Letter Sequence Other |
---|
|
|
MONTHYEARML0926104352009-09-11011 September 2009 R. E. Ginna - Fifth Ten-Year Inservice Test Program for Safety-Related Pumps and Valves Project stage: Request ML0927505172009-10-0101 October 2009 E-mail Ginna Acceptance Review of IST Relief Requests Project stage: Acceptance Review ML0927501282009-10-0606 October 2009 Request for Additional Information Relief Request No. PR-01, Revision 0 for the Fifth 10-Year Inservice Testing Interval -R.E. Ginna Nuclear Power Plant Project stage: RAI ML0929504852009-10-16016 October 2009 Response to Request for Additional Information Associated with Inservice Test Program Relief Request Number PR-01 Project stage: Response to RAI ML0931400912009-11-0505 November 2009 R. E. Ginna Nuclear Power Plant, Withdrawal of Relief Request VR-03 from the Fifth Ten-Year Inservice Test Program for Safety-Related Pumps and Valves Project stage: Withdrawal ML0935701732009-12-30030 December 2009 Alternative Requests for Fifth 10-Year Pump and Valve Inservice Testing Program-R.E. Ginna Nuclear Power Plant Project stage: Acceptance Review ML1000601112010-01-19019 January 2010 Correction Letter to Alternative Requests for Fifth 10-Year Pump and Valve Inservice Testing Program-R. E. Ginna Project stage: Other ML1006903082010-03-0202 March 2010 R. E. Ginna Nuclear Power Plant - Commitment Associated with Technical Specification LCO 3.4.14 RCS Pressure Isolation Valve (PIV) Leakeage Project stage: Request ML1008902372010-04-14014 April 2010 Alternative Request GR-01 for the Fifth 10-Year Pump and Valve Inservice Testing Program-R.E. Ginna Nuclear Power Plant Project stage: Other 2009-12-30
[Table View] |
Similar Documents at Ginna |
---|
Category:Letter
MONTHYEARIR 05000244/20243012024-10-22022 October 2024 Initial Operator Licensing Examination Report 05000244/2024301 ML24286A0022024-10-11011 October 2024 Core Operating Limits Report Cycle 45, Revision 0 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing RS-24-092, Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-09-25025 September 2024 Revised Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000244/20245012024-09-24024 September 2024 LLC - Emergency Preparedness Biennial Exercise Inspection Report 05000244/2024501 IR 05000244/20240052024-08-29029 August 2024 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant (Report 05000244/2024005) ML24234A0922024-08-21021 August 2024 Requalification Program Inspection IR 05000244/20240102024-08-19019 August 2024 Biennial Problem Identification and Resolution Inspection Report 05000244/2024010 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000244/20240022024-08-0505 August 2024 LLC - Integrated Inspection Report 05000244/2024002 and Independent Spent Fuel Storage Installation Report 07200067/2024001 ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) ML24170A3852024-07-16016 July 2024 R. E. Ginna Nuclear Power Plant - Alternative Associated with Inservice Testing of B Auxiliary Feedwater Pump - PR-03 ML24197A0302024-07-15015 July 2024 LLC - Operator Licensing Examination Approval RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions IR 05000244/20244022024-06-20020 June 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000244/2024402 RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24143A0752024-05-22022 May 2024 Re. Ginna Nuclear Power Plant and Independent Spent Fuel Storage Installation (ISFSI) Registration for Use of General License ISFSI Casks ML24136A1692024-05-14014 May 2024 And Independent Spent Fuel Storage Installation (ISFSI) - 2023 Annual Radioactive Effluent Release Report and 2023 Annual Radiological Environmental Operating Report ML24134A0042024-05-13013 May 2024 Request for Information for a Biennial Problem Identification and Resolution Inspection; Inspection Report 05000244/2024010 RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications2024-05-0909 May 2024 Updated Notice of Intent to Pursue Subsequent License Renewal Applications RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests IR 05000244/20240012024-04-24024 April 2024 LLC - Integrated Inspection Report 05000244/2024001 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24101A0432024-04-10010 April 2024 2024 10 CFR 50.46 Annual Report IR 05000244/20240112024-04-10010 April 2024 LLC - Fire Protection Team Inspection Report 05000244/2024011 RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report ML24088A2042024-03-28028 March 2024 R. E. Ginna Nuclear Power Plant - Response to NRC Request for Additional Information Regarding Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump ML24110A0122024-03-28028 March 2024 2023 Report of Individual Monitoring for R.E. Ginna Nuclear Power Plant LLC, License DPR-18 05000244/LER-2023-003-01, Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam2024-03-0707 March 2024 Re. Ginna Nuclear Power Plant, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam IR 05000244/20230062024-02-28028 February 2024 Annual Assessment Letter for R.E. Ginna Nuclear Power