Notification of an NRC Triennial Heat Sink Performance Inspection and Gas Accumulation Management Temporary Inspection and Request for Information 050003313-10-002 (DRS)
ML100110562
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 01/08/2010
From: Ann Marie Stone
NRC/RGN-III/DRS/EB2
To: Richard Anderson
Duane Arnold
References
IR-10-002
Download: ML100110562 (11)


See also: IR 05000033/2013010

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE ROAD, SUITE 210

LISLE, IL 60532-4352

January 8, 2010

Mr. Christopher R. Costanzo

Vice President

NextEra Energy Duane Arnold, LLC

3277 DAEC Road

Palo, IA 52324-9785

SUBJECT: DUANE ARNOLD NUCLEAR POWER PLANT - NOTIFICATION OF AN NRC

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND GAS

ACCUMULATION MANAGEMENT TEMPORARY INSPECTION; AND

REQUEST FOR INFORMATION 05000331/2010002(DRS)

Dear Mr. Costanzo:

On March 8, 2010 the NRC will begin the on-site portion of the Triennial Heat Sink Performance

Inspection and the Gas Accumulation Management in Emergency Core Cooling, Decay Heat

Removal, and Containment Spray Systems Temporary Instruction at your Duane Arnold

Nuclear Station. These inspections will be performed in accordance with NRC baseline

inspection procedure (IP) 71111.07 and temporary instruction (TI) 2515/177 respectively.

In order to minimize the impact that the inspections have on the site and to ensure productive

inspections, we have enclosed two requests for documents needed for the inspections. The

documents have been divided into three groups for each inspection.

  • The first group lists information necessary for our initial inspection scoping activities. This

information should be available to the lead inspector no later than January 29, 2010. By

February 5, 2010, the inspector will communicate the initial selected set of approximately 2-3

risk significant heat exchangers for IP 71111.07 and the initial selected samples for TI

2515/177.

  • The second group of documents requested is those items needed to support our in-office

preparation activities. This set of documents should be available at the Regional Office no

later than February 25, 2010. This information should be separated by inspection and by

component, especially if provided electronically (e.g., folder with component name that

includes calculations, condition reports, maintenance history, etc). During the in-office

preparation activities, the inspector may identify additional information needed to support the

inspection.

  • The last group includes the additional information above as well as plant specific reference

material. This information should be available to the inspector on March 8, 2010. It is also

requested that corrective action documents and/or questions developed during the inspection

be provided to the inspector as the documents are generated.

C. Costanzo -2-

Please send the information to the following e-mail address nestor.feliz-adorno@nrc.gov. A

hard-copy with the required information is also an acceptable option.

It is important that these documents be as complete as possible, in order to minimize the

number of documents requested during the preparation week or during the on-site inspection.

All requested documents are to be for the time period from the onsite inspection period back to

the last Heat Sink Performance Inspection. If no activities were accomplished in that time

period, then the request applies to the last applicable document in the previous time period.

The lead inspector for this inspection is Néstor J. Féliz Adorno. If there are questions about the

material requested, or the inspection, please call Néstor J. Féliz Adorno at (630) 829-9739.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system

(ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the

Public Electronic Reading Room).

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number

3150-0011.

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for

information or an information collection requirement unless the requesting document displays a

currently valid Office of Management and Budget control number.

Sincerely,

/RA

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-331

License Nos. DPR-49

Enclosures:

1. Triennial Heat Sink Inspection Document Request

2. Management Of Gas Accumulation In Emergency Core Cooling, Decay Heat Removal,

And Containment Spray Systems Temporary Inspection Document Request

cc w/encl: Distribution via ListServ

TRIENNIAL HEAT SINK INSPECTION DOCUMENT REQUEST

Inspection Report: 05000331/2010002(DRS)

Inspection Dates: March 8 - 12, 2010

Inspection Procedure: IP 71111.07, Triennial Heat Sink Performance Inspection

Lead Inspector: Néstor J. Féliz Adorno

(630) 829-9739

nestor.feliz-adorno@nrc.gov

I. Information Requested By January 29, 2010

1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting

Safety-Related Equipment, heat exchangers in order of risk significance.

