License Amendment Request for Adoption of TSTF-478-A, Revision 2 Supplemental Response to Revise Technical Specifications Page Mark-ups
ML100130213
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 12/29/2009
From: Cowan P
Exelon Generation Co, Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML100130213 (8)


Text

Exelon Nuclear www.exeloncorp.com Exel n 200 Exelon Way Nucea-Kennett Square, PA 19348 10CFR50.90 December 29, 2009 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 Docket Nos. 50-277 and 50-278

Subject:

License Amendment Request for Adoption of TSTF-478-A, Revision 2 Supplemental Response to Revise Technical Specifications Page Mark-ups

References:

1) Letter from Pamela B. Cowan, Exelon Generation Company, LLC, to U.S.

Nuclear Regulatory Commission - License Amendment Request for Adoption of TSTF-478-A, Revision 2, "BWR Technical Specification Changes that Implement the Revised Rule for Combustible Gas Control," Using the Consolidated Line Item Improvement Process, dated July 30, 2009

2) Federal Register Notice 72FR65610 - Notice of Availability on Model Safety Evaluation; Model No Significant Hazards Determination, and Model Application for Licensees that Wish to Adopt TSTF-478, Revision 2, "BWR Technical Specification Changes that Implement the Revised Rule for Combustible Gas Control," dated November 21, 2007 By letter dated July 30, 2009 (Reference 1), Exelon Generation Company, LLC (Exelon) submitted a License Amendment Request (LAR) to revise the Technical Specifications (TS) for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. The proposed changes would revise the TS for PBAPS, Units 2 and 3, consistent with NRC-approved Industry TS Task Force (TSTF) Change Traveler TSTF-478-A, Revision 2, "BWR TechnicalSpecification Changes that Implement the Revised Rule for Combustible Gas Control"(Reference 2). The proposed changes would delete the TS requirements associated with the "Containment Atmospheric Dilution (CAD) System."

Subsequently, it was identified that the mark-ups on TS page 3.8-41 for Units 2 and 3 contained an editorial discrepancy. Specifically, there was a strikeout line through the reference to "LCO 3.6.3.1" indicating that the section should be deleted. However, the strikeout line was not completely carried through to include the remaining portion of the reference, i.e., "Containment Atmospheric Dilution (CAD) System."

Accordingly, this letter is being submitted to correct this editorial discrepancy. Attachment 1 contains the revised mark-up for the affected TS page for Units 2 and 3 and Attachment 2 includes the revised re-typed page for the affected Units 2 and 3 TS page.

14 f.--

U.S. Nuclear Regulatory Commission License Amendment Request Supplemental Response Deletion of CAD System from TS Docket Nos. DPR-44 and DPR-56 December 29, 2009 Page 2 Exelon has concluded that the information provided in this supplemental response does not impact the conclusions of the: 1) Technical Evaluation, 2) No Significant Hazards Consideration under the standards set forth in 10 CFR 50.92(c), or 3) Environmental Consideration as provided in the original submittal (Reference 1).

There are no new commitments contained in this submittal.

Should you have any questions concerning this letter, please contact Mr. Richard Gropp at (610) 765-5557.

I declare under penalty of perjury that the foregoing is true and correct. Executed on the 29th day of December 2009.

Respectfully, Pamela B. Cowan Director - Licensing and Regulatory Affairs Exelon Generation Company, LLC Attachments: 1 - Revised Mark-ups of Technical Specifications Pages 2 - Revised Re-typed Technical Specifications Pages cc: S. J. Collins, Administrator, Region I, USNRC F. L. Bower, USNRC Senior Resident Inspector, PBAPS J. Hughey, Project Manager, USNRC R. R. Janati, Commonwealth of Pennsylvania S. Gray, State of Maryland

A'TACHMENT 1 Revised Mark-ups of Technical Specifications Pages PBAPS, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 TECHNICAL SPECIFICATIONS PAGES Unit2 Unit3 . . . . ..

. 3 8 -41.....................................................3 .8 -41.........................

Distribution Systems-Operating 3.8.7 3.8 ELECTRICAL POWER SYSTEMS 3.8.7 Distribution Systems-Operating LCO 3.8.7 The following AC and DC electrical power distribution subsystems shall be OPERABLE:

a. Unit 2 Division I and Division II AC and DC electrical power distribution subsystems; and
b. Unit 3 AC and DC electrical power distribution subsystems needed to support equipment required to be OPERABLE by LCO 3.4.7, "Residual Heat Removal (RHR)

Shutdown Cooling System-Hot Shutdown," LCO 3.5.1, "ECCS-Operating," LCO 3.6.2.3, "RHR Suppression Pool Cooling," LCO 3.6.2.4, "RHR Suppression Pool Spray,"

LC=G0..1 "Containmolnt Atmolspher-ie Dilution (CAD)

Syste..... LCO 3.6.4.3, "Standby Gas Treatment (SGT)

System," LCO 3.7.1, "High Pressure Service Water (HPSW)

System," LCO 3.7.2, "Emergency Service Water (ESW)

System and Normal Heat Sink," LCO 3.7.3, "Emergency Heat Sink," and LCO 3.8.1, "AC Sources-Operating."