Plant, LLC, (Report 05000244/2023006) IR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of ‘B’ Auxiliary Feedwater Pump IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations 05000244/LER-2023-003, Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level2023-12-11011 December 2023 Manual Reactor Trip Due to Degraded Condenser Vacuum from Lowering Main Steam to Air Ejectors and Auxiliary Feedwater Actuation Due to Low Steam Generator Level ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums 05000244/LER-2023-002, Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure2023-11-0808 November 2023 Overtemperature Delta Temperature Reactor Protection System and Auxiliary Feedwater System Actuations on Due to 100% Load Rejection Caused by Turbine Overspeed Circuit Card Failure. IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23258A1382023-09-18018 September 2023 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000244/2023010 IR 05000244/20230052023-08-31031 August 2023 Updated Inspection Plan for R.E. Ginna Nuclear Power Plant, LLC (Report 05000244/2023005) 2024-09-25
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555*0001
.January 1 q, ~010 Mr. John T. Carlin Vice President RE. Ginna Nuclear Power Plant RE. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, NY 14519 SUB..IECT: CORRECTION LETrER TO ALTERNATIVE REQUESTS FOR FIFTH 10-YEAR PUMP AND VALVE INSERVICE TESTING PROGRAM - RE. GINNA NUCLEAR POWER PLANT (TAC NOS. ME2232, ME2233, ME2234, ME2235, ME2236, ME2237, ME2238, AND ME2239)
Dear Mr. Carlin:
By letter dated December 30, 2009, the Nuclear Regulatory Commission (NRC) authorized proposed alternatives PR-01, PR-02, GR-02, GR-03, VR-01, and VR-02 for the fifth 10-year interval inservice testing program at the RE. Ginna Nuclear Power Plant.
Your staff recently informed us of an error in the NRC staff's safety evaluation (SE) supporting proposed alternative PR-02 regarding the Group A (Preferred) and Group B (Standby) motor driven auxiliary feedwater (AFW) pumps. As described in your submittal dated September 11, 2009, vibration measurements are only performed during quarterly testing of the Group A AFW pumps. However, our SE inadvertently stated that vibration measurements would be performed during both Group A and Group B AFW pump testing. Enclosed are replacement pages for the NRC SE for PR-02 that clearly states that vibration measurements will only be performed during Group A AFW pump testing.
Please contact me at 301-415-1364 if you have any questions.
Sincerely, Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-244
Enclosure:
As stated cc w/enc/: Distribution via Listserv
-5 The licensee states:
The Auxiliary Feed Water (AFW) pumps each have a minimum flow path that can be utilized for the respective Group A and Group B pump tests. The minimum flow lines provide a fixed resistance flow path from the pump discharge to the condensate storage or test tank then back to the suction of each pump. However, the minimum flow lines are not provided with flow instrumentation.
The performance of pump tests using a fixed resistance flow path is an acceptable alternative to the Code requirements per NUREG-1482, Rev. 1, Section 5.9, "Pump Testing Using Minimum Flow Return Lines With or Without Flow Measuring Devices."
During the performance of quarterly pump testing, pump differential pressure will be measured and trended. This provides a reference value for differential pressure that can be duplicated during subsequent tests. This methodology provides for the acquisition of repeatable differential pressure, which is an adequate means of monitoring for pump degradation.
Concerns identified in NRC Bulletin 88-04, "Potential Safety Related Pump Loss," with regard to minimum recirculation flow line sizing have been assessed and verified to not be of concern during pump testing.
Therefore, the current testing protocol which has the potential for service water intrusion and requires a reactivity change, and the cost of installing either temporary or permanent flow instrumentation imposes an undue burden without a compensating increase in the level of quality and safety.
3.2.3 Licensee's Proposed Alternative Testing (as stated)
Quarterly testing of the designated Group A AFW pumps (PAF01 A, PAF01 B) will be performed on minimum flow recirculation measuring differential pressure across the pump and measuring vibration in accordance with ASME OM Code-2004, ISTB-5121 and NUREG-1482, Rev. 1, Section 5.9, "Pump Testing Using Minimum Flow Return Lines With or Without Flow Measuring Devices," for guidance.
Quarterly testing of the designated Group B AFW pumps (PSF01A, PSF01B) will be performed on minimum flow recirculation measuring differential pressure across the pump in accordance with ASME OM Code-2004, ISTB 5122 and NUREG-1482, Rev. 1 Section 5.9, "Pump Testing Using Minimum Flow Return Lines With or Without Flow Measuring Devices" for guidance.
The proposed alternative testing provides reasonable assurance that the AFW pumps will be operationally ready.