2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat

exchanger.

3. List of corrective action program documents (with a short description) associated

with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat

exchanger testing, for the previous two years or since the last Triennial heat sink

inspection.

4. Copy of any self-assessment done on any of GL 89-13 heat exchangers.

5. System health report(s) and maintenance rule system notebooks for all the GL 89-13

heat exchangers.

II. Information Requested By February 25, 2010

1. For the specific heat exchangers selected:

a. Copies of the two most recent completed tests confirming thermal performance

for those heat exchangers which are performance tested.

b. Copy of system description and design basis document for the heat exchangers

(as applicable).

c. Copy of any operability determinations or other documentation of degradation

associated with the heat exchangers or the systems that support the operation

for the selected heat exchangers.

1 Enclosure 1

TRIENNIAL HEAT SINK INSPECTION DOCUMENT REQUEST

d. Copy of the Updated Final Safety Analysis Report (UFSAR) sections applicable

for each heat exchanger.

e. Provide a list of calculations with a description which currently apply to each heat

exchanger.

2. A schedule of all inspections, cleanings, maintenance, or testing of any plant heat

exchanger to be done during the on-site portion of the inspection.

3. Copies of procedures developed to implement the recommendations of GL 89-13,

e.g., the GL 89-13 Heat Exchanger Program description.

4. Updated Final Safety Analysis Report pages for the GL 89-13 Heat Exchanger

Program.

5. Maximum Cooling Water system inlet temperature limit that still allows full licensed

power operation of the nuclear reactor. Please provide the document that states this

limit (e.g., USAR or TRM) and the operating procedure that ensures this limit is not

exceeded.

III. Information Requested to be Available on First Day of Inspection, March 08, 2010

1. For the specific heat exchangers selected:

a. Provide the Design Basis Documents and Updated Final Safety Analysis Report

pages for the selected heat exchangers.

b. Copy of the design specification and heat exchanger data sheets for each heat

exchanger.

c. Copy of the vendor manuals including component drawings for each heat

exchanger.

d. Copy of the calculation which establishes the limiting (maximum) design basis

heat load which is required to be removed by each of these heat exchangers.

e. Copy of the calculation which correlates surveillance testing results from these

heat exchangers with design basis heat removal capability (e.g., basis for

surveillance test acceptance criteria).

f. Copy of the calculations or documents which evaluate the potential for water

hammer or excessive tube vibration in the heat exchanger or associated piping.

g. List of engineering-related Operator Workarounds/Temporary Modifications for

these heat exchangers since the last Heat Sink Performance

h. Copy of the evaluations of data for the two most recent completed tests

confirming the thermal performance of each heat exchanger.

2 Enclosure 1

TRIENNIAL HEAT SINK INSPECTION DOCUMENT REQUEST

i. Documentation and procedures that identify the types, accuracy, and location of

any special instrumentation used for the two most recently completed thermal

performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow

instruments or temperature instruments). Include calibration records for the

instruments used during these tests.

j. Copies of those documents that describe the methods taken to control water

chemistry in the heat exchangers.

k. Copies of the documents that verify the structural integrity of the heat exchanger,

e.g., eddy current summary sheets, ultrasonic testing results, and visual

inspection results.

l. The cleaning and inspection maintenance schedule for each heat exchanger for

the next five years.

m. Copy of the document describing the inspection results for the last two clean and

inspection activities completed on each heat exchanger.

n. Copy of the document which identifies the current number of tubes in service for

each heat exchanger and the supporting calculation which establishes the

maximum number of tubes which can be plugged in each heat exchanger.

o. Copy of the document establishing the repair criteria (plugging limit) for degraded

tubes which are identified in each heat exchanger.

p. Information regarding any alarms which monitor on-line performance.

