impact statement for the proposed action.

For further details with respect to the proposed action, see the licensee's letter dated January 22, 2010, as supplemented by letter dated February 2, 2010. Portions of the submittal dated January 22, 2010, as supplemented by letter dated February 2, 2010, contain security related information and, accordingly, are not available to the public. Publicly-available versions of this document are accessible electronically from the ADAMS with Accession Nos.

ML100260716 and ML100351182, respectively.

Documents may be examined, and/or copied for a fee, at the NRC's Public Document Room (PDR), located at One White Flint North, Public File Area 01 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the ADAMS Public Electronic Reading Room on the Internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS should contact the NRC PDR Reference staff by telephone at 1-800-397-4209 or 301-415-4737, or send an e-mail to pdr@nrc.gov.

-5 Dated at Rockville, Maryland, this 3rd day of March 2010.

FOR THE NUCLEAR REGULATORY COMMISSION James Kim, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

March 3, 2010 Site Vice President Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508

SUBJECT:

PILGRIM NUCLEAR POWER STATION - ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT (TAC NO. ME3123)

Dear Sir or Madam:

Enclosed is a copy of the Environmental Assessment and Finding of No Significant Impact related to your application for an exemption dated January 22,2010, as supplemented on February 2,2010. The proposed exemption from specific requirements of Title 10 of the Code of Federal Regulations (10 CFR) Part 73, for the Pilgrim Nuclear Power Station would extend the deadline from March 31, 2010, until September 15, 2010, for the implementation of certain measures in 10 CFR Part 73.

The assessment is being forwarded to the Office of the Federal Register for publication.

Sincerely, IRA!

James Kim, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-293

Enclosure:

Environmental Assessment cc w/encl: Distribution via Listserv DISTRIBUTION:

PUBLIC DJackson, R1 RidsOGCRp Resource RidsRgn 1MailCenter LPL 1-1 RF RidsNrrLASLittle RidsNrrDirsltsb Resource RidsNrrDorlDpr Resource RidsNrrPMPilgrim RidsNrrDorlLpl1-1 Resource RidsAcrsAcnw_MailCTR Resource ADAMS ACCESSION NUMBER: ML100431403 OFFICE LPL1-1/PM LPL 1-1/LA REBA/BC OGC/NLO LPL 1-1/BC NAME JKim SLittie Almboden MSpencer NSalgado I/w/comments)

DATE 2/17/10 2/16/10 2/23/10 3/2/10 3/02/10 OFFICIAL RECORD COpy