APPLICABILITY: MODES 1, 2, and 3.

PBAPS UNIT 2 3.8-41 Amendment No. 2-1-GXXX

Distribution Systems -Operating 3.8.7 3.8 ELECTRICAL POWER SYSTEMS 3.8.7 Distribution Systems-Operating LCO 3.8.7 The following AC and DC electrical power distribution subsystems shall be OPERABLE:

a. Unit 3 Division I and Division II AC and DC electrical power distribution subsystems; and
b. Unit 2 AC and DC electrical power distribution subsystems needed to support equipment required to be OPERABLE by LCO 3.4.7, "Residual Heat Removal (RHR Shutdown Cooling System-Hot Shutdown," LCO 3.5.1, "ECCS-Operating," LCO 3.6.2.3, "RHR Suppression Pool Cooling," LCO 3.6.2.4, "RHR Suppression Pool Spray,"

LCO 36*31 /

pher.i. Dilution (CAD)

,Cntinmnt Atm.o..

Sys..*e....LCO 3.6.4.3, "Standby Gas Treatment (SGT)

System," LCO 3.7.1, "High Pressure Service Water (HPSW)

System," LCO 3.7.2, "Emergency Service Water (ESW)

System and Normal Heat Sink," LCO 3.7.3, "Emergency Heat Sink," LCO 3.7.4, "Main Control Room Emergency Ventilation (MCREV) System," and LCO 3.8.1, "AC Sources-Operating."

APPLICABILITY: MODES 1, 2, and 3.

PBAPS UNIT 3 3.8-41 Amendment No. 244XXX

ATTACHMENT 2 Revised Re-typed Technical Specifications Pages PBAPS, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 TECHNICAL SPECIFICATIONS PAGES U

iiiiiii~

un nit..

2 i-............

iii iiiiiiiii iiiiiiiii

..............................-ii iiiiiiii....

2. iii..............................

................... i i iiiiiiiiiiiiii

..... iiiiiiii U~n........

.................it 3i

...... ~iiiiii~ ii

Distribution Systems-Operating 3.8.7 3.8 ELECTRICAL POWER SYSTEMS 3.8.7 Distribution Systems-Operating LCO 3.8.7 The following AC and DC electrical power distribution subsystems shall be OPERABLE:

a. Unit 2 Division I and Division II AC and DC electrical power distribution subsystems; and
b. Unit 3 AC and DC electrical power distribution subsystems needed to support equipment required to be OPERABLE by LCO 3.4.7, "Residual Heat Removal (RHR) Shutdown Cooling System-Hot Shutdown," LCO 3.5.1, "ECCS-Operating," LCO 3.6.2.3, "RHR Suppression Pool Cooling," LCO 3.6.2.4, "RHR Suppression Pool Spray," LCO 3.6.4.3, "Standby Gas Treatment (SGT) System," LCO 3.7.1, "High Pressure Service Water (HPSW) System," LCO 3.7.2, "Emergency Service Water (ESW) System and Normal Heat Sink," LCO 3.7.3, "Emergency Heat Sink," and LCO 3.8.1, "AC Sources-Operating."

APPLICABILITY: MODES 1, 2, and 3.

PBAPS UNIT 2 3.8-41 Amendment No.

Distribution Systems -Operating 3.8.7 3.8 ELECTRICAL POWER SYSTEMS 3.8.7 Distribution Systems-Operating LCO 3.8.7 The following AC and DC electrical power distribution subsystems shall be OPERABLE:

a. Unit 3 Division I and Division II AC and DC electrical power distribution subsystems; and
b. Unit 2 AC and DC electrical power distribution subsystems needed to support equipment required to be OPERABLE by LCO 3.4.7, "Residual Heat Removal (RHR Shutdown Cooling System-Hot Shutdown," LCO 3.5.1, "ECCS-Operating," LCO 3.6.2.3, "RHR Suppression Pool Cooling," LCO 3.6.2.4, "RHR Suppression Pool Spray,"

LCO 3.6.4.3, "Standby Gas Treatment (SGT) System," LCO 3.7.1, "High Pressure Service Water (HPSW) System," LCO 3.7.2, "Emergency Service Water (ESW) System and Normal Heat Sink," LCO 3.7.3, "Emergency Heat Sink," LCO 3.7.4, "Main Control Room Emergency Ventilation (MCREV) System, and LCO 3.8.1, "AC Sources-Operating."

APPLICABILITY: MODES 1, 2, and 3.

PBAPS UNIT 3 3.8-41 Amendment No.