2. For the ultimate heat sink:

a. The toe of the weir or embankment inspection procedures and results.

b. The inspection, procedures and results of rip rap protection placed on excavated

side.

c. Dam inspections that monitor the integrity of the heat sink.

d. Inspections and/or maintenance related to preventing macrofouling (silt, dead

mussel shells, debris, etc.) and aquatic life such as fish, algae, grass or kelp.

e. Inspections and/or maintenance related to preventing biotic fouling.

f. Copies of any design change performed on the system.

g. Copies of procedures for a loss of UHS.

3 Enclosure 1

TRIENNIAL HEAT SINK INSPECTION DOCUMENT REQUEST

h. Copies of calculations and surveillances that determine the UHS reservoir

capacity and heat transfer capability.

i. Copies of surveillance procedures and testing results conducted on the level

instrumentation relied upon to determine UHS reservoir capability.

3. For the safety related service water system (or equivalent):

a. Copies of any design changes performed on the system.

b. Copies of procedures for a loss of service water system.

c. Copies of inspections and/or maintenance related to macrofouling (silt, dead

mussel shells, debris, etc.) and aquatic life such as fish, algae, grass or kelp.

d. Copies of inspections and/or maintenance related to preventing biotic fouling.

e. Copies of procedures and/or test results to survey or monitor interface valves

between the safety related section of the service water system and the non-

safety related section.

f. History of any thru wall pipe leak on the system.

g. Copies of evaluations for strong-pump vs. weak-pump interaction.

If the information requested above will not be available, please contact Néstor J. Féliz Adorno

as soon as possible at (630) 829-9739 or email nestor.feliz-adorno@nrc.gov.

4 Enclosure 1

MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY

HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION

DOCUMENT REQUEST

Inspection Report: 05000331/2010002(DRS)

Inspection Dates: March 8-12, 2010 and March 22-26, 2010

Inspection Procedure: TI 2515/177, Management of Gas Accumulation in Emergency

Core Cooling, Decay Heat Removal, and Containment Spray

Systems

Lead Inspector: Néstor J. Féliz Adorno

(630) 829-9739

nestor.feliz-adorno@nrc.gov

I. Information Requested By January 29, 2010

1. Copy of the station response to Generic Letter (GL) 2008-01 and any supplemental

report.

2. Copies of all the requests for additional information (RAIs) and the associated

responses.

3. List of corrective action program documents (with a short description) associated

with GL 2008-01, voids in piping, and waterhammer for the previous three years.

4. List of the suction piping sections identified as susceptible to gas accumulation (the

list should identify the corresponding system).

5. List of the discharge piping sections identified as susceptible to gas accumulation

(the list should identify the corresponding system).

6. List of changes (with a short description and tracking number) to the Final Safety

Evaluation Report (FSAR), Technical Specifications, Technical Specification Bases,

and Technical Requirement Manual associated with the resolution of GL 2008-01.

7. List of calculations that have been changed or created (with a short description of the

calculation and the change) in response to GL 2008-01.

8. List of physical modifications (with a short description) performed in response to

GL 2008-01.

1 Enclosure 2

MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY

HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION

DOCUMENT REQUEST

II. Information Requested By February 25, 2010

1. Copies of procedures developed to implement the resolution of GL 2008-01.

2. Copies of the modification packages for hardware modifications as part of the

resolution of GL 2008-01.

3. Copies of the selected calculations.

4. Copies of the selected corrective action program documents.

5. Copies of the selected licensing and design basis document changes.

6. List of commitments (with a description) done in response to GL 2008-01.

7. List of actions that were completed in response to GL 2008-01.

8. Copies of all the corrective actions identified in the nine-month response and

supplemental reports.

9. List (with a short description) of gas intrusion mechanisms that apply to the plant.

10. Basis for the void acceptance criteria (e.g. calculation). If applicable, provide the

justification for any deviation from the void acceptance criteria established by the

Office of Nuclear Reactor Regulations (NRR).

11. Basis for horizontal pipe acceptance criteria (e.g. calculation).

12. Design basis documents of the subject systems (i.e., emergency core cooling, decay

heat removal, and containment spray systems).

