ML093430188

From kanterella
Jump to navigation Jump to search
Acceptability Review, Part 73, Exemption
ML093430188
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 12/08/2009
From: Farideh Saba
Plant Licensing Branch II
To: Mccabe B, Miller D
Division of Operating Reactor Licensing
Saba F
References
Download: ML093430188 (1)


Text

From: Saba, Farideh Sent: Tuesday, December 08, 2009 4:28 PM To: McCabe, Brian; Miller, David (Bryan)

Cc: Murray, William R. (Bill)

Subject:

FW: Initial Review of Received Part 73 Exemptions Importance: High

Brian, The 10 CFR 73.5 exemption request for Brunswick Steam Electric Plant, Units 1 and 2 has been initially reviewed, by the NRC staff, for adequate technical content and appropriate documentation and has been found to contain both the technical content and documentation for further review:

Though initial reviews have been conducted, the thorough technical review of the exemption request must be conducted to arrive at a determination.

Thanks, Farideh Farideh E. Saba, P.E.

Senior Project Manager NRC/ADRO/NRR/DORL 301-415-1447 Mail Stop O-8G9A Farideh.Saba@NRC.GOV E-mail Properties Mail Envelope Properties ()

Subject:

FW: Initial Review of Received Part 73 Exemptions Sent Date: 12/8/2009 4:14:30 PM Received Date: 12/8/2009 4:28:00 PM From: Saba, Farideh Created By: Farideh.Saba@nrc.gov Recipients:

Brian.McCabe@pgnmail.com (McCabe, Brian)

Tracking Status: None David.Miller@pgnmail.com (Miller, David (Bryan))

Tracking Status: None Bill.Murray2@pgnmail.com (Murray, William R. (Bill))

Tracking Status: None

Post Office:

Files Size Date & Time MESSAGE 9668 12/8/2009 Options Expiration Date:

Priority: olImportanceHigh ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: