UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001
.Januarv 5, 2010 Vice President. Operations Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 SUB~IECT:
INDIAN POINT NUCLEAR GENERATING UNIT NO.3 - DETERMINATION ON EXIGENT CIRCUMSTANCES FOR LICENSE AMENDMENT REQUEST (TAC NO. ME2910)
Dear Sir or Madam:
On December 15, 2009, Agencywide Documents Access and Management System (ADAMS)
Accession No. ML093500595, as supplemented by letters dated December 22,2009 (ADAMS Accession No. ML093631142) and January 4,2010, Entergy Nuclear Operations, Inc. (Entergy),
submitted an application for a proposed amendment for Indian Point Nuclear Generating Unit No.3 (IP3) which would extend the allowed outage time for the turbine-driven auxiliary feedwater pump to 106 hours0.00123 days <br />0.0294 hours <br />1.752645e-4 weeks <br />4.0333e-5 months <br /> from the current 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to allow maintenance work on the pump with IP3 remaining at full power. The application requested that the notice for public comment period be reduced, using the exigent provisions of Title 10 of the Code of Federal Regulations (10 CFR),
Section 50.91, "Notice for public comment; State consultation."
The Nuclear Regulatory Commission (NRC) staff has reviewed the submittals and has determined that there is insufficient justification to use the exigent provisions of 10 CFR 50.91.
The NRC staff finds that there is not a sufficient need to act quickly such that the normal public notice period should be reduced. As stated in the amendment and supplements referenced above, you have determined that the turbine-driven auxiliary feedwater pump is currently operable per the IP3 Technical Specifications, and capable of performing its safety mission.
Please advise us if you desire to withdraw this amendment request, or if you desire to continue processing it under the normal public notice provisions of 10 CFR 50.91. Please contact me at (301) 415-2901 if you have any questions on this issue.
Sincerely, hn P. Boska, Senior Project Manager lant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-286 cc: Distribution via Listserv
January 5,2010 Vice President, Operations Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249
SUBJECT:
INDIAN POINT NUCLEAR GENERATING UNIT NO.3 - DETERMINATION ON EXIGENT CIRCUMSTANCES FOR LICENSE AMENDMENT REQUEST (TAC NO. ME2910)
Dear Sir or Madam:
On December 15, 2009, Agencywide Documents Access and Management System (ADAMS)
Accession No. ML093500595, as supplemented by letters dated December 22, 2009 (ADAMS Accession No. ML093631142) and January 4,2010, Entergy Nuclear Operations, Inc. (Entergy),
submitted an application for a proposed amendment for Indian Point Nuclear Generating Unit NO.3 (IP3) which would extend the allowed outage time for the turbine-driven auxiliary feedwater pump to 106 hours0.00123 days <br />0.0294 hours <br />1.752645e-4 weeks <br />4.0333e-5 months <br /> from the current 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to allow maintenance work on the pump with IP3 remaining at full power. The application requested that the notice for public comment period be reduced, using the exigent provisions of Title 10 of the Code of Federal Regulations (10 CFR),
Section 50.91, "Notice for public comment; State consultation."
The Nuclear Regulatory Commission (NRC) staff has reviewed the submittals and has determined that there is insufficient justification to use the exigent provisions of 10 CFR 50.91.
The NRC staff finds that there is not a sufficient need to act quickly such that the normal public notice period should be reduced. As stated in the amendment and supplements referenced above, you have determined that the turbine-driven auxiliary feedwater pump is currently operable per the IP3 Technical Specifications, and capable of performing its safety mission.
Please advise us if you desire to withdraw this amendment request, or if you desire to continue processing it under the normal public notice provisions of 10 CFR 50.91. Please contact me at (301) 415-2901 if you have any questions on this issue.
Sincerely, IRAI John P. Boska, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-286 cc: Distribution via Listserv DISTRIBUTION:
PUBLIC RidsNrrDorlLpl1-1 RidsNrrPMlndianPoint RidsOGCRp LPL1-1 Reading File RidsNrrLASLittle RidsAcrsAcnw_MaiICTR SGardocki RidsNrrDorlDpr RidsRgn1 MailCenter GCasto ADAMS ACCESSION NO.: ML100050260 OFFICE LPL1-1/PM LPL1-2/LA OGC LPL 1-1/BC NAME