13. Design basis documents of keep-full systems of the subject systems.

III. Information Requested to be Available on First Day of Inspection, March 08, 2010

1. Copies of surveillance procedures associated with the resolution of GL 2008-01 and

the results of the last two surveillances.

2. Copies of procedures use for detecting and determining void volumes.

3. Copies of procedures use for filling and venting.

4. Copies of isometric drawings of the subject systems.

5. Copies of piping and instrumentation diagrams (P&IDs) of the subject systems.

2 Enclosure 2

MANAGEMENT OF GAS ACCUMULATION IN EMERGENCY CORE COOLING, DECAY

HEAT REMOVAL, AND CONTAINMENT SPRAY SYSTEMS TEMPORARY INSPECTION

DOCUMENT REQUEST

6. Subject systems walkdown work documents associated with the resolution of

GL 2008-01 and the results of these walkdowns.

7. Copies of the engineering evaluations performed for all voids found since 2008.

8. Copies of trends of periodic venting results.

9. Copy of the design change review checklist that establish if a design change

introduces or increases the potential for gas accumulation beyond established

acceptance criteria.

10. Copies of training documents that ensure that personnel are aware of gas-related

concerns.

11. Copy of the void transport analysis.

12. If applicable, provide a list of inaccessible locations where plant walkdowns of the

subject systems have not been completed. Include an explanation of why each area

is considered inaccessible.

If the information requested above will not be available, please contact Néstor J. Féliz Adorno

as soon as possible at (630) 829-9739 or email nestor.feliz-adorno@nrc.gov.

3 Enclosure 2

R. Anderson -2-

Please send the information to the following e-mail address nestor.feliz-adorno@nrc.gov. A hard-copy with the

required information is also an acceptable option.

It is important that these documents be as complete as possible, in order to minimize the number of documents

requested during the preparation week or during the on-site inspection.

All requested documents are to be for the time period from the onsite inspection period back to the last Heat

Sink Performance Inspection. If no activities were accomplished in that time period, then the request applies to

the last applicable document in the previous time period.

The lead inspector for this inspection is Néstor J. Féliz Adorno. If there are questions about the material

requested, or the inspection, please call Néstor J. Féliz Adorno at (630) 829-9739.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be

available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading

Room).

This letter does not contain new or amended information collection requirements subject to the Paperwork

Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by

the Office of Management and Budget, Control Number 3150-0011.

The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or

an information collection requirement unless the requesting document displays a currently valid Office of

Management and Budget control number.

Sincerely,

/RA/

Ann Marie Stone, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-331

License Nos. DPR-49

Enclosures:

1. Triennial Heat Sink Inspection Document Request

2. Management Of Gas Accumulation In Emergency Core Cooling, Decay Heat Removal, And Containment

cc w/encl: Distribution via ListServ

Distribution

See next page

DOCUMENT NAME: G:\DRS\Work in Progress\Ltr 010810 Duane Arnold RFI-TI177-HS.doc

9 Publicly Available 9 Non-Publicly Available 9 Sensitive 9 Non-Sensitive

To receive a copy of this document, indicate in the concurrence box C = Copy without attach/encl; E = Copy with attach/encl N = No copy

OFFICE RIII RIII

NAME NFeliz-Adorno AMStone

DATE 01/08/2010 01/08/2010

OFFICIAL RECORD COPY

Letter to Richard Anderson from Ann Marie Stone dated January 8, 2010.

SUBJECT: DUANE ARNOLD NUCLEAR POWER PLANT - NOTIFICATION OF AN NRC

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND GAS

ACCUMULATION MANAGEMENT TEMPORARY INSPECTION; AND

REQUEST FOR INFORMATION 05000331/2010002(DRS)

DISTRIBUTION:

Susan Bagley

RidsNrrDorlLpl3-1 Resource

RidsNrrPMDuaneArnold Resource

RidsNrrDirsIrib Resource

Cynthia Pederson

Steven Orth

Jared Heck

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

Patricia Buckley

Tammy Tomczak

ROPreports Resource