UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

SAM NUNN ATLANTA FEDERAL CENTER

61 FORSYTH STREET, SW, SUITE 23T85

ATLANTA, GEORGIA 30303-8931

February 3, 2010

Mr. Jon A. Franke

Vice President, Crystal River Nuclear Plant

Crystal River Nuclear Plant (NA2C)

15760 W. Power Line Street

Crystal River, FL 34428-6708

SUBJECT:

NOTIFICATION OF CRYSTAL RIVER NUCLEAR PLANT - COMPONENT

DESIGN BASES INSPECTION - NRC INSPECTION REPORT

05000302/2010007

Dear Mr. Franke:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC)

Region II staff will conduct a component design bases inspection at your Crystal River Nuclear

Plant during the weeks of May 24 - 28, June 7 - 11, and June 21 - 25, 2010. The inspection

team will be led by D. Jones, a Senior Reactor Inspector from the NRC's Region II Office. This

inspection will be conducted in accordance with the baseline inspection procedure, Procedure

71111.21, Component Design Bases Inspection, issued August 19, 2008.

The inspection will evaluate the capability of risk significant / low margin components to function

as designed and to support proper system operation. The inspection will also include a review

of selected operator actions, operating experience, and modifications.

During a telephone conversation on January 25, 2010, Mr. Jones confirmed with Mr. D. Herrin

of your staff, arrangements for an information gathering site visit and the three-week onsite

inspection. The schedule is as follows:

Information gathering visit: Week of May 10 - 14, 2010

Onsite weeks: May 24 - 28, June 7 - 11, and June 21 - 25, 2010

The purpose of the information gathering visit is to meet with members of your staff to identify

risk-significant components and operator actions. Information and documentation needed to

support the inspection will also be identified. Mr. R. Bernhard, a Region II Senior Reactor

Analyst, may accompany Mr. Jones during the information gathering visit to review probabilistic

risk assessment data and identify risk significant components which will be examined during the

inspection.

FPC

2

Please provide the information requested in the enclosure to the Region II office by April 19,

2010. The enclosure lists documents that will be needed prior to the information gathering visit.

The inspectors will try to minimize your administrative burden by specifically identifying only

those documents required for the inspection preparation. Contact Mr. Jones with any questions

related to the information request. During the information gathering visit, the team leader will

also discuss the following inspection support administrative details: request for supplemental

documents to be made available to the inspection team in the Region II office prior to the team

preparation week of May 17 - 21, 2010; office space; arrangements for site access; and the

availability of knowledgeable plant engineering and licensing personnel to serve as points of

contact during the inspection.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding the

information requested or the inspection, please contact Mr. Jones at (404) 562-4631.

Sincerely,

/RA/

Binoy Desai, Chief

Engineering Branch 1

Division of Reactor Safety

Docket Nos.: 50-391

License Nos.: CPPR-92

Enclosure: Information Request for Crystal River

Component Design Bases Inspection

cc w/encl.: (See page 3)

FPC

3

cc w/encl:

R. J. Duncan, II

Vice President

Nuclear Operations

Carolina Power & Light Company

Electronic Mail Distribution

Brian C. McCabe

Manager, Nuclear Regulatory Affairs

Progress Energy Carolinas, Inc.

Electronic Mail Distribution

James W. Holt

Plant General Manager

Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution

Stephen J. Cahill

Engineering Manager

Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution

R. Alexander Glenn

Associate General Counsel

(MAC - BT15A)

Florida Power Corporation

Electronic Mail Distribution

Steven R. Carr

Associate General Counsel

Legal Department

Progress Energy Service Company, LLC

P.O. Box 1551

Raleigh, NC 27602-1551

Christos Kamilaris

Director

Fleet Support Services

Carolina Power & Light Company

Electronic Mail Distribution

William A. Passetti

Chief

Florida Bureau of Radiation Control

Department of Health

Electronic Mail Distribution

Daniel R. Westcott

Supervisor

Licensing & Regulatory Programs

Crystal River Nuclear Plant (NA1B)