Correction page dated January 19, 2010
-6 3.2.4 Staff Evaluation Motor-driven AFW pumps PAF01A and PAF01 B are Group A centrifugal pumps.
Inservice testing requirements for Group A centrifugal pumps are specified in ASME OM Code ISTB-5121.
Motor-driven AFW pumps PSF01A and PSF01 B are Group B centrifugal pumps.
Inservice testing requirements for Group B centrifugal pumps are specified in ASME OM Code ISTB-5122.
The licensee proposes alternative quarterly testing for the motor-driven auxiliary feedwater pumps. The current configuration does not meet ASME OM Code requirement ISTB-3550 which states that when measuring flow rate, a rate or quantity meter shall be installed in the pump test circuit. The licensee proposed alternative quarterly test shall use the minimum flow path lines which provide a fixed resistance flow path without installed flow rate instrumentation. Measurements will include differential pressure across the pump and vibration in accordance with ASME OM Code-2004, ISTB-5121 for Group A pumps and differential pressure across the pump in accordance with ASME OM Code-2004 ISTB-5122 for Group B pumps.
The NRC staff has reviewed the licensee's proposed alternative and has determined that the testing is consistent with the guidance in NUREG-1482, Revision 1, Section 5.9, "Pump Testing Using Minimum Flow Return Lines With or Without Flow Measuring Devices," and GL 89-04, "Guidance On Developing Acceptable Inservice Testing Programs," Position 9. The staff concludes that the proposed alternative provides an acceptable level of quality and safety.
3.3 Request GR-02 3.3.1 ASME OM Code Requirements:
ISTA-3130(b) (Application of Code Cases) states that code cases be applicable to the edition and addenda specified in the test plan.
ISTC-3100(a) (Preservice Testing) states that any valve that has undergone maintenance that could affect its performance after the preservice test be tested in accordance with ISTC-3310.
ISTC-3310 (Effects of Valve Repair, Replacement, or Maintenance on Reference Values) states that a new reference value be determined or the previous reference value be reconfirmed by an inservice test after a valve has been replaced, repaired, or has undergone maintenance that could affect the valve's performance.
ISTC-3510 (Exercising Test Frequency) states that active Category A and B valves be exercised nominally every 3 months.
ISTC-3521 (d) (Category A and Category B Valves) states if exercising is not practicable during operation at power and full-stroke during cold shutdowns is also not practicable, it may be limited to part-stroke during cold shutdowns, and full-stroke during refueling outages.
Correction page dated Januaryj o, 2010
January 19, 2010 Mr. John T. Carlin Vice President RE. Ginna Nuclear Power Plant RE. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, NY 14519
SUBJECT:
CORRECTION LETrER TO ALTERNATIVE REQUESTS FOR FIFTH 10-YEAR PUMP AND VALVE INSERVICE TESTING PROGRAM - RE. GINNA NUCLEAR POWER PLANT (TAC NOS. ME2232, ME2233, ME2234, ME2235, ME2236, ME2237, ME2238, AND ME2239)
Dear Mr. Carlin:
By letter dated December 30,2009, the Nuclear Regulatory Commission (NRC) authorized proposed alternatives PR-01, PR-02, GR-02, GR-03, VR-01, and VR-02 for the fifth 10-year interval inservice testing program at the RE. Ginna Nuclear Power Plant.
Your staff recently informed us of an error in the NRC staff's safety evaluation (SE) supporting proposed alternative PR-02 regarding the Group A (Preferred) and Group B (Standby) motor driven auxiliary feedwater (AFW) pumps. As described in your submittal dated September 11, 2009, vibration measurements are only performed during quarterly testing of the Group A AFW pumps. However, our SE inadvertently stated that vibration measurements would be performed during both Group A and Group B AFW pump testing. Enclosed are replacement pages for the NRC SE for PR-02 that clearly states that vibration measurements will only be performed during Group A AFW pump testing.
Please contact me at 301-415-1364 if you have any questions.
Sincerely, IRA!
Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-244
Enclosure:
Safety Evaluation cc w/encl: Distribution via Listserv Distribution:
PUBLIC LPL 1-1 r/f SWiliiams,EDO R1 RidsAcrsAcnw_MailCtrResource RidsNrrDciCptb RidsNrrDorlLpl1-1 RidsNrrPMDPickett RidsNrrLASLittle RidsRgn1 MailCenter MFarnan ADAMS Accession No. ML100060111 OFFICE LPL1-1/PM LPL1-1/LA CPTB/BC LPL1-1/BC NAME DPickett SLittie AMcMurtray NSalgado DATE 01/13/10 01 /13/ 10 01/14/10 01 /19/10 OFFICIAL RECORD COpy