ML093430199
| ML093430199 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 02/03/2010 |
| From: | Bo Pham License Renewal Projects Branch 1 |
| To: | Environmental Protection Agency |
| Doyle P, NRC/NRR/DPR/PRT, 415-1058 | |
| Shared Package | |
| ML09340204 | List: |
| References | |
| Download: ML093430199 (4) | |
Text
February 3, 2010 U.S. Environmental Protection Agency Office of Federal Activities NEPA Compliance Division EIS Filing Section Ariel Rios Building (South Oval Lobby)
Mail Code 2252-A, Room 7241 1200 Pennsylvania Avenue, NW Washington, DC 20460
SUBJECT:
NOTICE OF AVAILABILITY OF THE DRAFT PLANT-SPECIFIC SUPPLEMENT 42 TO THE GENERIC ENVIRONMENTAL IMPACT STATEMENT FOR LICENSE RENEWAL OF NUCLEAR PLANTS REGARDING DUANE ARNOLD ENERGY CENTER
Dear Sir or Madam:
The following documents are enclosed for official filing with the U.S. Environmental Protection Agency:
- 1.
Five copies of the draft Supplement 42 to NUREG-1437, ?Generic Environmental Impact Statement for License Renewal of Nuclear Plants (GEIS),@ regarding the license renewal of Duane Arnold Energy Center.
- 2.
Five copies of the U.S. Nuclear Regulatory Commission=s distribution list for the draft Supplement 42 to NUREG-1437.
Simultaneously with this filing, a copy of the draft Supplement 42 is being mailed to interested Federal and State agencies, industry organizations, interest groups, and members of the public.
A copy of this document has also been placed in the Nuclear Regulatory Commissions (NRC)
Agencywide Documents Access and Management System (ADAMS). ADAMS is located on the NRC=s website at http://adamswebsearch.nrc.gov/dologin.htm. The ADAMS Accession Number for the draft Supplement 42 to the GEIS is ML100310027. Please note that the public comment period for the draft Supplement 42 to the GEIS ends on April 19, 2010.
U.
If further information is required, please contact the Environmental Project Manager, Mr. Charles Eccleston, by telephone at 301-415-8537 or by e-mail at Charles.Eccleston@nrc.gov.
Sincerely,
/RA/
Bo M. Pham, Chief Projects Branch 1 Division of License Renewal Office of Nuclear Reactor Regulation Docket No.: 50-331
Enclosures:
As stated cc w/encls: See next page
ML093430204 (Package) ML093430199 (Letter) ML100310027 (Draft Supplement 42 to NUREG-1437)
OFFICE PM:RPB1:DLR LA:RPOB:DLR PM:RPB1:DLR OGC (NLO)
NAME CEccleston SFigueroa BHarris (CEccleston for)
LSubin DATE 02/03/10 12/11/09 02/03/10 02/03/10 OFFICE BC:RPB1:DLR NAME BPham (BBrady for)
DATE 02/03/10
Duane Arnold Energy Center cc:
Mr. M. S. Ross Vice President and Associate General Counsel Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Ms. Marjan Mashhadi Senior Attorney Florida Power & Light Company 801 Pennsylvania Avenue, NW Suite 220 Washington, DC 20004 Mr. Steven R. Catron Manager, Regulatory Affairs Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324 U.S. Nuclear Regulatory Commission Resident Inspector=s Office Rural Route #1 Palo, IA 52324 Mr. Mano Nazar Executive Vice President Nuclear and Chief Nuclear Officer Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408 Mr. D. A. Curtland Plant Manager Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785 Abdy Khanpour Vice President, Engineering Support Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408 Ms. Melanie Rasmussen Radiation Control Program Director Bureau of Radiological Health Iowa Department of Public Health Lucas State Office Building, 5th Floor 321 East 12th Street Des Moines, IA 50319-0075 Chairman, Linn County Board of Supervisors 930 1st Street SW Cedar Rapids, IA 52404 Mr. Gene St. Pierre Vice President Fleet Organizational Support Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. McHenry Cornell Director, Licensing and Performance Improvement Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 Mr. Christopher Costanzo Vice President, Nuclear Plant Support Florida Power & Light Company P.O. Box 14000 Juno Beach, FL 33408-0420