Electronic Mail Distribution

Joseph W. Donahue

Vice President

Nuclear Oversight

Carolina Power and Light Company

Electronic Mail Distribution

Jack E. Huegel

Manager, Nuclear Oversight

Crystal River Nuclear Plant

Electronic Mail Distribution

Mark Rigsby

Manager, Support Services - Nuclear

Crystal River Nuclear Plant (NA2C)

Electronic Mail Distribution

Senior Resident Inspector

U.S. Nuclear Regulatory Commission

Crystal River Nuclear Generating Plant

U.S. NRC

6745 N Tallahassee Rd

Crystal River, FL 34428

Attorney General

Department of Legal Affairs

The Capitol PL-01

Tallahassee, FL 32399-1050

Ruben D. Almaguer

Director

Division of Emergency Preparedness

Department of Community Affairs

Electronic Mail Distribution

Chairman

Board of County Commissioners

Citrus County

110 N. Apopka Avenue

Inverness, FL 36250

_________________________

xG SUNSI REVIEW COMPLETE

OFFICE

RII:DRS

RII:DRS

RII:DRP

SIGNATURE

\\RA\\

\\RA\\

\\RA\\

NAME

DJONES

RBERNHARD

MSYKES

DATE

1/27/2010

1/27/2010

1/27/2010

E-MAIL COPY?

YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO

Enclosure

Information Request for Crystal River Component Design Bases Inspection

Please provide the information electronically in .pdf files, Excel, or other searchable format on

CDROM. The CDROM should be indexed and hyperlinked to facilitate ease of use.

1.

From your most-recent probabilistic safety analysis (PSA) excluding external events and

fires:

a.

Two risk rankings of components from your site-specific probabilistic safety analysis

(PSA): one sorted by Risk Achievement Worth (RAW), and the other sorted by

Birnbaum Importance.

b.

A list of the top 500 cutsets.

2.

From your most-recent probabilistic safety analysis (PSA) including external events and

fires:

a.

Two risk rankings of components from your site-specific probabilistic safety analysis

(PSA): one sorted by Risk Achievement Worth (RAW), and the other sorted by

Birnbaum Importance.

b.

A list of the top 500 cutsets.

3.

Risk ranking of operator actions from your site specific PSA sorted by RAW. Provide

human reliability worksheets for these items.

4.

List of time critical operator actions with a brief description of each action.

5.

List of Emergency and Abnormal Operating Procedures revised since January 1, 2007 with

a brief description of each revision.

6.

List of components with low design margins (i.e., pumps closest to the design limit for flow

or pressure, diesel generator close to design required output, heat exchangers close to

rated design heat removal, MOV risk-margin rankings, etc.) and associated evaluations or

calculations.

7. List of station operating experience evaluations/reviews performed and documented in the

stations corrective action program for industry events and safety related equipment

failures/vulnerabilities [as communicated by NRC generic communications, industry

communications, 10 CFR part 21 notifications, etc.] since January 1, 2007.

8.

List and brief description of safety related SSC design modifications implemented since

January 1, 2007.

9.

List and brief description of common-cause component failures that have occurred since

January 1, 2007.

10. List and brief description of operability evaluations completed since January 1, 2007.

11. List of equipment on the sites Station Equipment Reliability Issues List, including a

description of the reason(s) why each component is on that list and summaries (if available)

of your plans to address the issue(s).

12. List and brief description of equipment currently in degraded or nonconforming status as

described in RIS 05-020.

2

Enclosure

13. List and reason for equipment classified in maintenance rule (a)(1) status since January 1,

2007 to present.

14. Copies of System Descriptions (or the like) for Safety-Related Systems

15. Copy of UFSAR(s)

16. List and brief description of Root Cause Evaluations that have been performed since

January 1, 2007.

17. Contact information for a person to discuss PRA information prior to the information

gathering trip: name, title, phone number, and e-mail address.